FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. GuangDong ELX Lighting Technology CO.,Ltd./
  3. 2ABAUGDD128-226

2ABAUGDD128-226High Bay Luminaire

GuangDong ELX Lighting Technology CO.,Ltd.
High Bay Luminaire - FCC ID 2ABAUGDD128-226 - GuangDong ELX Lighting Technology CO.,Ltd.
Click to zoom

Application Details

Equipment Class
8CC - Part 18 Consumer Device
Date of Grant
Nov 27, 2013
Application Purpose
Original Equipment
Date of Application
Nov 27, 2013
Equipment Note
High Bay Luminaire
Frequency Range
0.25000000 - 0.25000000
Company
GuangDong ELX Lighting Technology CO.,Ltd.
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

T High Bay Lamp (Please read the instruction manual before installation and use the product) Guangdong ELX Lighting Technology Co,LTD Address:NO.5 Liangyuan Road,Duruan Down,Pengjiang District,Jiangmen City,GuangDong,China Postcode:529000 Telephone:0750-3488206 Fax:0750-3488216 E-mail: [email protected] http://www.gdelx.com 1. Structure chart 2. Electrical schematic diagram Electrical connection symbol ―lamp high voltage side L―AC input wire ―safety ground N―AC input zero 3. The electrical connection diagram 4. Installation Instructions: 5. Main performance and technical parameters working frequency:250KHz nominal voltage:110-277VAC power factor:≥0.95 color temperature:5000K±300K operating humidity:≤90% 6. Install and use the matters needing attention 1.1 Install the basic requirements Based on the requirement of safety, at the same time to prevent the electromagnetic radiation, electrodeless lamp lighting installation must be ground wire, or not failure as a result of the grounding line and safety accident shall not be responsible for the company. The lamps and lanterns for the failure of the installation, maintenance and replacement of any parts must be conducted by the relevant qualifications of the electrical professionals, otherwise may cause failure of installation and safety accidents. 1.2 installation program Broke open the packing cases, check if packing goods is complete → Broke open the packing cases, check if packing goods is complete →According to the actual need, mount or lifting the lamps and lanterns → According to the electrical connection diagram connected lines → Using shaking table confirm the insulation level of lamps and lanterns → Try the power of lamps and lanterns → Finish. 1.3 Install and use the matters needing attention ① Installation of this product must use the company with the corresponding specifications of the electronic ballast, not ballast series and other products. ② High power, large area with lights, lighting principle to independence. ③ To stick to the installation of lamps and lanterns fasteners must be strong. ④ Product ballast earthing terminal to be connected to the shell of lamps and lanterns is good, the connection must be ground wire. ⑤ Power supply voltage allows the rated voltage of + 20% - 80% range. ⑥ During maintenance, must disconnect the power supply, and can be carried out after tubes temperature drop, prevent burns or get an electric shock accident. ⑦ Adopt the plug-in connection between lamp and electronic rectifier, it is strictly prohibited under the condition of electricity plug tubes. ⑧ Adopt the plug-in connection between lamp and electronic rectifier, it is strictly prohibited under the condition of electricity plug tubes. ⑨ Lamps and lanterns can't be modified outside of the specified wattage other bulb or ballast ⑩ The product must hold national electrician operators operating installation of recognition. 7. Safety precautions Please do not use this product for poor ventilation or high temperature, underwater, inflammable and explosive places. Its installation and maintenance should be in the normal work can work safely, lest produce danger to people and the environment. This lamps and lanterns for the failure of the installation, maintenance and replacement of any parts must be conducted by the professionals, otherwise it may have on the personal injury. Electronic ballast output voltage of 400 v, it is forbidden to touch output terminals under working state. Lamps and lanterns of the shell must be grounded, at the same time the need to guarantee the coupler base and electronic ballast with shell and grounding. Lamps and lanterns of surface temperature of about 60 °C at work, please do not touch lamps shell in the studio of lamps and lanterns, in order to avoid scald. 8. Trouble shooting fault phenomenon fault analysis abort situation handling way not bright when the light was on due to loose tubes coupler base, tube parameter is not stable modulator tube the new fixed tube or replace tubes the light not bright, but a slight ignition sound start more due to rupture or scraping the broken copper line arranged modulator tube tubes leak, replace the bulb lamp is not bright, no ignition because of the electronic ballast failure cause electronic ballast replace the electronic electronic ballast the light not bright, but start the obvious flicker due to electronic failure electronic ballast change the electronic ballast lamp light, normal light after a period of time not started again after a period of time or the same phenomenon such as due to the electronic ballast protect too sensitive electronic ballast observation power, if the power within the normal range, the change of electronic ballasts Lamp light when power significantly larger, lamp is red, or work after a period of time is not bright Caused by tube slow leak or vacuum degree is not enough modulator tube Change the new modulator tube 9. Storage and transportation The lamps and lanterns should be stored in shady and cool place. The storage temperature range of lamps and lanterns is to 40 °C to + 50 °C. The lamps and lanterns storage humidity of 90% or less. Transportation should contain the packing when the lamps and lanterns, please according to the packing and handling when placed outside logo direction stacked, the lamps and lanterns together the largest number must not exceed four. 10. Please read the following terms carefully before using 1. The power should be cut off when installing or changing. 2. Please touch the plastic area when installing or changing, do not touch the glass tube in order to protect this lamp. 3. Please do not use in these areas, such as easy fire, burning, humidity. 4. This lamp is not fit tof the exchanging circuit and closed linhting. 5. The temperature from -2°C to 60°C when using. Humidity is less than 80 percent. 6. Please check the installing between the lamp ang the lamp base is good or illuminate or twinkle, if you can not find where is…

Text truncated - open the document above for the full version.

External Photos

1. Photos of the EUT Model: GDD128-WJ150/T Model: GDD226-WJ200/T Model: GDD226-WJ300/T

ID Label/Location Info

SIZE:60mm*30mm

Internal Photos

1. Photos of the EUT Model: GDD128-WJ150/T \ Model: GDD226-WJ200/T Model: GDD226-WJ300/T

Test Report

FCC VERIFICATION TEST REPORT FOR Issued By: Dongguan Dongdian Testing Service Co., Ltd. Add: No. 17, Zongbu Road 2, Songshan Lake Sci&Tech, Industry Park, Dongguan City, Guangdong Province, China, 523808 Tel: +86-0769-22891499 Http://www.dgddt.com Applicant : GuangDong ELX Lighting Technology CO.,Ltd Address : NO. 5 Liangyuan Road, Duran Town, Pengjiang District, Jiangmen City, GuangDong, China Equipment under Test : High Bay Luminaire Model No : GDD128-WJ150/T, GDD226-WJ200/T, GDD226-WJ300/T, FCC ID : 2ABAUGDD128-226 Manufacturer : GuangDong ELX Lighting Technology CO.,Ltd Address : NO. 5 Liangyuan Road, Duran Town, Pengjiang District, Jiangmen City, GuangDong, China Report No: DDT-RE130281 Issued Date: 2013/11/19 Dongguan Dongdian Testing Service Co., Ltd Report No:DDT-RE130281 Page 2 of 32 TABLE OF CONTENTS Test report declare ....................................................................................................................... 3 1. Summary of test results ............................................................................................................... 3 2. General test information .............................................................................................................. 3 2.1. Description of EUT ..................................................................................................................... 3 2.2. Accessories of EUT..................................................................................................................... 3 2.3. Assistant equipment used for test ................................................................................................ 3 2.4. Block diagram EUT configuration for test..................................................................................3 2.5. Test environment conditions ....................................................................................................... 3 2.6. Test laboratory............................................................................................................................. 3 2.7. Measurement uncertainty ............................................................................................................ 3 3. Power Line Conducted Emission Test ........................................................................................ 3 3.1. Test equipment ............................................................................................................................ 3 3.2. Block diagram of test setup ......................................................................................................... 3 3.3. Power Line Conducted Emission Limits(RF lighting devices) ................................................... 3 3.4. Test Procedure............................................................................................................................. 3 3.5. Test Result................................................................................................................................... 3 4. Radiated emission test ................................................................................................................. 3 4.1. Test equipment ............................................................................................................................ 3 4.2. Block diagram of test setup ......................................................................................................... 3 4.3. Radiated emission limit(RF lighting devices) ............................................................................. 3 4.4. Test Procedure............................................................................................................................. 3 4.5. Test result .................................................................................................................................... 3 5. Test setup photograph ................................................................................................................. 3 5.1. Photos of power line conducted emission test............................................................................. 3 5.2. Photos of radiated emission test .................................................................................................. 3 6. Photos of the EUT ....................................................................................................................... 3 Dongguan Dongdian Testing Service Co., Ltd Report No: DDT-RE130281 Page 3 of 32 TEST REPORT DECLARE Test Standard Used: FCC Part 18:2010; FCC/OST MP-5 (1986) We Declare: The equipment described above is tested by Dongguan Dongdian Testing Service Co., Ltd and in the configuration tested the equipment complied with the standards specified above (class B). The test results are contained in this test report and Dongguan Dongdian Testing Service Co., Ltd is assumed of full responsibility for the accuracy and completeness of these tests. After test and evaluation, our opinion is that the equipment provided for test compliance with the requirement of the above FCC standards. Report No: DDT-RE130281 Date of Test: 2013/10/17Date of Report: 2013/10/23 Prepared By: Approved By: ________________ _____________________ Leo Liu/Engineer Jamy Yu/EMC Manager Note: This report applies to above tested sample only. This report shall not be reproduced in parts without written approval of Dongguan Dongdian Testing Service Co., Ltd. Applicant : GuangDong ELX Lighting Technology CO.,Ltd Address : NO. 5 Liangyuan Road, Duran Town, Pengjiang District, Jiangmen City, GuangDong, China Equipment under Test : High Bay Luminaire Model No : GDD128-WJ150/T, GDD226-WJ200/T, GDD226-WJ300/T, FCC ID :2ABAUGDD128-226 Manufacturer : GuangDong ELX Lighting Technology CO.,Ltd Address : NO. 5 Liangyuan Road, Duran Town, Pengjiang District, Jiangmen City, GuangDong, China Dongguan Dongdian Testing Service Co., Ltd Report No: DDT-RE130281 Page 4 of…

Text truncated - open the document above for the full version.

Test Setup Photos

Dongguan Dongdian Testing Service Co., Ltd Report No: DDT-RE130281 Page 23 of 32 5. Test setup photograph 5.1. Photos of power line conducted emission test 5.2. Photos of radiated emission test

Contact Information

Applicant

Tan GuoZhen
[email protected]0750-3488206Fax: 0750-3488216

Test Firm

Dongguan Dongdian Testing Service Co.,LtdJamy Yu
[email protected]086-0769-22891499

Technical Specifications

#Rule PartsFrequency RangePower Output
1180.25 MHz - 0.25 MHz-
Confidentiality
Long Term