FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Vimtag Technology Co., Ltd/
  3. 2AFG2-IPC

2AFG2-IPCCloud Camera

Vimtag Technology Co., Ltd
Cloud Camera - FCC ID 2AFG2-IPC - Vimtag Technology Co., Ltd
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Aug 29, 2015
Application Purpose
Original Equipment
Date of Application
Aug 25, 2015
Equipment Note
Cloud Camera
Frequency Range
2412.00000000 - 2462.00000000
Company
Vimtag Technology Co., Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗
↗

External Photos

ID Label/Location Info

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

VT - 361 user manuals IP Camera (HD Cloud camera) User's manual M M o o d d e e l l:VT-361 Note: After landing in order to protect your privacy, please modify the factory password, and take good care of the user name and password. Manual version: VersionDatedescription V1.0September 16, 2012 IPC1 revised version of A1 Note: in practical application, it is possible to instruction function to the user the hands of the function of the machine have access. 1  VT - 361 user manuals Content Product Overview.............................................................................................................................4 Packing List..............................................................................................................................4 System Requirements................................................................................................................4 Introduction...............................................................................................................................4 Features.....................................................................................................................................5 Overview of the Hardware view...............................................................................................6 Installation.........................................................................................................................................7 Hardware Installation................................................................................................................7 Camera Installation Wizard.......................................................................................................8 Wireless Installation Considerations.......................................................................................11 Home page......................................................................................................................................13 One .Camera status bar:..........................................................................................................13 Two. Image settings and PTZ control bar...............................................................................14 The recorded single frequency................................................................................................15 Playback..........................................................................................................................................15 Log..................................................................................................................................................16 Management....................................................................................................................................17 One. Product information:..................................................................................................17 Two . User...............................................................................................................................18 Equipment nickname.......................................................................................................18 Password:........................................................................................................................18 Three. Media stream:..............................................................................................................19 Stream.............................................................................................................................19 Image:.............................................................................................................................19 Framerate........................................................................................................................19 Four. Network.........................................................................................................................20 1. Ethernet:......................................................................................................................20 2. Wireless Network:.......................................................................................................21 Five. Servers...........................................................................................................................22 IP address........................................................................................................................22 Six. Media transfer:.................................................................................................................23 Transfer Protocol:............................................................................................................23 Seven. PTZ..............................................................................................................................23 Speed...............................................................................................................................24 Eight. OSD:.............................................................................................................................24 Display Name..................................................................................................................25 Display date.....................................................................................................................25 Date format.....................................................................................................................25 Display week...................................................................................................................25 NineˊAudio:..........................................................................................................................26 Speaker..........................................................…

Text truncated - open the document above for the full version.

Cover Letter(s)

W ou VT 1,V ele dif We, Vim ur prod T‐362,V VT‐321 ectrica fferent D mtag Te duct Cl VT‐360 1,VT‐32 ally ide t. Declara echnolo loud C 0W,VT‐ 20W,V entical ation ogy Co Camera ‐366,VT VT‐322, ,only m lette o., Ltd a, Mod T‐368, ,VT‐32 model er declar del No. ,VT‐83 2/B6 a no is red tha : VT‐3 1,VT‐ 8 are at 61, 86

Internal Photos

Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 43 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 44 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 45 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 46 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 47 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 48 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 49 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 50 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 51 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 52 of 53 Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 53 of 53 ------End of report------

RF Exposure Info

Prediction of MPE at a given distance 1. Limits The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in 1.1307(b) Frequency range (MHz) Electric field strength (V/m) Magnetic field strength (A/m) Power density (mW/cm 2 ) Averaging time (minutes) (A) Limits for Occupational/Controlled Exposures 0.3–3.0 614 1.63 *(100) 6 3.0–30 1842/f 4.89/f *(900/f 2 ) 6 30–300 61.4 0.163 1.0 6 300–1500 f/300 6 1500–100,000 5 6 (B) Limits for General Population/Uncontrolled Exposure 0.3–1.34 614 1.63 *(100) 30 1.34–30 824/f 2.19/f *(180/f 2 ) 30 30–300 27.5 0.073 0.2 30 300–1500 f/1500 30 1500–100,000 1.0 30 2. Test Procedure Equation from page 18 of OET Bulletin 65, Edition 97-01 Where: S = power density P = power input to the antenna G = numeric gain of the antenna in the direction of interest relative to an isotropic radiator R = distance to the centre of radiation of the antenna 3. Result Frequency (MHz) Maximum Output power (dBm) Maximum Output power (mW) Antenna Gain (dBi) Antenna Gain (numeric) Distance (cm) Result (mW/cm 2 ) Limits for General Population/ Uncontrolled Exposure (mW/cm 2 ) 802.11b 2412 11.56 14.32 3.0 2.00 20.00 0.0057 1 Note: Just the worst case mode was shown in report.

Test Report

Shenzhen Zhongjian Nanfang Testing Co., Ltd. Report No: CCIS15080063001 Authorized Signature: Bruce Zhang Laboratory Manager This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other samples of the same product and does not permit the use of the CCIS product certification mark. The manufacturer should ensure that all products in series production are in conformity with the product sample detailed in this report. This report may only be reproduced and distributed in full. If the product in this report is used in any configura tion other than that detailed in the report, the manufacturer must ensure the new system complies with all relevant standards. This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Unless otherwise stated the results shown in this test report refer only to the sample(s) t ested and such sample(s) are retained for 90 days only. 1 Cover Page FCC REPORT (WIFI) Applicant: Vimtag Technology Co., Ltd Address of Applicant: 6F. Suite A, Nanfeng Building, No.1183, Liuxian Road, Nanshan District, Shenzhen, CN Equipment Under Test (EUT) Product Name: Cloud Camera Model No.: VT-361, VT-362, VT-360W, VT-366, VT-368, VT-831, VT-861, VT-321, VT-320W, VT-322, VT-322/B6 Trade mark: Vimtag FCC ID: 2AFG2-IPC Applicable standards: FCC CFR Title 47 Part 15 Subpart C Section 15.247 Date of sample receipt: 07 Aug., 2015 Date of Test: 07 Aug., 2015 to 21 Aug., 2015 Date of report issued: 24 Aug., 2015 Test Result: PASS* * In the configuration tested, the EUT complied with the standards specified above. Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 2 of 53 2 Version Version No. Date Description 00 24 Aug., 2015 Original Prepared by: Date: 24 Aug., 2015 Report Clerk Reviewed by: Date: 24 Aug., 2015 Project Engineer Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 3 of 53 3 Contents Page 1 COVER PAGE ....................................................................................................................................................... 1 2 VERSION ............................................................................................................................................................... 2 3 CONTENTS ........................................................................................................................................................... 3 4 TEST SUMMARY .................................................................................................................................................. 4 5 GENERAL INFORMATION .................................................................................................................................. 5 5.1 CLIENT INFORMATION ............................................................................................................................................ 5 5.2 GENERAL DESCRIPTION OF E.U.T. ....................................................................................................................... 5 5.3 TEST ENVIRONMENT AND MODE ............................................................................................................................ 7 5.4 LABORATORY FACILITY .......................................................................................................................................... 8 5.5 LABORATORY LOCATION ....................................................................................................................................... 8 5.6 TEST INSTRUMENTS LIST ....................................................................................................................................... 9 6 TEST RESULTS AND MEASUREMENT DATA .............................................................................................. 10 6.1 ANTENNA REQUIREMENT ..................................................................................................................................... 10 6.2 CONDUCTED EMISSION ....................................................................................................................................... 11 6.3 CONDUCTED OUTPUT POWER ............................................................................................................................ 14 6.4 OCCUPY BANDWIDTH .......................................................................................................................................... 16 6.5 POWER SPECTRAL DENSITY ............................................................................................................................... 19 6.6 BAND EDGE ......................................................................................................................................................... 21 6.6.1 Conducted Emission Method...................................................................................................................... 21 6.6.2 Radiated Emission Method ......................................................................................................................... 23 6.7 SPURIOUS EMISSION ........................................................................................................................................... 28 6.7.1 Conducted Emission Method...............…

Text truncated - open the document above for the full version.

Test Setup Photos

Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 36 of 53 7 Test Setup Photo Radiated Spurious Emission Report No: CCIS15080063001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS150800630RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 37 of 53 Conducted Emission

Contact Information

Applicant

Yong Xie
[email protected]0755-26518999Fax: 0755-26518222

Technical Contact

Shenzhen Zhongjian Nanfang TestingBruce Zhang
bruce.zhang@ccis-cb/com

Shenzhen · China

Non-Technical Contact

Shenzhen Zhongjian Nanfang Testing CoLisa Chen
[email protected]

Test Firm

Shenzhen Zhongjian Nanfang Testing Co.,LtdBruce Zhang
[email protected]86-755-23118282Fax: 86-755-23116366

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.41 GHz - 2.46 GHz14.32 mW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other transmitter. End-users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance.

Other Applications from Vimtag Technology Co., Ltd

Cloud Camera - FCC ID 2AFG2-M1 - Vimtag Technology Co., Ltd
2AFG2-M1

Cloud Camera

Dec 11, 2015

Equipment Class

DTS - Digital Transmission System
Cloud Camera - FCC ID 2AFG2-P1 - Vimtag Technology Co., Ltd
2AFG2-P1

Cloud Camera

Dec 06, 2015

Equipment Class

DTS - Digital Transmission System