FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Zeeva International Limited/
  3. 2ADM5-ET-0811

2ADM5-ET-0811RC Shark

Zeeva International Limited
RC Shark - FCC ID 2ADM5-ET-0811 - Zeeva International Limited
Click to zoom

Application Details

Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter
Date of Grant
Dec 02, 2023
Application Purpose
Original Equipment
Date of Application
Dec 02, 2023
Equipment Note
RC Shark
Frequency Range
27.14500000 - 27.14500000
Company
Zeeva International Limited
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Attestation Statements

Rev1/26/2023 ZeevaInternationalLimited FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 USA Date:2023.11.27 Ref:AttestationStatementsPart2.911(d)(5)(i)Filing FCCID:2ADM5-ET-0811 ZeevaInternationalLimited(“theapplicant”)certifiesthattheequipmentforwhichauthorizationis soughtisnot“covered”equipmentprohibitedfromreceivinganequipmentauthorizationpursuantto section2.903oftheFCCrules. Sincerely, KEVINTSO Rev1/26/2023 ZeevaInternationalLimited FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 USA Date:2023.11.27 Ref:AttestationStatementsPart2.911(d)(5)(ii)Filing FCCID:2ADM5-ET-0811 ZeevaInternationalLimited(“theapplicant”)certifiesthat,asofthedateofthefilingoftheapplication, theapplicantisnotidentifiedontheCoveredList(asaspecificallynamedentityoranyofitssubsidiaries oraffiliates)asanentityproducing“covered”equipment. Sincerely, KEVINTSO

Attestation Statements

ZeevaInternationalLimited Suite 1007B,10th Floor, ExchangeTower,33 Wang Chiu Road,KowloonBay, Hong Kong, China Date: [2023. 11 .21 ] FederalCommunicationsCommission Authorizationand EvaluationDivision 7435 OaklandMills Road Columbia,MD 21046 FCC ID :2ADM5-ET-0811 FRN : 0024102113 US Agent – AttestationStatement/ Part 2.911(d)(7) [ZeevaInternationalLimited] certifies,that as of [2023. 11 .21 ], we have designatedFCC US Agent, LLC to acceptserviceof processon our behalffor FCC ID :2ADM5-ET-0811 [ZeevaInternationalLimited], acceptsto maintainan agent of serviceof processin the United Statesfor no less than one year after her the granteehas permanentlyterminatedall marketing and importationof the applicableequipmentwithin the U.S., or the conclusionof any Commission- relatedadministrativeor judicialproeitceedinginvolvingthe equipment,whicheveris later. FCC US Agent,LLC, acceptsas of the date of the filing of this application,the obligationof being the designatedagent for the purposeof acceptingserviceof processon behalfof [Zeeva InternationalLimited] for FCC ID :2ADM5-ET-0811 DesignatedAgentInformation: CompanyName:FCC US Agent,LLC FRN: 0033402884 Address:3722 IllinoisAvenue,Saint Charles,IL, 60174,USA ContactPerson:Tim Payne Phone:708-571-3148 Email:[email protected] Sincerely, Company:[ZeevaInternationalLimited]DesignatedAgent:FCC US Agent,LLC CompanyRepresentative:[Kevin Tso ]DesignatedAgent Representative:Tim Payne Signature:[Signature]Signature:

Cover Letter(s)

Rev11/20/07 ZeevaInternationalLimited FederalCommunicationsCommission AuthorizationandEvaluationDivision ConfidentialityRequestregardingapplicationforcertificationof FCCID:2ADM5-ET-0811 PursuanttoSections0.457and0.459oftheCommission’sRules,weherebyrequestconfidential treatmentofinformationaccompanyingthisapplicationasoutlinedbelow: ExhibitTypeFileName BlockDiagram Schematics OperationalDescription BlockDiagram Schematics OperationalDescription Theabovematerialscontaintradesecretsandproprietaryinformationnotcustomarilyreleasedto thepublic.Thepublicdisclosureofthesematerialsmaybeharmfultotheapplicantandprovide unjustifiedbenefitstoitscompetitors. TheapplicantunderstandsthatpursuanttoSection0.457oftheRules,disclosureofthis applicationandallaccompanyingdocumentationwillnotbemadebeforethedateoftheGrant forthisapplication. PursuanttoDA04-1705June15,2004oftheCommission’spublicnotice,Wealsorequestingthe commissiontograntshort-termconfidentialityrequestonthefollowingattachmentsuntil180 daysaftertheGrantDateofEquipmentAuthorizations. ExhibitTypeFileName ManualUsermanual InternalphotoInternalphoto Date:2023.11.27 Sincerely, KEVINTSO

Cover Letter(s)

ZeevaInternationalLimited FederalCommunicationsCommission AuthorizationandEvaluationDivision 7453OaklandMillsRoad Columbia,MD21046 Date:2023.11.27 SUBJECT:FCCApplicationfor(FCCID:2ADM5-ET-0811) ToWhomItMayConcern: We,theundersigned,herebyauthorizeSamLvatEMTEK(DONGGUAN)CO.,LTD.on ourbehalf,toapplytotheFederalCommunicationsCommissiononourequipment.Any andallactscarriedoutbyEMTEK(DONGGUAN)CO.,LTD.onourbehalfshallhave thesameeffectasactsofourown. ThisistoadvisethatweareinfullcompliancewiththeAnti-DrugAbuseAct.We,the applicant,arenotsubjecttoadenialoffederalbenefitspursuanttoSection5301ofthe Anti-DrugActof1988,21USC853a,andnopartytotheapplicationissubjecttoadenial offederalbenefitspursuanttothatsection. Regards, Sincerely, KEVINTSO

External Photos

Report No. EDG2311020142E001Page 1 of 4Ver.1.0 FCC ID: 2ADM5-ET-0811 ANT Report No. EDG2311020142E001Page 2 of 4Ver.1.0 Report No. EDG2311020142E001Page 3 of 4Ver.1.0 Report No. EDG2311020142E001Page 4 of 4Ver.1.0

Internal Photos

Report No. EDG2311020142E001Page 1 of 2Ver.1.0 FCC ID: 2ADM5-ET-0811 Report No. EDG2311020142E001Page 2 of 2Ver.1.0

RF Exposure Info

ReportNo.EDG2311020142E00102RPage1of7Ver.1.0 TESTREPORT ProductName : RCShark ModelNumber : ET-0811 FCCID : 2ADM5-ET-0811 Preparedfor:ZeevaInternationalLimited Address:Suite1007B,10thFloor,ExchangeTower,33WangChiu Road,KowloonBay,HongKong,China Preparedby:EMTEK(DONGGUAN)CO.,LTD. Address:-1&2/F.,Building2,ZoneA,ZhongdaMarineBiotechnology ResearchandDevelopmentBase,No.9,XinchengAvenue, SongshanhuHigh-technologyIndustrialDevelopmentZone, Dongguan,Guangdong,China TEL:+86-0769-22807078 FAX:+86-0769-22807079 ReportNumber:EDG2311020142E00102R Date(s)ofTests:November02,2023toNovember17,2023 Dateofissue:November17,2023 $二维码$ ReportNo.EDG2311020142E00102RPage2of7Ver.1.0 TableofContents 1.TESTRESULTCERTIFICATION...............................................................................................................................................3 2.EUTSPECIFICATION.................................................................................................................................................................5 3.TESTREQUIREMENT................................................................................................................................................................6 4.MEASUREMENTRESULT.........................................................................................................................................................7 ReportNo.EDG2311020142E00102RPage3of7Ver.1.0 1.TESTRESULTCERTIFICATION Applicant:ZeevaInternationalLimited Address: Suite1007B,10thFloor,ExchangeTower,33WangChiuRoad,KowloonBay, HongKong,China Manufacturer:ZeevaInternationalLimited Address: Suite1007B,10thFloor,ExchangeTower,33WangChiuRoad,KowloonBay, HongKong,China EUT:RCShark ModelName:ET-0811 Trademark:N/A MeasurementProcedureUsed: APPLICABLESTANDARDS STANDARDTESTRESULT §1.1307(b),§2.1093 PASS TheaboveequipmentwastestedbyEMTEK(DONGGUAN)CO.,LTD.Thetestdata,dataevaluation,test procedures,andequipmentconfigurationsshowninthisreportweremadeinaccordancewiththeprocedures giveninANSIC63.10(2013)andtheenergyemittedbythesampleEUTtestedasdescribedinthisreportisin compliancewiththerequirementsofFCCRulesFCC§1.1307(b),§2.1093. Thetestresultsofthisreportrelateonlytothetestedsampleidentifiedinthisreport DateofTest:November02,2023toNovember17,2023 Preparedby: XiaYang/Editor Reviewer: TimDong/Supervisor Approve&AuthorizedSigner: SamLv/Manager ReportNo.EDG2311020142E00102RPage4of7Ver.1.0 ModifiedHistory VersionReportNo.RevisionDateSummary EDG2311020142E00102R/OriginalReport ReportNo.EDG2311020142E00102RPage5of7Ver.1.0 2. EUTSpecification CharacteristicsDescription Product:RCShark ModelNumber:ET-0811 Sample:1# ColorGRAY SKU#9113376 UPC#1922342339954 OperatingFrequency Range(s): 27.145MHz NumberofChannels: 1Channel MaxFieldStrength46.97dBuV@3m AntennaType:Hoseantenna PowerSupplyDC3VfromBattery Evaluationapplied:MPEEvaluation SAREvaluation ReportNo.EDG2311020142E00102RPage6of7Ver.1.0 3. TestRequirement RFEXPOSUREEVALUATION AccordingtoKDB447498D01V06and§1.1307(b)(1),systemsoperatingundertheprovisionsofthissection shallbeoperatedinamannerthatensuresthatthepublicisnotexposedtoradiofrequencyenergylevelin excessoftheCommission’sguidelines. RoutineSARevaluationreferstothatspecificallyrequiredby§2.1093,usingmeasurementsorcomputer simulation.WhenroutineSARevaluationisnotrequired,portabletransmitterswithoutputpowergreaterthan theapplicablelowthresholdrequireSARevaluationtoqualityforTCBapproval. OneantennaisavailablefortheEUT.Theminimumseparationdistanceis5mm. AccordingtoANSIC63.10-2013 9.5EquationstocalculateEIRP CalculatetheEIRPfromtheradiatedfieldstrengthinthefarfieldusingEquation(22): EIRP=E+20log(d)−104.7(22) where EIRPistheequivalentisotropicallyradiatedpower,indBm Eisthefieldstrengthoftheemissionatthemeasurementdistance,indBμV/m disthemeasurementdistance,inm ReportNo.EDG2311020142E00102RPage7of7Ver.1.0 4. MeasurementResult Antennagain:0dBi Whenasinglemoduleworks,themeasurementresultsareasfollows: 27.145MHz ChannelFreq. (MHz) MaxField Strength (dBuV/m) peakoutput power (dBm) Tune upPower (dBm) Maxtune uppower (dBm) CalculationResult1-gSAR 27.14546.97-48.1876-49±1-480.00000016363 AccordingtoKDB447498,nostand-alonerequiredforBTantenna,andnosimultaneousSARmeasurementis required. ***EndofReport***

Test Report

天线规格书 AntennaSpecification 制造商:汕头市澄海区焯隆五金配件厂 Manufacturer: ShantouChenghaiZhuorongHardwareFactory 制造商地址: 汕头市澄海区凤翔街道东湖工业区 Address:SanzhuganArea,TuchiVillage,FengxiangStreet, ChenghaiDistrict,ShantouCity. 产品尺寸(mm)/SIZ

Test Report

ReportNo.:EDG2311020142E00101RPage1of25Ver.1.0 TESTREPORT ProductName : RCShark ModelNumber : ET-0811 FCCID : 2ADM5-ET-0811 Preparedfor:ZeevaInternationalLimited Address:Suite1007B,10thFloor,ExchangeTower,33WangChiu Road,KowloonBay,HongKong,China Preparedby:EMTEK(DONGGUAN)CO.,LTD. Address:-1&2/F.,Building2,ZoneA,ZhongdaMarineBiotechnology ResearchandDevelopmentBase,No.9,XinchengAvenue, SongshanhuHigh-technologyIndustrialDevelopmentZone, Dongguan,Guangdong,China TEL:+86-0769-22807078 FAX:+86-0769-22807079 ReportNumber:EDG2311020142E00101R Date(s)ofTests:November02,2023toNovember17,2023 Dateofissue:November17,2023 $二维码$ ReportNo.:EDG2311020142E00101RPage2of25Ver.1.0 TESTREPORTDESCRIPTION Applicant:ZeevaInternationalLimited Address: Suite1007B,10thFloor,ExchangeTower,33WangChiuRoad,KowloonBay,Hong Kong,China Manufacturer:ZeevaInternationalLimited Address: Suite1007B,10thFloor,ExchangeTower,33WangChiuRoad,KowloonBay,Hong Kong,China EUT:RCShark ModelName:ET-0811 Trademark:N/A MeasurementProcedureUsed: APPLICABLESTANDARDS STANDARDTESTRESULT FCC47CFRPart2,SubpartJ FCC47CFRPart15,SubpartC PASS TheaboveequipmentwastestedbyEMTEK(DONGGUAN)CO.,LTD.Thetestdata,dataevaluation,test procedures,andequipmentconfigurationsshowninthisreportweremadeinaccordancewiththeprocedures giveninANSIC63.10-2013andtheenergyemittedbythesampleEUTtestedasdescribedinthisreportisin compliancewithconductedandradiatedemissionlimitsofFCCRulesPart15.227. DateofTest:November02,2023toNovember17,2023 Preparedby: XiaYang/Editor Reviewer: TimDong/Supervisor Approved&AuthorizedSigner: SamLv/Manager ReportNo.:EDG2311020142E00101RPage3of25Ver.1.0 ModifiedHistory VersionReportNo.RevisionDateSummary EDG2311020142E00101R/OriginalReport ReportNo.:EDG2311020142E00101RPage4of25Ver.1.0 TableofContents 1.GENERALINFORMATION............................................................................................................5 1.1PRODUCTDESCRIPTION...............................................................................................................................5 2.SYSTEMTESTCONFIGURATION...............................................................................................6 2.1EUTCONFIGURATION.................................................................................................................................6 2.2EUTEXERCISE............................................................................................................................................6 2.3TESTPROCEDURE.......................................................................................................................................6 2.4LIMITATION...................................................................................................................................................7 2.5CONFIGURATIONOFTESTEDSYSTEM........................................................................................................8 3.SUMMARYOFTESTRESULTS...................................................................................................9 4.DESCRIPTIONOFTESTMODES..............................................................................................10 5.TESTFACILITY..............................................................................................................................11 6.TESTSYSTEMUNCERTAINTY..................................................................................................12 7.CONDUCTEDEMISSIONSTEST...............................................................................................13 7.1MEASUREMENTPROCEDURE:....................................................................................................................13 7.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION)...........................................................................13 7.3MEASUREMENTEQUIPMENTUSED:...........................................................................................................13 7.4MEASUREMENTRESULT:............................................................................................................................13 7.5CONDUCTEDMEASUREMENTPHOTOS:....................................................................................................13 8.RADIATEDEMISSIONTEST.......................................................................................................14 8.1MEASUREMENTPROCEDURE.....................................................................................................................14 8.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION)...........................................................................14 8.3MEASUREMENTEQUIPMENTUSED:...........................................................................................................15 8.4RADIATEDEMISSIONLIMIT........................................................................................................................16 FIELDSTRENGTHOFTHEFUNDAMENTALSIGNAL...........................................................................................16 8.5MEASUREMENTRESULTS..........................................................................................................................17 8.6RADIATEDMEASUREMENTPHOTOS:........................................................................................................22 9.OCCUPIEDBANDWIDTH............................................................................................................23 9.1MEASUREMENTPROCEDURE.....................................................................................................................23 9.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION)...........................................................................23 9.3MEASUREMENTEQUIPMENTUSED:...........................................................................................................23 9.4MEASUREMENTREQUIREMENTS:.........................................................................................................…

Text truncated - open the document above for the full version.

Test Setup Photos

Report No. EDG2311020142E001Page 1 of 1Ver.1.0 FCC ID: 2ADM5-ET-0811

Contact Information

Applicant

Kevin Tso(Engineering & Compliance Manager)
[email protected]852-2868 0511Fax: 852-2524 1986

Test Firm

EMTEK (Dongguan) Co., Ltd.Sam Lv
[email protected]886-0769-22807078

Technical Specifications

#Rule PartsFrequency RangePower Output
115C27.145 MHz - 27.145 MHz-
Confidentiality
Long Term

Other Applications from Zeeva International Limited

2ADM5-HP-0022

DJ STYLE BT HP F26

Aug 27, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
DISNEY MICKEY DOME SPKR - FCC ID 2ADM5-SP-0774 - Zeeva Int Limited
2ADM5-SP-0774

DISNEY MICKEY DOME SPKR

Jul 15, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
RC STUNT CAR F26 - FCC ID 2ADM5-ET-0973-27 - Zeeva Int Limited
2ADM5-ET-0973-27

RC STUNT CAR F26

Jun 04, 2026

Equipment Class

DXX - Part 15 Low Power Communication Device Transmitter
LANAS LIFE VGA MOUSE - FCC ID 2ADM5-GA-0541 - Zeeva Int Limited
2ADM5-GA-0541

LANAS LIFE VGA MOUSE

Apr 16, 2026

Equipment Class

DTS - Digital Transmission System
TRANSLATION OWS - FCC ID 2ADM5-EP-0739 - Zeeva Int Limited
2ADM5-EP-0739

TRANSLATION OWS

Jan 04, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter