Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
1/1 US Agent for Service of Process LETTER OF ATTESTATION TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 US Agent for Service of Process: Company Name: FCC US Agent,LLC FRN: 0033402884 Contact Name:Tim Payne Address: 3722 Illinois Avenue,Saint Charles,IL,60174,USA Telephone No: 708-571-3148 Email:[email protected] Applicant: Company name: Globe Electric Company Inc. Product Description: Ceiling Fan Grantee code: 2AQUQ FCC ID: 2AQUQGL37119 FRN:0027755594 Contact Name: Celine Zhu Address: 150 Oneida, Montreal, Quebec, Canada, H9R 1A8, Montreal , Canada Telephone No: +86-755-25192522 Email: [email protected] Globe Electric Company Inc. certifies that, as of the date of this filing of the application with the TCB, [FCC US Agent, LLC] is our designated US agent for service of process for the above referenced FCC ID. [Globe Electric Company Inc.] accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any commission related proceeding involving equipment. [FCC US Agent, LLC accepts, as of the date of the filing of the application, the obligation of the designated US agent for service of process for the above reference FCC ID. The US Agent for Service of Process is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. The Applicant is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. Date: 2026-08-25 Applicant’s Name: Celine Zhu US Agent’s Name: Title: Senior Project Manager Title: Signature: Signature Manager
Globe Electric Company Inc. Covered Equipment Certification Attestation Letter 2026-08-25 Nemko North America, Inc. 303 River Road Ottawa K1V 1H2 Canada ATTN.: Reviewing Engineer FCC ID:2AQUQGL37119 Globe Electric Company Inc. (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. Note: If the equipment for which the applicant seeks authorization is produced by any of the entities identified on the current Covered List, the applicant should include an explanation on why the equipment is not “covered” equipment. Globe Electric Company Inc. (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Globe Electric Company Inc. (“the applicant”) certifies that the equipment for which authorization is sought does not include cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors and assignees, including equipment with integrated Kaspersky Lab, Inc. (or any of its successors and assignees) cybersecurity or anti-virus software pursuant to DA-24-886 and KDB 986446 D01 Covered Equipment Guidance section B(2a). Signed: Printed name: Celine Zhu Title: Senior Project Manager Company Name: Globe Electric Company Inc. Address: 150 Oneida, Montreal, Quebec, Canada, H9R 1A8, Montreal , Canada Phone: +86-755-25192522 E-Mail: [email protected] Date: 2026-08-25
Globe Electric Company Inc. 2026-08-25 Nemko North America, Inc. 303 River Road Ottawa, Ontario, Canada K1V 1H2 AUTHORITY TO ACT AS AGENT - FCC On our behalf, I appoint Damon Hu, Guangdong Dongdian Testing Service Co.,Ltd.( Unit 2, Building 1, No.17, Zongbu 2nd Road, Songshan Lake Park, Dongguan, Guangdong, China, 523808), to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in FCC regulations will have affixed to it a label identical to that submitted for approval with this application. In signing this letter, Applicant certifies that neither the applicant nor any party to the application is not subject to a denial of Federal benefits, that include FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. § 862 because of a conviction for possession or distribution of a controlled substance. See 47 CFR 1.2002(b) for the definition of a "party" for these purposes. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by Nemko North America Inc., still resides still resides with us. Sincerely, Printed name: Celine Zhu Title: Senior Project Manager Company Name: Globe Electric Company Inc. Address: 150 Oneida, Montreal, Quebec, Canada, H9R 1A8, Montreal , Canada Phone: +86-755-25192522 E-Mail: [email protected] Date: 2026-08-25
Globe Electric Company Inc. 2026-08-25 Nemko North America, Inc. 303 River Road Ottawa, Ontario, Canada K1V 1H2 REQUEST FOR CONFIDENTIALITY – FCC FCC ID: 2AQUQGL37119 Pursuant to Sections 0.457(d) and 0.459 of the Commission’s Rules and FCC Guidance document 726920, we hereby request permanent confidential treatment of exhibits identified as such in the table below and request they are permanently withheld from public review based on the documents containing trade secrets and proprietary information not customarily released to the public. The public disclosure of this information might be harmful to the applicant and provide unjustified benefits to its competitors. We also request short-term confidentiality on certain exhibits until the intended date of marketing as outlined below. We request the exhibits be withheld from public view for a period of 180 days. We attest marketing of the product will only commence after the period of short-term confidentiality expires, or if marketing is to commence before the requested number of days listed above, the grantee will inform Nemko to release the Short-Term Confidentiality information withheld on the FCC equipment authorization website. Exhibit Type of Confidentiality Requested Block Diagrams ☒ Permanent ☐ Short Term External Photos ------------------ ☒ Short Term Internal Photos ☐ Permanent* ☒ Short Term Operation Description ☒ Permanent ☐ Short Term Parts List & Placement/BOM ☒ Permanent ☐ Short Term Tune-Up Procedure ☐ Permanent ☐ Short Term Schematic Diagrams ☒ Permanent ☐ Short Term Test Setup Photos ------------------ ☒ Short Term User’s Manual ☐ Permanent* ☒ Short Term The asterisked items (*) require further information to be provided in this justification letter before permanent confidentiality will be extended to these exhibits. Please refer to FCC KDB 726920 D01 found at: https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=41731 and review section II, 3) regarding specific information that must accompany these requests. Note: any documents held under the Short-Term confidentiality will automatically become public after the requested time if an appropriate extension request has not been received. Any exhibits (i.e., schematic diagrams) that may have already been requested to have “Permanent” confidentiality as shown above need not be repeated under Short-Term confidentiality request. Sincerely, Signed: Printed name: Celine Zhu Title: Senior Project Manager Company Name: Globe Electric Company Inc. Address: 150 Oneida, Montreal, Quebec, Canada, H9R 1A8, Montreal , Canada Phone: +86-755-25192522 E-Mail: [email protected] Date: 2026-08-25
120*32mm银底黑字 37000119ML016B-2 铭牌标 COMPAGNIE GLOBE ELECTRIQUE INC. GLOBE ELECTRIC COMPANY INC. c CAN ICES (B)/NMB (B) CERT. TO CSA STD C22.2#60335-1 C22.2#60335-2-80 CONFORMS TO UL 507 CEILING FAN SUITABLE FOR DAMP LOCATIONS. MODEL 37000119 HVIN: GL37000119 EFS2426 AC 120V 60HZ MADE IN CHINA CEILING FAN : 0.7A 57W LIGHT KIT: 0.3A 18W USE ONLY WITH LIGHT KITS MARKED SUITABLE FOR USE IN DAMP LOCATIONS. FCC ID: 2AQUQGL37119 IC: 8290A-GL37119 VENTILATEUR DE PLAFOND CONVIENTAUX EMPLACEMENTS HUMIDES MODELO 37000119 HVIN: 37000119 EFS2426 AC 120V 60HZ HECHO EN CHINA VENTILADOR CON COMPONENTE DE ILUMINACIóN: 0.7A 57W KITS D'ÉCLAIRAGE: 0.3A 18W N'UTILISEZ QUE DES KITS D'ÉCLAIRAGE PORTANT LA MENTION ADAPTÉ AUX ENDROITS HUMIDES. CAN ICES (B)/NMB (B) CERTIFIÉ SELON LA NORME CSA C22.2 #60335-1 C22.2#60335-2-80 CONFORME À UL 507 FCC ID: 2AQUQGL37119 IC: 8290A-GL37119 5029728
Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF No.: RT-4-E-006Page 1 of 7 RF EXPOSURE REPORT Applicant : GLOBE ELECTRIC COMPANY INC. Address of Applicant : 150 Oneida, Montreal, Quebec, Canada, H9R 1A8 Manufacturer : Satellite Electronics (Zhong shan) Co Ltd. Address of Manufacturer : No.8, Chuang Ye Road, Torch Development Zone, Zhongshan, Guangdong, China Equipment under Test : Ceiling Fan Model No. : 37000119 FCC ID : 2AQUQGL37119 Test Standard(s) : KDB447498 D01 General RF Exposure Guidance v06 Report No. : DDT-RE26060401-2E03 Issue Date : 2026/09/08 Issue By : Guangdong Dongdian Testing Service Co., Ltd. Unit 2, Building 1, No. 17, Zongbu 2nd Road, Songshan Lake Park, Dongguan, Guangdong, China, 523808 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF No.: RT-4-E-006Page 2 of 7 Table of Contents 1.General Test Information..............................................................................................5 1.1.Description of EUT .......................................................................................................5 1.2.Accessories of EUT......................................................................................................5 1.3.Test laboratory .............................................................................................................5 2.RF Exposure evaluation for FCC .................................................................................6 2.1.Assessment procedure.................................................................................................6 2.2.Assess result ................................................................................................................7 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF:RT-4-E-006Page 3 of 7 $!CeMetaLims!digital$ Test Report Declare Applicant : GLOBE ELECTRIC COMPANY INC. Address of Applicant : 150 Oneida, Montreal, Quebec, Canada, H9R 1A8 Equipment under Test : Ceiling Fan Model No. : 37000119 Manufacturer : Satellite Electronics (Zhong shan) Co Ltd. Address of Manufacturer : No.8, Chuang Ye Road, Torch Development Zone, Zhongshan, Guangdong, China Test Standard Used: KDB447498 D01 General RF Exposure Guidance v06 We Declare: The equipment described above is tested by Guangdong Dongdian Testing Service Co., Ltd. and in the configuration tested the equipment complied with the standards specified above. The test results are contained in this test report and Guangdong Dongdian Testing Service Co., Ltd. is assumed of full responsibility for the accuracy and completeness of these tests. Report No.:DDT-RE26060401-2E03 Date of Receipt:2026/06/04Date of Test:2026/06/22 - 2026/08/04 Note: This report applies to above tested sample only. This report shall not be reproduced in parts without written approval of Guangdong Dongdian Testing Service Co., Ltd. Created: Bobo ChenReviewed: Tiger MoApproved: Ella Gong 2026/07/302026/09/082026/09/08 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF:RT-4-E-006Page 4 of 7 Revision History VersionRevision ContentIssue DateApproved V0Initial issue2026/09/08Ella Gong Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF:RT-4-E-006Page 5 of 7 1. General Test Information 1.1. Description of EUT EUT Name:Ceiling Fan Model Number:37000119 EUT Function Description:Please reference user manual of this device Power Supply:AC 120V/60Hz Note: The above EUT information is declared by manufacturer and for more detailed features description please refer to the manufacturer's specifications or User's Manual. 1.2. Accessories of EUT AccessoriesManufacturerModel numberDescription //// 1.3. Test laboratory Guangdong Dongdian Testing Service Co., Ltd. Add.: Unit 2, Building 1, No. 17, Zongbu 2nd Road, Songshan Lake Park, Dongguan, Guangdong, China, 523808. Tel.: +86-0769-38826678, http://www.dgddt.com, Email: [email protected]. CNAS Accreditation No. L6451; A2LA Accreditation Number: 3870.01 FCC Designation Number: CN1182, Test Firm Registration Number: 540522 Innovation, Science and Economic Development Canada Site Registration Number: 10288A Conformity Assessment Body identifier: CN0048 VCCI facility registration number: C-20087, T-20088, R-20123, R-20240, G-20118 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF:RT-4-E-006Page 6 of 7 2. RF Exposure evaluation for FCC 2.1. Assessment procedure Requirement: Systems operating under the provisions of FCC 47 CFR section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. In accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091 this device has been defined as mobile device whereby a distance of 0.2 m normally can be maintained between the user and the device, and below RF Permissible Exposure limit shall comply with. Limits for General Population/Uncontrolled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic FieldStrength (H) (A/m) Power Density (S) (mW/cm 2 ) Averaging Time |E| 2 ,|H| 2 or S (minutes) 0.3-1.346141.63(100)*30 1.34-30824/f2.19/f(180/f)*30 30-30027.50.0730.230 300-1500 F/150030 1500-100000 1.030 Note: f= frequency in MHz; *Plane-wave equivalent power density Calculation method From the peak EUT RF output power, the minimum mobile separation distance, d=0.2 m, as well as the gain of the used antenna, the RF power density can be obtained. Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E03 TRF:RT-4-E-006Page 7 of 7 2.2. Assess result Mode Output power (dBm) Output power (mW) Tune up power (dBm) Tune up power (mW) Antenna Gain (dBi) Antenna Gain (linear) MPE Values (mW/cm 2 ) MPE Limit (mW/cm 2 ) BLE8.236.65 1010.00 -0.230.95 0.0019 1 2.4G WiFi9.649.20 1112.59 -0.230.95 0.0024 1 Simultaneous transmit evaluation result: 0.0019+0.0024 =0.0043 <1. Note: The estima…
