
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
1 set 1 set 1 set Packing List: Main body(Include telescopic rod) Base(Include Power supply cord) Remote controller User manual 1 set Remote controller User Manual This user manual is applicable to B4D product model. Please read this manualcarefully and keep it properly before using the product. Hot /Cool mode switch Cool-hot recycle mode 3-stage wind speed adjustment Kid's mode Mood light 3-stage wind speed display 5-speed temperature display Negative ion release display 5-speed temperature adjustment Product introduction When the dryer is powered on normally, if the remote control has power but cannot control the hair dryer, please re- pair the remote control as follows: Prepare:Make sure the hair dryer is powered on and the power button switch is pressed Press the on/off button of the remote control Remote controller Re-Connect Press touchable area for about 3 seconds, the hair dryer will make a "beep" sound, the mood light will flash, you can let it go at this time. After the hair dryer receives the pairing signal from the remote control, the mood light changes from blinking to steady light, the hair dryer starts to blow hot air, and the pairing is successful. 6. Press the button to illuminate the screen ,then you can adjust the hair 1 1 dryer with the remote controller. You can press the button to turn o ffthe hair dryer when the screen is on. 1 Installation guide 1 CAUTIONS AND NOTE This device contains licence-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canada’s licence-exempt RSS(s). Operation is subject to the following two conditions: (1) This device may not cause interference. (2) This device must accept any interference, including interference that may cause undesired operation of the device. Changes or modifications to this unit not expressly approved by the party responsible for compliance could void the user's authority to This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: Reorient or relocate the receiving antenna. Increase the separation between the equipment and receiver. Consult the dealer or an experienced radio/TV technician for help. operate the equipment. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. This appliance has a polarized plug (one blade is wider than the other).As a safety feature, this plug will fit in a polarized outlet only one way. If the plug does not fit fully in the outlet, reverse the plug.If it still does not fit, contact a qualified electrician. Do not attempt to defeat this safety feature. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference,and (2) this device must accept any interference received, including interference that may cause undesired operation. 2 1 Put the battery back into the remote Cr2032 Note:When the battery is replaced, if the remote controller can not control the hair dryer, please re-connect with the main body 2 The instructions of remote controller battery replacement If the display does not light up after the remote control is turned on, the battery may be insufficient. Please replace the battery as follows: + Remove the battery and replace a new one. When installing the battery,please note "+" is upward. Follow step 1 to push the small buckle to the right to unlock it, and at the same time pull out the curved buckle in the direction of step 2 to open the battery compartment. button battery please note “+”is upward This device contains licence-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canada’s licence-exempt RSS(s). Operation is subject to the following two conditions: (1) This device may not cause interference. (2) This device must accept any interference, including interference that may cause undesired operation of the device. L’émetteur/récepteur exempt de licence contenu dans le présent appareil est conforme aux CNR d’Innovation, Sciences et Développement économique Canada applicables aux appareils radio exempts de licence. L’exploitation est autorisée aux deux conditions suivantes : 1) L’appareil ne doit pas produire de brouillage; 2) L’appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible d’en compromettre le fonctionnement. Specification Product name Product model Rated voltage Date of manufacture Remote controller B4D 3V See commodity for details 3
