FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. SHENZHEN AOME CO.,LTD/
  3. 2ARL5-RODPJS350

2ARL5-RODPJS350Projector

SHENZHEN AOME CO.,LTD
Projector - FCC ID 2ARL5-RODPJS350 - SHENZHEN AOME CO.,LTD
Click to zoom

Application Details

Equipment Class
NII - Unlicensed National Information Infrastructure TX
Date of Grant
Feb 06, 2023
Application Purpose
Original Equipment
Date of Application
Feb 06, 2023
Equipment Note
Projector
Frequency Range
5745.00000000 - 5825.00000000
Company
SHENZHEN AOME CO.,LTD
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

LOCATION OF PARTS AND CONTROLS LOCATION OF PARTS AND CONTROLS N M O KP L QUICK GUIDE AB D C FIHG K Speaker- Built in speakers Projector Lens LED Power indicator-Redcolor when charging, White color when full charging Touch buttons-To control the projector and adjust volume Audio Out (3.5mm)-Connect an external speaker or headphones USB 2.0-Video and images input, or provide power to HDMI Streaming Stick HDMI input-Connect a HDMI cable to a device that support HDMI video output Reset Button-Press to reset the projector when freezes DC charging port-Please use the original 15V/2A adapter A B C D E F G H I J K L M N O P Focus Wheel-Roll the focus wheel to adjust the clarity of the image Power Switch-Press 3 seconds to turn on/off the projector Air inlet-Don’t cover or block the airflow to the grid Tripod hole-1/4 standard tripod Rubber foot pads-Provides stability and proper airflow Air outlet-Don’t cover or block the airflow to the grid HDMI Connection to iPhone/iPad You will need an Apple Digital AV Adapter (sold separately) and a HDMI cable. HDMI Connection to Macbook You will need USB-C Digital AV Multiport Adapter (sold separately) and a HDMI cable. E Remote control The 2.4G wireless remote control must be paired with projector before using. Within 3 minutes after power on, press and hold the Vol+ and Vol- around 3 seconds, When the volume bar appears on the screen, the pairing has been successful. Make sure the adapter is disconnected before power on. AAA Battery Volume Power offHome Confirm Direction Key Menu Mouse Return Indicator Note: Some apps need to use USB mouse to control. Rating label-information of projector HDMI CableLightning Digital AV Adapter (Sold separately) USB-C Digital AV Multiport Adapter (Sold separately) HDMI Cable J Wireless Connection to Android Devices To connect your Android device to the projector by Smart view/Miracast Wireless Connection to Apple Devices To connect your Apple device to the projector by Screen mirroring/Airplay. Steps 1: Connect the projector and iPhone to the same Wifi router, or connect the projector to the hotspot of iPhone. Steps 2: Enter the mirroring page for iOS device in the projector. Steps 3: Open the drop-down menu of iPhone to active the screen mirroring, find the projector name and connect it. Note: Some Streaming apps don’t allow video output, such as Netflix... Settings WLAN WLAN Mobile 4G Office001 Office002 PRO-xxxxxx No Internet Connection CHOOSE A NETWORK... Steps 1: Turn on the projector and enter the mirroring page for Android device. Steps 2: Open the drop-down menu of Android device, and active Smart view. Note: You may need to check with your android device manufacturer to verify that your Android device supports video out..(In Samsung device, this function named Smart view) Steps 3: Find the projector name and connect it. HDMI Connection to Laptop and USB Connect to the laptop and USB directly, plug and play. Smart View Phone Other device Select a device below to mirror your phone’s screen or play content. Projector-xxxx Play content HDMI Connection to Streaming Sticks Simply plug the FireTV, Roku TV, Chromecast or other streaming sticks to the projector. the projector can provide 5V/1A power to the stick by USB port. Note: Some streaming sticks need their own power. HDMI Connection to Android Devices You will need an USB-C to HDMI Adapter (sold separately) and a HDMI cable. Note: Make sure your android device support video output. Audio Out The projector build in 2 speakers for normal use, but it can output the audio also, Plug the earphone or line-in cable of speaker to the projector’s 3.5mm AUDIO OUT port as below image. EarphoneSpeaker HDMI Cable To connect Android devices you will need a USB-C to HDMI Adapter (Sold separately) Warning: Changes or modifications to this unit not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment. NOTE: This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. FCC Statement: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: —Reorient or relocate the receiving antenna. —Increase the separation between the equipment and receiver. —Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. —Consult the dealer or an experienced radio/TV technician for help. The equipment complies with FCC Radiation exposure limit set forth for uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator and your body.