Text truncated - open the document above for the full version.
AntennaSpecification Manufacture:TUYA ProductName:T1-U-HLAntenna AntennaType:PCB TestDate:2023.11.28 Testedby:ZhangYinhua Approvedby:Licco Content 1.GeneralDescription.................................................................................1 2.TestConfigurations...................................................................................2 2.1TestEnvironment............................................................................2 2.2TestEquipment...............................................................................2 2.3TestPrinciple...................................................................................2 3.TestResults..............................................................................................3 3.1GainandEfficiency..........................................................................3 3.2RadiationPattern............................................................................4 4.AntennaDimensions................................................................................6 5.EUTPhoto................................................................................................6 6.TestSetupPhoto......................................................................................7 1 1.GeneralDescription ManufacturerHangzhouTuyaInformationTechnologyCo.,Ltd Address Room701,Building3,MoreCenter,No.87GuDunRoad, Hangzhou,Zhejiang,China TestLocation Room106,Building3,LetongSciencePark,No.500, QiuyiRoad,BinjiangDistrict,Hangzhou ProductNameT1-U-HLAntenna Productmodel T1-U-HL AntennaType PCBAntenna TestItems Gain;Efficiency;RadiationPattern TestFrequency 2400-2500MHz TestStandard ANSI/IEEEStd149-1979 2 2.TestConfigurations 2.1TestEnvironment Temperature(°C)25 Humidity(%RH)60 AtmosphericPressure(kPa)100.5 2.2TestEquipment TestSystemTEM24Multi-probeMicrowaveChamber TestInstrumentAgilentE5071B 2.3TestPrinciple 3 3.TestResults 3.1GainandEfficiency Frequency(MHz)PeakGain(dBi)Efficiency(%) 2400 -1.21 22.39 2410 -1.01 23.07 2420 -0.55 23.71 2430 -0.39 24.43 2440 -0.28 25.12 2450 -0.26 25.64 2460 -0.32 25.41 2470 -0.23 25.59 2480 -0.53 25.06 2490 -0.48 24.95 2500 -0.96 23.50 4 3.2RadiationPattern Phi02D Phi902D Theta902D 5 2400MHz3D 2450MHz3D 2500MHz3D 6 4.AntennaDimensions Unit:mm 5.EUTPhoto 7 6.TestSetupPhoto
Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E01 TRF: RT-4-E-005Page 1 of 62 RADIO TEST REPORT Applicant : GLOBE ELECTRIC COMPANY INC. Address of Applicant : 150 Oneida, Montreal, Quebec, Canada, H9R 1A8 Manufacturer : Satellite Electronics (Zhong shan) Co Ltd. Address of Manufacturer : No.8, Chuang Ye Road, Torch Development Zone, Zhongshan, Guangdong, China Equipment under Test : Ceiling Fan Model No. : 37000119 HVIN : GL37000119 FCC ID : 2AQUQGL37119 IC : 8290A-GL37119 Test Standard(s) : FCC Rules and Regulations Part 15 Subpart C, ANSI C63.10-2020+Cor.1-2023, RSS-247 Issue 4 July 24, 2025, RSS-Gen Issue 5, Apr. 2018, Amendment 2 (February 2021), ANSI C63.10-2020+Cor.1-2023+C63.10a- 2024+Errata to C63.10a-2024 Report No. : DDT-RE26060401-2E01 Issue Date : 2026/09/08 Issue By : Guangdong Dongdian Testing Service Co., Ltd. Unit 2, Building 1, No. 17, Zongbu 2nd Road, Songshan Lake Park, Dongguan, Guangdong, China, 523808 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E01 TRF: RT-4-E-005Page 2 of 62 Table of Contents 1.Summary of Test Results .............................................................................................7 2.General Test Information..............................................................................................8 2.1.Description of EUT .......................................................................................................8 2.2.Accessories of EUT......................................................................................................9 2.3.Block diagram of EUT configuration for test.................................................................9 2.4.Decision of final test mode ...........................................................................................9 2.5.Deviations of test standard.........................................................................................10 2.6.Test environment conditions ......................................................................................10 2.7.Test laboratory ...........................................................................................................10 2.8.Measurement uncertainty...........................................................................................11 3.Equipment Used During Conductive Test ..................................................................12 4.6 dB Bandwidth ..........................................................................................................13 4.1.Block diagram of test setup ........................................................................................13 4.2.Limits ..........................................................................................................................13 4.3.Test procedure ...........................................................................................................13 4.4.Test result...................................................................................................................14 4.5.Test graphs ................................................................................................................15 5.99% Bandwidth ..........................................................................................................16 5.1.Block diagram of test setup ........................................................................................16 5.2.Limits ..........................................................................................................................16 5.3.Test procedure ...........................................................................................................16 5.4.Test result...................................................................................................................17 5.5.Test graphs ................................................................................................................18 6.Maximum Peak Output Power....................................................................................19 6.1.Block diagram of test setup ........................................................................................19 6.2.Limits ..........................................................................................................................19 6.3.Test procedure ...........................................................................................................19 6.4.Test result...................................................................................................................20 6.5.Test graphs ................................................................................................................21 7.Power Spectral Density ..............................................................................................22 7.1.Block diagram of test setup ........................................................................................22 7.2.Limits ..........................................................................................................................22 7.3.Test procedure ...........................................................................................................22 7.4.Test result...................................................................................................................23 7.5.Test graphs ................................................................................................................24 8.Band Edge Compliance (Conducted Method)............................................................25 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E01 TRF: RT-4-E-005Page 3 of 62 8.1.Block diagram of test setup ........................................................................................25 8.2.Limits ..........................................................................................................................25 8.3.Test proc…
Text truncated - open the document above for the full version.
Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E02 TRF: RT-4-E-005Page 1 of 86 RADIO TEST REPORT Applicant : GLOBE ELECTRIC COMPANY INC. Address of Applicant : 150 Oneida, Montreal, Quebec, Canada, H9R 1A8 Manufacturer : Satellite Electronics (Zhong shan) Co Ltd. Address of Manufacturer : No.8, Chuang Ye Road, Torch Development Zone, Zhongshan, Guangdong, China Equipment under Test : Ceiling Fan Model No. : 37000119 HVIN : GL37000119 FCC ID : 2AQUQGL37119 IC : 8290A-GL37119 Test Standard(s) : FCC Rules and Regulations Part 15 Subpart C, ANSI C63.10-2020+Cor.1-2023, RSS-247 Issue 4 July 24, 2025, RSS-Gen Issue 5, Apr. 2018, Amendment 2 (February 2021), ANSI C63.10-2020+Cor.1-2023+C63.10a- 2024+Errata to C63.10a-2024 Report No. : DDT-RE26060401-2E02 Issue Date : 2026/09/08 Issue By : Guangdong Dongdian Testing Service Co., Ltd. Unit 2, Building 1, No. 17, Zongbu 2nd Road, Songshan Lake Park, Dongguan, Guangdong, China, 523808 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E02 TRF: RT-4-E-005Page 2 of 86 Table of Contents 1.Summary of Test Results .............................................................................................7 2.General Test Information..............................................................................................8 2.1.Description of EUT .......................................................................................................8 2.2.Accessories of EUT......................................................................................................8 2.3.Block diagram of EUT configuration for test.................................................................8 2.4.Decision of final test mode ...........................................................................................9 2.5.Deviations of test standard...........................................................................................9 2.6.Test environment conditions ........................................................................................9 2.7.Test laboratory ...........................................................................................................10 2.8.Measurement uncertainty...........................................................................................10 3.Equipment Used During Conductive Test ..................................................................11 4.6dB Bandwidth ...........................................................................................................12 4.1.Block diagram of test setup ........................................................................................12 4.2.Limits ..........................................................................................................................12 4.3.Test procedure ...........................................................................................................12 4.4.Test result...................................................................................................................13 4.5.Test graphs ................................................................................................................14 5.99% Bandwidth ..........................................................................................................17 5.1.Block diagram of test setup ........................................................................................17 5.2.Limits ..........................................................................................................................17 5.3.Test procedure ...........................................................................................................17 5.4.Test result...................................................................................................................18 5.5.Test graphs ................................................................................................................19 6.Conducted Output Power ...........................................................................................22 6.1.Block diagram of test setup ........................................................................................22 6.2.Limits ..........................................................................................................................22 6.3.Test procedure ...........................................................................................................22 6.4.Test result average.....................................................................................................23 7.Power Spectral Density ..............................................................................................24 7.1.Block diagram of test setup ........................................................................................24 7.2.Limits ..........................................................................................................................24 7.3.Test procedure ...........................................................................................................24 7.4.Test result...................................................................................................................25 7.5.Test graphs ................................................................................................................26 8.Band Edge Compliance (Conducted Method)............................................................29 8.1.Block diagram of test setup ........................................................................................29 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E02 TRF: RT-4-E-005Page 3 of 86 8.2.Limits ..........................................................................................................................29 8.3.Test procedure ...........................................................................................................29 8.4.Test resul…
Text truncated - open the document above for the full version.
Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E02 TRF:RT-4-E-005Page 43 of 86 11N20SISO_Ant1_2462_30~1000 11N20SISO_Ant1_2462_1000~26500 Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E02 TRF:RT-4-E-005Page 44 of 86 10. Duty Cycle 10.1. Block diagram of test setup 10.2. Limit Just for Report. 10.3. Test procedure (1) Connected the EUT’s antenna port to the Spectrum Analyzer by suitable attenuator, The cable loss and attenuator loss have been put into spectrum analyzer as amplitude offset. set the Spectrum Analyzer as below: Centre Frequency: The centre frequency of the middle hopping channel. Resolution BW: 10 MHz. Video BW: 10 MHz. Span: Zero span. Detector: Peak. Trace Mode: Clear Write. Sweep: Video Trigger (2) When the trace is complete, measure the sending time of 1 burst and the duty cycle of 1 burst cycle. (3) Calculate dwell time follow below formula: Duty cycle= Pulse’s on time / Burst cycle Appendix H: Duty Cycle Guangdong Dongdian Testing Service Co., Ltd. Report No.:DDT-RE26060401-2E02 TRF:RT-4-E-005Page 45 of 86 10.4. Test result Te…
Text truncated - open the document above for the full version.
3722 Illinois Avenue, Saint Charles, IL · Saint charles, Illinois, 60174 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 6.65 mW |
| 2 | 15C | 2.41 GHz - 2.46 GHz | 9.20 mW |