
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
MXC-545 User Manual Contents...............................................................................1 β’ Introduction o Overview........ ........................................................................2 o Box Contents........ ....................................................................2 o Buttons Functions...... .................................................................2 o Getting Started β In stalling the battery.....................................................3 o Installing the Battery.... ..................................................................3 o Charging the Battery...... ................................................................3 o Powering ON/OFF........................ .......................................................................................4 β’ Making Phone Calls o Making a Call using the Keypad.. ..........................................................4 o Making a Call from Contacts.. .............................................................4 o Answering a Call.. ........................................................................4 o Adjusting the Volume.. ....................................................................4 β’ Messages o SMS Settings. . ............................................................................4 o MMS Settings..............................................................................4 o Composing a SMS. . .......................................................................4 o Composing a MMS.. .......................................................................4 o Save the info as a Draft.. ...................................................................5 o Reading and Replying to a Message.. .......................................................5 o Changing the notification for a new Text and Multimedia Message....................................................5 o Fo rwarding Messages..............................................................................................................................5 o Deleting Messages............................................................................................................5 β’ Phone Settings o Sounds..............................................................................................................................6 o Phone Settings..................................................................................................................6 o Display..............................................................................................................................6 o Call Settings........................................................................................................................6 o Security..............................................................................................................................6 β’ Ma naging Contacts o Creating a New Contact.......................................................................................................7 o Searching for a Contact...................................................................................................8 o Deleting a Contact.........................................................................................................8 β’ Using Bluetooth o Turning ON the Bluetooth....................................................................................................8 o Pairing with a Bluetooth Device............................................................................................8 o Un-pairing a Bluetooth Device..............................................................................................8 o Sending and Receiving Files.................................................................................................9 β’ Tools o Calendar...............................................................................................................................9 o Games............................................................................................................................9 o Notes...................................................................................................................................9 o Camera................................................................................................................................9 o Recorder............................................................................................................................9 o Alarm..................................................................................................................................9 o World Clock......................................................................................................................10 o Calculator...........................................................................................................................10 o Stopwatch........................................................................................................................10 o Bluetooth..........................................................................................................................10 β’ File Manager o Graphics...........................................................................................................................10 o Music..............................................................................................................................10 o My video..........................................................................................................................10 o Recordings........................................................................................................................11 o Themes..............................................................................................................................11 o Downloads........................................................................................β¦
Text truncated - open the document above for the full version.
External Photos 1. EUT front view 2. EUT rear view 3. EUT left side view 4. EUT right side view 5. EUT top view 6. EUT bottom view 7. Accessories
Internal Photos 1. EUT uncover view 2. Mainboard front view 3. Mainboard rear view 4. RF chip view 5. Main antenna view 6. Diversity antenna view
MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 2 0f 4 SZ15010051S01 1. EUT Right Head Touch Cheek Position 2. EUT Right Head Tilt15 Position MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 3 0f 4 SZ15010051S01 3. EUT Left Head Touch Cheek Position 4. EUT Left Head Tilt15 Position MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 4 0f 4 SZ15010051S01 5. Side Position with earphone 6. Back Side Position 10mm 10mm MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 5 0f 4 SZ15010051S01 Liquid Level Photo Head Liquid Liquid depth: 15.1cm Liquid Level Photo Body Liquid
MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 2 0f 99 SZ15010051S01 DIRECTORY TEST REPORT DECLARATION βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 4 1.TECHNICAL INFORMATION ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 5 1.1 IDENTIFICATION OF APPLICANT ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 5 1.2 IDENTIFICATION OF MANUFACTURER βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 5 1.3 EQUIPMENT UNDER TEST (EUT) ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 5 1.3.1 PHOTOGRAPHS OF THE EUT ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ5 1.3.2 IDENTIFICATION OF ALL USED EUT ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ6 1.4 APPLIED REFERENCE DOCUMENTS ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 6 1.5 DEVICE CATEGORY AND SAR LIMITS βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 6 2. SPECIFIC ABSORPTION RATE (SAR) ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 7 2.1 INTRODUCTION ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 7 2.2 SAR DEFINITION ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 7 3. SAR MEASUREMENT SETUP ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 8 3.1 THE MEASUREMENT SYSTEM ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 8 3.2 PROBE βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 8 3.3 PROBE CALIBRATION PROCESS βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 10 3.3.1 DOSIMETRIC ASSESSMENT PROCEDURE βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 10 3.3.2 FREE SPACE ASSESSMENT PROCEDURE βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 10 3.3.3 TEMPERATURE ASSESSMENT PROCEDURE βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 10 3.4 PHANTOM ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 11 3.5 DEVICE HOLDER βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 11 4. TISSUE SIMULATING LIQUIDS βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 12 5. UNCERTAINTY ASSESSMENT βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 14 5.1 UNCERTAINTY EVALUATION FOR EUT SAR TEST ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 14 5.2 UNCERTAINTY FOR SYSTEM PERFORMANCE CHECK βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 15 MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 3 0f 99 SZ15010051S01 6. SAR MEASUREMENT EVALUATION ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 17 6.1 SYSTEM SETUP βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 17 6.2 VALIDATION RESULTS βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 18 7. OPERATIONAL CONDITIONS DURING TEST ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 19 7.1 INFORMATION ON THE TESTING ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 19 7.2 BODYβWORN CONFIGURATIONS βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 20 7.3 MEASUREMENT PROCEDURE βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 20 7.4 DESCRIPTION OF INTERPOLATION/EXTRAPOLATION SCHEME βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 21 8. MEASUREMENT OF CONDUCTED OUTPUT POWER βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 22 9. TEST RESULTS LIST ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 23 ANNEX A GRAPH TEST RESULTS ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ 26 ANNEX B GENERAL INFORMATION βββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ¦
Text truncated - open the document above for the full version.
Report No.: BL-SZ1520007-701 2 / 83 Revision History Version Issue Date Revisions Rev. 01 Feb. 02, 2015 Additional report base on test report BL-SZ1440002-701 TABLE OF CONTENTS 1 GENERAL INFORMATION ..................................................................................................................... 4 1.1 Identification of the Testing Laboratory ............................................................................................. 4 1.2 Identification of the Responsible Testing Location ............................................................................ 4 1.3 Test Environment Condition .............................................................................................................. 4 1.4 Announce .......................................................................................................................................... 4 2 PRODUCT INFORMATION ..................................................................................................................... 6 2.1 Applicant ........................................................................................................................................... 6 2.2 Manufacturer ..................................................................................................................................... 6 2.3 General Description for Equipment under Test (EUT) ...................................................................... 6 2.4 Technical Information ........................................................................................................................ 6 2.5 EUT Air Interface description ............................................................................................................ 7 2.6 Ancillary Equipment .......................................................................................................................... 7 3 SUMMARY OF TEST RESULTS ............................................................................................................. 8 3.1 Test Standards .................................................................................................................................. 8 3.2 HAC Test Configuration and Setting ................................................................................................. 8 3.3 Summary Of HAC M-Rating .............................................................................................................. 8 3.4 ANSI C63.19 HAC RF Categories .................................................................................................... 9 3.5 HAC Test Uncertainty ..................................................................................................................... 10 4 SATIMO HSC MEASUREMENT SYSTEM ............................................................................................ 11 4.1 Definition of Hearing Aid Compatibility (HAC) ................................................................................. 11 4.2 SATIMO HAC System ..................................................................................................................... 11 5 SYSTEM VERIFICATION ...................................................................................................................... 17 5.1 System Check Procedure ............................................................................................................... 17 5.2 Validation Procedure ....................................................................................................................... 17 5.3 System Validation Setup ................................................................................................................. 18 5.4 System Validation Results .............................................................................................................. 18 Report No.: BL-SZ1520007-701 3 / 83 6 Probe Modulation Factor (PMF) ............................................................................................................ 19 6.1 PMF Summary ................................................................................................................................ 20 7 HAC RF IMMUNITY MEASUREMENT PROCEDURES ....................................................................... 21 7.1 HAC Measurement Process Diagram ............................................................................................. 21 7.2 HAC RF Test Setup ........................................................................................................................ 22 7.3 RF Emission Measurement Procedure ........................................................................................... 22 8 CONDUCTED RF OUPUT POWER ...................................................................................................... 23 9 11 HAC RF Emission Test Results ........................................................................................................ 24 9.1 E-Filled Emission Test Results ....................................................................................................... 24 9.2 H-Filled Emission Test Results ....................................................................................................... 24 10 TEST EQUIPMENTS LIST .................................................................................................................... 25 11 REFERENCES ...................................................................................................................................... 26 ANNEX A HAC TEST RESULT OF SYSTEM VERIFICAION ................................................................... 27 ANNEX B HAC TEST SETUP PHOTOS .................................................................................................. 31 ANNEX C HAC RF MEASUREMENT RESULT ........................................................................................ 32 ANNEX D CALIBRATIOβ¦
Text truncated - open the document above for the full version.
Report No.: BL-SZ1520007-702 2 / 57 Revision History Version Issue Date Revisions Rev. 01 Feb 02, 2015 Additional report base on test report BL-SZ1440002-702 TABLE OF CONTENTS 1 GENERAL INFORMATION ..................................................................................................................... 4 1.1 Identification of the Testing Laboratory ............................................................................................. 4 1.2 Identification of the Responsible Testing Location ............................................................................ 4 1.3 Test Environment Condition .............................................................................................................. 4 1.4 Announce .......................................................................................................................................... 4 2 PRODUCT INFORMATION ..................................................................................................................... 6 2.1 Applicant ........................................................................................................................................... 6 2.2 Manufacturer ..................................................................................................................................... 6 2.3 General Description for Equipment under Test (EUT) ...................................................................... 6 2.4 Technical Information ........................................................................................................................ 6 2.5 EUT Air Interface description ............................................................................................................ 7 2.6 Ancillary Equipment .......................................................................................................................... 7 3 SUMMARY OF TEST RESULTS ............................................................................................................. 8 3.1 Test Standards .................................................................................................................................. 8 3.2 HAC Test Configuration and Setting ................................................................................................. 8 3.3 Summary Of HAC T-Rating ............................................................................................................... 8 3.4 ANSI C63.19 HAC T-Coil Categories ................................................................................................ 9 3.5 HAC Test Uncertainty ..................................................................................................................... 11 4 SATIMO HSC MEASUREMENT SYSTEM ............................................................................................ 12 4.1 Definition of Hearing Aid Compatibility (HAC) ................................................................................. 12 4.2 SATIMO HAC System ..................................................................................................................... 12 5 T-Coil AUDIO VALIDATION .................................................................................................................. 16 5.1 System Audio Validation ................................................................................................................. 16 5.2 System Validation Results .............................................................................................................. 16 6 HAC MEASUREMENT PROCEDURES ................................................................................................ 17 6.1 HAC Measurement Process Diagram ............................................................................................. 17 Report No.: BL-SZ1520007-702 3 / 57 6.2 HAC T-Coil Test Setup .................................................................................................................... 18 6.3 T-Coil Measurement Procedure ...................................................................................................... 18 7 CONDUCTED RF OUPUT POWER ...................................................................................................... 20 8 HAC T-Coil Test Results ........................................................................................................................ 21 9 TEST EQUIPMENTS LIST .................................................................................................................... 22 10 REFERENCES ...................................................................................................................................... 23 ANNEX A HAC T-Coil TEST SETUP PHOTOS ........................................................................................ 24 ANNEX B HAC RF MEASUREMENT RESULT ........................................................................................ 25 ANNEX C CALIBRATION FOR PROBE AND DIPOLE ............................................................................ 44 Report No.: BL-SZ1520007-702 4 / 57 1 GENERAL INFORMATION 1.1 Identification of the Testing Laboratory Company Name Shenzhen BALUN Technology Co., Ltd. Address Block B, 1st FL, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China Phone Number +86 755 6683 3402 Fax Number +86 755 6182 4271 1.2 Identification of the Responsible Testing Location Test Location Shenzhen BALUN Technology Co., Ltd. Address Block B, 1st FL, Baisha Science and Technology Park, Shahe Xi Road, Nanshan District, Shenzhen, Guangdong Province, P. R. China Accreditation Certificate The laboratory has been listed by Industry Canada to perform electromagnetic emission measurements. The recognition numbers of test site are 11524A-1. The laboratory has been listed by US Federal Communications Commission to perform electromaβ¦
Text truncated - open the document above for the full version.
Report No.: SZ15010051W01 MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 2 0f 58 TABLE OF CONTENTS 1. GENERAL INFORMATION ...................................................................................................................... 4 1.1 EUT DESCRIPTION .................................................................................................................................... 4 1.2 TEST STANDARDS AND RESULTS .............................................................................................................. 5 1.3 FACILITIES AND ACCREDITATIONS ............................................................................................................. 6 2. 47 CFR PART 2, PART 22H & 24E & 90S REQUIREMENTS .............................................................. 7 2.1 CONDUCTED RF OUTPUT POWER ............................................................................................................. 7 2.2 PEAK TO AVERAGE RADIO ....................................................................................................................... 14 2.3 99% OCCUPIED BANDWIDTH ................................................................................................................... 17 2.4 EMISSIONS MASK MEASUREMENT ........................................................................................................... 23 2.5 FREQUENCY STABILITY ............................................................................................................................ 25 2.6 CONDUCTED OUT OF BAND EMISSIONS ................................................................................................... 28 2.7 BAND EDGE ............................................................................................................................................. 38 2.8 TRANSMITTER RADIATED POWER (EIRP/ERP) ....................................................................................... 41 2.9 RADIATED OUT OF BAND EMISSIONS ....................................................................................................... 47 Change History Issue Date Reason for change 1.0 Feb 03, 2015 First edition Report No.: SZ15010051W01 MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 4 0f 58 1. GENERAL INFORMATION 1.1 EUT Description Frequency Range ................ : CDMA 800MHz (BC 0) Tx: 824.7 β 848.31 MHz; Rx: 869.7-893.31MHz CDMA 1900MHz: (BC 1) Tx: 1851.25 MHz -1908.75 MHz; Rx: 1931.25 MHz-1988.75 MHz CDMA 800MHz (BC 10) Tx: 817.9 β 823.1 MHz; Rx: 903.8-914.2MHz Modulation Type ................... : CDMA 1X Antenna Type ....................... : PIFA Antenna Antenna Gain ....................... : CDMA800(BC 0):1 dBi CDMA800(BC 10): 1 dBi CDMA1900(BC 1): -1 dBi Emission Designators .......... : CDMA800(BC 0):1M27F9W CDMA1900(BC 1):1M26F9W CDMA800(BC 10):1M26F9W Note 1: The transmitter (Tx) frequency arrangement of the Cellular 800MHz band used by the EUT can be represented with the formula F(n)=824.2+0.2*(n-128), 128<=n<=251; the lowest, middle, highest channel numbers (ARFCHs) used and tested in this report are separately BC0 1013 (824.7MHz), 384 (836.52MHz) and 777 (848.31MHz), and BC10 476 (817.9MHz), 526 (819.1MHz) and 684 (823.1MHz) Note 2: The transmitter (Tx) frequency arrangement of the CDMA 1900MHz band used by the EUT can be represented with the formula F(n)=1850.2+0.2*(n-512), 512<=n<=810; the lowest, middle and highest channel numbers (ARFCHs) used and tested in this report are separately 25 (1851.25MHz), 600 (1880.0MHz) and 1175 (1908.75MHz). Note 3: For a more detailed description, please refer to Specification or Userβs Manual supplied by the applicant and/or manufacturer. Report No.: SZ15010051W01 MORLAB GROUP FL1-3, Building A, FeiYang Science Park, No.8 LongChang Road, Tel: 86-755-36698555 Fax: 86-755-36698525 Block67, BaoAn District, ShenZhen , GuangDong Province, P. R. ChinaHttp://www.morlab.com E-mail: [email protected] Page 5 0f 58 1.2 Test Standards and Results The objecβ¦
Text truncated - open the document above for the full version.
FL.3, Building A, FeiYang Science Park Β· ShenZhen, GuangDong Province Β· China
| # | Rule Parts | Frequency Range | Power Output | Emission | Tolerance |
|---|---|---|---|---|---|
| 3 | 9 | 817.9 MHz - 823.1 MHz | 959.00 mW | 1M26F9W | 0.043 ppm |

CDMA 1x Advanced Feature Phone
Equipment Class
PCE - PCS Licensed Transmitter held to ear