
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
1 English Smart Solar Pathway Lights User Guide WůĞĂƐĞĐŚĞĐŬŝĨƚŚĞůŝŐŚƚĂŶĚƚŚĞƉĂƌƚƐĂƌĞŝŶƚĂĐƚďĞĨŽƌĞŝŶƐƚĂůůĂƟŽŶ͘ WůĞĂƐĞŵĂŬĞƐƵƌĞƚŚĂƚƚŚĞďĂƩĞƌŝĞƐĂƌĞŝŶƚĂĐƚĂŶĚǁĞůůŝŶƐƚĂůůĞĚďĞĨŽƌĞƵƐĞ͕ ŝĨƚŚĞLJĂƌĞĚĂŵĂŐĞĚ͕ƉůĞĂƐĞƐƚŽƉƵƐŝŶŐƚŚĞŵ͘ WůĞĂƐĞƚĂŬĞŽīƚŚĞĐŽǀĞƌŽĨƚŚĞůŝŐŚƚ͕ŇŝƉƚŚĞƚŽŐŐůĞƐǁŝƚĐŚƵŶĚĞƌƚŚĞĐŽǀĞƌƚŽ ƚŚĞ͞KE͟Žƌ͞&͟ŵŽĚĞƚŽŵĂŬĞƐƵƌĞƚŚĞůŝŐŚƚǁŽƌŬƐĂƚŶŝŐŚƚ͘ This ƐŵĂƌƚƐŽůĂƌƉĂƚŚǁĂLJůŝŐŚƚĐŽŵĞƐǁŝƚŚĂ>ŝŐŚƚŽŶƚƌŽů&ƵŶĐƟŽŶ͕ǁŚŝĐŚŵĞĂŶƐ ƚŚĂƚŝƚǁŝůůĂƵƚŽŵĂƟĐĂůůLJůŝŐŚƚƵƉŝŶƚŚĞĚĂƌŬŶĞƐƐ͕ĂŶĚƐŚƵƚŽīĚƵƌŝŶŐƚŚĞĚĂLJƟŵĞ͘ WůĞĂƐĞŝŶƐƚĂůůƚŚĞůŝŐŚƚƐŝŶĂƉůĂĐĞǁŚĞƌĞĂůůŽǁƐƚŚĞůŝŐŚƚƐƚŽŐĞƚĨƵůůLJĞdžƉŽƐĞĚƚŽ ƐƵŶůŝŐŚƚƚŽĐŽŵƉůĞƚĞƚŚĞĐŚĂƌŐŝŶŐƉƌŽĐĞƐƐ͘ WůĞĂƐĞƉůƵŐŝƚǀĞƌƟĐĂůůLJŝŶƚŽƚŚĞƐŽŌŐƌŽƵŶĚƚŽĂǀŽŝĚĂŶLJĚĂŵĂŐĞƚŽƚŚĞůŝŐŚƚƐ͘ The farthest distance for the mobile phone APP to control the lights is no more ƚŚĂŶϯϮŌ;ϭϬŵͿ͕ƚŽĐŽŶƚƌŽůƚŚĞůŝŐŚƚĞĸĐŝĞŶƚůLJƉůĞĂƐĞŵĂŬĞƐƵƌĞƚŚĂƚĂůůůŝŐŚƚƐĂƌĞ ǁŝƚŚŝŶϯϮŌŽĨLJŽƵƌƉŚŽŶĞ͘ WŚŽŶĞWWĐĂŶĐŽŶƚƌŽůƵƉƚŽςůŝŐŚƚƐĂƚƚŚĞƐĂŵĞƟŵĞ͕LJŽƵĂƌĞĂďůĞƚŽƉƌĞƐĞƚƚŚĞ ĐŽůŽƌƐĂŶĚŵŽĚĞƐĂĐĐŽƌĚŝŶŐƚŽLJŽƵƌƉƌĞĨĞƌĞŶĐĞ͘ (1) (2) (3) (4) (5) (6) (7) (8) 1. Specification Warning TD01 RGB+Warm Light built-in 1000mhA battery Solar charging IP65(Only Solar panels) Phone App Max. 10m 30000H -40 Σ~60Σ P/N Quantity Model Color Power Protection Rating Controlled By Remote Control Distance Life Span