Form: RFT-AMER-TCB-OP-19n Revision: 1 Page 1 of 1 Date: 1/25/2023 Shenzhen Topband Co., Ltd Attention: Application Examiner Re: Covered List, located at https://www.fcc.gov/supplychain/coveredlist and 47 CFR parts §2.903 and §2.911(d)(5)(ii) of the FCC rules Applicant: Shenzhen Topband Co., Ltd FCC ID: 2ADDW-24GB4D To whom it may concern, Shenzhen Topband Co., Ltd (“Applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to 47 CFR part §2.903 of the FCC rules and does not originate directly or indirectly from any company named on the covered list located in the link above or any subsidiary or affiliate thereof. Applicant further certifies that, as of the date of the filing of the application, the Applicant [is not] identified on the Covered List as an entity producing “covered” equipment and is not a subsidiary or affiliate of any such entity pursuant to 47 CFR part §1.50002 and required by 47 CFR part §2.911(d)(5)(ii) of the FCC rules. I HEREBY CERTIFY THAT I am authorized to make the representations above on behalf of the Applicant and agree to immediately notify Intertek if there is any change in the status identified above. ______________________________ [Signature of authorized Proprietor, Partner or Authorized Officer] [Printed Name] Ou Liang [Title] Certification engineer [Company name] Shenzhen Topband Co., Ltd [Date] 2023-02-22
Form: RFT-AMER-TCB-OP-19o Revision: 1 Page 1 of 1 Date: 1/25/2023 [Shenzhen Topband Co., Ltd] Attention: Application Examiner Re: Certification designating a U.S. agent for service of process pursuant to section 2.911(d)(7) of the FCC rules To whom it may concern, This letter is to confirm both [TUNNU INNOVATION, INC] (“Agent”) and [Shenzhen Topband Co., Ltd] (“Applicant”) acknowledge consent to obligations of each party pursuant to 47 CFR part §2.911(d)(7) of the FCC rules in regard to the agent for service of process. I [Ou Liang] HEREBY CERTIFY THAT I am authorized to make the representations above on behalf of the Applicant. I further acknowledge the requirement to maintain an agent extends for no less than one year after the termination of all marketing and importation or the conclusion of and commission-related proceeding involving the equipment and agree to immediately notify the FCC if there is any change in the status identified above. Applicant Company Name : Shenzhen Topband Co., Ltd Contact Name : Ou Liang Address : Topband Industrial Park,Liyuan Industrial Zone,Shiyan Town,Bao'An District, Shenzhen, 518108, China Telephone No : 15013453381 Email : [email protected] Applicant FRN : 0024006298 Signature: __________________________ Date: _______2023-02-16_____________________________ I [Li Yanqi] HEREBY CERTIFY THAT I am authorized to make the representations above on behalf of the Agent. I consent to the obligation to accept service of process on behalf of the applicant in regard to all certification applications to the FCC submitted by above applicant and agree to immediately notify the FCC if there is change in this representation. Agent Company Name : TUNNU INNOVATION, INC Contact Name : Li Yanqi Address : 92 CORPORATE PARK STE C 204 IRVINE, CA 92606 Telephone No : 1-626-6017206 Email : [email protected] Agent FRN : 0033438458 Signature: __________________ Date: _______2023-02-16____________________
Shenzhen Topband Co., Ltd [2023-02-22] Federal Communications Commission 445 12 th Street SW Washington, DC 20554 Subject: Limited Agency Agreement Shenzhen Topband Co., Ltd FCC ID: 2ADDW-24GB4D To Whom It May Concern: We, Shenzhen Topband Co., Ltd, hereby authorized Intertek Testing Services Shenzhen Ltd. Guangzhou Branch to act as our Agent for the purpose of preparing application for FCC ID number 2ADDW-24GA4D under all applicable parts of the FCC rules and regulations. The effective date of this limited agency agreement is 2023-02-22. The Limited Agency Agreement expires on 2023-08-21, unless sooner terminated or extended by written notice to Intertek Testing Services Shenzhen Ltd. Guangzhou Branch and the Federal Communications Commission. This is to advise that we are in full compliance with the Anti-Drug Abuse Act. The applicant is not subject to a denial of federal benefits pursuant to Section 5301 of the Anti-Drug Act of 1988, 21 U.S.C. 862, and no party to the application is subject to a denial of federal benefits pursuant to that section. If you have any questions or comments, please do not hesitate to contact me. Sincerely, [Signature] [Printed Name]Ou Liang [Type Title]Certification engineer
Shenzhen Topband Co., Ltd [2023-02-22] Attention: Application Examiner RE: Request for Confidentiality Applicant: Shenzhen Topband Co., Ltd FCC ID: 2ADDW-24GB4D To Whom It May Concern: Permanent Confidentiality [Complete this section if permanent confidentiality is requested] Request is hereby submitted by Shenzhen Topband Co., Ltd to withhold permanently from public review certain portions of the application for equipment certification for the referenced FCC identifiers. This request for confidentiality is made pursuant to 47 CFR 0.457(d) and 0.459 of the FCC Rules. In particular, the following sections of the application are to be kept permanently confidential: [Select one or more of items below, as appropriate] • Schematics • Detailed Block Diagrams • Detailed Operational/Functional Description Rationale for request for confidentiality: Shenzhen Topband Co., Ltd has invested considerable time and materials in research and development to produce the referenced product. [Permanent confidentiality: Disclosure of the permanently confidential portions of this application to competitors would not only give them significant competitive advantages in developing similar products, but would also disclose successful implementation of unpublished, leading edge technology developed by us.] If you have questions or need further information, please contact the undersigned. Since rely, [Signature] [Printed Name] Ou Liang [Type Title] Certification engineer [Company name] Shenzhen Topband Co., Ltd 1(1)
69.38 mm D W D A - 2 2 : 4 G D I B C 4 D C F B4D
Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Job No.: 230313158GZU FCC ID: 2ADDW-24GB4D RF Exposure Compliance Requirement Calculation formula: E (V/m) = (30*P*G) 0.5/d E = Electric Field (V/m) P = Peak RF output Power (W) G = EUT Antenna numeric gain (numeric) d = Separation distance between EUT and antenna (m) Remark: E(V/m)=10 X (dBUV/m) /20 ×10 -6 P=(E*d) 2 /30G in the formula above, d=3m, field strength= 89.6dBuV/m (max described by client), so EIRP= 0.2754mW The worst case test separation distance is 5mm. The product belongs to standalone portable device base the FCC rule part 2.1091&2.1093. The transmission frequencies of the device are between 100 MHz and 6 GHz. In KDB 447498 D01 v06: 4.3.1 Standalone SAR test exclusion considerations: The SAR Test Exclusion Threshold is calculated from: [(max. power of channel, including tune-up tolerance, mW)/(min. test separation distance, mm)] ·[√f(GHz)] ≤ 3.0 for 1-g SAR ⚫ f(GHz) is the RF channel transmit frequency in GHz ⚫ Power and distance are rounded to the nearest mW and mm before calculation 17 ⚫ The result is rounded to one decimal place for comparison The Max Conducted Output Power and SAR Test Exclusion Threshold (mW) are listed below: Transmit Frequency (MHz) Output power (mW) SAR Test Exclusion Threshold (mW) 2478 0.2754 9.53 According to SAR Exclusion Threshold in KDB 447498 (D01) General RF Exposure Guidance v06, the SAR report is not required. Test Location: Intertek Testing Services Shenzhen Ltd. Guangzhou Branch All tests were performed at: Room102/104, No 203, KeZhu Road, Science City, GETDD Guangzhou, China
Shenzhen Topband Co., Ltd TEST REPORT SCOPE OF WORK EMC TESTING–B4D REPORT NUMBER 230313158GZU-001 ISSUE DATE [REVISED DATE] 03-April-2023 [--------------------] PAGES 22 DOCUMENT CONTROL NUMBER FCC Part 15.249-f © 2017 INTERTEK TEST REPORT Room 02, & 101/E201/E301/ E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Telephone: +86 20 8213 9688 Facsimile: +86 20 3205 7538 www.intertek.com.cn This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Version: 14 December 2022 Page 2 of 22 FCC Part 15.249-f Applicant Name & Address : Shenzhen Topband Co., Ltd Topband Industrial Park,Liyuan Industrial Zone,Shiyan Town, Bao'An District Shenzhen 518108 China Manufacturing Site : Same as applicant Intertek Report No: FCC ID: 230313158GZU-001 2ADDW-24GB4D Test standards 47 CFR PART 15 Subpart C: 2021 section 15.249 Sample Description Product : Remote controller Model No. : B4D Electrical Rating : 3VDC Serial No. : Not Labeled Date Received : 13 March 2023 Date Test Conducted : 13 March 2023-14 March 2023 Prepared and Checked By Elena Lei Engineer Approved By: Dean Liu Project Engineer TEST REPORT Intertek Report No.: 230313158GZU-001 Version: 14 December 2022 Page 3 of 22 FCC Part 15.249-f CONTENT TEST REPORT ........................................................................................................................... 1 CONTENT ............................................................................................................................. 3 1.0 TEST RESULT SUMMARY ............................................................................................ 4 2.0 GENERAL DESCRIPTION .............................................................................................. 5 2.1 PRODUCT DESCRIPTION ........................................................................................................ 5 2.2 RELATED SUBMITTAL(S) GRANTS ............................................................................................ 5 2.3 TEST METHODOLOGY ........................................................................................................... 5 2.4 TEST FACILITY ...................................................................................................................... 5 3.0 SYSTEM TEST CONFIGURATION .................................................................................. 6 3.1 JUSTIFICATION ..................................................................................................................... 6 3.2 EUT EXERCISING SOFTWARE.................................................................................................. 7 3.3 SPECIAL ACCESSORIES ........................................................................................................... 7 3.4 MEASUREMENT UNCERTAINTY ............................................................................................... 7 3.5 EQUIPMENT MODIFICATION .................................................................................................. 7 3.6 SUPPORT EQUIPMENT LIST AND DESCRIPTION .......................................................................... 8 4.0 MEASUREMENT RESULTS ........................................................................................... 9 4.1 ANTENNA REQUIREMENT ...................................................................................................... 9 4.2 OCCUPIED BANDWIDTH ...................................................................................................... 10 4.3 RADIATED EMISSION .......................................................................................................... 12 4.4 BAND EDGES REQUIREMENT ................................................................................................ 19 4.5 CONDUCTED EMISSIONS AT MAINS TERMINALS ...................................................................... 21 5.0 TEST EQUIPMENT LIST ............................................................................................. 22 TEST REPORT Intertek Report No.: 230313158GZU-001 Version: 14 December 2022 Page 4 of 22 FCC Part 15.249-f 1.0 TEST RESULT SUMMARY Test Item Test Requirement Test Method Result Antenna Requirement FCC PART 15 C Section 15.203 FCC PART 15 C Section 15.203 PASS Occupied Bandwidth FCC PART 15 C section 15.215(c) ANSI C63.10: Clause 6.9 PASS Radiated Emission FCC PART 15 C section 15.249 (a), (d) ANSI C63.10: Clause 6.4, 6.5 & 6.6 PASS Band Edges Measurement FCC PART 15 C section 15.249 (d) ANSI C63.10: Clause 6.10 PASS Conducted Emissions at Mains Terminals FCC PART 15 C section 15.207 ANSI C63.10: Clause 6.2 N/A Remark: N/A: not applicable. Refer to the relative section for the details. EUT: In this whole report EUT means Equipment Under Test. Tx: In this whole report Tx (or tx) means Transmitter. Rx: In this whole report Rx (or rx) means Receiver. RF: In this whole…
Text truncated - open the document above for the full version.
Note:EUT is positioned at the center of the turntable to keep 3 m between the measurement antenna and EUT for the radiated emissions measurements Radiated Emission (30MHz-1000MHz) Radiated Emission (Above 1000MHz)
lock E, No.7-2 Guang Dong Software Science Park, C · Guangzhou, Guangdong · China
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.48 GHz - 2.48 GHz | - |
Robotic Lawn Mower
Equipment Class
DTS - Digital Transmission System
Bluetooth wireless module
Equipment Class
DTS - Digital Transmission System
USB Charging Adapter
Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
AERA LIGHT
Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
2.4G WIFI-BLE Module
Equipment Class
DTS - Digital Transmission System