Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
ning bo rui qi shang mao you xian gong si 2.911 (d)(5)(i) Equipment Type Attestation v1.2 Section 2.911(d)(5)(i) Certification – EquipmentType Company name: ning bo rui qi shang mao you xian gong si Address: Room 12-1, building 052, No. 696, Yongfeng West Road, Haishu District, Ningbo City, Zhejiang, China Product Name: Treadmill FCCID: 2A7KM-R9 Model(s): R9 2.911(d)(5)(i) EquipmentType We, [ning bo rui qi shang mao you xian gong si] (“the applicant”) certify that the equipment for which authorization is sought through certification is not: Prohibited from receiving an equipment authorization pursuant to § 2.903; of the FCC rules. Identified as an equipment type in the “Covered List” NOTE 1 Yours sincerely, Name: Kunkun Zhang Date: Mar. 11, 2024 Title: Manager Company name: ning bo rui qi shang mao you xian gong si Signature: NOTE 1 “Covered List ”; is the List of Equipment and Services Covered By Section 2 of The Secure Networks Act, available at https://www.fcc.gov/supplychain/coveredlist References; 1) 986446 D01 Covered Equipment v01 https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=325672 2) Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-national-security-threats-to-the-com munications-supply-chain-through-the
ning bo rui qi shang mao you xian gong si 2.911 (d)(5)(ii) Applicant Attestation v1.3 Section 2.911(d)(5)(ii) Certification – Applicant (Covered List ) Company name: ning bo rui qi shang mao you xian gong si Address: Room 12-1, building 052, No. 696, Yongfeng West Road, Haishu District, Ningbo City, Zhejiang, China Product Name: Treadmill FCCID: 2A7KM-R9 Model(s): R9 2.911(d)(5)(ii) Applicant filing We, [ning bo rui qi shang mao you xian gong si] (“the applicant”) certify that, as of the date of the filing of the application, the applicant is not identified NOTE 1 on the “Covered List” NOTE 2 , established pursuant to §1.50002 of this chapter, as an entity producing covered communications equipment. Yours sincerely, Name: Kunkun Zhang Date: Mar. 11, 2024 Title: Manager Company name: ning bo rui qi shang mao you xian gong si Signature: NOTE 1 Delete option not applicable to this application. NOTE 2 “Covered List ”; is the List of Equipment and Services Covered By Section 2 of The Secure Networks Act, available at https://www.fcc.gov/supplychain/coveredlist References; 1) 986446 D01 Covered Equipment v01 https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=325672 2) Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-national-security-threats-to-the-com munications-supply-chain-through-the
ning bo rui qi shang mao you xian gong si Agent Authorization Company: ning bo rui qi shang mao you xian gong si Address: Room 12-1, building 052, No. 696, Yongfeng West Road, Haishu District, Ningbo City, Zhejiang, China Product Name: Treadmill Model Number(s): R9 Product Description: Treadmill We authorize MiCOM Labs Inc., 575 Boulder Court, Pleasanton, California 94566, USA, to act on our behalf on all matters concerning the certification of above named equipment. We declare that MiCOM Labs Inc. is allowed to forward all information related to the approval and certification of equipment to the regulatory agencies as required and to discuss any issues concerning the approval application. Any and all acts carried out by MiCOM Labs on our behalf shall have the same effect as acts of our own. Signature: Date: Mar. 11, 2024 Name: Kunkun Zhang Title: Manager Company: ning bo rui qi shang mao you xian gong si
ning bo rui qi shang mao you xian gong si Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 USA Date: Mar. 11, 2024 Subject; Request for Confidentiality FCC ID: 2A7KM-R9 To Whom It May Concern, Pursuant to the provisions of the Commission’s rules Title 47 Sections §0.457 and §0.459, we are requesting the Commission to withhold the following attachment(s) as confidential documents from public disclosure indefinitely. These documents contain detailed system and equipment descriptions and are considered as proprietary information in operation of the equipment. The public disclosure of these documents might be harmful to our company and would give competitors an unfair advantage in the market. Schematic Diagram Block Diagram Parts List Operational Description Tune-up Procedure In additional to above mentioned documents, in order to comply with the marketing regulations in Title 47 CFR §2.803 and the importation rules in Title 47 CFR §2.1204, while ensuring that business sensitive information remains confidential until the actual marketing of newly authorized devices, we request Short Term Confidentiality of the following attachment(s); External Photos Test Setup Photos Internal Photos User Manual For 45 days, pursuant to Public Notice DA 04-1705. OR For 180 days pursuantto KDB 726920 D01. It is our understanding that all measurement test reports, FCC ID label format and correspondence during the certification review process cannot be granted as confidential documents and this information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: Kunkun Zhang Title: Manager