Attestation Statements

2.911 (d)(5)(i) Equipment Type Attestation v1.2 SHENZHEN AOME CO.,LTD Section 2.911(d)(5)(i) Certification – Equipment Type Company name: SHENZHEN AOME CO.,LTD Address: Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet,Nanshan District, Shenzhen Product Name: Projector FCC ID: 2ARL5-RODPJS350 Model(s): RODPJS350, S200 2.911(d)(5)(i) Equipment Type We, SHENZHEN AOME CO.,LTD certify that the equipment for which authorization is sought through certification is not: Prohibited from receiving an equipment authorization pursuant to § 2.903; of the FCC rules. Identified as an equipment type in the “Covered List” NOTE 1 Yours sincerely, Name: Andy Ma Date: Feb. 06, 2023 Title and Company name: manager/ SHENZHEN AOME CO.,LTD NOTE 1 “Covered List”; is the List of Equipment and Services Covered By Section 2 of The Secure Networks Act, available at https://www.fcc.gov/supplychain/coveredlist References; 1)986446 D01 Covered Equipment v01 https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=325672 2) Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-national-security-threats-to-the-com munications-supply-chain-through-the

Attestation Statements

2.911 (d)(5)(ii) Applicant Attestation v1.2 SHENZHEN AOME CO.,LTD Section 2.911(d)(5)(ii) Certification – Applicant (Covered Lis t ) Company name: SHENZHEN AOME CO.,LTD Address: Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet,Nanshan District, Shenzhen Product Name: Projector FCC ID: 2ARL5-RODPJS350 Model(s): RODPJS350, S200 2.911(d)(5)(ii) Applicant filing We, SHENZHEN AOME CO.,LTD certify that, as of the date of the filing of the application, the applicant is not identified NOTE 1 on the “Covered List” NOTE 2 , established pursuant to § 1.50002 of this chapter, as an entity producing covered communications equipment. Yours sincerely, Name: Andy Ma Date: Feb. 06, 2023 Title and Company name: manager/ SHENZHEN AOME CO.,LTD NOTE 1 Delete option not applicable to this application. NOTE 2 “Covered List”; is the List of Equipment and Services Covered By Section 2 of The Secure Networks Act, available at https://www.fcc.gov/supplychain/coveredlist References; 1)986446 D01 Covered Equipment v01 https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=325672 2) Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-national-security-threats-to-the-com munications-supply-chain-through-the

Attestation Statements

SHENZHEN AOME CO.,LTD 2.911 (d)(7)USA Agent v1.2 Section 2.911(d)(7) USA Agent for Service of Process Company name: SHENZHEN AOME CO.,LTD Address: Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet,Nanshan District, Shenzhen Product Name: Projector FCC ID: 2ARL5-RODPJS350 Model(s): RODPJS350, S200 2.911(d)(7) USA Designated Agent for Service of Process We, SHENZHEN AOME CO.,LTD designate C&A Marketing for the purpose of accepting service of process on behalf of the applicant. Applicant consent: We Acknowledge our consent to accept service of process in the United States for matters related to the applicable equipment, and at the physical U.S. address and email address of the designated agent and acknowledge our acceptance of our obligation to maintain an agent for service of process in the United States for no less than one year after either the grantee has permanently terminated all marketing and importation of the applicable equipment within the U.S., or the conclusion of any Commission-related administrative or judicial proceeding involving the equipment, whichever is later. Agent obligation: We Acknowledge our obligation to accept service of process in the United States for matters related to the applicable equipment at our physical U.S. address and email address for no less than one year after either the grantee has permanently terminated all marketing and importation of the applicable equipment within the U.S., or the conclusion of any Commission-related administrative or judicial proceeding involving the equipment, whichever is later. USA Agent Company name: C&A Marketing,Inc. Address: 114 Tived Lane East Edison NJ 08837 , US FRN:0025643727 FCC ID Number: 2ARL5-RODPJS350 Contact Name: Joel Tyrnauer Telephone No: 848-244-2306 Email: [email protected] Applicant Company name: SHENZHEN AOME CO.,LTD Address: Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet, Nanshan District, Shenzhen, China FCC Grantee Code: 2ARL5 Contact Name: Andy Ma Telephone No: 13510182865 Email: [email protected] SHENZHEN AOME CO.,LTD 2.911 (d)(7)USA Agent v1.2 Signature: Title: manager Signature: Title: manager Date: 2023-2-7 Date: 2023-2-7 NOTE 1: An applicant located in the United States may designate itself as the agent for service of process. Reference; Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-nation al-security-threats-to-the-communications-supply-chain-through-the

Cover Letter(s)

FCC Software Configuration Control Declaration Rev1.1 SHENZHEN AOME CO LTD FCC Software Configuration Control Declaration Date: Jan. 15, 2023 Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 USA Attn: OET Dept. Product/ Model Number: Projector/RODPJS350, S200 Regarding FCC Country Code Selection guidelines identified in KDB 594280. “All applications for equipment authorization for transmitters that can have radio parameters, or other technical parameters, reported to the Commission set by software must have an attestation indicating that no third party will have software, or configuration control, to program the device out of compliance of the technical rules under which it has been certified.” We declare that no third party will have software, or configuration control, to program the device out of compliance of the technical rules under which it has been certified. Date: 2023-1-15 Name:Andy Ma Title: manager Signature of applicant

Cover Letter(s)

SHENZHEN AOME CO.,LTD Agent Authorization Company: SHENZHEN AOME CO.,LTD Address: Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet,Nanshan District, Shenzhen Product Name: Projector Model Number(s): RODPJS350, S200 We authorize MiCOM Labs Inc., 575 Boulder Court, Pleasanton, California 94566, USA, to act on our behalf on all matters concerning the certification of above named equipment. We declare that MiCOM Labs Inc. is allowed to forward all information related to the approval and certification of equipment to the regulatory agencies as required and to discuss any issues concerning the approval application. Any and all acts carried out by MiCOM Labs on our behalf shall have the same effect as acts of our own. Date: Jan. 13, 2023 Signature: Name: Andy Ma Title: manager Company: SHENZHEN AOME CO.,LTD

Cover Letter(s)

SHENZHEN AOME CO LTD Date: Jan. 13, 2023 Offic e of Engineering Technology Federal Communications Commission 743 5 Oakland Mill s Road Columbia, MD 21046 USA Subject; Request for Confidentiality FCC ID: 2ARL5-RODPJS350 To Whom It May Concern, Pursuant to the provisions of the Commission’s rules Title 47 Sections §0.457 and §0.459, we are requesting the Commission to withhold the following attachment(s) as confidential documents from public disclosure indefinitely. These documents contain detailed system and equipment descriptions and are considered as proprietary information in operation of the equipment. The public disclosure of these documents might be harmful to our company and would give competitors an unfair advantage in the market. In additional to above mentioned documents, in order to comply with the marketing regulations in Title 47 CFR §2.803 and the importation rules in Title 47 CFR §2.1204, while ensuring that business sensitive information remains confidential until the actual marketing of newly authorized devices, we request Short Term Confidentiality of the following attachment(s); External Photos Test Setup Photos Internal Photos User Manual For 45 days, pursuant to Public Notice DA 04-1705 . OR For 180 days pursuant to KDB 726920 D01. It is our understanding that all measurement test reports, FCC ID label format and correspondence during the certification review process cannot be granted as confidential documents and this information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: Andy Ma Title: manager Schematic Diagram Block Diagram Parts List Operational Description Tune-up Procedure FCC Software Security Requirements for UNII devices

