FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Dongguan MingHeng Plastic Products Co., Ltd./
  3. 2A45Z-62570

2A45Z-62570North Pole Power and Light Switch

Dongguan MingHeng Plastic Products Co., Ltd.

Application Details

Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
Date of Grant
Apr 10, 2026
Application Purpose
Original Equipment
Equipment Note
North Pole Power and Light Switch
Frequency Range
433.92000000 - 433.92000000
Company
Dongguan MingHeng Plastic Products Co., Ltd.
Country
China

Documents & Files

Select a file to view

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗

ID Label/Location Info

↗

RF Exposure Info

↗

Test Report

↗
↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Attestation Statements

DongguanMingHengPlasticProductsCo.,Ltd. 2.911(d)(7)USAAgentv1.5 Section2.911(d)(7)USAAgentforServiceofProcess Companyname:DongguanMingHengPlasticProductsCo.,Ltd. Address:Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,Dongguan City,GuangdongProvince,China FCCID:2A45Z-62570 2.911(d)(7)USADesignatedAgentforServiceofProcess We,[DongguanMingHengPlasticProductsCo.,Ltd.]designate[LinkwldLLC] NOTE1forthepurposeofacceptingserviceofprocessonbehalfoftheapplicant. Applicantconsent:Weacknowledgeourconsenttoacceptserviceofprocessinthe UnitedStatesformattersrelatedtotheapplicableequipment,andatthephysicalU.S. addressandemailaddressofthedesignatedagentandacknowledgeour acceptanceofourobligationtomaintainanagentforserviceofprocessintheUnited Statesfornolessthanoneyearaftereitherwethegranteehavepermanently terminatedallmarketingandimportationoftheapplicableequipmentwithintheU.S., orattheconclusionofanyCommission-relatedadministrativeorjudicialproceeding involvingtheequipment,whicheverislater. Agentobligation:Weacknowledgeourobligationtoacceptserviceofprocessinthe UnitedStatesformattersrelatedtotheapplicableequipmentatourphysicalU.S. addressandemailaddressfornolessthanoneyearaftereitherthegranteehas permanentlyterminatedallmarketingandimportationoftheapplicableequipment withintheU.S.,orattheconclusionofanyCommission-relatedadministrativeor judicialproceedinginvolvingtheequipment,whicheverislater. DongguanMingHengPlasticProductsCo.,Ltd. 2.911(d)(7)USAAgentv1.5 USAAgentApplicant Companyname:LinkwldLLCCompanyname:DongguanMingHeng PlasticProductsCo.,Ltd. USAAddress:7595TechnologyWaySte 100,Denver,CO80237,US Address:Room101,Block2,No.59,Shipai XiashaRoad,ShipaiTown,DongguanCity, GuangdongProvince,China FRNNumber:0033625682GranteeFRNNumber:0032030090 ContactName:TimothyZhu FCCGranteeCode:2A45Z TelephoneNo:(747)717-2691ContactName:HeiYuen Email:[email protected] TelephoneNo:(86)769-81819912 Email:[email protected] Signature: Title:Manager Signature: Title:ProjectManager Date:2026-04-01Date:2026-04-01 NOTE1:AnapplicantlocatedintheUnitedStatesmaydesignateitselfastheagentforservice ofprocess. Reference;FederalRegisterdocument2022-28263publishedon02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-nation al-security-threats-to-the-communications-supply-chain-through-the

Attestation Statements

DongguanMingHengPlasticProductsCo.,Ltd. Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,GuangdongProvince,China 1|Page AttestationStatements To:FederalCommunicationsCommissionDate:Apr.3,26 7435OaklandMillsRoad, Columbia,MD21046,USA Subject:AttestationofCompliancewithFCCCoveredListSoftwareRequirements FCCID:2A45Z-62570 ProductName:NorthPolePowerandLightSwitch Thisletterservesasanattestationthattheequipmentidentifiedaboveisnot(selectone)"covered"software asdefinedundertheFederalCommunicationsCommission(FCC)CoveredListrequirements,asoutlined inFCC22-84andKDB986446. Specifically,theundersignedcertifiesthattheequipmentforwhichauthorizationissought: 1.Doesnotcontaincybersecurityoranti-virussoftwareproducedorprovidedbyKasperskyLab, Inc.oranyofitssuccessors,assignees,parents,subsidiaries,affiliates,oranyentitythathasrebranded orrelabeledsoftwareproducedbytheaforementionedentities. 2.Doesnothavethecapabilitytostore,run,ordeliveranysoftwareidentifiedontheFCCCoveredList, includingbutnotlimitedtocybersecurityandanti-virussoftware. Tosupportthisattestation,theappendixevaluationdocumentationhasbeenpreparedandisincludedinthe certificationfiling. Thisattestationisbasedonathoroughevaluationofthedevice'sdesign,functionality,andsoftware environment.Theundersignedaffirmsthattheinformationprovidedisaccurateandcompletetothebestof theirknowledge. Sincerelyyours, PrintedName:HeiYuen Title:ProjectManager Address:Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,GuangdongProvince, China Tel.:(86)769-81819912 Email:[email protected] DongguanMingHengPlasticProductsCo.,Ltd. Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,GuangdongProvince,China 2|Page EvaluationregardingtotheCoveredListSoftware: Compliance Methodology EvaluationProcessResults Deviceis Inherent compliance ☒ TheChipset(s)usedislimitedtorun theCybersecurityoranti-virus software. Compliance ☒ TheMemoryusedislimitedtorunthe Cybersecurityoranti-virussoftware. Compliance ☒ Thereisstoragecapacitylimitationfor storeorinstalltheCybersecurityor anti-virussoftware. Compliance ☒ Operatingsystemusedislimitedto run,installordelivertheCybersecurity oranti-virussoftware. Compliance Deviceisnot Inherent compliance ☐ EvaluationBasedonSoftware BillofMaterials(SBoM) Seeattached“SBoM“ Note:TheSBoMcontentislimited tothescopeofcoveredlist software(e.g.antivirusand cybersecuritysoftware). ☐ EvaluationBasedonScanfor Softwareonthedevice ☐ EvaluationBasedonFilesystemscan ☐ EvaluationBasedonRunning softwarecheck

Attestation Statements

DongguanMingHengPlasticProductsCo.,Ltd. Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,Guangdong Province,China AttestationStatements NotCoveredEntityApplicant&NotCoveredEquipment To:FederalCommunicationsCommissionDate:4/3/2026 7435OaklandMillsRoad, Columbia,MD21046,USA Ref:InformationRequiredbySection2.911(d)(5)(i)&(ii) FCCID:2A45Z-62570 DongguanMingHengPlasticProductsCo.,Ltd.certifiesthat,asofthedateofthefilingofthe application,theapplicantisnotidentifiedontheCoveredList,establishedpursuantto§1.50002of referencechapter,asanentityproducing“covered”communicationequipment.Theequipmentfor whichauthorizationissoughtisnot“covered”telecommunicationsequipmentandvideosurveillance equipmentproducedbyentitiesidentifiedontheCommission’sCoveredListthatprohibitedfrom receivinganequipmentauthorizationpursuanttosection§2.903oftheFCCrules. Sincerelyyours, PrintedName:HeiYuen Title:ProjectManager Address:Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,GuangdongProvince, China Tel.:(86)769-81819912 Email:[email protected]

Cover Letter(s)