FCC ID LABEL: Ca. 20mm x 30mm Label Location FCC ID: 2A7KM-R9
FCC RF Exposure EUT Description: Treadmill Model No.: R9 FCC ID: 2A7KM‐R9 1. Limits According to KDB 447498 D01 General RF Exposure Guidance v06 The 1‐g and 10‐g SAR test exclusion thresholds for 100 MHz to 6 GHz at test separation distances ≤50 mm are determined by: [(max power of channel, including tune‐up tolerance, mW)/(min. test separation distance, mm)] ·[√ f(GHz)]≤3.0 for 1‐g SAR and ≤ 7.5 for 10‐g extremity SAR, Where: Result=P/D*√F F= the RF channel transmit frequency in GHz P=Maximum turn‐up power in mw D=Min. test separation distance in mm 2. Test Result of RF Exposure Evaluation Frequency (MHz) Output power (dBm) Tune Up Power (dBm) Max Tune Up power (dBm/mW) Min test separation distance (mm) ResultLimit (mW/cm 2 ) SAR Test Exclusion 2440 ‐0.38 ‐1±1 0/1 5 0.3123.0 Pass Note: PK Output power= conducted power. Conducted power see the test report HK2401150270‐E, antenna gain= 0dBi Per KDB 447498 D01, when the minimum test separation distance is < 5 mm, a distance of 5 mm is applied to determine RF Exposure test exclusion. The test exclusion threshold is 0.312 which is<= 3, RF Exposure testing is not required. Note: Exclusion Thresholds Results=[(max. power of channel, including tune-up tolerance, mW)/(min. test separation distance, mm)] ·[√f (GHz)] f(GHz) is the RF channel transmit frequency in GHz Distance=5mm
Antenna Describe 1.Antenna Describe: 2. External View Drawing: Picture of Antenna Antenna PlateIFA Antenna Gain0 dBi Frequency Range2402 - 2480 MHz Connector TypePCB Model NameFS-BT-XX Company NameFitShow (Xiamen) Information Technology Co., Ltd 3.Test Data Frequency2.4GHz 2.41GHz 2.42GHz 2.43GHz 2.44GHz 2.45GHz 2.46GHz 2.47GHz 2.48GHz 2.485GHz Horizontal () H Peak EIRP (dBi)-0.47-1.23-2.1-2.23-2.18-2.17-1.96-2.5-3.35-4.05 H Directivity (dBi)4.454.284.083.893.873.974.124.234.234.18 H Efficiency (dB)-4.92-5.51-6.18-6.12-6.05-6.14-6.08-6.73-7.58-8.23 H Efficiency (%)32.2128.1224.124.4324.8324.3224.6621.2317.4615.03 H Gain (dBi)-0.47-1.23-2.1-2.23-2.18-2.17-1.96-2.5-3.35-4.05 Maximum H Value (dBi)-0.47-1.23-2.1-2.23-2.18-2.17-1.96-2.5-3.35-4.05 Minimum H Value (dBi)-32.5-38.32 -39.99 -45.96 -42.99 -39.14 -36.62 -33.55 -32.89 -34.78 Vertical () V Peak EIRP (dBi)-7.95-8.31-9.05-9.17-8.59-8.09-7.56-7.73-8.09-8.6 V Directivity (dBi)5.075.25.024.754.955.155.165.175.295.33 V Efficiency (dB)-13.02 -13.51 -14.07 -13.92 -13.54 -13.24 -12.72-12.9-13.38 -13.93 V Efficiency (%)4.994.463.924.064.434.745.355.134.594.05 V Gain (dBi)-7.95-8.31-9.05-9.17-8.59-8.09-7.56-7.73-8.09-8.6 Maximum V Value (dBi)-7.95-8.31-9.05-9.17-8.59-8.09-7.56-7.73-8.09-8.6 Minimum V Value (dBi) -42.86 -40.86 -37.04 -41.11 -44.37 -38.86-44.8-44.22 -39.58 -39.93 4 、Test Pattern 2.4GHzUp View2.4GHzDown View2.4GHzFront View 2.45GHzUp View 2.45GHzDow n View 2.45GHzFro nt View 2.485GHzUp View 2.485GHzDo wn View 2.485GHzFr ont View 2.4GHz@Theta 0.0 Horizontal 2.4GHz@Theta 0.0 Vertical 2.4GHz@Theta 0.0 Total 2.45GHz@Theta 0.0 Horizontal 2.45GHz@Theta 0.0 Vertical 2.45GHz@Theta 0.0 Total 2.485GHz@Theta 0.0 Horizontal 2.485GHz@Theta 0.0 Vertical 2.485GHz@Theta 0.0 Total 2.4GHz@Theta 0.0 Horizontal 2.4GHz@Theta 0.0 Vertical 2.4GHz@Theta 0.0 Total 2.45GHz@Theta 0.0 Horizontal 2.45GHz@Theta 0.0 Vertical 2.45GHz@Theta 0.0 Total 2.485GHz@Theta 0.0 Horizontal 2.485GHz@Theta 0.0 Vertical 2.485GHz@Theta 0.0 Total
Page 1 of 44 Report No.: HK2401150270-E FCC Test Report Test report On Behalf of ning bo rui qi shang mao you xian gong si For Treadmill Model No.: R9 FCC ID: 2A7KM-R9 Prepared For : ning bo rui qi shang mao you xian gong si Room 12-1, building 052, No. 696, Yongfeng West Road, Haishu District, Ningbo City, Zhejiang, China Prepared By : Shenzhen HUAK Testing Technology Co., Ltd. 1-2/F., Building B2, Junfeng Zhongcheng Zhizao Innovation Park, Heping, Fuhai Street, Bao’an District, Shenzhen, Guangdong, China Date of Test: Jan.15, 2024 ~ Feb. 22, 2024 Date of Report: Feb. 22, 2024 Report Number: HK2401150270-E Page 2 of 44 Report No.: HK2401150270-E Test Result Certification Applicant’s name ................... : ning bo rui qi shang mao you xian gong si Address .................................... : Room 12-1, building 052, No. 696, Yongfeng West Road, Haishu District, Ningbo City, Zhejiang, China Manufacture's Name .............. : ning bo rui qi shang mao you xian gong si Address .................................... : Room 12-1, building 052, No. 696, Yongfeng West Road, Haishu District, Ningbo City, Zhejiang, China Product description Trade Mark ................................. : BOTORRO Product name ............................. : Treadmill Model and/or type reference .. : R9 Standards ................................ : 47 CFR FCC Part 15 Subpart C 15.247 KDB 558074 D01 15.247 Meas Guidance v05r02 ANSI C63.10: 2013 This publication may be reproduced in whole or in part for non-commercial purposes as long as the Shenzhen HUAK Testing Technology Co., Ltd. is acknowledged as copyright owner and source of the material. Shenzhen HUAK Testing Technology Co., Ltd. takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. Date of Test .............................................. : Date (s) of performance of tests ................ : Jan.15, 2024 ~ Feb. 22, 2024 Date of Issue ............................................. : Feb. 22, 2024 Test Result ................................................. : Pass Testing Engineer : ( Len Liao) Technical Manager : (Sliver Wan) Authorized Signatory : (Jason Zhou) Page 3 of 44 Report No.: HK2401150270-E Contents Page 1 Test Summary ................................................................................................................................................ 5 1.1 Test Description ......................................................................................................................................... 5 1.2 Measurement Uncertainty ......................................................................................................................... 6 1.3 Information of the Test Laboratory ............................................................................................................ 6 2 General Information ....................................................................................................................................... 7 2.1 General Description of EUT ...................................................................................................................... 7 2.2 Description of Test Conditions .................................................................................................................. 9 2.3 Description of Test Setup ........................................................................................................................ 10 2.4 DESCRIPTION OF SUPPORT UNITS .................................................................................................... 11 3 Equipments List for All Test Items ............................................................................................................. 12 4 Test Result .................................................................................................................................................... 14 4.1 Antenna Requirement.............................................................................................................................. 14 4.2 Conduction Emissions Measurement ...................................................................................................... 15 4.3 Radiated Emissions Measurement .......................................................................................................... 19 4.4 Maximum Output Power Measurement ................................................................................................... 28 Maximum Peak Conducted Output Power (dBm) .............................................................................................. 28 4.5 Power Spectral Density ........................................................................................................................... 29 4.6 6db Bandwidth ......................................................................................................................................... 32 4.7 Occupied Bandwidth ................................................................................................................................ 35 4.8 Band Edge ............................................................................................................................................... 36 4.9 Conducted Spurious Emissions .............................................................................................................. 38 5 Test Setup Photo ......................................................................................................................................... 42 6 Photos of the EUT ........................................................................................................................................ 44 Page 4 of 44 Report No.: HK2401150270-E ** Modified History ** Revision Description Issued Data Remark Revision 1.0 Initial Test Report Release Feb. 22, 2024 Jason Zhou Page 5 of 44 …
Text truncated - open the document above for the full version.
Radiated Emission Conducted Emission
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 920.00 µW |
Rowing Machine
Equipment Class
DTS - Digital Transmission System