Working Temperature MWSS06RGBW 6-pack2-pack MWSS02RGBW 2 English 2. Dimension 125mm0.41 153mm0.50ft 152mm0.50ft 145mm0.48ft 450mm/1.48ft 55mm 0.18ft RightON Battery case Lighting source LeftFADE MiddleOFF Charge during daytime Automatic light up at night,with memory function: keep the previous lighting mode. Note: the mobile APP can connect up to 6pcs of lights at the same time. Max.distance:10m For the first use, please turn the switch to the “ON” or “FADE” mode. Solar panels Solar Pathway Light Front Back 3. Phone APP Control Methods WWŽŶŶĞĐƟŽŶ/ŶƐƚƌƵĐƟŽŶƐ͗ ^ƵƉƉŽƌƚ͗ďůƵĞƚŽŽƚŚκ͘ϬĂďŽǀĞ WŚŽŶĞ^ƵƉƉŽƌƚ͗ŝŽƐϭϭŽƌĂďŽǀĞĂŶĚĂŶĚƌŽŝĚ κ͘κŽƌĂďŽǀĞ͘ >ĂŶŐƵĂŐĞƐƵƉƉŽƌƚ͗ŶŐůŝƐŚ WWŶĂŵĞ͗>ŽƚƵƐ>ĂŶƚĞƌŶ ŚŽŽƐĞůŝŐŚƟŶŐĐŽůŽƌƐŽŶƚŚĞĐŽůŽƌǁŚĞĞůĂŶĚĂĚũƵƐƚďƌŝŐŚƚŶĞƐƐďLJĚƌĂŐŐŝŶŐƚŚĞƐůŝĚĞƌ ďĂƌďĞůŽǁ͘ ^ƚĞƉKŶĞ͗KƉĞŶWWĂŶĚĞŶƚĞƌƚŚĞZ'ĐŽůŽƌƐĞƫŶŐ͘ ON/OFF ĚũƵƐƚďƌŝŐŚƚŶĞƐƐ tĂƌŵǁŚŝƚĞůŝŐŚƚƐĞůĞĐƟŽŶ ^ĞƫŶŐ ůŝĐŬƚŽĞŶƚĞƌƚŚĞ pairing interface "RGB" / "WW" ŽůŽƌĐŝƌĐůĞƐǁŝƚĐŚ Z'ŽůŽƌƐĞůĞĐƟŽŶ English 3 English tŚĞŶƚŚĞůƵĞƚŽŽƚŚĨƵŶĐƟŽŶŝƐ ĂĐƟǀĂƚĞĚŽŶLJŽƵƌƉŚŽŶĞ͕ click “Refresh” to connect ĂƵƚŽŵĂƟĐĂůůLJ;EŽƚƌĞĐŽŵŵĞŶĚĞĚ ĨŽƌĐŚĂŶŐĞƐͿ͘ Shake to change colors or ůŝŐŚƟŶŐŵŽĚĞƐ WŝdžĞůƐƐĞƫŶŐ Z'ůŝŐŚƟŶŐƐĞƋƵĞŶĐĞƐĞƫŶŐ ;EŽƚƌĞĐŽŵŵĞŶĚĞĚĨŽƌĐŚĂŶŐĞƐͿ >ŝŐŚƚƐǁŝůůďĞĐŽŶŶĞĐƚĞĚĂƵƚŽŵĂƟĐĂůůLJƚŽƚŚĞWWǁŚĞŶƚŚĞůƵĞƚŽŽƚŚĨƵŶĐƟŽŶŝƐ ĂĐƟǀĂƚĞĚŽŶLJŽƵƌƉŚŽŶĞ͘ ŶƚĞƌƐŚĂŬĞŵŽĚĞďLJĐůŝĐŬŝŶŐ͞^ĞƫŶŐ͟ďƵƩŽŶ͘ English 4 5 English ^ƚĞƉdǁŽ͗ŶƚĞƌ͞DŽĚĞ͟ĨŽƌůŝŐŚƟŶŐŵŽĚĞƐĂŶĚƐƉĞĞĚƐĞƫŶŐ͘ ^ƚĞƉdŚƌĞĞ͗ ŶƚĞƌ͞DƵƐŝĐ͟ƐĞƫŶŐƚŽƉůĂLJLJŽƵƌĨĂǀŽƌŝƚĞŵƵƐŝĐ͕ĂŶĚůŝŐŚƟŶŐǁŝůůĚĂŶĐĞ ǁŝƚŚƚŚĞŵƵƐŝĐ͘ ^ƚĞƉ&ŝǀĞ͗ŶƚĞƌ͞dŝŵĞƌ͟ĨŽƌůŝŐŚƟŶŐƐĐŚĞĚƵůĞƐĞƫŶŐ͖ ^ƚĞƉ&ŽƵƌ͗ŶƚĞƌ͞DŝĐƌŽƉŚŽŶĞ͟ƐĞƫŶŐ͕ƚŽĐŚŽŽƐĞďƵŝůƚͲŝŶDŝĐ͕ǁŚŝĐŚƵƐĞƚŚĞ ŵŝĐƌŽƉŚŽŶĞĨƵŶĐƟŽŶŽŶLJŽƵƌƉŚŽŶĞƚŽƌĞĐĞŝǀĞĂƵĚŝŽĂŶĚĐŚĂŶŐĞůŝŐŚƟŶŐĐŽůŽƌƐ ĂĐĐŽƌĚŝŶŐůLJ͘;dŚĞƐĞůŝŐŚƚƐĐŽŵĞǁŝƚŚŽƵƚĞdžƚĞƌŶĂůDŝĐ͕ƚŚŝƐĨĞĂƚƵƌĞŝƐƵƐĞůĞƐƐ͕ ƉůĞĂƐĞŝŐŶŽƌĞŝƚ͘Ϳ Speed Brightness &ŽƌŶĚƌŽŝĚƉŚŽŶĞƐ͕ŝŶƉƵƚ ŵƵƐŝĐĮůĞƐĚŝƌĞĐƚůLJĨƌŽŵ its internal storage; For ŝWŚŽŶĞƐ͕ŝŶƉƵƚŵƵƐŝĐĮůĞƐ ďLJƵƐŝŶŐƚŚĞƐLJŶĐƐĞƫŶŐ ŝŶŝdƵŶĞƐƚŚƌŽƵŐŚW ĚĞƐŬƚŽƉ͘ ^ƉĞĞĚĂĚũƵƐƚŵĞŶƚ English /ĨƚŚĞůƵĞƚŽŽƚŚĐŽŶŶĞĐƟŽŶŝƐŶŽƚƐƵĐĐĞƐƐĨƵů͕ĐŚĞĐŬƚŚĞƉŽƐƐŝďůĞĐĂƵƐĞƐďLJ ĨŽůůŽǁŝŶŐƚŚĞƐƚĞƉƐďĞůŽǁ͘ WůĞĂƐĞŵĂŬĞƐƵƌĞƚŚĂƚƚŚĞƐǁŝƚĐŚƵŶĚĞƌƚŚĞĐŽǀĞƌŝƐŇŝƉƉĞĚƚŽƚŚĞ͞KE͟Žƌ͞&͟ŵŽĚĞ͘ WůĞĂƐĞŵĂŬĞƐƵƌĞƚŚĂƚLJŽƵƌƉŚŽŶĞΖƐůƵĞƚŽŽƚŚŝƐƚƵƌŶĞĚŽŶ͘ WůĞĂƐĞŵĂŬĞƐƵƌĞƚŚĞůŝŐŚƚƐĂƌĞǁŝƚŚŝŶϯϮŌ;ϭϬŵͿĐŽǀĞƌĂŐĞŽĨƚŚĞŵŽďŝůĞƉŚŽŶĞ͘ WůĞĂƐĞĐŚĞĐŬǁŚĞƚŚĞƌƚŚĞůŝŐŚƚĐĂŶůŝŐŚƚƵƉŶŽƌŵĂůůLJĂƚŶŝŐŚƚ͕ŝĨŶŽƚ͕ƚŚĞďĂƩĞƌLJŵĂLJ bĞŽƵƚŽĨƉŽǁĞƌ͕ƉůĞĂƐĞĐŚĂƌŐĞƚŚĞůŝŐŚƚƵŶĚĞƌƚŚĞƐƵŶƵŶƟůŝƚĐĂŶďĞƵƐĞĚŶŽƌŵĂůůLJ͘ dŚŝƐůŝŐŚƟŶŐŬŝƚĂĚŽƉƚƐƚŚĞůƵĞƚŽŽƚŚκ͘ϬǀĞƌƐŝŽŶ͕ǁŚŝĐŚŽŶůLJƐƵƉƉŽƌƚƐĐŽŶŶĞĐƟŽŶ ǁŝƚŚŽŶĞƉŚŽŶĞ͘ŚĞĐŬŝĨƚŚĞůŝŐŚƟŶŐŬŝƚŚĂƐďĞĞŶƉĂŝƌĞĚƚŽĂƉŚŽŶĞ͘/ĨLJĞƐ͕ƉůĞĂƐĞ ĚŝƐĐŽŶŶĞĐƚŝƚǁŝƚŚƚŚĞƉƌĞǀŝŽƵƐƉŚŽŶĞĂŶĚƉĂŝƌŝƚƚŽLJŽƵƌƐ͘ ŚĞĐŬŝĨƚŚĞůƵĞƚŽŽƚŚŝƐƐƵĐĐĞƐƐĨƵůůLJƉĂŝƌĞĚƚŽƚŚĞůŝŐŚƟŶŐŬŝƚ͘/ĨŶŽƚ͕ĞdžŝƚƚŚĞWW ĂŶĚƌĞƐƚĂƌƚŝƚƚŽĐŽŶŶĞĐƚƚŚĞůŝŐŚƟŶŐŬŝƚĂŐĂŝŶ͘ /ĨƚŚĞůƵĞƚŽŽƚŚĐŽŶŶĞĐƟŽŶƐƟůůĨĂŝůƐĂŌĞƌƌĞƐƚĂƌƟŶŐƚŚĞWW͕ƉůĞĂƐĞĞdžŝƚƚŚĞWWĂŶĚ ƌĞƚLJŽƵƌƉŚŽŶĞ͘ WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞŵŽďŝůĞWWĐĂŶĐŽŶŶĞĐƚƵƉƚŽςƉĐƐŽĨůŝŐŚƚƐĂƚƚŚĞƐĂŵĞƟŵĞ͘ ;ϭͿ ;ϮͿ ;ϯͿ ;κͿ ;ρͿ ;ςͿ ;ϳͿ ;ΘͿ 6 English 7 English FCC WARNING This device complies with part 15 of the FCC Rules. Opera�on is subject to the following two condi�ons: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired opera�on.Any changes or modifica�ons not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protec�on against harmful interference in a residen�al installa�on. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instruc�ons, may cause harmful interference to radio communica�ons. However, there is no guarantee that interference will not occur in a par�cular installa�on. If this equipment does cause harmful interference to radio or television recep�on, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -- Reorient or relocate the receiving antenna. -- Increase the separa�on between the equipment and receiver. -- Connect the equipment into an outlet on a…
Text truncated - open the document above for the full version.
C5266091_X8_Ed.1 1/1 Letter of Authorization <Shenzhen Michuang Technology Ltd. > Company:Shenzhen Michuang Technology Ltd. Address:Rm.1012, A Bldg., No.142, Meilong St., Longhua District, Shenzhen, China Product Name: Solar Pathway Lights Model Number:TD01 FCC Identifier:2AWPYTD01 We authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, to act on our behalf on all matters concerning the above named equipment. Any individual within LGAI Technological Center S.A. is authorized to act on our behalf and take action on the application. We declare that authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, is allowed to forward all information related to the approval project to the Federal Communication Commission and to discuss any issues concerning the approval application. Any and all acts carried out by LGAI Technological Center S.A. on our behalf shall have the same effect as acts of our own. Name: GUO xiwei Date: 2022-03-31 Title: Test engineer Signature of applicant:
C5266091_X10_Ed.1 1/1 < Shenzhen Michuang Technology Ltd. > Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Date: 2022-03-31 Subject: Request for Confidentiality FCC ID:2AWPYTD01 To Whom It May Concern, Pursuant to the provisions of Sections 0.457 and 0.459 of Commission's rules (47CFR0.457, 0.459), we are requesting the Commission to withhold the following attachment(s) as confidential document from public disclosure. Exhibits Long-Term Confidentiality Short-Term Confidentiality ID Label/Location No No Attestation Statement No No External Photos No Block Diagram Schematics Test Report No No Test Setup Photos No User’s Manual Internal Photos Parts List / Tune Up RF Exposure Info Operational Description Cover Letter(s) No No SDR Software / Security Info No Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: GUO xiwei Title: Test engineer
EUTPHOTO(ExternalPhotos)
Labelandlabellocation SolarPathwayLights FCCID:2AWPYTD01
EUTPHOTO(InternalPhotos) ANT ※※※※※ENDOFREPORT※※※※※
FCC ID:2AWPYTD01 RF Exposure Evaluation Limits The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in 1.1307(b) Limits for Maximum Permissible Exposure (MPE) Frequency range (MHz) Electric field strength (V/m) Magnetic field strength (A/m) Power density (mW/cm 2 ) Averaging time (minutes) (A) Limits for Occupational/Controlled Exposures 0.3–3.0 614 1.63 *(100) 6 3.0–30 1842/f 4.89/f *(900/f 2 ) 6 30–300 61.4 0.163 1.0 6 300–1500 f/300 6 1500–100,000 5 6 (B) Limits for General Population/Uncontrolled Exposure 0.3–1.34 614 1.63 *(100) 30 1.34–30 824/f 2.19/f *(180/f 2 ) 30 30–300 27.5 0.073 0.2 30 300–1500 f/1500 30 1500–100,000 1.0 30 f = frequency in MHz Friis transmission formula: Pd = (Pout*G)/(4*pi*r 2 ) Where Pd = power density in mW/cm 2 , Pout = output power to antenna in mW; G = gain of antenna in linear scale, Pi = 3.1416; R = distance between observation point and center of the radiator in cm Pd id the limit of MPE, 1 mW/cm 2 . If we know the maximum gain of the antenna and the total power input to the antenna, through the calculation, we will know the distance r where the MPE limit is reached. Test Procedure Software provided by client enabled the EUT to transmit and receive data at lowest, middle and highest channel individually. Test Result of RF Exposure Evaluation BT mode Mode Output power to antenna (dBm) Output power to antenna (mW) Power Density at R=20cm (mW/cm 2 ) Limit (mW/cm 2 ) Result GFSK 0.604 1.15 0.000229 1.0 PASS Remark: antenna gain=0dBi
Project No.: ZKT-2203241853E Page 1 of 37 FCC TEST REPORT FCC ID:2AWPYTD01 Report Number. ................................ : ZKT-2203241853E Date of Test ........................................ Mar. 24, 2022 to Mar. 30, 2022 Date of issue .................................... : Mar. 30, 2022 Total number of pages ...................... 37 Test Result ..................................... : PASS Testing Laboratory. ........................ : Shenzhen ZKT Technology Co., Ltd. Address .......................................... : 1/F, No. 101, Building B, No. 6, Tangwei Community Industrial Avenue, Fuhai Street, Bao'an District, Shenzhen, China Applicant's name ......................... : Shenzhen Michuang Technology Ltd. Address .......................................... : Rm.1012, A Bldg., No.142, Meilong St., Longhua District, Shenzhen, China Manufacturer's name ................... : Shenzhen Yormick Technology Co.,Ltd Address .......................................... : 4F 39B Shapuwei No.2 Industrial Area,Songgang St., BaoAn Dist., SZ,CN 518000 Test specification: Standard ........................................... : FCC CFR Title 47 Part 15 Subpart C Section 15.247 ANSI C63.10:2013 Test procedure ................................. : / Non-standard test method ............. : N/A Test Report Form No. .................... : TRF-EL-111 _V0 Test Report Form(s) Originator .... : ZKT Testing Master TRF .................................... : Dated: 2020-01-06 This device described above has been tested by ZKT, and the test results show that the equipment under test (EUT) is in compliance with the FCC requirements. And it is applicable only to the tested sample identified in the report. This report shall not be reproduced except in full, without the written approval of ZKT, this document may be altered or revised by ZKT, personal only, and shall be noted in the revision of the document. Product name ................................. : Solar Pathway Lights Trademark ...................................... : N/A Model/Type reference......................: TD01 Ratings ............................................. : Input: DC 1.2V Battery Project No.: ZKT-2203241853E Page 2 of 37 Testing procedure and testing location: Testing Laboratory ................................... : Shenzhen ZKT Technology Co., Ltd. Address ...................................................... :1/F, No. 101, Building B, No. 6, Tangwei Community Industrial Avenue, Fuhai Street, Bao'an District, Shenzhen, China Alen He Tested by (name + signature) .................... : Joe Liu Reviewer (name + signature) ..................... : Lake Xie Approved (name + signature) .................... : Project No.: ZKT-2203241853E Page 3 of 37 Table of Contents Page 1.VERSION 5 2.SUMMARY OF TEST RESULTS 6 2.1 TEST FACILITY 7 2.2 MEASUREMENT UNCERTAINTY 7 3. GENERAL INFORMATION 8 3.1 GENERAL DESCRIPTION OF EUT 8 3.2 DESCRIPTION OF TEST MODES 9 3.3 BLOCK DIGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 9 3.4 DESCRIPTION OF SUPPORT UNITS(CONDUCTED MODE) 10 3.5 EQUIPMENTS LIST FOR ALL TEST ITEMS 11 4. EMC EMISSION TEST 12 4.1 CONDUCTED EMISSION MEASUREMENT 12 4.1.1 1POWER LINE CONDUCTED EMISSION LIMITS 12 4.1.2 TEST PROCEDURE 12 4.1.3 DEVIATION FROM TEST STANDARD 12 4.1.4 TEST SETUP 13 4.1.5 EUT OPERATING CONDITIONS 13 4.1.6 TEST RESULTS 13 4.2 RADIATED EMISSION MEASUREMENT 14 4.2.1 RADIATED EMISSION LIMITS 14 4.2.2 TEST PROCEDURE 15 4.2.3 DEVIATION FROM TEST STANDARD 15 4.2.4 TEST SETUP 15 4.2.5 EUT OPERATING CONDITIONS 16 5.RADIATED BAND EMISSION MEASUREMENT 21 5.1 TEST REQUIREMENT: 21 5.2 TEST PROCEDURE 21 5.3 DEVIATION FROM TEST STANDARD 21 5.4 TEST SETUP 22 5.5 EUT OPERATING CONDITIONS 22 5.6 TEST RESULT 23 6.POWER SPECTRAL DENSITY TEST 24 6.1 APPLIED PROCEDURES / LIMIT 24 6.2 TEST PROCEDURE 24 6.3 DEVIATION FROM STANDARD 24 6.4 TEST SETUP 24 Project No.: ZKT-2203241853E Page 4 of 37 Table of Contents Page 6.5 EUT OPERATION CONDITIONS 24 6.6 TEST RESULTS 25 7. CHANNEL BANDWIDTH 27 7.1 APPLIED PROCEDURES / LIMIT 27 7.2 TEST PROCEDURE 27 7.3 DEVIATION FROM STANDARD 27 7.4 TEST SETUP 27 7.5 EUT OPERATION CONDITIONS 27 7.6 TEST RESULTS 28 8.PEAK OUTPUT POWER TEST 30 8.1 APPLIED PROCEDURES / LIMIT 30 8.2 TEST PROCEDURE 30 8.3 DEVIATION FROM STANDARD 30 8.4 TEST SETUP 30 8.5 EUT OPERATION CONDITIONS 30 8.6 TEST RESULTS 31 9. CONDUCTED BAND EDGE AND SPURIOUS EMISSION 32 9.1 APPLICABLE STANDARD 32 9.2 TEST PROCEDURE 32 9.3 DEVIATION FROM STANDARD 32 9.4 TEST SETUP 32 9.5 EUT OPERATION CONDITIONS 32 10.ANTENNA REQUIREMENT 36 11. TEST SETUP PHOTO 37 12. EUT CONSTRUCTIONAL DETAILS 37 Project No.: ZKT-2203241853E Page 5 of 37 1.VERSION Report No. Version Description Approved ZKT-2203241853E Rev.01 Initial issue of report Mar. 30, 2022 Project No.: ZKT-2203241853E Page 6 of 37 2. SUMMARY OF TEST RESULTS Test procedures according to the technical standards: FCC Part15 (15.247) , Subpart C Standard Section Test Item Judgment Remark FCC part 15.203/15.247 (c) Antenna requirement PASS FCC part 15.207 AC Power Line Conducted Emission N/A FCC part 15.247 (b)(3)Conducted Peak Output Power PASS FCC part 15.247 (a)(2)Channel Bandwidth& 99% OCB PASS FCC part 15.247 (e) Power Spectral Density PASS FCC part 15.247(d) Band Edge PASS FCC part 15.205/15.209 Spurious Emission PASS NOTE: (1)“N/A” denotes test is not applicable in this Test Report Project No.: ZKT-2203241853E Page 7 of 37 2.1 TEST FACILITY Shenzhen ZKT Technology Co., Ltd. Add. : 1/F, No. 101, Building B, No. 6, Tangwei Community Industrial Avenue, Fuhai Street, Bao'an District, Shenzhen, China FCC Test Firm Registration Number: 692225 Designation Number: CN1299 IC Registered No.: 27033 2.2 MEASUREMENT UNCERTAINTY The reported uncertainty of measurement y ± U,where expended uncertainty U is based on a standard uncertainty multiplied by a coverage factor of k=2,providing a level of confidence of approximately 95 %。 No. Item Uncertainty 1 Conducted Emission Test ±1.38dB 2 RF power conducted ±0.16dB 3 …
Text truncated - open the document above for the full version.
EUTTESTPHOTO
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 1.15 mW |

Smart Module
Equipment Class
DTS - Digital Transmission System
Smart LED Flood Light
Equipment Class
DTS - Digital Transmission System
Smart LED Flood Light
Equipment Class
DTS - Digital Transmission System
LED Spotlight
Equipment Class
DTS - Digital Transmission System