DongguanMingHengPlasticProductsCo.,Ltd. Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,Guangdong Province,China 2026/4/3 FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 Subject:AgentAuthorizationforFCCID:2A45Z-62570 I,theundersigned,herebyauthorize(ShenzhenAnbotekComplianceLaboratoryLimited.)toactonour behalfinallmattersrelatingtothisapplicationforequipmentcertification. Anyactcarriedoutby(ShenzhenAnbotekComplianceLaboratoryLimited.)shallhavethesameeffectas ourownandIacknowledgethatallresponsibilityforcomplyingwiththetermsandconditionsof certification,asspecifiedbyDERYCOMCERTIFICATIONSERVICES,INC.,stillresideswith(Dongguan MingHengPlasticProductsCo.,Ltd.). WecertifythatwearenotsubjecttoadenialoffederalbenefitsthatincludesFCCbenefitspursuantto Section5301oftheAnti-DrugAbuseActof1988,21U.S.C.§862,andthatnopartytotheapplication,as definedin47CFR§1.2002(b),issubjecttoadenialoffederalbenefitsthatincludesFCCbenefits pursuanttothatsection. Sincerely, PrintedName:HeiYuen Title:ProjectManager Tel.:(86)769-81819912 Fax:N/A Email:[email protected]

Cover Letter(s)

DongguanMingHengPlasticProductsCo.,Ltd. Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity, GuangdongProvince,China ProductSimilarityDeclaration Productname:NorthPolePowerandLightSwitch Modelname:62570,62571,62572,62573,62574,62575,62576, 62577,62578,62579,62580,62581,62582,62583,62584,62585, 62586,62587,62588,62589 FCCID:2A45Z-62570 We(DongguanMingHengPlasticProductsCo.,Ltd.)herebystatethat allthemodelsareelectricalidenticalincludingthesamesoftware parameterandhardwaredesign(i.e.,circuitdesign,PCBLayout,RF module/circuit,antennatype(s)andantennalocation,componentson PCB,etc.,),samemechanicalstructureanddesign(includingproduct enclosure,materials,etc.,),Allsamplesarethesameexceptthemodel numberandappearancecolor. Signature: Name:HeiYuen Title:ProjectManager Date:Apr.3,26

Cover Letter(s)

DongguanMingHengPlasticProductsCo.,Ltd. Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity, GuangdongProvince,China 4/3/2026 FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 Subject:ConfidentialityRequestfor:FCCID:2A45Z-62570 PursuanttoSections0.457and0.459oftheCommission’sRules,weherebyrequestpermanent confidentialtreatmentoftheexhibitsaccompanyingthiscertificationapplicationasoutlinedbelow: BlockDiagram Schematics OperationalDescription Theaboveexhibitscontaintradesecretsand/orproprietaryinformationthatarenotpubliclyavailableand materialsthattheApplicanthasspentconsiderableeffortsindeveloping.Publicdisclosureofthesemay beharmfultotheApplicantandgiveanunfairadvantagetocompetitorsonthemarket. PursuanttoDA04-1705,theapplicantalsorequeststemporaryconfidentialtreatmentoftheexhibits outlinedbelowforaperiodof(upto180)daysfromthedateofequipmentauthorizationandpriorto marketingintheUnitedStatestopreventtheprematurereleaseofanysensitiveinformation.Applicantis awareoftheirresponsibilitytonotifyDERYCOMintheeventinformationregardingtheproductorthe productismadeavailabletothepublicbeforetherequestedperiodhasexpired.  UserManual InternalPhotos  ExternalPhotos TestSetupPhotos Sincerely, Title:ProjectManager Address:Room101,Block2,No.59,ShipaiXiashaRoad,ShipaiTown,DongguanCity,Guangdong Province,China Tel.:(86)769-81819912 Email:[email protected]

ID Label/Location Info

©Mr. Christmas Model No.: 62570 Power: DC4.5V 100mA FCC ID: 2A45Z-62570 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: ( 1 ) this device may not cause harmful interference, and ( 2 ) this device must accept any interference received, including interference that may cause undesired operation. ©Mr. Christmas Model No.: 62570 Power: DC4.5V 100mA FCC ID: 2A45Z-62570 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: ( 1 ) this device may not cause harmful interference, and ( 2 ) this device must accept any interference received, including interference that may cause undesired operation. 1:1, actual size: 75x20mm