Cover Letter(s)

SHENZHEN AOME CO LTD Model Confirmation Letter We, SHENZHEN AOME CO LTD, certify the product: Projector , Model No.: RODPJS350, S200 The BOM and pcb used in these models have the same design and layout, and the appearance color of the products may be a little different (such as black, gray and white, etc.), or the models may be different because of different customer requirements, but these differences will not affect the EMC and wireless performance of the products themselves, so the test model is RODPJS350 Signiture: Grantee Contact : Andy Ma Company Name: SHENZHEN AOME CO LTD Date: 2023-1-15 Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350

External Photos

Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 External photos Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350

ID Label/Location Info

Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 Label place Label size: 30*20mm Sample: KODAK LUMA350 Projector Model Number : RODPJS350 Rated Input: 15V 1.5A Rated Output: 5V 1.0A Licensed TM: KODAK FCC ID: 2ARL5-RODPJS350 Made in China SN: XXXXXXXXXXXXXX

Internal Photos

Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 Internal photos Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 WIFI ANT1 WIFI ANT2 Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 RX ANT Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350 BT ANT Report Number.:ZKT-230104L0116-01 FCC ID: 2ARL5-RODPJS350

RF Exposure Info

FCC ID: 2ARL5-RODPJS350 RF Exposure Evaluation According to KDB447498D01 General RF Exposure Guidance v06 4.3.1. Standalone SAR test exclusion considerations Unless specifically required by the published RF exposure KDB procedures, standalone 1-g head or body and 10-g extremity SAR evaluation for general population exposure conditions, by measurement or numerical simulation, is not required when the corresponding SAR Exclusion Threshold condition, listed below, is satisfied. Limits According to FCC Part1.1310: The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in part1.1307(b) F= Frequency in MHz Friis Formula Friis transmission formula: Pd = (Pout*G)/(4* Pi * R 2) Where Pd = power density in mW/cm2 Pout = output power to antenna in mW G = gain of antenna in linear scale Pi = 3.1416 R = distance between observation point and center of the radiator in cm Pd id the limit of MPE . If we know the maximum gain of the antenna and the total power input to the antenna, through the calculation, we will know the distance r where the MPE limit is reached. Test Result of RF Exposure Evaluation EDR/BLE-PCB ANT: 1.81 dBi 2.4G- WIFI ANT1: 1.33dBi; WIFI ANT2: 2.47dBi; MIMO: 4.93dBi 5G- WIFI ANT1:3.31dBi ; WIFI ANT2:4.67dBi ; MIMO: 7.03Bi Antenna Gain: The maximum Gain measured in fully anechoic chamber is 1.0 in linear scale. Output Power Into Antenna & RF Exposure Evaluation Distance: Measurement Data The Max Conducted Peak Output Power data refer to report Report No.: ZKT-230104L0116-01 & ZKT-230104L0116-02 & ZKT-230104L0116-03 & ZKT-230104L0116-04 BT/BLE-worst mode and channel: Test channel Output Power (dBm) Tune up tolerance (dBm) Maximum tune-up Power Calculated value (mW/cm2) (dBm) (mW) (BT) 8-DPSK Highest channel 4.15 5±1 6 3.981 0.0012 (BLE-1Mbps)GFSK Lowest channel 0.64 1±1 2 1.585 0.0005 Limit: 1.0 EUT RF Exposure Evaluation simultaneous transmission operations According to 865664D02 2.2 d) 1): The sum of the ratios of the spatially averaged results to the applicable frequency dependent MPE limits : Simultaneous transmission mode The sum of the ratios SUM Limit BT+ BLE 0.0012+0.005 0.0017 1.0 conclusion : 0.0017<1.0, So there is no sar requirement 2.4GWIFI-worst mode and channel: Test channel Antenna Output Power (dBm) Tune up tolerance (dBm) ANT1 ANT2 SUM ANT1 ANT2 SUM 802.11n –2412MHz 17.12 16.73 19.94 17±1 17±1 20.01±1 Test worst case Maximum tune-up Power (dBm) Maximum tune-up Power (mW) Calculated value (mW/cm2) Limit (mW/cm2) ANT1 ANT2 SUM ANT1 ANT2 SUM / / 17±1 17±1 20.01±1 18 18 21.01 0.07812 1.0 Remark: 1)The Max Conducted Peak Output Power data refer to report Report No.: ZKT-230104L0116-03 2) Pd = (Pout*G)/(4* Pi * R 2 )=( 126.19*3.1117)/(4*3.14159*20*20)=0.07812, G=10 gain/10 = 3.1117 5GWIFI- worst mode and channel: Mode Test channel Antenna Output Power (dBm) Tune up tolerance (dBm) Max Tune up (dBm) ANT1 ANT2 SUM ANT1 ANT2 SUM 802.11ac- 5240MHz 14.19 14.02 17.12 15±1 15±1 18.01±1 19.01 802.11ac-5785MHz 13.51 13.51 16.52 14±1 14±1 17.01±1 18.01 Test worst case Maximum tune-up Power (dbm) Maximum tune-up Power (mW) Calculated value (mW/cm2) Limit (mW/cm2) 19.01 79.62 0.07994 1.0 Remark: 1)The Max Conducted Peak Output Power data refer to report Report No.: ZKT-230104L0116-04 2) Pd = (Pout*G)/(4* Pi * R 2 )=( 79.62*5.0466)/(4*3.14159*20*20)= 0.201, G=10 gain/10 =5.0466 EUT RF Exposure Evaluation simultaneous transmission operations According to 865664D02 2.2 d) 1): The sum of the ratios of the spatially averaged results to the applicable frequency dependent MPE limits : Simultaneous transmission mode The sum of the ratios SUM Limit BT+2.4G WIFI + 5G WIFI 0.0017+0.07812+0.07994 0.1598 1.0 conclusion : 0.1598 < 1.0, So there is no sar requirement NOTE: 1. EUT is more than 20cm away from the human body. 2. The sum of the ratios(2.4GWIFI + 5G WIFI+BT) is less than the limit value of 1.0, so there is no sar requirement.

Test Report

Project No.: ZKT-230104L0116-04 Page 1 of 126 FCC TEST REPORT FCC ID: 2ARL5-RODPJS350 Report Number. .............................. : ZKT-230104L0116-04 Date of Test ...................................... : Dec. 26, 2022 -- Jan. 09, 2023 Date of issue .................................... : Jan. 09, 2023 Total number of pages ..................... : 126 Test Result ....................................... : PASS Testing Laboratory. ........................ : Shenzhen ZKT Technology Co., Ltd. Address .......................................... : 1/F, No. 101, Building B, No. 6, Tangwei Community Industrial Avenue, Fuhai Street, Bao'an District, Shenzhen, China Applicant's name ......................... : SHENZHEN AOME CO.,LTD Address .......................................... : Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet, Nanshan District, Shenzhen, China Manufacturer's name ................... : SHENZHEN AOME CO.,LTD Address .......................................... : Room301 workshop, Xinfeng Building,Yangguang Community, Xili subdustreet, Nanshan District, Shenzhen, China Test specification: Standard .......................................... : FCC CFR Title 47 Part 15 Subpart E Section 15.407 ANSI C63.10:2013 Test procedure ................................. : KDB 789033 D02 General U-NII Test Procedures New Rules v01r02 Non-standard test method ............. : N/A Test Report Form No. .................... : TRF-EL-110_V0 Test Report Form(s) Originator .... : ZKT Testing Master TRF .................................... : Dated: 2020-01-06 This device described above has been tested by ZKT, and the test results show that the equipment under test (EUT) is in compliance with the FCC requirements. And it is applicable only to the tested sample identified in the report. This report shall not be reproduced except in full, without the written approval of ZKT, this document may be altered or revised by ZKT, personal only, and shall be noted in the revision of the document. Product name ................................. : Projector Trademark ...................................... : / Model/Type reference ...................... : RODPJS350, S200 Ratings ............................................. : DC 15V 1.5A from adapter DC11.1V from battery(2500mAh, 27.75Wh) Project No.: ZKT-230104L0116-04 Page 2 of 126 Testing procedure and testing location: Testing Laboratory ................................... : Shenzhen ZKT Technology Co., Ltd. Address ...................................................... : 1/F, No. 101, Building B, No. 6, Tangwei Community Industrial Avenue, Fuhai Street, Bao'an District, Shenzhen, China Alen He Tested by (name + signature) .................... : Joe Liu Reviewer (name + signature) ..................... : Lake Xie Approved (name + signature) .................... : Project No.: ZKT-230104L0116-04 Page 3 of 126 Table of Contents Page 1. VERSION 5 2. SUMMARY OF TEST RESULTS 6 2.1 TEST FACILITY 6 3. GENERAL