
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
1 User Manual SWV(EN) V . A Zigbee Smart Water Valve powered by four AA batteries, which easy and quick to install. You can remotely control and set scheduled irrigation, quantitative irrigation, intelligent scenes and so on through the APP to make the traditional irrigation system intelligent. It supports statistics of irrigation water consumption, and can view 6-month historical records at any time, helping you better manage water resources and save water bills. Introduction Zigbee Smart Water Valve User Manual V1.0 APP control Timed watering Cyclic irrigation 2 *The functional characteristics depend on the functionality of Zigbee gateway. Compatible Voice Assistants Specification Water consumption statistics 6-month history Scene linkage ① Inlet ② Outlet ③ Button • Single press: Turn on/off the smart device. • Press and hold for 5 seconds: The device enters the pairing mode. ④ LED indicator (Green) • Steady on: Normal connection with the gateway. • Slow flash: The device is in pairing mode. • Fast flash: Abnormal connection with the gateway. ⑤ Battery slot 3 Please download the "eWeLink" App from Google Play Store or Apple App Store. Download the eWeLink App & Add SONOFF Zigbee Gateway Power On the Device Model SWV-NH, SWV-BSP MCU EFR32MG22 Rating 6V⎓(4*1.5V AA) Wireless connection Zigbee 3.0 Communication distance 130M (open space) Waterproof IP55 Working Pressure 0.06~0.8 MPa Net weight 278g Dimension 152x100x46mm Color Black Casing materials PC+ABS Working Temperatur 5~60°C Watering Temperatur 5~40°C Working humidity 5%~95% RH, non-condensing Working altitude ≤2000M Certification CE/FCC/ISED Executive standard EN62368-1 4 Scan QR Code to Add Device ① Hold both ends of the battery compartment cover and pull out the battery slot. ② Install four AA batteries. ③ Firmly press the battery slot into the device until the snap at the arrow is visible. ④ After powering on, the button LED light flashes. 5 Enter “Scan” Scan the QR code on the device Select “Add Device” Long press the button for 5 seconds The LED indicator flashes slowly for 180s Select Zigbee gateway 6 Recommended SONOFF gateway models: ZBBridge-P (V2.0.0), NSPanel Pro (V3.3.0), iHost (V2.1.0), ZBBridge-U (soon to be supported) *Before adding a device, please upgrade the gateway firmware to the above version or the latest version. Other compatible SONOFF gateway models: ZBDongel-P, ZBDongel-E Third-party compatible gateway models: Amazon Gateway Model:E cho Plus 2nd, Echo Show 2nd, Echo 4th Gen *Other gateways supporting ZigBee3.0 wireless protocol. Detailed information is in accordance with the final product. First, wrap the thread seal tape around the thread of the faucet, then screw the nut of the water inlet of the equipment onto the faucet. After testing that there is no leakage, finally connect the hose to the water outlet of the equipment (if the water outlet leaks, please wrap thread seal tape around the thread of the water outlet). Matched Gateways Installation Wait until the addition is done 7 *It is recommended to install vertically as horizontal installation may increase the error in flow rate measurement. The maximum communication distance of this device is 130M (open space). 1.This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. 2.Changes or modifications not expressly approved by the party responsible for compliance Communication Distance FCC compliance statement 8 could void the user's authority to operate the equipment. Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: —Re orient or relocate the receiving antenna. —I ncrease the separation between the equipment and receiver. —C onnect the equipment to an outlet on a circuit different from that to which the receiver is connected. —C onsult the dealer or an experienced radio/TV technician for help. FCC Radiation Exposure statement: This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with a minimum distance of 20 cm between the radiator and your body. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. This device contains license-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canada’s license-exempt RSS(s). Operation is subject to the following two conditions: (1)This device may not cause interference. (2)This device must accept any interference, including interference that may cause undesired operation of the device. This Class B digital apparatus complies with Canadian ICES‐003(B). This device complies with RSS‐247 of Industry Canada. Operation is subject to the condition that ISED Notice 9 this device does not cause harmful interference. L’émetteur/récepteur exempt de licence contenu dans le présent appareil est conforme aux CNR d’Innovation, Sciences et Développement économique Canada applicables aux appareils radio exempts de licence. L’exploitation est autorisée aux deux conditions suivantes : (1)L’appareil n…
Text truncated - open the document above for the full version.
Shenzhen Sonoff Technologies Co.,Ltd. Covered Equipment Certification Attestation Letter 3/28/2024 Nemko North America, Inc. 303 River Road Ottawa K1V 1H2 Canada ATTN.: Reviewing Engineer FCC ID: 2APN5SWV Shenzhen Sonoff Technologies Co.,Ltd. (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. Note: If the equipment for which the applicant seeks authorization is produced by any of the entities identified on the current Covered List, the applicant should include an explanation on why the equipment is not “covered” equipment. Shenzhen Sonoff Technologies Co.,Ltd. (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Signed: Printed name: Stan Li Title: Manager Company Name: Shenzhen Sonoff Technologies Co.,Ltd. Date: 3/28/2024
Shenzhen Sonoff Technologies Co.,Ltd. * the applicant must designate a contact located in the United States for purposes of acting as the applicant’s agent for service of process, regardless of whether the applicant is a domestic or foreign entity. An applicant located in the United States may designate itself as the agent for service of process. U.S. Agent Designation for Service of Process - Certification Attestation Letter June 24, 2024 Nemko North America, Inc. 303 River Road Ottawa K1V 1H2 Canada ATTN.: Reviewing Engineer FCC ID: 2APN5SWV Per section 2.911(d)(7) of the FCC rules, Shenzhen Sonoff Technologies Co.,Ltd. (“the applicant”) certifies that the equipment for which authorization is sought is designated to the following U.S. Designated agent* for service of process: Company Name: ITEAD,LLC Physical U.S. Company Address: 651 N Broad St, Suite 201 Middletown, DE 19709 United States Agent name: Felix Li Agent Email Address: [email protected] FRN: 0033682634 The above contact person accepts the obligation for service of process. The applicant accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any Commission-related proceeding involving the equipment. Applicant Signed: Designated Agent Signed: (Required, if different to Applicant): Signed: Signed: Printed name: Stan Li Printed name: Felix Li Title: Manager Title: Manager Company Name: Shenzhen Sonoff Technologies Co.,Ltd. Company Name: ITEAD,LLC Date: March 28, 2024 Date: March 28, 2024 FRN Code: 0027467786 FRN Code: 0033682634
Shenzhen Sonoff Technologies Co.,Ltd. Differences Declaration Date: Mar. 28, 2024 To whom concern, We company Shenzhen Sonoff Technologies Co.,Ltd. Here by declares: The product model(s) SWV-BSP, SWV-NH (All these models are identical in the same PCB, layout, electrical circuit and enclosure. The difference is the model name and the interface thread.) Sincerely yours, Signature: Name: Stan Li Company: Shenzhen Sonoff Technologies Co.,Ltd. Address: 3F & 6F, Bldg A, No. 663, Bulong Rd, Shenzhen, Guangdong, China Phone: 0755-27955416 Fax: 0755-27955416 Email: [email protected]
Shenzhen Sonoff Technologies Co.,Ltd. Date: Mar. 28, 2024 Equipment Autorisation Division Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 FCC ID:__2APN5SWV____ Product Name:___Zigbee Smart Water Valve____ Request for Confidentiality Pursuant to Sections 0.457 and 0.459 of the commissions rules, we hereby request that the following documents be held confidential: (List here the documents for which you are seeking confidentiality – for example ...) • Schematics • Block Diagram • Operation Description These materials contain trade secrets and proprietary information and are not customarily released to the public. The public disclosure of this information might be harmful to the company and provide unjustified benefits to our competitors. Signature: Name: Stan Li Company: Shenzhen Sonoff Technologies Co.,Ltd. Address: 3F & 6F, Bldg A, No. 663, Bulong Rd, Shenzhen, Guangdong, China Phone: 0755-27955416 Fax: 0755-27955416 Email: [email protected]
CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn Page 1 of 3 External Photos Page 2 of 3 Page 3 of 3
CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn Page 1 of 3 External Photos Page 2 of 3 Page 3 of 3
认证缺失信息 2024.04.19 (注意分清正反面) 1 字体:opensanssemibold(sonoff主用的) 65.79 mm 5 0 . 8 9 m m 48.31 mm 40.42 mm 2 1 . 8 0 m m 4 6 . 6 3 m m 20.17 mm
认证缺失信息 2024.04.19 (注意分清正反面) 1 字体:opensanssemibold(sonoff主用的) :灰色 SWV-NH中壳镭雕 2024.6.20 1 2 . 1 6 m m 21.56 mm 4 6 . 4 7 m m 48.02 mm 65.66 mm 5 0 . 6 2 m m
CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn Page 1 of 3 Internal Photos Page 2 of 3 Antenna Page 3 of 3
CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn Page 1 of 3 Internal Photos Page 2 of 3 Antenna Page 3 of 3
ANTENNA SPECIFICATION Product description: 2.4G PCB Antenna Uni Link’s part number: ANTENNA-2400-2500A(Zigbee) Issue Date: 2024.02.26 Note: 2400-2500MHz Manufacturer: Shenzhen Sonoff Technologies Co.,Ltd. Address: 3F & 6F, Bldg A, No. 663, Bulong Rd, Shenzhen, Guangdong, China 1、(PRODUCT TECHNICAL SPECIFICATION) Electrical Specifications Frequency Range (MHz) 2400-2500 Input Impendence (Ω) 50 V.S.W.R ≤2 Gain(dBi) -0.17 Polarization Type Horizontal Power Capacity (w) 2 Mechanical Specifications Antenna Length (mm) NC Radiator Cuprum Connect Type NC Working Temp( °C) -10~60 2、PRODUCT PICTURE 3、PRODUCT SPECIFICATION CHART 4、Image of antenna field shape test Storage Temperature(°C) -20~85 antenna size 14.5*5mm Weight(g) /
CTC Laboratories, Inc. (FCC Designation Number: CN1208) Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel.: (86)755-27521059 Fax: (86)755-27521011 Http://www.sz-ctc.org.cn For anti-fake verification, please visit the official website of Certification and Accreditation Administration of the People’s Republic of China : yz.cnca.cn Maximum Permissible Exposure Evaluation FCC ID: 2APN5SWV According to FCC 1.1310: The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) Radiation as specified in §1.1307(b). EUT Specification Applicant Shenzhen Sonoff Technologies Co.,Ltd. Address 3F & 6F, Bldg A, No. 663, Bulong Rd, Shenzhen, Guangdong, China Product Name: Zigbee Smart Water Valve Trade Mark: Sonoff Model/Type Reference: SWV-BSP Listed Model(s): SWV-NH Model Differences: All these models are identical in the same PCB, layout, electrical circuit and enclosure. The difference is the model name and the interface thread. Frequency Band (Operating) Zigbee: 2405~2480MHz Device Category Portable (<5mm separation) Mobile (>20cm separation) Fixed (>20cm separation) Others ___ Exposure Classification Occupational/Controlled exposure (S=5mW/cm 2 ) General Population/Uncontrolled exposure (S=1mW/cm 2 ) Antenna Diversity Single antenna Multiple antennas TX diversity RX diversity TX/RX diversity Antenna Gain (Max) -0.17dBi Evaluation Applied MPE Evaluation SAR Evaluation Page 2 of 2 Report No.: CTC20240757E05 CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel.: (86)755-27521059 Fax: (86)755-27521011 Http://www.sz-ctc.org.cn For anti-fake verification, please visit the official website of Certification and Accreditation Administration of the People’s Republic of China : yz.cnca.cn Limits for Maximum Permissible Exposure (MPE) Frequency Range (MHz) Electric Field Strength (V/m) Magnetic Field Strength (A/m) Power Density (mW/cm 2 ) Averaging Time (minutes) (A) Limits for Occupational/Controlled Exposure 300-1500 -- -- F/300 <6 1500-100000 -- -- 5 <6 (B) Limits for General Population/Uncontrolled Exposure 300-1500 -- -- F/1500 <30 1500-100000 -- -- 1 <30 Calculation Method Friis transmission formula: Pd=(P out *G)/(4*Pi*R 2 ) Where: Pd= Power density in mW/cm 2 P out = output power to antenna in mW G= gain of antenna in linear scale Pi= 3.1416 R= distance between observation point and center of the radiator in cm Pd limit of MPE is 1mW/cm 2 . If we know the maximum gain of the antenna and total power input to the antenna, through the calculation, we will know the distance where the MPE limit is reached. Measurement Result Mode Frequency (MHz) Antenna Gain (dBi) Maximum Power (dBm) Tune Up Tolerance (dB) Max. Tune Up Power (dBm) Power Density at 20cm (mW/cm 2 ) Limit (mW/cm 2 ) Result Zigbee 2405 -0.17 6.01 ±1 7.00 0.0010 1 Pass Note: 1. Calculate in the worst-case mode. 2. Max. Tune Up Power is declared by manufacturer, and used to calculate. 3. For a more detailed features description, please refer to the RF Test Report. **********************THE END**********************
CTC Laboratories, Inc. $CNAS$ Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn TEST REPORT Report No. ··························: CTC20240757E04 FCC ID.................................: 2APN5SWV IC........................................: 29127-SWV Applicant····························: Shenzhen Sonoff Technologies Co.,Ltd. Address·······························: 3F & 6F, Bldg A, No. 663, Bulong Rd, Shenzhen, Guangdong, China Manufacturer························: Shenzhen Sonoff Technologies Co.,Ltd. Address·······························: 3F & 6F, Bldg A, No. 663, Bulong Rd, Shenzhen, Guangdong, China Product Name······················: Zigbee Smart Water Valve Trade Mark···························: , Sonoff Model/Type reference·············: SWV-BSP Listed Model(s) ·····················: SWV-NH Standard·····························: FCC CFR Title 47 Part 15 Subpart C Section 15.247 RSS-247 Issue 3 Date of receipt of test sample...: Mar. 12, 2024 Date of testing.......................: Mar. 12, 2024 to Mar. 27, 2024 Date of issue.........................: Jun. 19, 2024 Result.................................: PASS Compiled by: (Printed name+signature) Jim Jiang Supervised by: (Printed name+signature) Eric Zhang Approved by: (Printed name+signature) Totti Zhao $英文检测章$ $Totti$ This test report may be duplicated completely for legal use with the approval of the applicant. It should not be reproduced except in full, without the written approval of our laboratory. The client should not use it to claim product endorsement by CTC. The test results in the report only apply to the tested sample. The test report shall be invalid without all the signatures of testing engineers, reviewer and approver. Any objections must be raised to CTC within 15 days since the date when the report is received. It will not be taken into consideration beyond this limit. The test report merely correspond to the test sample. Page 2 of 40 Report No.: CTC20240121E04 CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel.: (86)755-27521059 Fax: (86)755-27521011 Http://www.sz-ctc.org.cn For anti-fake verification, please visit the official website of Certification and Accreditation Administration of the People’s Republic of China : yz.cnca.cn Table of Contents Page 1. TEST SUMMARY ..........................................................................................................................................................3 1.1. TEST STANDARDS .............................................................................................................................................................3 1.2. REPORT VERSION ............................................................................................................................................................3 1.3. TEST DESCRIPTION ...........................................................................................................................................................3 1.4. TEST FACILITY .................................................................................................................................................................4 1.5. MEASUREMENT UNCERTAINTY ...........................................................................................................................................4 1.6. ENVIRONMENTAL CONDITIONS ...........................................................................................................................................5 2. GENERAL INFORMATION .............................................................................................................................................6 2.1. CLIENT INFORMATION ......................................................................................................................................................6 2.2. GENERAL DESCRIPTION OF EUT .........................................................................................................................................6 2.3. ACCESSORY EQUIPMENT INFORMATION ...............................................................................................................................7 2.4. OPERATION STATE ...........................................................................................................................................................8 2.5. MEASUREMENT INSTRUMENTS LIST ....................................................................................................................................9 3. TEST ITEM AND RESULTS ........................................................................................................................................... 11 3.1. CONDUCTED EMISSION ...................................................................................................................................................11 3.2. RADIATED EMISSION ......................................................................................................................................................13 3.3. BAND EDGE EMISSIONS (RADIATED) .................................................................................................................................21 3.4. BAND EDGE AND SPURIOUS EMISSIONS (CONDUCTED) .........................................................................................................26 3.5. DTS BANDWIDTH ..........................................................................................................................................................32 3.6. PEAK OUTPUT POWER ...................................................................................................................................................35 3.7. POWER SPECTRAL DENSITY .....…
Text truncated - open the document above for the full version.
CTC Laboratories, Inc. Room 101 Building B, No. 7, Lanqing 1st Road, Luhu Community, Guanhu Subdistrict, Longhua District, Shenzhen, Guangdong, China Tel: +86-755-27521059 Fax: +86-755-27521011 http://www.sz-ctc.org.cn Page 1 of 1 Radiated Measurement 30-1000MHz Above 1GHz
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 4.00 mW |

Zigbee Temperature Humidity Sensor
Equipment Class
DTS - Digital Transmission System
Matter Over WiFi Smart Switch
Equipment Class
DTS - Digital Transmission System
Zigbee/Thread USB Dongle
Equipment Class
DTS - Digital Transmission System
Matter Over WiFi Smart Plug
Equipment Class
DTS - Digital Transmission System
Zigbee Siren
Equipment Class
DTS - Digital Transmission System