Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
CFR 47 §2.911 (d)(7) Agent Designation Attestation Date: 2025-07-25 FRN: 0024909822 FCC ID: 2AF2NBCB4WFL1 Product Model Number: BXBWFL1, BCB4WFL1 To: Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 USA Signify North America Corporation (“the applicant”) as required by section 2.911(d)(7), designates the following agent, located in the United States, for purposes of acting as the applicant’s agent for service of process. The applicant acknowledges that they will maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any Commission-related proceeding involving the equipment. The applicant further acknowledges their responsibility to inform the FCC whenever the agent information changes. U. S. Agent Information: Contact Person: Arun Ganesh Company Name: Signify North America Corporation Company Address: 10275 West Higgins Road, Rosemont, IL 60018 Email: [email protected] Sincerely yours, Name: Arun Ganesh Job Title: R&D Manager, North America Company Name: Signify North America Corporation Email: [email protected]
CFR 47 §2.911 (d)(5) Attestation Date: 2025-07-25 FRN: 0024909822 FCC ID: 2AF2NBCB4WFL1 Product Model Number: BXBWFL1, BCB4WFL1 To: Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 USA 1. Signify North America Corporation (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. 2. Signify North America Corporation (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment and is not an affiliate or subsidiary of an entity identified on the Covered List. Sincerely yours, Name: Arun Ganesh Address: 10275 West Higgins Road, Rosemont, IL 60018 Email: [email protected] Job Title: R&D Manager, North America Company Name: Signify North America Corporation
Signify North America Corporation 10275 W. Higgins Rd. Rosemont IL 60018, USA Classified 7/22/2025 Nemko North America, Inc. 303 River Road Ottawa, Ontario, Canada K1V 1H2 AUTHORITY TO ACT AS AGENT - FCC On our behalf, I appoint Kathy Wang (Audix Technology (Shanghai) Co., Ltd.), to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in FCC regulations will have affixed to it a label identical to that submitted for approval with this application. In signing this letter, Applicant certifies that neither the applicant nor any party to the application is not subject to a denial of Federal benefits, that include FCC benefits, pursuant to Section 5301 of the Anti- Drug Abuse Act of 1988, 21 U.S.C. § 862 because of a conviction for possession or distribution of a controlled substance. See 47 CFR 1.2002(b) for the definition of a "party" for these purposes. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by Nemko North America Inc., still resides with us. Sincerely, Printed name: Arun Ganesh Date: 7/22/2025
Signify North America Corporation 10275 W. Higgins Rd. Rosemont IL 60018, USA Classified 7/22/2025 Nemko North America, Inc. 303 River Road Ottawa, Ontario, Canada K1V 1H2 REQUEST FOR CONFIDENTIALITY - FCC FCC ID: 2AF2NBCB4WFL1 Pursuant to Sections 0.457(d) and 0.459 of the Commission’s Rules and FCC Guidance document 726920, we hereby request permanent confidential treatment of exhibits identified as such in the table below and request they are permanently withheld from public review based on the documents containing trade secrets and proprietary information not customarily released to the public. The public disclosure of this information might be harmful to the applicant and provide unjustified benefits to its competitors. We also request short-term confidentiality on certain exhibits until the intended date of marketing as outlined below. We request the exhibits be withheld from public view for a period of 180 days. We attest marketing of the product will only commence after the period of short-term confidentiality expires, or if marketing is to commence before the requested number of days listed above, the grantee will inform Nemko to release the Short-Term Confidentiality information withheld on the FCC equipment authorization website. Exhibit Type of Confidentiality Requested Block Diagrams ☒ Permanent ☐ Short Term External Photos ------------------ ☒ Short Term Internal Photos ☐ Permanent* ☒ Short Term Operation Description ☒ Permanent ☐ Short Term Parts List & Placement/BOM ☒ Permanent ☐ Short Term Tune-Up Procedure ☐ Permanent ☐ Short Term Schematic Diagrams ☒ Permanent ☐ Short Term Test Setup Photos ------------------ ☒ Short Term User’s Manual ☐ Permanent* ☒ Short Term The asterisked items (*) require further information to be provided in this justification letter before permanent confidentiality will be extended to these exhibits. Please refer to FCC KDB 726920 D01 found at: https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=41731 and review section II, 3) regarding specific information that must accompany these requests. Sincerely, Signed : Printed name: Arun Ganesh Title: R&D Manager Company Name: Signify North America Corporation
Signify North America Corporation 10275 W. Higgins Rd. Rosemont IL 60018, USA Classified Family Certification Attestation Letter 7/22/2025 Nemko North America, Inc. 303 River Road Ottawa K1V 1H2 Canada ATTN.: Reviewing Engineer FCC: 2AF2NBCB4WFL1 Models: BXBWFL1, BCB4WFL1 We hereby request Family Certification for the above mentioned Models based on them being the differences as below: BXBWFL1 and BCB4WFL1:main board PCB layout and RF module is the same, but the BCB4WFL1 with circuit of drive additional Bug-eye (2LED) on main board and the BXBWFL1 without this circuit. The circuit, RF Chip, PCB Component and the specifications of wireless functions are the same, which are not affect the RF characteristics. As the differences, therefore the test performed on the model BCB4WFL1 for main test and model BXBWFL1 for differential test. Signed: Printed name: Arun Ganesh Title: R&D Manager Date: 7/22/2025
Signify North America Corporation 10275 W. Higgins Rd. Rosemont IL 60018, USA Classified Zigbee Statement Letter 7/22/2025 Nemko North America, Inc. 303 River Road Ottawa K1V 1H2 Canada ATTN.: Reviewing Engineer FCC: 2AF2NBCB4WFL1 Models: BXBWFL1, BCB4WFL1 Only channel CH11, CH20 and CH25 used for Zigbee in North America market. This setting was shipped on firmware and the customer can’t change it. Signed: Printed name: Arun Ganesh Title: R&D Manager Date: 7/22/2025
label Mainboard location
label Mainboard Location
Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 1 of 3 RADIO FREQUENCY EXPOSURE EVALATION General Information Applicant : Signify North America Corporation EUT Description : EXIT SIGN WITH FIRSTLINK, COMBO EXIT SIGN WITH FIRSTLINK Model No. : BXBWFL1, BCB4WFL1 Radio Tech : BLE 5.0, Zigbee. Description of Test Facility Name of Firm : Audix Technology (Shanghai) Co., Ltd. Site Location : 3F, Building 34, No. 680 Guiping Rd., Caohejing, Hi-Tech Park, Shanghai 200233, China NVLAP, Lab Code : 200371-0 FCC Designation Number : CN5027 Test Firm Registration Number: 954668 Evaluation Method KDB 447498 D04 Interim General RF Exposure Guidance v01 Applicable Standard: KDB 447498 D04 v01: Section 2.1.3: SAR-Based Exemption. A more comprehensive exemption, considering a variable power threshold that depends on both the separation distance and power, is provided in § 1.1307(b)(3)(i)(B). This exemption is applicable to the frequency range between 300 MHz and 6 GHz, with test separation distances between 0.5 cm and 40 cm, and for all RF sources in fixed, mobile, and portable device exposure conditions. Accordingly, a RF source is considered an RF exempt device if its available maximum time-averaged (matched conducted) power or its effective radiated power (ERP), whichever is greater, are below a specified threshold. This exemption threshold was derived based on general population 1-g SAR requirements and is detailed in Appendix C. FCC CFR 47 §1.1307(b)(3)(i)(B): A single RF source is exempt if the available maximum time-averaged power or effective radiated power (ERP), whichever is greater, is less than or equal to the threshold P th (mW) described in the following formula. This method shall only be used at separation distances (cm) from 0.5 centimeters to 40 centimeters and at frequencies from 0.3 GHz to 6 GHz (inclusive). P th is given by: Audix Technology (Shanghai) Co., Ltd. Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 2 of 3 Audix Technology (Shanghai) Co., Ltd. Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 3 of 3 RF Exposure evaluation: Mode Frequency Max output power Ant. Gain Max E.I.R.P P th MHz dBm mW dBi dBm mW mW BLE1M 2442 5.406 3.47 2.85 8.256 6.693 3060 BLE2M 2402 5.426 3.49 2.85 8.276 6.724 3060 Zigbee 2475 9.648 9.22 2.85 12.498 17.775 3060 Note1: For this EUT, and the separation distance is 20 cm. And the Bluetooth and Zigbe e can not transmit at the same time. Note2: The Conducted output power and Maximum EIRP both no greater than the threshold P th , that meets the exemption, the RF exposure evaluation is not required. -END- Audix Technology (Shanghai) Co., Ltd.
Author: H.Wernars 14 November 2025 Page | 1 Signify Classified - Internal MCe MG24 Zigbee & BLE antenna information Base material: FR4 1mm, 4 layers Copper: 35u Applicable: MCe MG24, maximum transmitted power: +8dBm (±2dBm) Max Antenna gain: +2.85dBi Resonance frequency: 2.440 GHz, bandwidth: 80MHz, Line loss: 1.4dB Manufacturer: Signify Nederlands B.V. IBRS 10461, 5600VB, NL 15,0mm 4.95mmm 7.5mm Author: H.Wernars 28 June 2024 Page | 1 Signify Classified - Internal miniWDR_Gen2 Antenna gain Antenna gain is calculated with respect to a reference dipole antenna. The EIRP is taken from the report “EMC-24-FAR-6027-012-Wernars.pdf “: Average antenna gain: Average EIRP – Reference Dipole – Average TRP = 10.4 – 2.15 – 5.5 = +2.75dBi Maximum antenna gain: Max (EIRP – Reference Dipole – TRP) = 9.9 – 2.15 – 4.9 = +2.85dBi
Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 1 of 79 Prepared For: Signify North America Corporation 10275 W. Higgins Rd. Rosemont IL 60018, USA. Prepared By: Audix Technology (Shanghai) Co., Ltd. 3F, Building 34, No. 680 Guiping Rd., Caohejing, Hi-Tech Park, Shanghai 200233, China Tel: +86-21-64955500 File No. : C1D2507054 Report No. : ACI-F25103 Date of Test : 2025.02.25-06.30 Date of Report : 2025.08.19 TEST REPORT On behalf of Signify North America Corporation Product Name Model Number EXIT SIGN WITH FIRSTLINK BXBWFL1 COMBO EXIT SIGN WITH FIRSTLINK BCB4WFL1 FCC ID: 2AF2NBCB4WFL1 The statement is based on a single evaluation of one sample of the above-mentioned products. It does not imply an assessment of the whole production and does not permit the use of the test lab logo. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Government. TESTING NVLAP LAB CODE 200371-0 Audix Technology (Shanghai) Co., Ltd. Report No.: ACI-F25103 Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 2 of 79 TABLE OF CONTENTS Page 1 SUMMARY OF STANDARDS AND RESULTS .......................................................................... 5 1.1 Description of Standards and Results ......................................................................................... 5 2 GENERAL INFORMATION .......................................................................................................... 6 2.1 Description of Equipment Under Test ........................................................................................ 6 2.2 EUT Specifications Assessed in Current Report ........................................................................ 7 2.3 Test Information ......................................................................................................................... 7 2.4 Duty Cycle Check ...................................................................................................................... 8 2.5 Sample Description .................................................................................................................... 9 2.6 Supported equipment .................................................................................................................. 9 2.7 Description of Test Facility ........................................................................................................ 9 3 CONDUCTED EMISSION TEST ................................................................................................ 10 3.1 Test Equipment ......................................................................................................................... 10 3.2 Block Diagram of Test Setup ................................................................................................... 10 3.3 Conducted Emission Limits ..................................................................................................... 11 3.4 Test Configuration .................................................................................................................... 11 3.5 Operating Condition of EUT .................................................................................................... 11 3.6 Test Procedures ........................................................................................................................ 11 3.7 Test Results .............................................................................................................................. 12 4 RADIATED EMISSION TEST ..................................................................................................... 17 4.1 Test Equipment ......................................................................................................................... 17 4.2 Block Diagram of Test Setup ................................................................................................... 18 4.3 Radiated Emission Limit .......................................................................................................... 20 4.4 Test Configuration .................................................................................................................... 20 4.5 Operating Condition of EUT .................................................................................................... 21 4.6 Test Procedures ........................................................................................................................ 21 4.7 Test Results .............................................................................................................................. 22 5 6 DB BANDWIDTH MEASUREMENT ...................................................................................... 56 5.1 Test Equipment ......................................................................................................................... 56 5.2 Block Diagram of Test Setup ................................................................................................... 56 5.3 Specification Limits (§15.247(a)(2)) ........................................................................................ 56 5.4 Operating Condition of EUT .................................................................................................... 56 5.5 Test Procedure .......................................................................................................................... 56 5.6 Test Results .............................................................................................................................. 57 6 MAXIMUM PEAK OUTPUT POWER MEASUREMENT ...................................................... 60 6.1 Test Equipment ......................................................................................................................... 60 6.2 Block Diagram of Test Setup ..........................................................…
Text truncated - open the document above for the full version.
Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 1 of 64 Prepared For: Signify North America Corporation 10275 W. Higgins Rd. Rosemont IL 60018, USA. Prepared By: Audix Technology (Shanghai) Co., Ltd. 3F, Building 34, No. 680 Guiping Rd., Caohejing, Hi-Tech Park, Shanghai 200233, China Tel: +86-21-64955500 File No. : C1D2507054 Report No. : ACI-F25104 Date of Test : 2025.02.25-06.30 Date of Report : 2025.08.19 TEST REPORT On behalf of Signify North America Corporation Product Name Model Number EXIT SIGN WITH FIRSTLINK BXBWFL1 COMBO EXIT SIGN WITH FIRSTLINK BCB4WFL1 FCC ID: 2AF2NBCB4WFL1 The statement is based on a single evaluation of one sample of the above-mentioned products. It does not imply an assessment of the whole production and does not permit the use of the test lab logo. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Government. TESTING NVLAP LAB CODE 200371-0 Audix Technology (Shanghai) Co., Ltd. Report No.: ACI-F25104 Signify North America Corporation FCC ID: 2AF2NBCB4WFL1 Page 2 of 64 TABLE OF CONTENTS Page 1 SUMMARY OF STANDARDS AND RESULTS .......................................................................... 5 1.1 Description of Standards and Results ......................................................................................... 5 2 GENERAL INFORMATION .......................................................................................................... 6 2.1 Description of Equipment Under Test ........................................................................................ 6 2.2 EUT Specifications Assessed in Current Report ........................................................................ 7 2.3 Test Information ......................................................................................................................... 7 2.4 Duty Cycle Check ...................................................................................................................... 7 2.5 Sample Description .................................................................................................................... 8 2.6 Supported equipment .................................................................................................................. 8 2.7 Description of Test Facility ........................................................................................................ 8 3 CONDUCTED EMISSION TEST .................................................................................................. 9 3.1 Test Equipment ........................................................................................................................... 9 3.2 Block Diagram of Test Setup ..................................................................................................... 9 3.3 Conducted Emission Limits ..................................................................................................... 10 3.4 Test Configuration .................................................................................................................... 10 3.5 Operating Condition of EUT .................................................................................................... 10 3.6 Test Procedures ........................................................................................................................ 10 3.7 Test Results .............................................................................................................................. 11 4 RADIATED EMISSION TEST ..................................................................................................... 16 4.1 Test Equipment ......................................................................................................................... 16 4.2 Block Diagram of Test Setup ................................................................................................... 17 4.3 Radiated Emission Limit (§15.209) ......................................................................................... 19 4.4 Test Configuration .................................................................................................................... 19 4.5 Operating Condition of EUT .................................................................................................... 19 4.6 Test Procedures ........................................................................................................................ 19 4.7 Test Results .............................................................................................................................. 21 5 6 DB BANDWIDTH MEASUREMENT ...................................................................................... 47 5.1 Test Equipment ......................................................................................................................... 47 5.2 Block Diagram of Test Setup ................................................................................................... 47 5.3 Specification Limits (§15.247(a)(2)) ........................................................................................ 47 5.4 Operating Condition of EUT .................................................................................................... 47 5.5 Test Procedure .......................................................................................................................... 47 5.6 Test Results .............................................................................................................................. 48 6 MAXIMUM PEAK OUTPUT POWER MEASUREMENT ...................................................... 50 6.1 Test Equipment ......................................................................................................................... 50 6.2 Block Diagram of Test Setup ..............................................................…
Text truncated - open the document above for the full version.
10275 West Higgins Road · Rosemont, Illinois, 60018 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 3.50 mW |
| 2 | 15C | 2.40 GHz - 2.48 GHz | 9.20 mW |