INFORMATION 7 3.1 GENERAL DESCRIPTION OF EUT 7 3.2 DESCRIPTION OF TEST MODES 8 3.3 BLOCK DIGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 9 3.4 DESCRIPTION OF SUPPORT UNITS(CONDUCTED MODE) 9 3.5EQUIPMENTS LIST FOR ALL TEST ITEMS 9 4. EMC EMISSION TEST 11 4.1 CONDUCTED EMISSION MEASUREMENT 11 4.1.1 POWER LINE CONDUCTED EMISSION LIMITS 11 4.1.2 TEST PROCEDURE 11 4.1.3 DEVIATION FROM TEST STANDARD 11 4.1.4 TEST SETUP 12 4.1.5 EUT OPERATING CONDITIONS 12 4.1.6 TEST RESULT 13 4.2 RADIATED EMISSION MEASUREMENT 15 4.2.1 RADIATED EMISSION LIMITS 15 4.2.2 TEST PROCEDURE 16 4.2.3 DEVIATION FROM TEST STANDARD 16 4.2.4 TEST SETUP 17 4.2.5 EUT OPERATING CONDITIONS 18 4.2.6 TEST RESULTS 19 5.POWER SPECTRAL DENSITY TEST 46 5.1 APPLIED PROCEDURES / LIMIT 46 5.2 TEST PROCEDURE 46 5.3 DEVIATION FROM STANDARD 46 5.4 TEST SETUP 46 5.5 EUT OPERATION CONDITIONS 47 5.6 TEST RESULT 47 6. -26 DB & 6DBM EMISSION BANDWIDTH 48 6.1 APPLIED PROCEDURES / LIMIT 48 6.2 TEST PROCEDURE 48 6.3 DEVIATION FROM STANDARD 48 6.4 TEST SETUP 48 6.5 EUT OPERATION CONDITIONS 48 6.6 TEST RESULT 48 Project No.: ZKT-230104L0116-04 Page 4 of 126 7. OUTPUT POWER TEST 49 7.1 APPLIED PROCEDURES/LIMIT 49 7.2 DEVIATION FROM STANDARD 49 7.3 TEST SETUP 49 7.4 EUT OPERATION CONDITIONS 49 8. OUT OF BAND EDGE EMISSION 50 8.1 TEST PROCEDURE 50 8.2 DEVIATION FROM STANDARD 50 8.3 TEST SETUP 50 8.4 EUT OPERATION CONDITIONS 50 8.5 TEST RESULTS 50 9. FREQUENCY STABILITY MEASUREMENT 51 9.4 TEST RESULT 51 10.ANTENNA REQUIREMENT 56 11.APPENDIX1---5.2GWIFI 57 12.APPENDIX1---5.8GWIFI 86 13. TEST SETUP PHOTO 126 14. EUT CONSTRUCTIONAL DETAILS 126 Project No.: ZKT-230104L0116-04 Page 5 of 126 1. VERSION Report No. Version Description Approved ZKT-230104L0116-04 Rev.01 Initial issue of report Jan. 09, 2023 Project No.: ZKT-230104L0116-04 Page 6 of 126 2. SUMMARY OF TEST RESULTS Test procedures according to the technical standards: FCC Part15 (15.407) , Subpart C Standard Section Test Item Result Remark 15.203/15.247 (c) Antenna requirement PASS 15.207 AC Power Line Conducted Emission PASS 15.407 (a) (b) Spurious Radiated Emissions and Band Edge PASS 15.407 (e) /15.403(i) 6 dB bandwidth, 26dB Emission Bandwidth& 99% Occupied Bandwidth PASS 15.407 (a) Power Spectral Density PASS 15.407 (a)(1)(2)(3) Maximum conducted output power PASS 15.407 (g) Frequency Stability PASS NOTE: (1)” N/A” denotes test is not applicable in this Test Report 2.1 TEST FACILITY Shenzhen ZKT Technology Co., Ltd. Add. : 1/F, No. 101, Building B, No. 6, Tangwei Community Industrial Avenue, Fuhai Street, Bao'an District, Shenzhen, China FCC Test Firm Registration Number: 692225 Designation Number: CN1299 IC Registered No.: 27033 2.2 MEASUREMENT UNCERTAINTY The reported uncertainty of measurement y ± U, where expended uncertainty U is based on a standard uncertainty multiplied by a coverage factor of k=2, providing a level of confidence of approximately 95 % Project No.: ZKT-230104L0116-04 Page 7 of 126 3. GENERAL INFORMATION 3.1 GENERAL DESCRIPT…

Text truncated - open the document above for the full version.

Test Report

Project No.: ZKT-230104L0116-04 Page 86 of 126 12.APPENDIX1---5.8GWIFI 1. -6dB Emission Bandwidth Condition Antenna Mode Frequency(MHz) -6dB_Emission_Bandwidth(MHz) Limit(MHz) Result NVNT ANT1 LCH 5745.00 16.434 0.500 Pass NVNT ANT1 MCH 5785.00 16.439 0.500 Pass NVNT ANT1 HCH 5825.00 16.447 0.500 Pass NVNT ANT1 LCH 5745.00 17.334 0.500 Pass NVNT ANT1 MCH 5785.00 17.548 0.500 Pass NVNT ANT1 HCH 5825.00 17.584 0.500 Pass NVNT ANT1 LCH 5745.00 17.312 0.500 Pass NVNT ANT1 MCH 5785.00 17.655 0.500 Pass NVNT ANT1 HCH 5825.00 17.459 0.500 Pass NVNT ANT1 LCH 5755.00 35.201 0.500 Pass NVNT ANT1 HCH 5795.00 35.202 0.500 Pass NVNT ANT1 LCH 5755.00 35.202 0.500 Pass NVNT ANT1 HCH 5795.00 35.188 0.500 Pass NVNT ANT1 MCH 5775.00 75.071 0.500 Pass Condition Antenna Mode Frequency(MHz) -6dB_Emission_Bandwidth(MHz) Limit(MHz) Result NVNT ANT2 LCH 5745.00 16.329 0.500 Pass NVNT ANT2 MCH 5785.00 16.367 0.500 Pass NVNT ANT2 HCH 5825.00 16.384 0.500 Pass NVNT ANT2 LCH 5745.00 17.654 0.500 Pass NVNT ANT2 MCH 5785.00 17.602 0.500 Pass NVNT ANT2 HCH 5825.00 17.618 0.500 Pass NVNT ANT2 LCH 5745.00 17.502 0.500 Pass NVNT ANT2 MCH 5785.00 17.667 0.500 Pass NVNT ANT2 HCH 5825.00 17.595 0.500 Pass NVNT ANT2 LCH 5755.00 35.199 0.500 Pass NVNT ANT2 HCH 5795.00 35.455 0.500 Pass NVNT ANT2 LCH 5755.00 35.206 0.500 Pass NVNT ANT2 HCH 5795.00 35.774 0.500 Pass NVNT ANT2 MCH 5775.00 75.181 0.500 Pass ANT1 -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5785_20M Project No.: ZKT-230104L0116-04 Page 87 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5825_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5785_20M Project No.: ZKT-230104L0116-04 Page 88 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5825_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5785_20M Project No.: ZKT-230104L0116-04 Page 89 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5825_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT40)_5755_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT40)_5795_40M Project No.: ZKT-230104L0116-04 Page 90 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT40)_5755_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT40)_5795_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT80)_5775_80M Project No.: ZKT-230104L0116-04 Page 91 of 126 ANT2 -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5785_20M Project No.: ZKT-230104L0116-04 Page 92 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5825_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5785_20M Project No.: ZKT-230104L0116-04 Page 93 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5825_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5785_20M Project No.: ZKT-230104L0116-04 Page 94 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5825_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT40)_5755_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT40)_5795_40M Project No.: ZKT-230104L0116-04 Page 95 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT40)_5755_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT40)_5795_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT80)_5775_80M Project No.: ZKT-230104L0116-04 Page 96 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5785_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11a_5825_20M Project No.: ZKT-230104L0116-04 Page 97 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5785_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT20)_5825_20M Project No.: ZKT-230104L0116-04 Page 98 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5745_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5785_20M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT20)_5825_20M Project No.: ZKT-230104L0116-04 Page 99 of 126 -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT40)_5755_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11n(HT40)_5795_40M -6dB_Emission_Bandwidth_5_8GWiFi_802_11ac(VHT40)_5755_40M Project No.: ZKT-230104L0116-04 Page 100 of 126 -6dB_Emissi…

Text truncated - open the document above for the full version.

Contact Information

Applicant

andy Ma(manager)
[email protected]0755-26624161Fax: 0755-26624161

Technical Contact

SHENZHEN AOME CO.,LTD
[email protected]

China

Test Firm

Shenzhen ZKT Technology Co., Ltd.Lake Xie
[email protected]0086-13620010775

Technical Specifications

#Rule PartsFrequency RangePower Output
215E5.75 GHz - 5.83 GHz44.87 mW
Confidentiality
Long Term
Grant Notes
Output power listed is maximum combined conducted power. This device contains 20, 40 and 80 MHz signal bandwidth. Device is a 2x2 MIMO as is described in the filing. The antenna used with this transmitter must be installed to provide a minimum separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi- transmitter product procedures. End-users must be provided with operating procedures for satisfying RF exposure compliance.

Other Applications from SHENZHEN AOME CO.,LTD

Remote Control - FCC ID 2ARL5-RC11 - SHENZHEN AOME CO.,LTD
2ARL5-RC11

Remote Control

Jul 23, 2026

Equipment Class

DTS - Digital Transmission System
Projector - FCC ID 2ARL5-S350RN - SHENZHEN AOME CO.,LTD
2ARL5-S350RN

Projector

Mar 10, 2021

Equipment Class

DTS - Digital Transmission System