RF Exposure Info

FCCID:2A45Z-62570 RFEXPOSUREEVALUATION EUTSpecification EUTNorthPolePowerandLightSwitch ModelName 62570,62571,62572,62573,62574,62575,62576, 62577,62578,62579,62580,62581,62582,62583, 62584,62585,62586,62587,62588,62589 Frequencyband(Operating)WLAN:2.412GHz~2.462GHz WLAN:5.18GHz~5.32GHz/5.50GHz~5.70GHz WLAN:5.745GHz~5825GHz Others(433.92MHz) DevicecategoryPortable(<20cmseparation) Mobile(>20cmseparation) Others___ AntennadiversitySingleantenna Multipleantennas Txdiversity Rxdiversity Tx/Rxdiversity Max.outputpower69.30dBuV/m(-25.958dBm)(0.0025365mW) EvaluationappliedMPEEvaluation SAREvaluation StandardRequirement PortableDevice 2.1093Radiofrequencyradiationexposureevaluation:portabledevices. Accordingto§15.247(i)and§1.1307b(1),systemsoperatingundertheprovisionsofthissection shallbeoperatedinamannerthatensuresthatthepublicisnotexposedtoradiofrequency energylevelsinexcessoftheCommission’sguidelines.SeeKDB447498D01GeneralRF ExposureGuidanceV6,section4.3.1. The1-gand10-gSARtestexclusionthresholdsfor100MHzto6GHzattestseparation distances ≤ 50mmaredeterminedby: [(max.powerofchannel,includingtune-uptolerance,mW)/(min.testseparationdistance, mm)] · [ √ f(GHz)] ≤ 3.0for1-gSARand ≤ 7.5for10-gextremitySAR, 16 where · f(GHz)istheRFchanneltransmitfrequencyinGHz · PoweranddistanceareroundedtothenearestmWandmmbeforecalculation17 · Theresultisroundedtoonedecimalplaceforcomparison Thetestexclusionsareapplicableonlywhentheminimumtestseparationdistanceis ≤ 50 mmandfortransmissionfrequenciesbetween100MHzand6GHz.Whentheminimumtest separationdistanceis<5mm,adistanceof5mmisappliedtodetermineSARtestexclusion. FCCID:2A45Z-62570 MeasurementResult Channel Frequency (GHz) MaxOutput power (dBm) Maxtune-up tolerance Outputpower (dBm) MaxOutput power (dBm) MaxOutput power (mW) Calculation Value (Note1) Threshold Value 0.43392-25.958-25.958±1-24.9580.0031930.00042073.0 power=TransmitterSpurious-95.2=69.30-95.2=-25.958dBm Note1:CalculationValue=[(max.powerofchannel,mW)/(min.testseparationdistance, mm)]·[√f(GHz)]. Foxexample:0.003193/5* √ 0.43392= 0.0004207 ≤ 3.0 AccordingtoKDB447498D01V6,thresholdatwhichnoSARrequiredis≤3.0for1-gSAR, separationdistanceis5mm,andnosimultaneousSARmeasurementisrequired. TheSARmeasurementisnotnecessary.

Test Report

Page 1 of 25 Code:AB-RF-05-b FCC Test Report Report No.:1812C60137012501 Applicant: Dongguan MingHeng Plastic Products Co., Ltd. Address: Room 101, Block 2, No. 59, Shipai Xiasha Road, Shipai Town, Dongguan City, Guangdong Province, China Product Name: North Pole Power and Light Switch Report Date: 2026-04-09 Shenzhen Anbotek Compliance Laboratory Limited #资质章# #检测章# #报告二维码# Report No.: 1812C60137012501Page 2 of 25 FCC ID: 2A45Z-62570 Code:AB-RF-05-b Contents 1. General Information .............................................................................................................................5 1.1. Client Information ......................................................................................................................5 1.2. Description of Device (EUT) ......................................................................................................5 1.3. Auxiliary Equipment Used During Test......................................................................................6 1.4. Description of Test Configuration ..............................................................................................6 1.5. Description of Test Setup ..........................................................................................................7 1.6. Test Equipment List...................................................................................................................8 1.7. Measurement Uncertainty .........................................................................................................9 1.8. Description of Test Facility ........................................................................................................9 1.9. Disclaimer................................................................................................................................10 2. Summary of Test Results ..................................................................................................................11 3. Conducted Emission Test..................................................................................................................12 3.1. Test Standard and Limit ..........................................................................................................12 3.2. Test Setup ...............................................................................................................................12 3.3. Test Procedure ........................................................................................................................12 3.4. Test Data .................................................................................................................................12 4. Field Strength of Fundamental and Spurious Emission ....................................................................13 4.1. Test Standard and Limit ..........................................................................................................13 4.2. Test Setup ...............................................................................................................................14 4.3. Test Procedure ........................................................................................................................15 4.4. Test Data .................................................................................................................................15 5. 20dB Occupy Bandwidth Test ...........................................................................................................20 5.1. Test Standard and Limit ..........................................................................................................20 5.2. Test Setup ...............................................................................................................................20 5.3. Test Procedure ........................................................................................................................20 5.4. Test Data .................................................................................................................................21 6. Transmission Cease Time Test .........................................................................................................22 6.1. Test Standard and Limit ..........................................................................................................22 6.2. Test Setup ...............................................................................................................................22 6.3. Test Procedure ........................................................................................................................22 6.4. Test Data .................................................................................................................................23 7. Antenna Requirement........................................................................................................................24 7.1. Test Standard and Requirement .............................................................................................24 7.2. Antenna Connected Construction ...........................................................................................24 APPENDIX I -- TEST SETUP PHOTOGRAPH .....................................................................................25 APPENDIX II -- EXTERNAL PHOTOGRAPH .......................................................................................25 APPENDIX III -- INTERNAL PHOTOGRAPH........................................................................................25 Report No.: 1812C60137012501Page 3 of 25 FCC ID: 2A45Z-62570 Code:AB-RF-05-b TEST REPORT Applicant:Dongguan MingHeng Plastic Products Co., Ltd. Manufacturer:Dongguan MingHeng Plastic Products Co., Ltd. Product Name:North Pole Power and Light Switch Model No.: 62570, 62571, 62572, 62573, 62574, 62575, 62576, 62577, 62578, 62579, 62580, 62581, 62582, 62583, 62584, 6258…

Text truncated - open the document above for the full version.

Test Report

Report No.: Ti-EE26030513-901 Tel: +86-755-66850100 E-mail: [email protected] Page No. 1 / 13 Web: www.titcgroup.com Template No.: TRP-Passive-EN (2022-09-07) Add: Block B, 1/F, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China TEST REPORT Applicant: Dongguan MingHeng Plastic Products Co., Ltd. Address: Room 101, Block 2, No. 59, Shipai Xiasha Road, Shipai Town, Dongguan City, Guangdong Province, China Equipment Type: North Pole Power and Light Switch Model Name: 62570 Brand Name: Mr. Christmas Test Standard: IEEE Std 149-2021 Sample Arrival Date: Mar. 18, 2026 Test Date: Mar. 23, 2026 Date of Issue: Mar. 25, 2026 ISSUED BY: Shenzhen BALUN Technology Co., Ltd. Tested by: Mai Jintian Checked by: Xia Long Approved by: Tolan Tu (Technical Director) _______________ _______________ _______________ DRAFT Report No.: Ti-EE26030513-901 Tel: +86-755-66850100 E-mail: [email protected] Page No. 2 / 13 Web: www.titcgroup.com Template No.: TRP-Passive-EN (2022-09-07) Add: Block B, 1/F, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China Revision History Version Issue Date Revisions Rev. 01 Mar. 25, 2026 Initial Issue TABLE OF CONTENTS 1 GENERAL INFORMATION ........................................................................................................ 3 1.1 Test Laboratory .................................................................................................................. 3 1.2 Test Location ...................................................................................................................... 3 2 PRODUCT INFORMATION ....................................................................................................... 4 2.1 Applicant Information .......................................................................................................... 4 2.2 Manufacturer Information .................................................................................................... 4 2.3 General Description for Equipment under Test (EUT) ......................................................... 4 2.4 Ancillary Equipment ............................................................................................................ 4 3 SUMMARY OF TEST RESULTS ............................................................................................... 5 3.1 Test Standards ................................................................................................................... 5 3.2 Test Verdict ........................................................................................................................ 5 3.3 Test Uncertainty ................................................................................................................. 5 4 GENERAL TEST CONFIGURATIONS ...................................................................................... 6 4.1 Test Condition .................................................................................................................... 6 4.2 Test Equipment List ............................................................................................................ 6 4.3 Test Setup .......................................................................................................................... 7 4.4 Test Frequencies ................................................................................................................ 7 ANNEX A TEST RESULTS .......................................................................................................... 8 A.1 Gain and Efficiency ............................................................................................................. 8 A.2 VSWR ................................................................................................................................. 8 ANNEX B RADIATION PATTERN ............................................................................................... 9 ANNEX C TEST SETUP PHOTOS ............................................................................................ 12 ANNEX D EUT PHOTO.............................................................................................................. 12 DRAFT Report No.: Ti-EE26030513-901 Tel: +86-755-66850100 E-mail: [email protected] Page No. 3 / 13 Web: www.titcgroup.com Template No.: TRP-Passive-EN (2022-09-07) Add: Block B, 1/F, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China 1 GENERAL INFORMATION 1.1 Test Laboratory Name Shenzhen BALUN Technology Co., Ltd. Address Building 2, Intelligent Connected Vehicle Industrial Park, No. 55, Xiangshan Road, Luotian Community, Yanluo Sub-district, Bao'an District, Shenzhen, Guangdong Province, China Phone Number +86 755 6685 0100 1.2 Test Location Name Shenzhen BALUN Technology Co., Ltd. Location Block B, 1/F, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China 1/F, Building B, Ganghongji High-tech Intelligent Industrial Park, No. 1008, Songbai Road, Yangguang Community, Xili Sub-district, Nanshan District, Shenzhen, Guangdong Province, P. R. China Building 2, Intelligent Connected Vehicle Industrial Park, No. 55, Xiangshan Road, Luotian Community, Yanluo Sub-distict DRAFT Report No.: Ti-EE26030513-901 Tel: +86-755-66850100 E-mail: [email protected] Page No. 4 / 13 Web: www.titcgroup.com Template No.: TRP-Passive-EN (2022-09-07) Add: Block B, 1/F, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China 2 PRODUCT INFORMATION 2.1 Applicant Information Applicant Dongguan MingHeng Plastic Products Co., Ltd. Address Room 101, Block 2, No. 59, Shipai Xiasha Road, Shipai Town, Dongguan City, Guangdong Province, China 2.2 Manufacturer Information Manufacturer Dongguan MingHeng Plastic Products Co., Ltd. Address Room 101…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Hei Yuen(Project Manager)
[email protected]Fax: N.A

Technical Contact

Linkwld LLCTimothy Zhu
[email protected]

7595 Technology Way Ste 100 · Denver, Colorado, 80237 · United States

Test Firm

Shenzhen Anbotek Compliance Laboratory LimitedJeff Zhu
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115.231433.92 MHz - 433.92 MHz-
Confidentiality
Long Term

Other Applications from Dongguan MingHeng Plastic Products Co., Ltd.

2A45Z-13320

Santas Magical Telephone

Jun 05, 2026

Equipment Class

DTS - Digital Transmission System