FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Telco Accessories B.V./
  3. 2AQOFDS201

2AQOFDS201Xtorm Wireless Charging Pad &Stand-Delta

Telco Accessories B.V.
Xtorm Wireless Charging Pad &Stand-Delta - FCC ID 2AQOFDS201 - Telco Accessories B.V.
Click to zoom

Application Details

Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
Date of Grant
Mar 21, 2020
Application Purpose
Original Equipment
Date of Application
Mar 21, 2020
Equipment Note
Xtorm Wireless Charging Pad &Stand-Delta
Frequency Range
0.11000000 - 0.20500000
Company
Telco Accessories B.V.
Country
Netherlands

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

IN THE BOX USB10 USB-C CABLE INSTRUCTION MANUAL 1/3 Wireless Output FAST CHARGING 15W Input USB-C "' PD 18W (5V/2A. 9V/2A.12V/1.5A) SPECIFICATIONS Output lx Wireless Qi (SW/ 7jsw / ,ow / 1SW) Input USB-CP01SW(SV/2,4. 9V/2A, 12V/1.SA) Quick Charge 3.01BWI Recommended Adapter USB-C PD 18W + USB-C PD cable (both not includqd) ql..= Dimensions 155x75x7mm Weight 160 grams Including 30cm USB to USB-C cable. CHARGING aluminium stand, manual (<{;_]>)) WIRELESS FAST CHARGING QI TECHNOLOGY STAND INCLUDED DETAILED DESIGN 8 2YEA� WARRANTY Some Qi compa ible devices are able to charge at speeds of up to �5W. To achieve this high output it 1s necessary to co1nect this wireless charger to a 18W USB- PD a dapter Qi is the urnvers I standard used for wireless charging Its name is borro ed from the traditional Chinese language. mean · g "life force· or ·natural energy" } The De l ta can b used as either a c harging pad or charging stand, t�anks to the inclu d ed aluminium stand This makes charging your smartphone super easy, while keeping your horpe both stylish an d organized The Delta 1s des, ned and engineered with a great attention to detai , and incorporates high quality materials like alu inium and tempered glass All Xterm produ ts have a 2 year warranty in case something goes !wrong. We ensure that you will receive a replac ment if the product fails within 2 years 2/3 QUICK START I Fl ST USE - 18W USB-C PD adapter Power outlet Connect your own USB adapter with the USB-C cable and plug It Into a power outlet Connect the USB-C cable with the Charging Stand_ Plea .. note: You can use the charging pad filth other adapters, although the wireless output will be limited. In order to make full he of the 1SW wireless output, It Is recommended to use a 1BW USB CPD adapter. 3/3 CHARGE YOUR M BILE DEVICE I WIRELESSLY I WIRELESS CHARGING SURFACE COMPATIBLE WITH D Smartphones with QI TECHNOLOGY ,r Wireless EARBUDS FCC Statement This device complies with Part 15 of the FCC Rules. Operation is subject to the foUowing two conditions: (1) this device may not cause harmful interfsrenca, and (2) this dsvice must accept any interference received, including interference that may cause undesired operation. Caution: The user is cautioned tha1 changes or modilications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. Note: Tois equipment has been tested and found to comply with the linits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the i'lstructions, may cause haimful interffrence to radio oommunications. However, there is no guarantee that interference will not occur in a particular i'lstallation. If this equipment does cause harmful interference to radio or television reception, which can be detemiined by turning the equipment off and on, the user is encouraged to try to correct the interfa'ence by one or more of the folkJwing measures: Reorient or relocate the receMng antsrna. Increase the separation between the equipment and receiver. Connect the equipment into an outlet on a circuit different from tha1 to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. FCC RF radiation exposure statement This equipment complies with FCC radiation exposure limits set forth for an uncontrolled erNironment. This equipment shouk:J be installed and operated with a minimum distance of 20cm between the radiator and any part of your body.

Cover Letter(s)

Telco Accessories B.V. Date: 07-01-2020 Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 To whom it may concern: I, the undersigned, hereby authorize UL Verification Services Inc. to act on our behalf in all manners relating to application for equipment authorization, including signing of all documents relating to these matters. Any and all acts carried out by UL Verification Services Inc. on our behalf shall have the same effect as acts of our own. I, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 853(a). In authorizing UL Verification Services Inc. as our representative, we still recognize that we are responsible to: a) comply with the relevant provisions of the certification program; b) make all necessary arrangements for the conduct of the evaluation, including provision for examining documentation and access to all areas, records (including internal audit reports) and personnel for the purposes of evaluation (e.g. testing, inspection, assessment, surveillance, reassessment) and resolution of complaints; c) make claims regarding certification only in respect of the scope for which certification has been granted; d) do not use our product certification in such a manner as to bring the Certification Division into disrepute and not make any statement regarding our product certification which the Certification Division may consider misleading or unauthorized; e) upon suspension or cancellation of certification, discontinue use of all advertising matter that contains any reference thereto and return any certification documents as required by the Certification Division; f) use certification only to indicate the products are certified as being in conformity with specified standards; g) endeavor to ensure that no certificate or report nor any part thereof is used in a misleading manner; h) ensure that any reference to our product certification in communication media such as documents, brochures or advertising, complies with the requirements of the Certification Division; i) keep a record of all complaints made known to us relating to the product’s compliance with requirements of the relevant standard and to make these records available to the when requested; j) take appropriate action with respect to such complaints and any deficiencies found in products or services that affect compliance with the requirements for certification; k) document the actions taken. This authorization is valid until further written notice from the applicant. Sincerely Yours, Signed by: Company Name: Telco Accessories B.V. Contact Name: Ralph Both Title of Person:CEO Address: Hoofdveste 19, 3992DH, Houten, The Netherlands

Cover Letter(s)

Telco Accessories B.V. Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 Subject: Request for Confidentiality FCC ID: 2AQOFDS201 To Whom It May Concern: Pursuant to the provisions of Sections 0.457 and 0.459 of the Commission’s rules (47 CFR §§ 0.457, 0.459), we are requesting the Commission to withhold the following attachments as confidential document from public disclosure indefinitely. Schematic Diagram Block Diagram Theory of Operation Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Best Regards Company Name: Telco Accessories B.V. Contact Name: Ralph Both Title of Person:CEO Address: Hoofdveste 19, 3992DH, Houten, The Netherlands

External Photos

Appendix I External Photographs Page 2 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. View of EUT-1 View of EUT-2 Page 3 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. View of EUT-3 View of EUT-4 Page 4 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. View of EUT-5

ID Label/Location Info

1 零件名称 产品编号 A 投影方向 批准:审批: 4 材 料 比 例 制图: 3 图 号 产品名称 4 3 B A 2 1 C 处理工艺 零件料号 版 本 日 期 单 位mm C BP264丝印 移动电源 D 2 B C 2 1 标记 修改前 修改日期修改后 T-RD-CAD-18A 公差表 2020-01-08 BP264-SY3155C label location Label 32.4mm 21.8mm 12mm 1mm 21.8mm 15mm 43.4mm 修改丝印颜色 修改丝印位置 2020-01-03 2020-01-08 FCC ID:2AQOFDS201 18 18

Internal Photos

Appendix II Internal Photographs Page 2 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Internal View of EUT-1 Internal View of EUT-2 Antenna 1 Antenna 2 Page 3 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Internal View of EUT-3 Internal View of EUT-4 Page 4 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Internal View of EUT-5

RF Exposure Info

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. This report does not imply that the product(s) has met the criteria for certification. FCC RF EXPOSURE REPORT For Xtorm Wireless Charging Pad &Stand-Delta DS201 FCC ID: 2AQOFDS201 REPORT NUMBER: 4789251037.2-2 ISSUE DATE: January 6, 2020 Prepared for Telco Accessories B.V. Hoofdveste 19, 3992DH, Houten, The Netherlands Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4789251037.2-2 Page 2 of 14 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO.: 10-SL-F0019 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Revision History Rev. Issue Date Revisions Revised By V0 01/06/2020 Initial Issue This test report is only published to and used by the applicant, and it is not for evidence purpose in China. REPORT NO.: 4789251037.2-2 Page 3 of 14 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO.: 10-SL-F0019 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS ..................................................................................4 2. TEST METHODOLOGY ......................................................................................................5 3. FACILITIES AND ACCREDITATION ..................................................................................5 4. REQUIREMENT ..................................................................................................................7 REPORT NO.: 4789251037.2-2 Page 4 of 14 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO.: 10-SL-F0019 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch 1. ATTESTATION OF TEST RESULTS Applicant Information Company Name: Telco Accessories B.V. Address: Hoofdveste 19, 3992DH, Houten, The Netherlands Manufacturer Information Company Name: Shenzhen Trusda Industrial Co.,Ltd. Address: 3/F, Building 4, Lianchuang Technology Park, Bulan Road,Nanwan Street,Longgang District, Shenzhen, China EUT Description EUT Name: Xtorm Wireless Charging Pad &Stand-Delta Model: DS201 Model Difference: / Brand Name: XTORM Sample Status: Normal Sample ID: 2756343 Sample Received Date: December 13, 2019 Date of Tested: December 18, 2019 ~ December 24, 2019 APPLICABLE STANDARDS STANDARD TEST RESULTS FCC 47CFR§1.1307 PASS FCC 47CFR§1.1310 PASS FCC 47CFR§2.1093 PASS FCC 47CFR§2.1091 PASS Prepared By: Checked By: Denny Huang Shawn Wen Project Engineer Laboratory Leader Approved By: Stephen Guo Laboratory Manager REPORT NO.: 4789251037.2-2 Page 5 of 14 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO.: 10-SL-F0019 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch 2. TEST METHODOLOGY The tests documented in this report were performed in accordance with FCC 47CFR§1.1307(b)(1), FCC 47CFR§1.1310, FCC 47CFR§2.1093, 680106 D01 RF Exposure wireless charging apps v03. 3. FACILITIES AND ACCREDITATION Accreditation Certificate A2LA (Certificate No.: 4102.01) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with A2LA. FCC (FCC Designation No.: CN1187) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. Has been recognized to perform compliance testing on equipment subject to the Commission's Declaration of Conformity (DoC) and Certification rules IC (Company No.: 21320) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been registered and fully described in a report filed with Industry Canada. The Company Number is 21320. VCCI (Registration No.: G-20019, R-20004, C-20012 and T-20011) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with VCCI, the Membership No. is 3793. Facility Name: Chamber D, the VCCI registration No. is G-20019 and R-20004 Shielding Room B , the VCCI registration No. is C-20012 and T-20011 Note: All tests measurement facilities use to collect the measurement data are located at Building 10, Innovation Technology Park, Song Shan Lake Hi tech Development Zone, Dongguan, 523808, China REPORT NO.: 4789251037.2-2 Page 6 of 14 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO.: 10-SL-F0019 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch 4. DESCRIPTION OF EUT EUT Name Xtorm Wireless Charging Pad &Stand-Delta EUT Description The EUT is a wireless charger. Model DS200 Product Description Operation Frequency 110 ~ 205kHz Modulation Type MSK Rated Output Power Maximum 15W Antenna type Coil Ratings Type-C Input: DC 12V, 2A Note 1: The EUT have 2 coils, but only 1 coil active at any moment in time, both the coils and circuit before antenna are the same. Note 2: Because of the limited of the circuit, the 2 coils can’t be active at the same time. Note 3: The wireless charger function can’t use in standup configuration due to the sha…

Text truncated - open the document above for the full version.

Test Report

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. This report does not imply that the product(s) has met the criteria for certification. FCC 47 CFR PART 15 SUBPART C TEST REPORT For Xtorm Wireless Charging Pad &Stand-Delta DS201 FCC ID: 2AQOFDS201 REPORT NUMBER: 4789251037.2-1 ISSUE DATE: March 4, 2020 Prepared for Telco Accessories B.V. Hoofdveste 19, 3992DH, Houten, The Netherlands Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4789251037.2-1 Page 2 of 23 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0053 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 01/06/2020 Initial Issue REPORT NO.: 4789251037.2-1 Page 3 of 23 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0053 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Summary of Test Results Description of Test Item Standard Results Power Line Conducted Emission Test FCC 15.207 PASS Radiated Emission Test FCC 15.209 PASS 20dB Bandwidth FCC 15.215 PASS This test report is only published to and used by the applicant, and it is not for evidence purpose in China. REPORT NO.: 4789251037.2-1 Page 4 of 23 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0053 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS..................................................................................... 5 2. TEST METHODOLOGY......................................................................................................... 6 3. FACILITIES AND ACCREDITATION..................................................................................... 6 4. CALIBRATION AND UNCERTAINTY ................................................................................... 7 4.1. MEASURING INSTRUMENT CALIBRATION ........................................................... 7 4.2. MEASUREMENT UNCERTAINTY ............................................................................ 7 5. EQUIPMENT UNDER TEST .................................................................................................. 8 5.1. DESCRIPTION OF EUT ........................................................................................... 8 5.2. TEST MODE ............................................................................................................. 8 5.3. TEST ENVIRONMENT ............................................................................................. 8 5.4. ACCESSORY ........................................................................................................... 9 5.5. MEASURING INSTRUMENT LIST.......................................................................... 10 6. 20dB BANDWIDTH TEST ................................................................................................... 11 7. EMISSION TEST ................................................................................................................. 13 7.1. SPURIOUS EMISSIONS 30MHz - 1GHz ................................................................ 19 8. AC POWER LINE CONDUCTED EMISSIONS .................................................................... 21 REPORT NO.: 4789251037.2-1 Page 5 of 23 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0053 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 1. ATTESTATION OF TEST RESULTS Applicant Information Company Name: Telco Accessories B.V. Address: Hoofdveste 19, 3992DH, Houten, The Netherlands Manufacturer Information Company Name: Shenzhen Trusda Industrial Co.,Ltd. Address: 3/F, Building 4, Lianchuang Technology Park, Bulan Road,Nanwan Street,Longgang District, Shenzhen, China EUT Description EUT Name: Xtorm Wireless Charging Pad &Stand-Delta Model: DS201 Brand Name: XTORM Sample Status: Normal Sample ID: 2756343 Sample Received Date: December 13, 2019 Date of Tested: December 18, 2019 ~ March 4, 2020 APPLICABLE STANDARDS STANDARD TEST RESULTS CFR 47 FCC PART 15 SUBPART C PASS Prepared By: Checked By: Denny Huang Shawn Wen Project Engineer Laboratory Leader Approved By: Stephen Guo Laboratory Manager REPORT NO.: 4789251037.2-1 Page 6 of 23 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0053 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 2. TEST METHODOLOGY All tests were performed in accordance with the standard FCC CFR 47 Part 2, FCC CFR 47 Part 15C, KDB414788 D01 Radiated Test Site v01r01 and ANSI C63.10-2013. 3. FACILITIES AND ACCREDITATION Test Location UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. Address Building 10, Innovation Technology Park, Song Shan Lake Hi tech Development Zone, Dongguan, 523808, China Accreditation Certificate A2LA (Certificate No.: 4102.01) UL Verification Services (Guangzhou) Co., L…

Text truncated - open the document above for the full version.

Test Setup Photos

Appendix III Setup Photographs RADIATED EMISSIONS MEASUREMENT SETUP (30MHz ~ 1 GHz) POWERLINE CONDUCTED EMISSIONS MEASUREMENT SETUP RADIATED EMISSIONS MEASUREMENT SETUP (Below 30MHz) E-FILED AND H-FILED STRENGTH MEASUREMENT SETUP-1 E-FILED AND H-FILED STRENGTH MEASUREMENT SETUP-2 E-FILED AND H-FILED STRENGTH MEASUREMENT SETUP-3 E-FILED AND H-FILED STRENGTH MEASUREMENT SETUP-4 E-FILED AND H-FILED STRENGTH MEASUREMENT SETUP-5

Contact Information

Applicant

Ralph Both(CEO)
[email protected]+31 030 635 4800Fax: +31 030 635 4801

Test Firm

UL Verification Services (Guangzhou) Co., Ltd.Stephen Guo
[email protected]+86 0769 33817120

Technical Specifications

#Rule PartsFrequency RangePower Output
115C0.11 MHz - 0.205 MHz-
Confidentiality
Long Term
Grant Notes
This transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter. End-users and installers must be provided with transmitter operating conditions for satisfying RF exposure compliance.

Other Applications from Telco Accessories B.V.

Xtorm Power Bank Wireless 8000 - Alpha - FCC ID 2AQOFDS200 - Telco Accessories B.V.
2AQOFDS200

Xtorm Power Bank Wireless 8000 - Alpha

Mar 24, 2020

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz