
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Fuze Technology, Inc. Federal Communications Commission Authorization and Evaluation Division Equipment Authorization Branch 7435 Oakland Mills Road Columbia, MD 21046 [February 28, 2026] U.S. Agent Designation [Fuze Technology, Inc.] acknowledges their consent for the following contact located in the United States to act as their agent for service of process for the equipment for which authorization is sought FCC ID: 2A73PCF-010 Name and company of U.S. agent: [Fuze Technology, Inc.] Physical U.S. address of agent: [3100 E 12th St Los Angeles CA 90023] FRN of U.S. agent: [0032696973] Email address of U.S. agent: [[email protected]] Telephone of U.S.agent: 13538218145 [Fuze Technology, Inc.] acknowledges their obligation to accept service of process on behalf of [Fuze Technology, Inc.]. [Fuze Technology, Inc.] with the FRN [0032696973] accepts its obligation to maintain an agent for service of process in the United States for no less than 1 year after either the grantee has permanently terminated all marketing and importation of the applicable equipment within the U.S., or the conclusion of any Commission- related administrative or judicial proceeding involving the equipment, whichever is later. By signing this form, we confirm the above and that we are aware of the application requirements listed under § 2.911(d)(7). The information provided in this letter is based on the referenced rule parts of Title 47 of the CFR as well as KDB 986446 D01. Sincerely, Signature Signature [Brandon afari] [Brandon afari] [Manager] [Manager] [Fuze Technology, Inc.] [Fuze Technology, Inc.]
Fuze Technology, Inc. (January 23, 2026) Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: Attestation Statements Part 2.911(d)(5)(i) request for FCC ID:2A73PCF-010 [Fuze Technology, Inc.] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. We also certify that, as of the date of the filing of the application, the equipment does not utilize cyber-security or anti-virus software from Kaspersky Lab, Inc, or any of its successors and assignees, which is also on the “covered list”. Sincerely, (Applicant signature) (Applicant printed name)Brandon afari Fuze Technology, Inc. (January 23, 2026) Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: Attestation Statements Part 2.911(d)(5)(ii) request for FCC ID:2A73PCF-010 [Fuze Technology, Inc.] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Sincerely, (Applicant signature) (Applicant printed name)Brandon afari
Fuze Technology, Inc. (January 28, 2026) Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: CONFIDENTIALITY REQUEST FOR (10 Slots Charge Station with Screen / CF- 010 / FCC ID: 2A73PCF-010 ) To Whom It May Concern: This letter serves as an official request for confidentiality under sections 0.457 and 0.459 of CFR 47. We have requested that the Exhibits Long-Term Confidentiality Short-Term Confidentiality NOTE 2 ID Label/Location No No Attestation Statement No No External Photos No ☐ Block Diagram ☒ ☐ Schematics ☒ ☐ Test Report No No Test Setup Photos No ☐ User’s Manual ☐ NOTE 1 ☒ Internal Photos ☐ NOTE 1 ☒ Parts List / Tune Up ☐ ☐ RF Exposure Info No No Operational Description ☒ ☐ Cover Letter(s) No No SDR Software / Security Info ☐ No required to be submitted with this application be permanently withheld from public review. Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. Please contact me if there is any information you may need. Sincerely, Signature: Name: Brandon afari Title: Manager
Fuze Technology, Inc. (January 23, 2026) Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: LETTER OF AGENT AUTHORIZATION To Whom It May Concern: We, the undersigned, hereby authorize (Shenzhen CTB Testing Technology Co., Ltd.) to act on our behalf in all matters relating to application for equipment authorization, including the signing of all documents relating to these matters. We also hereby certify that no party to the application authorized hereunder is subject to the denial of benefits, including FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C.853(a). This agreement expires one year from the current date. Sincerely, Signature: Name: Brandon afari Title: Manager
FCC ID LABEL: Label Location:
Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 1 of 13 Model: CF-010 Internal Photos Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 2 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 3 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 4 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 5 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 6 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 7 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 8 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 9 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 10 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 11 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 12 of 13 Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 13 of 13
FCC §15.247 (i), §2.1091 – RF Exposure FCC ID: 2A73PCF-010 Applied procedures / limit According to FCC §15.247(i) and §1.1307(b)(1), systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. Limits for Occupational / Controlled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S) (mW/ cm 2 ) Averaging Time |E| 2 ,|H| 2 or S (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842 / f 4.89 / f (900 / f)* 6 30-300 61.4 0.163 1.0 6 300-1500 F/300 6 1500-100,000 5 6 Note: ƒ is frequency in MHz * = Power density limit is applicable at frequencies greater than 100 MHz Limits for General Population / Uncontrolled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S) (mW/ cm 2 ) Averaging Time |E| 2 ,|H| 2 or S (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f)* 30 30-300 27.5 0.073 0.2 30 300-1500 F/1500 30 1500-100,000 1.0 30 Note: f = frequency in MHz * = Plane-wave equivalent power density MPE PREDICTION Predication of MPE limit at a given distance, Equation from OET Bulletin 65, Edition 97-01 Where: S = power density P = power input to antenna G = power gain of the antenna in the direction of interest relative to an isotropic radiator R = distance to the center of radiation of the antenna,R=20cm Test Result of RF Exposure Evaluation BT+WIFI +LTE supported simultaneous transmission: BLE+2.4GWIFI+LTE : ∑MPE Ratio =0.0005/1+0.0062/1+0.1977/1 =0.2044≤1, So passed. Tune up Produce power Maximu m peak output power (dBm) Output power to antenna (mW) Antenna Gain (numeric) Power Density (S) (mW/ cm2) Limit (mW / cm2 ) Result EDR 8DPSK& MCH 2±1 3 1.9953 1.1668 (0.67dBi) 0.0005 1 Pass 2.4G WIFI 802.11n(HT 40)&2452 14±1 15 31.6228 0.9772 (-0.1dBi) 0.0062 1 Pass LTE BAND 2 25±1 26 398.107 2 1.7140 (2.34dBi) 0.1358 1 Pass LTE BAND 4 25±1 26 398.107 2 2.4946 (3.97dBi) 0.1977 1 Pass LTE BAND 5 25±1 26 398.107 2 0.8204 (-0.86dBi) 0.065 0.5 Pass LTE BAND 7 25±1 26 398.107 2 2.1727 (3.37dBi) 0.1722 1 Pass LTE BAND 12 25±1 26 398.107 2 1.1220 (0.5dBi) 0.0889 0.5 Pass
江苏倍斯特科技有限公司天线承认书 Acknowledgement of antenna of Jiangsu Best Technology Co. , Ltd. 客户名称:江苏倍斯特科技有限公司 Client name: Jiangsu Best Technology Co. , Ltd. 供应商品名:圆盒天线 Name of supplier: circular box antenna 规格型号:81*24.9mm,带一代端子,4G 天线长390mm (黑色),WIFI 天线长 550mm(灰色) Specifications: 81 * 24.9 mm, with first generation terminal, 4G antenna length 390 mm (black) , WIFI antenna length 550 mm (Gray) 物料编号: Material number: 口口新料口替代料适用机型: New substitute material for mouth, suitable for machine type: 送样日期:样品数量:1签样日期: Date of sample delivery: number of samples: 1 date of signature: 供货商承认 Supplier recognition FICTION拟制 Fiction CHECKER审核 Checker APPROVER批准 APPROVER 客户承认 Customer recognition CONFIRMER采购确认 Confirmer EXAMINER Examiner 研发/ CE确认 R & D/CE validation CHECKER品管确认 Checker 批准 Approved APPROVER APPROVER 承认书性质 Nature of the instrument of recognition Nature of the instrument of Nature of the instrument of recognition Recognition ■ 正式承认■临时承认临时周期: formal recognition provisional recognition, ■■ provisional cycle: 上海尚远通讯科技有限公司天线承认书 Antenna Acceptance Letter of Shanghai Shangyuan Communication Technology Co. , Ltd. 客户名称:倍斯特 Client name: Bester 项目名称:/ Project name:/ 工作频段: Operating Frequency: 尚远物料规格 Specification of far away material 规格型号 Specifications 尚远料号 Shangyuan material number 客户料号 Customer material number 圆盒天线 Circular box antenna / 变更履历 Change your resume 编制/变 更日期 Preparatio n/date of change 变更内容 Change of subject 变更人 The Changers 版本 Version 2026.02. 02 2026.02.0 2 新版发行 The new edition is released /A 尚远会签栏 Shanyuan will sign the column 研发 Research 结构: Structure: 审核: Review: 品质工程 师: 批准: Approval: and developm ent Quality Engineer: 射频: RF: 审核: Review: 客户会签栏 The customer will sign the column 电子工程 师 Electrical engineer 项目经理 Project Manager 结构工程师 Structural engineer 品质工程 师 Quality Engineer TTel:+86-021-64842326 (上海);+86-0755-82504258(深圳) TTEL: + 86-021-64842326(Shanghai) ; + 86-0755-82504258(Shenzhen) Fax:+86-021-64842328 Fax: + 86-021ー64842328 上海研发中心: 上海市青浦区高光路215 弄99 号4 号楼1楼 Shanghai R & D Center: 1/F, Building 4, Lane 99,215 Gaoguang Road, Qingpu District, Shanghai 深圳研发中心: 深圳市光明区南太云创谷中心5 栋6楼 Shenzhen R & D Center: 6th Floor, Building 5, South Taiyun Chuanggu Center, Guangming District, Shenzhen 重庆研发中心:重庆市渝北区仙桃数据谷东路19 号ARM 生态产业园1F Chongqing R & D Center: 1F, ARM eco-industrial Park, No. 19 Xiantao Data Valley East Road, Yubei District, Chongqing 惠州工厂地址:惠州市惠城区水口街道青荔二路15 号雄韬科技城8 栋4-6层 Huizhou factory address: 4th-6th floor, 8th building, Xiongtao Science and Technology City, No. 15 Qinglier Road, Shuikou Street, Huicheng District, Huizhou city 目录 Contents 1项目图片 1 project images 2 LTE天线数据 2LTE antenna data 2.1 S11参数 2.1 S11 parameters 2.2天线和效率增益 2.2 antenna and efficiency gain 2.3 3D方向图 2.33 d direction map 3 WIFI天线数据 3wifi antenna data 3.1 S11参数 3.1 S11 parameters 3.2天线和效率增益 3.2 antenna and efficiency gain 3.3 3D方向图 3.33 d pattern 4结构图纸 4 structural drawings 1.项目图片 1. Project Pictures 项目图片如下: The project image is below: 2.LTE天线数据 LTE antenna data 2.1 S11参数 2.1 S11 parameters VSWR VSWR 2.2天线增益和效率 2.2 antenna gain and efficiency Frequen cy/Mhz Frequency /Mhz MaxGai n/dBi MaxGain/ DBI Efficienc y/% Efficiency/ % Frequen cy/Mhz Frequency /Mhz MaxGai n/dBi MaxGain/ DBI Efficienc y/% Efficiency/ % 上海尚远通讯科技有限公司天线承认书 Antenna Acceptance Letter of Shanghai Shangyuan Communication Technology Co. , Ltd. 820-2.6833.519001.6447.42 850-0.8639.9919300.1238.37 -0.86 880-0.39 -0.39 38.9919601.4944.16 910-0.98 -0.98 38.4619902.0852.6 940-2.7 -2.7 34.7220201.8452.97 970-3.84 -3.84 38.1120501.2947.1 1270-0.15 -0.15 34.8320801.2748.98 13000.0137.9921101.3546.67 1330-1.56 -1.56 32.7521401.1545.81 1360-0.39 -0.39 38.5521700.7342.95 1390-0.54 -0.54 35.0622000.1540.09 1420-0.47 -0.47 36.222300.4239.17 14500.1435.42260-1.01 -1.01 38.81 14800.6842.272290-1.15 -1.15 37.86 15101.1345.712320-1.46 -1.46 34.12 15401.2550.582350-1.76 -1.76 33.98 15702.3360.392380-0.38 -0.38 37.61 16001.9856.3624100.7234.12 16301.7750.8224400.8532.66 16603.3552.4824701.7735.97 16904.7359.4325003.1546.34 17203.9748.8725303.3755.21 17503.0142.7625602.4955.59 17802.0241.8825902.6761.24 18103.5850.5826202.1354.95 18403.0848.8726502.149.32 18702.3446.5626803.5261.8 2.3 3D方向图 2.33 d direction map 上海尚远通讯科技有限公司天线承认书 Antenna Acceptance Letter of Shanghai Shangyuan Communication Technology Co. , Ltd. 3. WIFI天线数据 3. WIFI antenna data 3.1 S11参数 3.1 S11 parameters 3.2天线和效率增益 3.2 antenna and efficiency gain Frequency/Mhz Frequency/Mhz MaxGain/dBi MaxGain/DBI Efficiency/% Efficiency/% 23500.2944.87 23800.6547.42 24100.6752.97 2440-0.144.16 24700.4342.27 25001.1545.81 25301.447.53 上海尚远通讯科技有限公司天线承认书 Antenna Acceptance Letter of Shanghai Shangyuan Communication Technology Co. , Ltd. 25600.9443.45 25900.5744.46 3.3 2D方向图 3.32 d direction map 4.结构图纸 4. Structural drawings 上海尚远通讯科技有限公司天线承认书 Antenna Acceptance Letter of Shanghai Shangyuan Communication Technology Co. , Ltd.
Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 1 of 63 TEST REPORT Compiled by: Reviewed by: Approved by: Kai Chen Martin Feng Bin Mei / Director Note: If there is any objection to the inspection results in this report, please submit a written report to the company within 15 days from the date of receiving the report. The test report is effective only with both signature and specialized stamp. This result(s) shown in this report refer only to the sample(s) tested. Without written approval of Shenzhen CTB Testing Technology Co., Ltd. this report can’t be reproduced except in full. The tested sample(s) and the sample information are provided by the client. “*” indicates the testing items were fulfilled by subcontracted lab. “#” indicates the items are not in CNAS accreditation scope. Test item description: 10 Slots Charge Station with Screen FCC ID: 2A73PCF-010 Trademark(s): Model/Type reference: CF-010 Applicant’s name: Fuze Technology, Inc. Address: 3100 E 12th St Los Angeles CA 90023 Manufacturer: Shenzhen Welink Energy Co., LTD Address: No. 8-4, Longwangmiao Road, Baishixia Community, Fuyong Street, Baoan District, Shenzhen, Guangdong, China Prepared By: Shenzhen CTB Testing Technology Co., Ltd. Address: 1&2/F., Building A, No.26, Xinhe Road, Xinqiao, Xinqiao Street, Bao'an District, Shenzhen, Guangdong, China Sample Received Date: Nov. 11, 2025 Sample tested Date: Nov. 11, 2025 to Dec. 29, 2025 Issue Date: Dec. 29, 2025 Report No.: CTB25111314003RF02 Test Standards FCC CFR Title 47 Part 15 Subpart C Section 15.247 ANSI C63.10:2020 Test Results PASS Remark: This is WIFI-2.4GHz band radio test report. Shenzhen CTB Testing Technology Co., Ltd. Report No.: CTB25111314003RF02 Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 2 of 63 TABLE OF CONTENT Test Report Declaration Page 1. VERSION .......................................................................... 3 2. TEST SUMMARY ................................................................... 4 3. MEASUREMENT UNCERTAINTY ..................................................... 5 4. PRODUCT INFORMATION AND TEST SETUP .......................................... 6 4.1 Product Information .................................................................... 6 4.2 Test Setup Configuration ............................................................... 6 4.3 Support Equipment .................................................................... 6 4.4 Channel List .......................................................................... 7 4.5 Test Mode ............................................................................ 7 4.6 Test Environment ...................................................................... 7 5. TEST FACILITY AND TEST INSTRUMENT USED ....................................... 8 5.1 Test Facility ........................................................................... 8 5.2 Test Instrument Used .................................................................. 8 6. AC POWER LINE CONDUCTED EMISSION ............................................ 11 6.1 Block Diagram Of Test Setup .......................................................... 11 6.2 Limit ................................................................................ 11 6.3 Test procedure ....................................................................... 11 6.4 Test Result .......................................................................... 13 7. RADIATED SPURIOUS EMISSION ................................................... 15 7.1 Block Diagram Of Test Setup .......................................................... 15 7.2 Limit ................................................................................ 15 7.3 Test procedure ....................................................................... 16 7.4 Test Result .......................................................................... 17 8. BAND EDGE AND RF COUNDUCTED SPURIOUS EMISSIONS .......................... 39 8.1 Block Diagram Of Test Setup .......................................................... 39 8.2 Limit ................................................................................ 39 8.3 Test procedure ....................................................................... 39 8.4 Test Result .......................................................................... 40 9. CONDUCTED OUTPUT POWER ..................................................... 48 9.1 Block Diagram Of Test Setup .......................................................... 48 9.2 Limit ................................................................................ 48 9.3 Test procedure ....................................................................... 48 9.4 Test Result .......................................................................... 48 10. 6DB OCCUPIED BANDWIDTH ....................................................... 49 10.1 Block Diagram Of Test Setup ......................................................... 49 10.2 Limit ............................................................................... 49 10.3 Test procedure ...................................................................... 49 10.4 Test Result ......................................................................... 50 11. POWER SPECTRAL DENSITY ...................................................... 55 11.1 Block Diagram Of Test Setup ......................................................... 55 11.2 Limit ............................................................................... 55 11.3 Test procedure ...................................................................... 55 11.4 Test Result ......................................................................... 56 12. ANTENNA REQUIREMENT ......................................................... 61 13. EUT TEST SETUP PHOTOGRAPHS .................................................. 62 (NOTE: N/A MEANS NOT APPLICABLE) Shenzhen CTB Testing Technology Co…
Text truncated - open the document above for the full version.
Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 1 of 2 Model: CF-010 Radiated Emission Below 1G Above 1G Shenzhen CTB Testing Technology Co., Ltd. Report Tel: 4008-707-283 Web: http://www.ctb-lab.net Page 2 of 2 Conducted emissions
3100 E 12th St · Los Angeles, 90023 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.41 GHz - 2.46 GHz | 27.89 mW |