
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
User Manual Click here for the HaritoraXmanual 2023-3 , 2023-11©Shiftall Inc. All Rights Reserved. Returnto productpage 1.SetupGuide Quick Setup Guide We havepreparedan instructionalvideoto help you get startedwith HaritoraX1.1 / 1.1B right away. Onceyou havefollowedthe instructions,you can start usingHaritoraX1.1 / 1.1B immediately. ●STEP 0 Downloadthe "HaritoraConfigurator"softwarefrom the Shopifystorepage . Followthe stepsup to 1 minuteand 14 secondsinto the videoto set up the "HaritoraConfigurator". Video:https://youtu.be/gQRmdVGw1nQ *TheHaritoraConfiguratoris the sameas HaritoraX.If you are alreadyusingHaritoraX,STEP1 is not necessary. The "ProductCode"onthebackoftheMainunitisrequiredtosetuptheHaritoraConfigurator. Werecommendthatyoutakeapictureormakeanoteofthe"productcode"andkeepitinasafe place. [NOTE]The productcode entry is no longerrequiredstartingfrom HaritoraConfiguratorVer. 0.8.0. ●STEP 1 Assemblethe HaritoraXsuit. Pleasereferto the assemblyvideo. HaritoraXsuit assemblyinstructions Video:https://youtu.be/rVbB_NYLTkg ●STEP 2 Put on HaritoraX1.1 / 1.1B . How to put on the HaritoraXsuit Video:https://youtu.be/m8ntin-f08Q ●STEP 3 Downloadthe HaritoraConfiguratorapplication. DownloadURL:https://store-us.shiftall.net/products/haritoraconfigurator Pleasefollowthe procedurefrom 1 minute15 secondsonwardin the videoto set up "Haritora Configurator"and variouspartsof the system. Video:https://youtu.be/gQRmdVGw1nQ That'sall. HaritoraXis readynow. It is highly recommendedto calibrate the magnetometerin it where it is used for stable operation. HaritoraX1.1 onlinemanual(English) 1.1.Calibratethe magnetometer Turn on the power of the main unit and lift all the units together so that they don’t move individually. Then draw a large figure of eight in the air, just like calibratingyour smartphone'selectroniccompass. Do this for about 3 minutes. This operationcan reduce the unintentionalrotation (the drift). This operationdoes nothave to berepeated in the same environmentbecause the calibrationdata is stored in the non-volatilememory. If the magnetic environmentis changed, repeat this operationto reduce the drift. * It is impossibleto completelyremove the drift dueto the characteristicsof the magnetometer,and the drifting speed may vary. 2.BeforeYou Begin 2.1. Introduction Thank you for your purchase of the HaritoraX1.1 / 1.1B . Please read this manual carefully and observe the precautionsto ensure safe use as you enjoy your FBT experience. Please read "ImportantSafety Information " before use. 2.2. Requirements To useHaritoraX1.1 / 1.1B, you will need: ● PC runningSteamVRwith Windows10. Windows10 21 H1 or later,SteamVR1.17 or later. ● VR headsetthat connectsto SteamVR. OculusQuest,Quest2,Rift S, VIVE(1st),VIVEPro, VIVECosmos,FujitsuFMVHDS1,Valve Index,HP ReverbG2,PICO4, QuestPro ● Bluetoothadapterfor pc *Thisis requiredif your computerdoesnot haveBluetooth. UnbrandedBluetoothadapters for pc that are sold on sites such as Amazon and claim to support Bluetooth 5.0 (often printed with BT 5.0) cannot connect to HaritoraX1.1/ 1.1Bas they do not support SPP. Please use a BluetoothUSB adapter that has already been tested. Verified working Bluetoothadapter for pc. BrandModel name TP-LinkUB400 TP-LinkUB4A ASUSUSB-BT400 ZEXMTE0054 AvantreeBTDG-40S-BLK PlugableUSB-BT4LE ● USB wall charger Please have on hand a USB wall charger, output: 5V/1A or higher. 2.3.IncludedItems Namequantity Main unit1 Sub unit A 2 Sub unit B 2 Connectioncable4 USB cable (Type C)1 HaritoraXsuit 1 Safety Precautions/ Warranty1 2.4. Overview 2.4.1.Mainunit This unit attachesto the chest.The mainunit also containsa sensor. 1. USB port for charging 2. Subunitconnectorport for left foot 3. Subunitconnectorport for right foot 4. Subunitextensionconnectorport 5. Button1 6. Button2 7. Powerbutton 8. Blue LED 9. GreenLED 10. Red LED 2.4.2.Sub unit A Sensorto be mountedabovethe knee. 1. Top side connectorport 2. Bottom side connectorport 2.4.3.Sub unit B Sensorto be attachedbelowthe knee.It is markedwith a “V”. 1. Topside connectorport 2. Extensionconnectorport 3. Distance sensor 2.5.ImportantSafetyInformation 3.Put on the HaritoraX1.1 / 1.1B Be sure to attachthe HaritoraX1.1 / 1.1B to your suit beforewearingit. This chapterdescribes how to assembleand attacha HaritoraXsuit to your body. *Videoexplanationsare also available. 3.1.Assemblethe HaritoraXsuit Video:HaritoraX1.1 How to assemblethe specialsuit *Theconnectioncablesare availablein two lengths(80cmx 2, 100cmx 2). Pleaseuse accordingto your body. *Copy the "ProductCode" printed on the sticker on the rear of the main unit by hand or take a picture to use for setup later. 1. Install# 1 into # 9. First,insertthe long claw of # 1 into the # 9 fixingcloth,and pull up the shortclaw with clawsor tweezers.Do this in two placeson the left and right to fix it. (The one assembledby mountingis called# A) *It will be easierto insertif you move# 1 so that the nail slidesinto the hole from the side. 2. Install# 2 into # 10. Insertthe # 2 clawsone at a time into the # 10 fixingfabricin 4 placesat the top and bottom.The pointis to insert# 10 into the fixedclothwhilefoldingit. (The one attachedtogetheris called# B) 3. Install# 3 into # 10. Just like above,insertthe # 3 clawsinto the # 10 fixingclothat 4 places aboveand belowto fix. (The one attachedtogetheris called# C) #A, #B, #C is complete! 4. Install# A in # 4. Attachedto the end as shownin the picturebelow. 5. Pass# 8 through# 12. As shownin the photo,pleasepassthroughthe part withouta hook and surfacefastenerand stretchthe tip longer. 6. Insert# 8 through# A belt adjuster.Pleasepass throughthe one withouta surface fastener. Installthe otherone as well. 7. Install# B on # 5 and # C on # 6. # B and # C has mountingdirections.Confirmthe mounting positionand orientationin the photobeforemounting. 8. # 7 connects# 5 to # 6. Attachthe printerwhilecheckingthe positionin the photo. Installthe otherone as well. 9. Connect# A and # 5 with # 8. 10. Connect…
Text truncated - open the document above for the full version.
Rev1/26/2023 ShiftallInc. FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 USA Date:2023.12.04 Ref:AttestationStatementsPart2.911(d)(5)(i)Filing FCCID:2A4GC-SVPMC2BS ShiftallInc.(“theapplicant”)certifiesthattheequipmentforwhichauthorizationissoughtisnot “covered”equipmentprohibitedfromreceivinganequipmentauthorizationpursuanttosection2.903of theFCCrules. Sincerely, YoTOKUMORI Rev1/26/2023 ShiftallInc. FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 USA Date:2023.12.04 Ref:AttestationStatementsPart2.911(d)(5)(ii)Filing FCCID:2A4GC-SVPMC2BS ShiftallInc.(“theapplicant”)certifiesthat,asofthedateofthefilingoftheapplication,theapplicantis notidentifiedontheCoveredList(asaspecificallynamedentityoranyofitssubsidiariesoraffiliates)as anentityproducing“covered”equipment. Sincerely, YoTOKUMORI
[COMPANY NAME] Shiftall Inc. [COMPANY STREET ADDRESS] 4F Toky oDaiwa Bldg., 2-6-10 Nihonbash ibakuroch o, Chuo, [COMPANY CITY, STATE, ZIPCODE] Toky o [COUNTRY] Ja pan Date: [DATE] 2023.12.04 Federal Communica tions Commissi on Authorization and Evaluation Divi si on 7435 Oakl and Mills Road Columbia, MD 21046 FCC ID: [FCC ID] 2A4GC-SVPMC2BS FRN: [FRN] 0031961626 US Agent – Attest ation Stateme nt / Part 2.911(d )(7 ) Shiftall Inc. certifies, that as of 2023.12.04, we hav e designated FCC US Agent, LLC to accept service of process on our behalf for FCC ID: 2A4GC-SVPMC2BS. Shiftall Inc., accepts to maintain an agent of service of process in the United States for no less than one year after either the grantee has permanently terminated all marke ting and importation of the applicable equipment within the U.S., or the conclusion of any Commission-related administrative or judicial proceeding involving the equipment, whichever is later. FCC US Agent, LLC, accepts as of the date of the filing of this application, the obligation of being the designated agent for the purpose of accepting service of process on behalf of Shiftall Inc. for FCC ID: 2A4GC-SVPMC2BS. Designated Agent Information: Company Name: FCC US Agent, LLC FRN: 0033402884 Address: 3722 Illinois Avenue, Saint Charles, IL, 60174, USA Contact Person: Tim Payne Phone: 708-571-3148 Email: [email protected] Sincerely, Designated Agent: FCC US Agent, LLC Designated Agent Representative: Tim Payne Signature Company: Shiftall Inc. Company Representative: Yo TOKUMORI Signature: [Signature]:
Rev11/20/07 ShiftallInc. FederalCommunicationsCommission AuthorizationandEvaluationDivision ConfidentialityRequestregardingapplicationforcertificationofFCCID:2A4GC-SVPMC2BS PursuanttoSections0.457and0.459oftheCommission’sRules,weherebyrequestconfidential treatmentofinformationaccompanyingthisapplicationasoutlinedbelow: ExhibitTypeFileName BlockDiagram Schematics OperationalDescription BlockDiagram Schematics OperationalDescription Theabovematerialscontaintradesecretsandproprietaryinformationnotcustomarilyreleasedto thepublic.Thepublicdisclosureofthesematerialsmaybeharmfultotheapplicantandprovide unjustifiedbenefitstoitscompetitors. TheapplicantunderstandsthatpursuanttoSection0.457oftheRules,disclosureofthis applicationandallaccompanyingdocumentationwillnotbemadebeforethedateoftheGrant forthisapplication. PursuanttoDA04-1705June15,2004oftheCommission’spublicnotice,Wealsorequestingthe commissiontograntshort-termconfidentialityrequestonthefollowingattachmentsuntil180 daysaftertheGrantDateofEquipmentAuthorizations. ExhibitTypeFileName ManualUsermanual InternalphotoInternalphoto Sincerely, YoTOKUMORI/2023.12.04
ShiftallInc. Declarationonmodeldifference WetheundersignedherebyconfirmthatthemainEUTofthefourmodelsisthesame,havethe sameRFmoduleandantenna,PCBlayoutandschematics,onlythemodelnumberisdifferent,and itisusedwithfourdifferentinductiondevices.Thefourcollocationmethodshavebeentested,and thereportshowstheworstcase Allmodelsconsistofdifferentcombinationsofthemainequipmentanddifferentinduction devices.Allconfigurationmethodsweretestedandworst-casescenarios(all4sensingdevices) weregiveninthereport. ProductionnameTrademarkFCCModelno. HaritoraX1.1BHaritoraX2A4GC-SVPMC2BSSVP-MC2BS,SVP-MC2BF, SVP-MC2BE,SVP-MC2BW Confirmedby: YoTOKUMORI
ShiftallInc. FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 Date:2023.12.04 SUBJECT:FCCApplicationfor(FCCID:2A4GC-SVPMC2BS) ToWhomItMayConcern: We,theundersigned,herebyauthorizeSamLvatEMTEK(DONGGUAN)CO.,LTD.on ourbehalf,toapplytotheFederalCommunicationsCommissiononourequipment.Any andallactscarriedoutbyEMTEK(DONGGUAN)CO.,LTD.onourbehalfshallhave thesameeffectasactsofourown. ThisistoadvisethatweareinfullcompliancewiththeAnti-DrugAbuseAct.We,the applicant,arenotsubjecttoadenialoffederalbenefitspursuanttoSection5301ofthe Anti-DrugActof1988,21USC853a,andnopartytotheapplicationissubjecttoadenial offederalbenefitspursuanttothatsection. Regards, Sincerely, YoTOKUMORI/2023.12.04
Report No. EDG2310180194E001Page 1 of 9Ver.1.0 FCC ID: 2A4GC-SVPMC2BS SVP-MC2BS Report No. EDG2310180194E001Page 2 of 9Ver.1.0 Report No. EDG2310180194E001Page 3 of 9Ver.1.0 Report No. EDG2310180194E001Page 4 of 9Ver.1.0 Report No. EDG2310180194E001Page 5 of 9Ver.1.0 Report No. EDG2310180194E001Page 6 of 9Ver.1.0 Report No. EDG2310180194E001Page 7 of 9Ver.1.0 SVP-MC2BE Report No. EDG2310180194E001Page 8 of 9Ver.1.0 SVP-MC2BW Report No. EDG2310180194E001Page 9 of 9Ver.1.0
38.5 21.5 HaritoraX1.1B-0104051 SVP-MC2BS FCC ID:2A4GC-SVPMC2BS HaritoraX1.1B-0104051 SVP-MC2BS FCC ID:2A4GC-SVPMC2BS Aug 23th 2023 MC2B
Report No. EDG2310180194E001Page 1 of 9Ver.1.0 FCC ID: 2A4GC-SVPMC2BS Report No. EDG2310180194E001Page 2 of 9Ver.1.0 ANT Report No. EDG2310180194E001Page 3 of 9Ver.1.0 Report No. EDG2310180194E001Page 4 of 9Ver.1.0 Report No. EDG2310180194E001Page 5 of 9Ver.1.0 Report No. EDG2310180194E001Page 6 of 9Ver.1.0 Report No. EDG2310180194E001Page 7 of 9Ver.1.0 Report No. EDG2310180194E001Page 8 of 9Ver.1.0 Report No. EDG2310180194E001Page 9 of 9Ver.1.0
. Test Laboratory: Shenzhen EMTEK Co.,Ltd.Date: 2023/11/22 System Check_H2450 DUT: Dipole 2450 MHz; Type:D2450V2; SN:927 Communication System: CW; Frequency: 2450 MHz;Duty Cycle: 1:1 Medium: H2450 Medium parameters used: f = 2450 MHz;σ=1.78S/m;ε r = 39.70;ρ=1000kg/m 3 AmbientTemperature:22.6°C; LiquidTemperature:22.4°C DASY5 Configuration: - Probe: EX3DV4 - SN3970; ConvF(7.91, 7.91, 7.91); Calibrated: 2023/5/17; - Sensor-Surface: 2mm (Mechanical Surface Detection) - Electronics: DAE4 Sn1418; Calibrated: 2023/4/25 - Phantom: ELI v5.0; Type: QDOVA002AA; Serial: TP:1231 - Measurement SW: DASY52, Version 52.8 (7); SEMCAD X Version 14.6.10 (7164) Pin=250mW/Area Scan (41x51x1):Interpolated grid: dx=2.000 mm, dy=2.000 mm Maximum value of SAR (interpolated) = 22.2 W/kg Pin=250mW/Zoom Scan (5x5x7)/Cube 0:Measurement grid: dx=5mm, dy=5mm, dz=5mm Reference Value = 110.47 V/m; Power Drift = 0.18 dB Peak SAR (extrapolated) = 28.4 W/kg SAR(1 g) = 13.08 W/kg; SAR(10 g) = 6.13 W/kg Maximum value of SAR (measured) = 23.35 W/kg
TestLaboratory:ShenzhenEMTEKCo.,Ltd.Date:2023/11/22 2.4GWIFI DUT: SVP-MC2BS Communication System: 802.11b ; Frequency: 2437 MHz;Duty Cycle: 1:1 Medium: H2450 Medium parameters used: f = 2437 MHz;σ=1.776S/m;ε r = 40.424;ρ= 1000 kg/m 3 AmbientTemperature:22.6°C; LiquidTemperature:22.4°C DASY5 Configuration: - Probe: EX3DV4 - SN3970; ConvF(8.06, 8.06, 8.06); Calibrated: 2023/5/17; - Sensor-Surface: 3mm (Mechanical Surface Detection) - Electronics: DAE4 Sn1418; Calibrated: 2023/4/25 - Phantom: ELI v5.0; Type: QDOVA002AA; Serial: TP:1231 - Measurement SW: DASY52, Version 52.8 (7); SEMCAD X Version 14.6.10 (7164) Front/Area Scan (8x11x1):Measurement grid: dx=15mm, dy=15mm Maximum value of SAR (measured) = 0.0881 W/kg Front/Zoom Scan (7x7x7)/Cube 0:Measurement grid: dx=5mm, dy=5mm, dz=5mm Reference Value = 3.063 V/m; Power Drift = -0.19 dB Peak SAR (extrapolated) = 0.166 W/kg SAR(1 g) = 0.080 W/kg; SAR(10 g) = 0.037 W/kg Maximum value of SAR (measured) = 0.101 W/kg
PhotographsofEUTSetup Fig-4.1FrontofEUTwith0cmGap (BodyMode) Fig-4.2RearFaceofEUTwith0cmGap (BodyMode) Fig-4.3RightSideofEUTwith0cmGap (BodyMode)
ReportNo.ENS2311160219W00101RPage 1 of 37 Ver.1.0 TESTREPORT ProductName : HaritoraX1.1B ModelNumber : SVP-MC2BS,SVP-MC2BF,SVP-MC2BE, SVP-MC2BW FCCID : 2A4GC-SVPMC2BS Preparedfor:ShiftallInc. Address:4FTokyoDaiwaBldg.,2-6-10Nihonbashibakurocho,Chuo, Tokyo,Japan Preparedby:EMTEK(SHENZHEN)CO.,LTD. Address:Bldg69,MajialongIndustryZone,NanshanDistrict, Shenzhen,Guangdong,China Tel:(0755)26954280 Fax:(0755)26954282 ReportNumber:ENS2311160219W00101R Date(s)ofTests:November22,2023toNovember22,2023 DateofIssue:November23,2023 ReportNo.ENS2311160219W00101RPage 2 of 37 Ver.1.0 TABLEOFCONTENTS 1.TESTRESULTCERTIFICATION................................................................................................................................................4 2.DescriptionofEquipmentUnderTest......................................................................................................................................6 3.SARMeasurementSystem.......................................................................................................................................................7 3.1DefinitionofSpecificAbsorptionRate(SAR)........................................................................................................................7 3.2SPEAGDASYSystem........................................................................................................................................................7 3.2.1Robot...................................................................................................................................................................8 3.2.2Probes..................................................................................................................................................................9 3.2.3DataAcquisitionElectronics(DAE)......................................................................................................................9 3.2.4Phantoms...........................................................................................................................................................10 3.2.5DeviceHolder.....................................................................................................................................................11 3.2.6SystemValidationDipoles..................................................................................................................................11 3.2.7TissueSimulatingLiquids..................................................................................................................................12 3.3SARSystemVerification...................................................................................................................................................14 3.4SARMeasurementProcedure..........................................................................................................................................15 3.4.1Area&ZoomScanProcedure...........................................................................................................................15 3.4.2VolumeScanProcedure.....................................................................................................................................15 3.4.3PowerDriftMonitoring.......................................................................................................................................16 3.4.4SpatialPeakSAREvaluation............................................................................................................................16 3.4.5SARAveragedMethods.....................................................................................................................................16 4.SARMeasurementEvaluation.................................................................................................................................................17 4.1ApplicableStandards........................................................................................................................................................17 4.2EUTConfigurationandSetting.........................................................................................................................................17 4.3EUTTestingPosition.........................................................................................................................................................19 4.3.1Hand-heldusageofthedevice,notattheheadortorso...................................................................................19 4.3.2SARTestExclusionEvaluations........................................................................................................................21 4.4TissueVerification.............................................................................................................................................................22 4.5SystemValidation.............................................................................................................................................................22 4.6SystemVerification...........................................................................................................................................................23 4.7MaximumOutputPower...................................................................................................................................................24 4.7.1MaximumConductedPower..............................................................................................................................24 4.7.2MeasuredConductedPowerResult..................................................................................................................24 4.8SARTestingResults.........................................................................................................................................................25 4.8.1SARTestReductionConsiderations.............................................…
Text truncated - open the document above for the full version.
Report No. EDG2310180194E00101RPage 1 of 47Ver.1.0 TEST REPORT Product Name:HaritoraX 1.1B Model Number: SVP-MC2BS, SVP-MC2BF, SVP-MC2BE, SVP-MC2BW FCC ID:2A4GC-SVPMC2BS Prepared for:Shiftall Inc. Address:4F TokyoDaiwa Bldg., 2-6-10 Nihonbashibakurocho, Chuo, Tokyo, Japan Prepared by:EMTEK (DONGGUAN) CO., LTD. Address:-1&2/F.,Building 2, Zone A, Zhongda Marine Biotechnology Research and Development Base, No.9, Xincheng Avenue, Songshanhu High-technology Industrial Development Zone, Dongguan, Guangdong, China TEL: +86-0769-22807078 FAX: +86-0769-22807079 Report Number:EDG2310180194E00101R Date(s) of Tests:October 18, 2023 to November 29, 2023 Date of issue:November 29, 2023 $二维码$ Report No. EDG2310180194E00101RPage 2 of 47Ver.1.0 TABLE OF CONTENTS 1 TEST RESULT CERTIFICATION.............................................................................................................3 2 EUT TECHNICAL DESCRIPTION............................................................................................................5 3 SUMMARY OF TEST RESULT................................................................................................................6 4 TEST METHODOLOGY............................................................................................................................7 4.1 GENERAL DESCRIPTION OF APPLIED STANDARDS...................................................................7 4.2 MEASUREMENT EQUIPMENT USED..............................................................................................7 4.3 DESCRIPTION OF TEST MODES.................................................................................................... 8 4.4 TABLE OF PARAMETERS OF TEXT SOFTWARE SETTING..........................................................8 5 FACILITIES AND ACCREDITATIONS.....................................................................................................9 5.1 FACILITIES.........................................................................................................................................9 5.2 EQUIPMENT...................................................................................................................................... 9 5.3 LABORATORY ACCREDITATIONS AND LISTINGS........................................................................9 6 TEST SYSTEM UNCERTAINTY............................................................................................................ 10 7 SETUP OF EQUIPMENT UNDER TEST................................................................................................11 7.1 RADIO FREQUENCY TEST SETUP 1............................................................................................11 7.2 RADIO FREQUENCY TEST SETUP 2............................................................................................11 7.3 CONDUCTED EMISSION TEST SETUP........................................................................................ 14 7.4 BLOCK DIAGRAM CONFIGURATION OF TEST SYSTEM............................................................15 7.5 SUPPORT EQUIPMENT..................................................................................................................15 8 TEST REQUIREMENTS.........................................................................................................................16 8.1 DTS 6DB BANDWIDTH....................................................................................................................16 8.2 DTS 99% BANDWIDTH................................................................................................................... 19 8.3 MAXIMUM PEAK CONDUCTED OUTPUT POWER.......................................................................22 8.4 MAXIMUM POWER SPECTRAL DENSITY.....................................................................................25 8.5 UNWANTED EMISSIONS IN NON-RESTRICTED FREQUENCY BANDS.................................... 28 8.6 RADIATED SPURIOUS EMISSION.................................................................................................35 8.7 CONDUCTED EMISSION TEST......................................................................................................43 8.8 ANTENNA APPLICATION................................................................................................................46 Report No. EDG2310180194E00101RPage 3 of 47Ver.1.0 1 TEST RESULT CERTIFICATION Applicant: Shiftall Inc. Address: 4F TokyoDaiwa Bldg., 2-6-10 Nihonbashibakurocho, Chuo, Tokyo, Japan Manufacturer: Shiftall Inc. Address: 4F TokyoDaiwa Bldg., 2-6-10 Nihonbashibakurocho, Chuo, Tokyo, Japan Factory: P. IMES Corporation Address: Block 16 Phase IV, Cavite Economic Zone, Rosario, Cavite PHILIPPINES EUT: HaritoraX 1.1B Model Name: SVP-MC2BS, SVP-MC2BF, SVP-MC2BE, SVP-MC2BW Trademark: HaritoraX Measurement Procedure Used: APPLICABLE STANDARDS STANDARDTEST RESULT FCC 47 CFR Part 2 , Subpart J FCC 47 CFR Part 15, Subpart C PASS The above equipment was tested by EMTEK (DONGGUAN) CO., LTD. The test data, data evaluation, test procedures, and equipment configurations shown in this report were made in accordance with the procedures given in ANSI C63.10 (2013) and the energy emitted by the sample EUT tested as described in this report is in compliance with the requirements of FCC Rules Part 2 and Part 15.247. The test results of this report relate only to the tested sample identified in this report. Date of Test :October 18, 2023 to November 29, 2023 Prepared by : Xia Yang /Editor Reviewer : Tim Dong/ Supervisor Approve & Authorized Signer : Sam Lv / Manager Report No. EDG2310180194E00101RPage 4 of 47Ver.1.0 Modified History VersionReport No.Revision DateSummary EDG2310180194E00101R/Original Report Report No. EDG2310180194E00101RPage 5 of 47Ver.1.0 2 EUT TECHNICAL DESCRIPTION Note: for more details, please refer to the User’s manual of the EUT. CharacteristicsDescription Product:HaritoraX 1.1B Mode…
Text truncated - open the document above for the full version.
Report No. EDG2310180194E00103RPage 1 of 50Ver.1.0 TEST REPORT Product Name:HaritoraX 1.1B Model Number : SVP-MC2BS, SVP-MC2BF, SVP-MC2BE, SVP-MC2BW FCC ID:2A4GC-SVPMC2BS Prepared for:Shiftall Inc. Address:4F TokyoDaiwa Bldg., 2-6-10 Nihonbashibakurocho, Chuo, Tokyo, Japan Prepared by:EMTEK (DONGGUAN) CO., LTD. Address:-1&2/F.,Building 2, Zone A, Zhongda Marine Biotechnology Research and Development Base, No.9, Xincheng Avenue, Songshanhu High-technology Industrial Development Zone, Dongguan, Guangdong, China TEL: +86-0769-22807078 FAX: +86-0769-22807079 Report Number:EDG2310180194E00103R Date(s) of Tests:October 18, 2023 to November 29, 2023 Date of issue:November 29, 2023 $二维码$ Report No. EDG2310180194E00103RPage 2 of 50Ver.1.0 Table of Contents 1 TEST RESULT CERTIFICATION............................................................................................................3 2 EUT TECHNICAL DESCRIPTION..........................................................................................................5 3 SUMMARY OF TEST RESULT...............................................................................................................6 4 TEST METHODOLOGY..........................................................................................................................7 4.1 GENERAL DESCRIPTION OF APPLIED STANDARDS..................................................................7 4.2 MEASUREMENT EQUIPMENT USED............................................................................................ 7 4.3 DESCRIPTION OF TEST MODES...................................................................................................8 4.4 TABLE OF PARAMETERS OF TEXT SOFTWARE SETTING.........................................................8 5 FACILITIES AND ACCREDITATIONS....................................................................................................9 5.1 FACILITIES.......................................................................................................................................9 5.2 EQUIPMENT.....................................................................................................................................9 5.3 LABORATORY ACCREDITATIONS AND LISTINGS....................................................................... 9 6 TEST SYSTEM UNCERTAINTY...........................................................................................................10 7 SETUP OF EQUIPMENT UNDER TEST.............................................................................................. 11 7.1 RADIO FREQUENCY TEST SETUP 1...........................................................................................11 7.2 RADIO FREQUENCY TEST SETUP 2...........................................................................................11 7.3 CONDUCTED EMISSION TEST SETUP.......................................................................................14 7.4 BLOCK DIAGRAM CONFIGURATION OF TEST SYSTEM...........................................................15 7.5 SUPPORT EQUIPMENT................................................................................................................ 15 8 TEST REQUIREMENTS........................................................................................................................16 8.1 DTS 6DB BANDWIDTH..................................................................................................................16 8.2 DTS 99% BANDWIDTH..................................................................................................................19 8.3 MAXIMUM PEAK CONDUCTED OUTPUT POWER..................................................................... 22 8.4 MAXIMUM POWER SPECTRAL DENSITY......................................................…
Text truncated - open the document above for the full version.
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 2 | 15C | 2.40 GHz - 2.48 GHz | 1.04 mW |

AddCon+
Equipment Class
DTS - Digital Transmission System
AddCon+
Equipment Class
DTS - Digital Transmission Systemmutalk 2
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
HaritoraX 1.1
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter