Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Tesla, Inc. 3500 Deer Creek Road Palo Alto, California, U.S.A. Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 Subject: Certification designating a U.S. agent for service of process pursuant to Part 2.911(d)(7) To whom it may concern, [Tesla, Inc., Grantee Code 2AEIM] (“the applicant”) as required by section 2.911(d)(7), will also serve as the agent for service of process for the above referenced FCC Grantee Code. The service of process includes, but is not limited to, delivery of any correspondence, notices, orders, decisions, and requirements of administrative, legal, or judicial process related to Commission proceedings. The applicant acknowledges that they will maintain an agent for service of process in the United States for no less than one year after either the grantee has permanently terminated all marketing and importation of the applicable equipment within the U.S., or the conclusion of any Commission-related administrative or judicial proceeding involving the equipment, whichever is later. The applicant further acknowledges their responsibility to inform the FCC whenever the following agent information changes. Company Name: Tesla, Inc. Company US Address: 3500 Deer Creek Road, Palo Alto, CA, United States 94304 Contact Person: Viraj Andrabadu Kurundu Patabendige Email: [email protected] FRN: 0024474967 Sincerely yours, Signed by the Applicant Name: Viraj Andrabadu Kurundu Patabendige Title: Sr Manager, Compliance Engineering Email: [email protected] Date: May 19, 2026
Tesla, Inc. 3500 Deer Creek Road Palo Alto, California, U.S.A. Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 Date: May 19, 2026 Subject: Certifications concerning “covered” equipment pursuant to Part 2.911(d)(5)(i) and (ii) FCC ID: 2AEIM- 5443322 To whom it may concern, Tesla, Inc. (“the applicant”) certifies that the equipment for which authorization is sought is not the equipment on the Covered List, as established pursuant to § 1.50002 of CFR Title 47, that is prohibited from obtaining an equipment authorization under this subpart. This includes equipment that: (1) Has been certified as a modular transmitter; or (2) Meets the modular transmitter requirements of § 15.212 of this chapter and could be certified as a modular transmitter. pursuant to section 2.903 resulting the recent adoption of FCC 25-71 (et al., ET Docket No. 21-232, Second Report and Order); or (3) Uncrewed aircraft systems (UAS) and UAS critical components produced in a foreign country and all communications and video surveillance equipment and services listed in Section 1709(a)(1) of the FY25 National Defense Authorization Act (Pub. L. 118-159) Applicant certifies that, as of the date of the filing of the application, the applicant [is not] identified on the Covered List (as a specifically named entity or any of its subsidiaries or affiliates) as an entity producing “covered” equipment. Applicant further certifies that no Cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors and assignees, including equipment with integrated Kaspersky Lab, Inc. (or any of its successors and assignees) cybersecurity or anti-virus software is installed in the equipment being certified. The above-referenced Covered List is published by the Public Safety and Homeland Security Bureau (PSHSB), pursuant to Section 1.50002 of the Commission’s rules. Sincerely, Contact Name: Viraj Andrabadu Kurundu Patabendige Title: Sr Manager, Compliance Engineering E-mail: [email protected]
Tesla, Inc. 3500 Deer Creek Road Palo Alto, California, U.S.A. Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 Date: May 19, 2026 Subject: Certifications concerning “covered” equipment pursuant to Part 2.911(d)(5)(i) and (ii) FCC ID: 2AEIM- 5443322 To whom it may concern, Tesla, Inc. (“the applicant”) certifies that the equipment for which authorization is sought is not the equipment on the Covered List, as established pursuant to § 1.50002 of CFR Title 47, that is prohibited from obtaining an equipment authorization under this subpart. This includes equipment that: (1) Has been certified as a modular transmitter; or (2) Meets the modular transmitter requirements of § 15.212 of this chapter and could be certified as a modular transmitter. pursuant to section 2.903 resulting the recent adoption of FCC 25-71 (et al., ET Docket No. 21-232, Second Report and Order); or (3) Uncrewed aircraft systems (UAS) and UAS critical components produced in a foreign country and all communications and video surveillance equipment and services listed in Section 1709(a)(1) of the FY25 National Defense Authorization Act (Pub. L. 118-159) Applicant certifies that, as of the date of the filing of the application, the applicant [is not] identified on the Covered List (as a specifically named entity or any of its subsidiaries or affiliates) as an entity producing “covered” equipment. Applicant further certifies that no Cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors and assignees, including equipment with integrated Kaspersky Lab, Inc. (or any of its successors and assignees) cybersecurity or anti-virus software is installed in the equipment being certified. The above-referenced Covered List is published by the Public Safety and Homeland Security Bureau (PSHSB), pursuant to Section 1.50002 of the Commission’s rules. Sincerely, Contact Name: Viraj Andrabadu Kurundu Patabendige Title: Sr Manager, Compliance Engineering E-mail: [email protected]
Tesla, Inc. 3500 Deer Creek Road Palo Alto, California, U.S.A. Date: May 19, 2026 FCC Laboratory 7435 Oakland Mills Rd Columbia MD 21046 Subject: Request for Confidentiality FCC ID: 2AEIM- 5443322 To Whom It May Concern, Pursuant to the provisions of Sections 0.457 and 0.459 of Commission’s rules (47CFR§§0.457, 0.459), we are requesting the Commission to withhold the following documents from public disclosure indefinitely. Schematic Diagram Block Diagram Part List Operational Description Tune-up Procedure Above mentioned documents which contain detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. In additional to above mentioned documents, pursuant to Public Notice DA 04-1705 of the Commission’ s policy, in order to comply with the marketing regulations in 47 CFR §2.803 and the importation rules in 47 CFR §2.1204, while ensuring that business sensitive information remains confidential until the actual marketing of newly authorized devices, we are requesting the Commission to withhold the following documents for 180 days after the grant of equipment authorization is issued: External Photos Internal Photos Test Setup Photos User Manual It is our understanding that all measurement test reports, FCC ID label format cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Best Regards, _______________________ Contact Name: Viraj Andrabadu Kurundu Patabendige Title: Sr Manager, Compliance Engineering E-mail: [email protected]
Tesla, Inc. 3500 Deer Creek Road Palo Alto, California, U.S.A. FCC Agent Authorization Date: May 19, 2026 To whom it may concern, Tesla, Inc. hereby authorize Sporton International Inc. to act on our behalf in all matters relating to applications for FCC equipment authorization, including the signing of all documents relating to these matters. Any and all acts carried out by Sporton International Inc. on our behalf shall have the same effect as acts of our own. We also hereby certify that neither the applicant nor any party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to section 5301 of the Anti- Drug Abuse Act of 1988. 21 U.S.C. 862. This authorization is limited to the product of as following: FCC ID: 2AEIM- 5443322 This authorization is valid until further written notice from Tesla, Inc. Sincerely, ______________________ Contact Name: Viraj Andrabadu Kurundu Patabendige Title: Sr Manager, Compliance Engineering E-mail: [email protected]
TESLA, INC.
SPORTON INTERNATIONAL INC. Page Number : 1 of 3 TEL : 886-3-327-3456 Report Issued Date : Apr. 30, 2026 FAX : 886-3-328-4978 RF Exposure Evaluation Report Report No. : FA260322001 RF Exposure Evaluation Report FCC ID : 2AEIM- 5443322 Equipment : Megacharger Handle Brand Name : Tesla Model Name : 5443322 Applicant : Tesla, Inc. 3500 DEER CREEK ROAD PALO ALTO, CA 94304 Manufacturer : Tesla, Inc. 3500 DEER CREEK ROAD PALO ALTO, CA 94304 Standard : 47 CFR Part 2.1093 We, SPORTON INTERNATIONAL INC has been evaluated this product in accordance with 47 CFR Part 2.1093 and it complies with applicable limit. Sporton Lab is accredited to ISO 17025 by Taiwan Accreditation Foundation (TAF code: 1190) and the FCC designation No. TW1190 under the FCC 2.948(e) by Mutual Recognition Agreement (MRA) in FCC evaluation. The results in this report apply exclusively to the tested model / sample. Without written approval of SPORTON INTERNATIONAL INC. Laboratory, the test report shall not be reproduced except in full SPORTON INTERNATIONAL INC. Wensan Laboratory No.58, Aly. 75, Ln. 564, Wenhua 3rd, Rd., Guishan Dist., Taoyuan City 333010, Taiwan Approved by: Cona Huang / Deputy Manager SPORTON INTERNATIONAL INC. Page Number : 2 of 3 TEL : 886-3-327-3456 Report Issued Date : Apr. 30, 2026 FAX : 886-3-328-4978 RF Exposure Evaluation Report Report No. : FA260322001 Table of Contents 1. General Information ........................................................................................................................... 3 1.1 Description of Device Under Test (DUT) ........................................................................................... 3 2. Maximum RF output power among production units ......................................................................... 3 3. RF Exposure Evaluation .................................................................................................................... 3 Revision History REPORT NO. VERSION DESCRIPTION ISSUED DATE FA260322001 Rev. 01 Initial issue of report Apr. 30, 2026 SPORTON INTERNATIONAL INC. Page Number : 3 of 3 TEL : 886-3-327-3456 Report Issued Date : Apr. 30, 2026 FAX : 886-3-328-4978 RF Exposure Evaluation Report Report No. : FA260322001 1. General Information 1.1 Description of Device Under Test (DUT) Product Feature & Specification DUT Type Megacharger Handle Brand Name Tesla Model Name 5443322 FCC ID 2AEIM- 5443322 Wireless Technology and Frequency Range Bluetooth: 2400 MHz ~ 2483.5 MHz Mode Bluetooth LE 2. Maximum RF output power among production units Mode Maximum Average Power (dBm) Bluetooth LE 2.2 3. RF Exposure Evaluation Bluetooth Max Power (dBm) mW Separation Distance (mm) Frequency (GHz) Exclusion Thresholds 2.2 1.66 5 2.48 0.52 Note: 1. Per KDB 447498 D01v06 the 1-g and 10-g SAR test exclusion thresholds for 100 MHz to 6 GHz at test separation distances ≤ 50 mm are determined by: [(max. power of channel, including tune-up tolerance, mW)/(min. test separation distance, mm)] ·[√f(GHz)] ≤ 3.0 for 1-g SAR and ≤ 7.5 for 10-g extremity SAR f(GHz) is the RF channel transmit frequency in GHz Power and distance are rounded to the nearest mW and mm before calculation The result is rounded to one decimal place for comparison Conclusion: Per KDB 447498 D01v06, when the minimum test separation distance is < 5 mm, a distance of 5 mm is applied to determine SAR test exclusion. The Bluetooth test exclusion threshold is 0.52 which are <= 7.5, Extremity SAR testing is not required.
Antenna Test Report 1. General Information Applicant: Tesla Equipment: Megacharger Handle Model Name: 5443322 Manufacturer: Tesla Antenna Type: PCB Antenna 2. Test Site Information Test Site Name: Tesla Antenna Chamber Address: 3500 Deer Creek Road, Palo Alto, California Test Personnel: Gokul Ramsubbaraj/ [email protected] 3. Test Methods Test Procedures: - Radiation Pattern Measurement - Gain Measurement - Efficiency Measurement Method for Gain Determination: Passive test method 4. Test Environment Test Site: Deer Creek Anechoic Chamber Test Dates: 3/23/2026 Temperature: 25 Humidity(%): <60% Equipment Used: Equipment Name Manufacturer Model Number Serial Number Calibration Due OTA Anechoic Chambe Rohde & Schwarz TS8991 N/A N/A N/A Vector Analyzer Rohde & Schwarz ZNB20 101772 04/29/2025 04/29/2026 Device Controller Maturo Controller NCD NCD_599 N/A N/A AMS-32 Rohde & Schwarz N/A V12.30.00 N/A N/A 5. Test Results Frequency (MHz) Efficiency (dB) Efficiency (%) Peak Gain Phi (dBi) Peak Gain Theta (dBi) 2400 -1.84 65.51 2.41 2.94 2402.5 -1.84 65.53 2.29 2.96 2405 -1.82 65.81 2.38 3.01 2407.5 -1.8 66.04 2.54 2.98 2410 -1.81 65.86 2.59 2.99 2412.5 -1.85 65.3 2.67 2.93 2415 -1.86 65.11 2.76 2.94 2417.5 -1.86 65.24 2.75 2.91 2420 -1.86 65.1 2.77 2.89 2422.5 -1.86 65.22 2.8 2.9 2425 -1.86 65.2 2.73 2.96 2427.5 -1.87 65.06 2.59 2.93 2430 -1.88 64.87 2.52 2.87 2432.5 -1.88 64.86 2.49 2.94 2435 -1.9 64.6 2.36 2.92 2437.5 -1.9 64.59 2.49 2.96 2440 -1.93 64.05 2.5 2.97 2442.5 -2 63.16 2.56 3 2445 -2.02 62.76 2.63 2.96 2447.5 -2.06 62.27 2.64 2.98 2450 -2.09 61.82 2.63 3 2452.5 -2.11 61.55 2.66 3 2455 -2.15 60.95 2.7 2.97 2457.5 -2.16 60.78 2.73 3.04 2460 -2.2 60.29 2.72 2.96 2462.5 -2.25 59.63 2.72 2.91 2465 -2.28 59.17 2.64 2.95 2467.5 -2.31 58.81 2.69 2.93 2470 -2.33 58.43 2.72 2.93 2472.5 -2.37 57.99 2.65 2.93 2475 -2.39 57.71 2.72 2.97 2477.5 -2.41 57.42 2.73 2.88 2480 -2.43 57.19 2.75 2.94 3D Pattern
TEL: 408-904-3300 Page Number : 1 of 19 Issue Date : Jun. 12, 2026 Report Version : 02 FCC RADIO TEST REPORT Report No.: FR260322001 FCC RADIO TEST REPORT FCC ID : 2AEIM- 5443322 Equipment : Megacharger Handle Brand Name : Tesla Model Name : 5443322 Applicant : Tesla, Inc. 3500 DEER CREEK ROAD PALO ALTO, CA 94304 Manufacturer : Tesla, Inc. 3500 DEER CREEK ROAD PALO ALTO, CA 94304 Standard : FCC Part 15 Subpart C §15.247 The product was received on Mar. 26, 2026 and testing was performed from Jan. 27, 2026 to Apr. 09, 2026. We, Sporton International (USA) Inc.,, would like to declare that the tested sample has been evaluated in accordance with the test procedures and has been in compliance with the applicable technical standards. The test results in this report apply exclusively to the tested model / sample. Without written approval from Sporton International (USA) Inc.,, the test report shall not be reproduced except in full. Approved by: Louis Wu Sporton International (USA) Inc. 1175 Montague Expressway, Milpitas, CA 95035 TEL: 408-904-3300 Page Number : 2 of 19 Issue Date : Jun. 12, 2026 Report Version : 02 FCC RADIO TEST REPORT Report No.: FR260322001 Table of Contents History of this test report ................................................................................................................................. 3 Summary of Test Result................................................................................................................................... 4 1 General Description ................................................................................................................................... 5 1.1 Product Feature of Equipment Under Test ........................................................................................ 5 1.2 Modification of EUT ........................................................................................................................... 5 1.3 Testing Location ................................................................................................................................ 5 1.4 Applicable Standards ......................................................................................................................... 5 2 Test Configuration of Equipment Under Test ......................................................................................... 6 2.1 Carrier Frequency Channel ............................................................................................................... 6 2.2 Test Mode .......................................................................................................................................... 7 2.3 Connection Diagram of Test System ................................................................................................. 8 2.4 EUT Operation Test Setup ................................................................................................................ 8 2.5 Measurement Results Explanation Example ..................................................................................... 8 3 Test Result .................................................................................................................................................. 9 3.1 6dB and 99% Bandwidth Measurement ............................................................................................ 9 3.2 Output Power Measurement ............................................................................................................ 10 3.3 Power Spectral Density Measurement ............................................................................................ 11 3.4 Conducted Band Edges and Spurious Emission Measurement ..................................................... 12 3.5 Radiated Band Edges and Spurious Emission Measurement ........................................................ 13 3.6 Antenna Requirements .................................................................................................................... 17 4 List of Measuring Equipment ................................................................................................................. 18 5 Measurement Uncertainty ....................................................................................................................... 19 Appendix A. Conducted Test Results Appendix B. Radiated Spurious Emission Test Result Appendix C. Duty Cycle Plots Appendix D. Setup Photographs TEL: 408-904-3300 Page Number : 3 of 19 Issue Date : Jun. 12, 2026 Report Version : 02 FCC RADIO TEST REPORT Report No.: FR260322001 History of this test report Report No. Version Description Issue Date FR260322001 01 Initial issue of report May 11, 2026 FR260322001 02 Revised Product Feature of Equipment Under Test This report is an updated version, replacing the report issued on May 11, 2026. Jun. 12, 2026 TEL: 408-904-3300 Page Number : 4 of 19 Issue Date : Jun. 12, 2026 Report Version : 02 FCC RADIO TEST REPORT Report No.: FR260322001 Summary of Test Result Report Clause Ref Std. Clause Test Items Result (PASS/FAIL) Remark 3.1 15.247(a)(2) 6dB Bandwidth Pass - 3.1 2.1049 99% Occupied Bandwidth Pass - 3.2 15.247(b)(3) 15.247(b)(4) Output Power Pass - 3.3 15.247(e) Power Spectral Density Pass - 3.4 15.247(d) Conducted Band Edges and Spurious Emission Pass - 3.5 15.247(d) Radiated Band Edges and Spurious Emission Pass - - 15.207 AC Conducted Emission Not Required See Note 3.6 15.203 Antenna Requirement Pass - Note: The power source method of the EUT is to use DC power source, and there is no other AC power port, after assessing, AC Conduction Emission test is not required. Conformity Assessment Condition: 1. The test results (PASS/FAIL) with all measurement uncertainty excluded are presented against the regulation limits or in accordance with the requirements stipulated by the applicant/manufacturer who shall bear all the risks of non-compliance that may potentially occur if measurem…
Text truncated - open the document above for the full version.
TEL : 408 9043300 Page Number : B23 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 5 Band Edge - L 2400-2483.5_Bluetooth-LE_GFSK_CH19_2440MHz ANT 1 Pol. Horizontal Fundamental Peak Avg TEL : 408 9043300 Page Number : B24 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 5 Band Edge - R 2400-2483.5_Bluetooth-LE_GFSK_CH19_2440MHz ANT 1 Pol. Horizontal Fundamental Peak Blank Avg Blank TEL : 408 9043300 Page Number : B25 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 5 Band Edge - L 2400-2483.5_Bluetooth-LE_GFSK_CH19_2440MHz ANT 1 Pol. Vertical Fundamental Peak Avg TEL : 408 9043300 Page Number : B26 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 5 Band Edge - R 2400-2483.5_Bluetooth-LE_GFSK_CH19_2440MHz ANT 1 Pol. Vertical Fundamental Peak Blank Avg Blank TEL : 408 9043300 Page Number : B27 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 5 Harmonic 2400-2483.5_Bluetooth-LE_GFSK_CH19_2440MHz ANT 1 Pol. Horizontal Vertical Peak Avg TEL : 408 9043300 Page Number : B28 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 5 Harmonic 2400-2483.5_Bluetooth-LE_GFSK_CH19_2440MHz ANT 1 Pol. Horizontal Vertical 10.6G ~18G Avg TEL : 408 9043300 Page Number : B29 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 6 Band Edge 2400-2483.5_Bluetooth-LE_GFSK_CH39_2480MHz ANT 1 Pol. Horizontal Fundamental Peak Avg TEL : 408 9043300 Page Number : B30 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 6 Band Edge 2400-2483.5_Bluetooth-LE_GFSK_CH39_2480MHz ANT 1 Pol. Vertical Fundamental Peak Avg TEL : 408 9043300 Page Number : B31 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 6 Harmonic 2400-2483.5_Bluetooth-LE_GFSK_CH39_2480MHz ANT 1 Pol. Horizontal Vertical Peak Avg TEL : 408 9043300 Page Number : B32 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 6 Harmonic 2400-2483.5_Bluetooth-LE_GFSK_CH39_2480MHz ANT 1 Pol. Horizontal Vertical 10.6G ~18G Avg TEL : 408 9043300 Page Number : B33 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 7 LF 2400-2483.5_Bluetooth-LE_GFSK_CH39_2480MHz ANT 1 Pol. Horizontal Vertical QP/ Peak TEL : 408 9043300 Page Number : B34 of B34 FCC RADIO TEST REPORT Report No. : FR260322001 Mode 8 SHF 2400-2483.5_Bluetooth-LE_GFSK_CH39_2480MHz ANT 1 Pol. Horizontal Vertical Peak TEL: 408-904-3300 Page Number : C1 of C1 FCC RADIO TEST REPORT Report No. : FR260322001 Appendix C. Duty Cycle Plots Antenna Band Duty Cycle (%) T(us) 1/T(kHz) VBW Setting SISO BLE(1M) 100.00 15000 0.07 10Hz SISO BLE(2M) 100.00 3767 0.27 10Hz Bluetooth - LE for 1Mbps Bluetooth - LE for 2Mbps
3500 Deer Creek Road · Palo Alto, 94304 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 1.70 mW |
Wireless Phone Charger
Equipment Class
DXX - Part 15 Low Power Communication Device TransmitterB Pillar Endpoint
Equipment Class
DTS - Digital Transmission SystemB Pillar Endpoint
Equipment Class
DXX - Part 15 Low Power Communication Device TransmitterTuk Tuk Endpoint
Equipment Class
UWB - Ultra Wideband TransmitterLighthouse Top Module
Equipment Class
UWB - Ultra Wideband Transmitter