
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Test unlocking Press 1-2-3-4- Test the lock button with door open Before Opening Door Let Motor Complete Cycle Testing Operation7 B Install Batteries and Cover 6 Secure mounting plate to door L (optional) I C Install Interior Assembly 5 1Installation Overview C B Carefully insert control wire into the wire connector Work with the door open NOTE: Make sure the connector dots line up with the dots on the wire Test the lock NOTE: Make sure the Knob is in the correct position. Be careful not to pinch the control wire when assembling J H C B Lock and unlock using the knob make sure the latch is opening and closing easily. If not, go back to step 2 and ensure you followed the steps ENGLISH HIJKLM BC D EFG Read this manual carefully before installing and operating! 3/4” Scr ews1” Scr ews5/16” Scr ews1 3/8” Scr ews Exterior FaceplateInterior Faceplate User Guide Keys Latch Optional Set Screw Please car ef ully check the above list to confirm all items have been received. If any items are missing, please contact Consumer Assistance. (See page for contact information) Strike plate Mounting Plate A 2 NOTE: Do not extend Cylindrical Cover past 2-3/4” (70mm). J M C B C Install Enclosed Latch and Strike Plate. Do not over-tighten latch screws. Deadbolt Latch Must Be Retracted During Installation. TO CONVERT FROM 2-3/8” (60mm) BACKSET TO 2-3/4” (70mm) BACKSET: 1. Hold latch with numbers facing forward and thumb pressing on the bolt. 2. Rotate the cylinder cover clockwise. 3. Pull and twist the extension plate all the way out. 4. Rotate the cylinder counter clockwise so that the marking aligns with the 2-3/4” position indicator. Screw Mounting Post (M) into holes on Mounting Plate (C). Remove (J) Screw from inside the battery compartment within the (B) Housing to release the Mounting Plate (C). Preparation for Interior Assembly. The latch plate on the door needs to be straight and not protruding from door. Make adjustment before installing or this will cause problems with bolt fitting into latch hole. VERTICAL POSITION (L) screw goes into the door to prevent the lock from shifting and is optional. Work with the door open 3 Check that the Rubber Gasket is secured on the Exterior Assembly. Insert the Exterior Assembly onto the door with the tailpiece going through the Deadbolt Latch Set in the VERTICAL POSITION. Route the Control Wire through the door UNDER the Deadbolt Latch Set. Make sure the door is shut, lock and unlock using the key, ensure that the latch is operating smoothly and is aligned properly without scraping the strike plate. If not, go back to step 2 and ensure you followed the steps Install Exterior Assembly A 4 Install Interior Assembly Read this manual carefully before installing and operating! Important Use the QR code below for the most up to date instructions: • Phillips Screwdriver Tools Needed for Lock Installation: 1 - Exterior Faceplate 1 - Interior Faceplate 1 - User Guide 2 - Keys 1 - Strike Plate 1 - Mounting Plate 1 - Latch 1 - 1 3/8” Screws2 - Mounting Post 1 - Optional Set Screw 2 - 5/16” Screws 2 - 1” Screws 4 - 3/4” Screws Package Includes: Before Opening Door Let Motor Complete Cycle This Electronic lock requires (4) High Quality AA Alkaline batteries. When all 4 batteries are installed in the correct position, you should hear 2 beeps and the keypad will illuminate. The Lock motor will engage and do a series of locking and unlocking motions in order to automatically determine your door “Handing” (left or right handed door). When completed the lock will beep and the keypad will flash. NOTE: Do not touch the Keypad until the light turns off. Do not use rechargeable batteries or non-alkaline batteries. Refer to Template included for Door Prep Instructions Example Pr eparing Door • Drill • 2 1/8” Hole Saw • 1” Hole Saw • 3/4” Chisel Tools Needed for Door Preparation (if there is no knob hole): NOTE: Skip this step if your door comes with pre-drilled holes. 2 1/8” Hole Saw K E F Strike Plate Installation NOTE: The strike plate on the door frame needs to be straight and not protruding from door frame. Make adjustment before installing or this will cause problems with bolt fitting into latch hole. 1” Hole Saw 1. 2. 3. 4. H I J L M K Olympic Electronic Wifi Deadbolt with Biometric Touchscreen 2-3/4” position E 2-3/8” position E K • Programming InstructionsRegister an Account11 Creating and Sending eKeys57Additional Programming Functions Add a Lock 2 Change Admin Passcode 3 Locking and Unlocking via APP4 6Creating Custom PasscodesTroubleshooting Contact Us First! Do Not Return to Store 1. Press “Register” on the login screen2. Enter your phone number and prefered password 2. Select Basics from the setting list 3. Press “Get Code” and enter the verifiation code recieved via text msg in the required field 3. Press the “+” next to the lock you wish to add 4. Success! Name your Lockas 4. Configure Network 4. Success! Use the selected phone # and password to log into your My Key Moblie App 3. Select “Admin Passcode”4. Set your new 6-digit Admin Passcode 1. Select Door Lock 2. Activate the Keypad 1. On the Lock Screen select the eKey Icon 2. Select SEND eKEYS 3. Select Validity Period (Timed, Permanent, etc.) 3. Enter the recipiants Phone # and Name. Hit send to confirm 1. On the Lock Screen select the Passcode Icon 2. Select GENERATE PASSCODES 3. Select “Custom” and select the duration or toggle permanent. Press Set Passcode 4. Enter the desired 4-9 digit passcode Download the My Key Mobile App from the APP store or Google Play 1. Press the settings “ ” in the top right of the lock screen Tap the Lock Icon “ ” to unlock door Hold the Lock Icon “ ” to lock door Regulatory Compliance This product complies with standards established by following regulatory bodies: - Federal Communications Commission (FCC) FCC ID: 2AYCK174XXXX863XXXX This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, …
Text truncated - open the document above for the full version.
Form: RFT-AMER-TCB-OP-19o Revision: 1 Page 1 of 1 Date: 1/25/2023 Attention: Application Examiner Re: Certification designating a U.S. agent for service of process pursuant to 47 CFR part §2.911(d)(7) of the FCC rules To whom it may concern, This letter is to certify that Lewis Hyman Inc. (“Applicant”) accepts responsibilities to act as its own agent pursuant to 47 CFR part §2.911(d)(7) of the FCC rules for service of process. I consent to the obligation to accept service of process on behalf of the applicant in regard to the FCC ID designated below. I HEREBY CERTIFY THAT I am authorized to make the representations above on behalf of the Applicant. I further acknowledge the requirement to maintain an agent extends for no less than one year after the termination of all marketing and importation or the conclusion of and commission-related proceeding involving the equipment and agree to immediately notify the FCC and Intertek if there is any change in the status identified above. Applicant Company Name : Lewis Hyman Inc. Contact Name : ROBERT LEBLANC Address : 860 E. SANDHILL AVENUE, CARSON, CA 90746 Telephone No : 770-799-7944 ext 4108 Email : [email protected] FCC ID : 2AYCK-174XXXX863XXXX Applicant FRN : 0023808652 Signature: ____________________________________ Date: ___June/01/2023________________________________
Form: RFT-AMER-TCB-OP-19n Revision: 1 Page 1 of 1 Date: 1/25/2023 Attention: Application Examiner Re: Covered List, located at https://www.fcc.gov/supplychain/coveredlist and 47 CFR parts §2.903 and §2.911(d)(5)(ii) of the FCC rules Applicant: Lewis Hyman Inc. FCC ID: 2AYCK174XXXX863XXXX To whom it may concern, Lewis Hyman Inc. (“Applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to 47 CFR part §2.903 of the FCC rules and does not originate directly or indirectly from any company named on the covered list located in the link above or any subsidiary or affiliate thereof. Applicant further certifies that, as of the date of the filing of the application, the Applicant is not identified on the Covered List as an entity producing “covered” equipment and is not a subsidiary or affiliate of any such entity pursuant to 47 CFR part §1.50002 and required by 47 CFR part §2.911(d)(5)(ii) of the FCC rules. I HEREBY CERTIFY THAT I am authorized to make the representations above on behalf of the Applicant and agree to immediately notify Intertek if there is any change in the status identified above. ______________________________ [Signature of authorized Proprietor, Partner or Authorized Officer] Robert LeBlanc Vice Chairman Lewis Hyman Inc. June 1,2023
2024-01-10 Federal Communications Commission 445 12 th Street SW Washington, DC 20554 Subject: Limited Agency Agreement Lewis Hyman Inc. FCC ID: 2AYCK174XXXX863XXXX To Whom It May Concern: We, Lewis Hyman Inc., hereby authorized Intertek Testing Services Shenzhen Ltd. Guangzhou Branch to act as our Agent for the purpose of preparing application for FCC ID number 2AYCK174XXXX863XXXX under all applicable parts of the FCC rules and regulations. The effective date of this limited agency agreement is 2024-01-10. The Limited Agency Agreement expires on 2024-06-10, unless sooner terminated or extended by written notice to Intertek Testing Services Shenzhen Ltd. Guangzhou Branch and the Federal Communications Commission. This is to advise that we are in full compliance with the Anti-Drug Abuse Act. The applicant is not subject to a denial of federal benefits pursuant to Section 5301 of the Anti-Drug Act of 1988, 21 U.S.C. 862, and no party to the application is subject to a denial of federal benefits pursuant to that section. If you have any questions or comments, please do not hesitate to contact me. Sincerely, Robert LeBlanc Vice Chairman
Serial model 1745020-1745999: Series model 8635012-8635999: Series model 8730000-8739999:
Serial model 1745020-1745999: Series model 8635012-8635999: Series model 8730000-8739999:
Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Job No.: 230510042GZU FCC ID: 2AYCK174XXXX863XXXX Version: 08 July 2020 Page 1 of 3 FCC RF Exposure-Mobile (MPE) RF Exposure Compliance Requirement Model no.: 1745020-1745999, 8635012-8635999, 8730000-8739999 1. Standard requirement Systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess limit for maximum permissible exposure. In accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091 this device has been defined as a mobile device whereby a distance of 0.2m normally can be maintained between the user and the device. (a) Limits for Occupational / Controlled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S)(mW/cm 2 ) Averaging Times ׀E׀ 2 ׀, H׀ 2 or S (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f)* 6 30-300 61.4 0.163 1.0 6 300-1500 -- -- F/300 6 1500-100000 -- -- 5 6 (b) Limits for General Population / Uncontrolled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S)(mW/cm 2 ) Averaging Times ׀E׀ 2 ׀, H׀ 2 or S (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f)* 30 30-300 27.5 0.073 0.2 30 300-1500 -- -- F/1500 30 1500-100000 -- -- 1.0 30 Note: f=frequency in MHz; *Plane-wave equivalent power density Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Job No.: 230510042GZU FCC ID: 2AYCK174XXXX863XXXX Version: 08 July 2020 Page 2 of 3 FCC RF Exposure-Mobile (MPE) 2. MPE Calculation Method E (V/m)=(30*P*G) 0.5 /d Power Density: Pd(W/m 2 )=E 2 /377 E=Electric Field (V/m) P=Peak RF output Power (W) G=EUT Antenna numeric gain (numeric) d= Separation distance between radiator and human body (m) The formula can be changed to Pd= (30*P*G)/(377*d 2 ) From the peak EUT RF output power, the minimum mobile separation distance, d=0.2m, as well as the gain of the used antenna, the RF power density can be obtained. 3. Calculated Result and Limit WIFI Antenna 1: Peak Output Power = 8.03dBm(max.value declared by client), antenna gain = 2dBi Frequency (MHz) Antenna Gain (Numeric) Peak Output Power (dBm) Peak Output Power (mW) Power Density (S) (mW/cm 2 ) Limit of Power Density (S) (mW/cm 2 ) Test Result 2412-2462 1.58 8.03 6.353 0.02003 1 Complies MPE ratio: 0.02003(mW/cm 2 )/1(mW/cm 2 ) =0.02003 WIFI Antenna 2: Peak Output Power = 8.03dBm(max.value declared by client), antenna gain = 1.3dBi Frequency (MHz) Antenna Gain (Numeric) Peak Output Power (dBm) Peak Output Power (mW) Power Density (S) (mW/cm 2 ) Limit of Power Density (S) (mW/cm 2 ) Test Result 2412-2462 1.35 8.03 6.353 0.00171 1 Complies MPE ratio: 0.00171(mW/cm 2 )/1(mW/cm 2 ) =0.00171 BLE Peak Output Power = -6.38dBm(max.value declared by client), antenna gain = 1.78dBi Frequency (MHz) Antenna Gain (Numeric) Peak Output Power (dBm) Peak Output Power (mW) Power Density (S) (mW/cm 2 ) Limit of Power Density (S) (mW/cm 2 ) Test Result 2402-2480 1.51 -6.38 0.23 0.00007 1 Complies MPE ratio: 0.00007(mW/cm 2 )/1(mW/cm 2 ) =0.00007 Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Job No.: 230510042GZU FCC ID: 2AYCK174XXXX863XXXX Version: 08 July 2020 Page 3 of 3 FCC RF Exposure-Mobile (MPE) Sum of the MPE ratio for all simultaneously transmitting antennas: WIFI antenna 1+BLE=0.02003+0.00007 = 0.0201< 1 WIFI antenna 2+BLE=0.00171+0.00007 = 0.00178< 1 Test Location: Intertek Testing Services Shenzhen Ltd. Guangzhou Branch All tests were performed at: Room102/104, No 203, KeZhu Road, Science City, GETDD Guangzhou, China
Lewis Hyman Inc. TEST REPORT SCOPE OF WORK EMC TESTING–See page 2 REPORT NUMBER 230510042GZU-002 ISSUE DATE [REVISED DATE] 04-January-2024 [---------------------] PAGES 39 DOCUMENT CONTROL NUMBER FCC BT 4.0- f © 2017 INTERTEK TEST REPORT Room 02, & 101/E201/E301/ E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Telephone: +86 20 8213 9688 Facsimile: +86 20 3205 7538 www.intertek.com.cn This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Version: 14 December 2022 Page 2 of 39 FCC BT 4.0-f Applicant Name & Address : Lewis Hyman Inc. 860 East Sandhill Avenue, Carson, CA, 90746, USA Manufacturing Site : QINGDAO TRI-LINK LOCK GROUP CO., LTD. 11F, BUILDING 2, TIANBAO MANSION 61 HAIER ROAD QINGDAO Intertek Report No: FCC ID: 230510042GZU-002 2AYCK174XXXX863XXXX Test standards 47 CFR PART 15 Subpart C: 2021 section 15.247 Sample Description Product : WiFi lock Model No. : 1745020-1745999, 8635012-8635999, 8730000-8739999 Electrical Rating : DC 4x1.5V Battery Serial No. : Not Labeled Date Received : 10 May 2023 Date Test Conducted : 22 May 2023-04 January 2024 Prepared and Checked By Richard Liu Engineer Approved By: Dean Liu Project Engineer TEST REPORT Intertek Report No.: 230510042GZU-002 Version: 14 December 2022 Page 3 of 39 FCC BT 4.0-f CONTENT TEST REPORT ........................................................................................................................... 1 CONTENT ............................................................................................................................. 3 1.0 TEST RESULT SUMMARY ............................................................................................ 4 2.0 GENERAL DESCRIPTION .............................................................................................. 5 2.1 PRODUCT DESCRIPTION ........................................................................................................ 5 2.2 RELATED SUBMITTAL(S) GRANTS ............................................................................................ 5 2.3 TEST METHODOLOGY ........................................................................................................... 6 2.4 TEST FACILITY ...................................................................................................................... 6 3.0 SYSTEM TEST CONFIGURATION .................................................................................. 6 3.1 JUSTIFICATION ..................................................................................................................... 6 3.2 EUT EXERCISING SOFTWARE.................................................................................................. 7 3.3 SPECIAL ACCESSORIES ........................................................................................................... 7 3.4 MEASUREMENT UNCERTAINTY ............................................................................................... 8 3.5 EQUIPMENT MODIFICATION .................................................................................................. 8 3.6 SUPPORT EQUIPMENT LIST AND DESCRIPTION .......................................................................... 9 4.0 MEASUREMENT RESULTS ......................................................................................... 10 4.1 ANTENNA REQUIREMENT .................................................................................................... 10 4.2 6 DB BANDWIDTH (DTS BANDWIDTH) .................................................................................. 11 4.3 MAXIMUM PEAK CONDUCTED OUTPUT POWER ..................................................................... 13 4.4 PEAK POWER SPECTRAL DENSITY .......................................................................................... 16 4.5 OUT OF BAND CONDUCTED EMISSIONS ................................................................................. 19 4.6 OUT OF BAND RADIATED EMISSIONS .................................................................................... 22 4.7 RADIATED EMISSIONS IN RESTRICTED BANDS .......................................................................... 22 4.8 BAND EDGES REQUIREMENT ................................................................................................ 35 4.9 CONDUCTED EMISSION TEST ................................................................................................ 38 TEST REPORT Intertek Report No.: 230510042GZU-002 Version: 14 December 2022 Page 4 of 39 FCC BT 4.0-f 1.0 TEST RESULT SUMMARY Test Item Test Requirement Test Method Result Antenna Requirement FCC PART 15 C section 15.247 (c) and Section 15.203 FCC PART 15 C section 15.247 (c) and Section 15.203 PASS 6 dB Bandwidth (DTS bandwidth) FCC PART 15 C section 15.247 (a)(2) ANSI C63.10: Clause 11.8 PASS Maximum Peak Conducted Output Power FCC PART 15 C section 15.247…
Text truncated - open the document above for the full version.
Lewis Hyman Inc. TEST REPORT SCOPE OF WORK EMC TESTING–See page 2 REPORT NUMBER 230510042GZU-003 ISSUE DATE [REVISED DATE] 04-January-2024 [---------------------] PAGES 53 DOCUMENT CONTROL NUMBER FCC ISED WIFI-c © 2021 INTERTEK TEST REPORT Room 02, & 101/E201/E301/ E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Telephone: +86 20 8213 9688 Facsimile: +86 20 3205 7538 www.intertek.com.cn This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this report. Only the Client is authorized to permit copying or distribution of this report and then only in its entirety. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test results in this report are relevant only to the sample tested. This report by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Testing Services Shenzhen Ltd. Guangzhou Branch Room 02, & 101/E201/E301/E401/E501/E601/E701/E801 of Room 01 1-8/F., No. 7-2. Caipin Road, Science City, GETDD, Guangzhou, Guangdong, China Version: 14 December 2022 Page 2 of 53 FCC ISED WIFI-c Applicant Name & Address : Lewis Hyman Inc. 860 East Sandhill Ave, Carson, CA, 90746, USA Manufacturing Site : QINGDAO TRI-LINK LOCK GROUP CO., LTD. 11F, BUILDING 2, TIANBAO MANSION 61 HAIER ROAD QINGDAO Intertek Report No: 230510042GZU-003 FCC ID: 2AYCK174XXXX863XXXX Test standards 47 CFR PART 15 Subpart C: 2021 section 15.247 Sample Description Product : WiFi lock Model No. : 1745020-1745999, 8635012-8635999, 8730000-8739999 Electrical Rating : DC 4x1.5V Battery Serial No. : Not Labeled Date Received : 10 May 2023 Date Test Conducted : 22 May 2023-04 January 2024 Prepared and Checked By Richard Liu Engineer Approved By: Dean Liu Project Engineer TEST REPORT Intertek Report No.: 230510042GZU-003 Version: 14 December 2022 Page 3 of 53 FCC ISED WIFI-c CONTENT TEST REPORT ........................................................................................................................... 1 CONTENT ............................................................................................................................. 3 1.0 TEST RESULT SUMMARY ............................................................................................ 4 2.0 GENERAL DESCRIPTION ............................................................................................. 5 2.1 PRODUCT DESCRIPTION ........................................................................................................ 5 2.2 RELATED SUBMITTAL(S) GRANTS ............................................................................................ 5 2.3 TEST METHODOLOGY ........................................................................................................... 6 2.4 TEST FACILITY ...................................................................................................................... 6 3.0 SYSTEM TEST CONFIGURATION .................................................................................. 6 3.1 JUSTIFICATION ..................................................................................................................... 6 3.2 EUT EXERCISING SOFTWARE.................................................................................................. 7 3.3 SPECIAL ACCESSORIES ........................................................................................................... 7 3.4 MEASUREMENT UNCERTAINTY ............................................................................................... 7 3.5 EQUIPMENT MODIFICATION .................................................................................................. 8 3.6 SUPPORT EQUIPMENT LIST AND DESCRIPTION .......................................................................... 8 4.0 MEASUREMENT RESULTS ......................................................................................... 10 4.1 ANTENNA REQUIREMENT .................................................................................................... 10 4.2 6 DB BANDWIDTH (DTS BANDWIDTH) .................................................................................. 11 4.3 DUTY CYCLE ...................................................................................................................... 15 4.4 MAXIMUM AVERAGE CONDUCTED OUTPUT POWER ................................................................ 17 4.4 PEAK POWER SPECTRAL DENSITY .......................................................................................... 19 4.5 OUT OF BAND CONDUCTED EMISSIONS ................................................................................. 23 4.6 OUT OF BAND RADIATED EMISSIONS .................................................................................... 26 4.7 RADIATED EMISSIONS IN RESTRICTED BANDS .......................................................................... 26 4.8 BAND EDGES REQUIREMENT ................................................................................................ 50 4.9 CONDUCTED EMISSION TEST ................................................................................................ 52 5.0 TEST EQUIPMENT LIST ............................................................................................ 53 TEST REPORT Intertek Report No.: 230510042GZU-003 Version: 14 December 2022 Page 4 of 53 FCC ISED WIFI-c 1.0 TEST RESULT SUMMARY Test Item Test Requirement Test Method Result Antenna Requirement FCC PART…
Text truncated - open the document above for the full version.
Manufacturing site:SHENZHEN FEISHENG ELECTRONICS CO.,LTD. 3rd Floor, No.70 Baotong South Road, Yungu Street, Xikeng Industrial Zone, Yuanshan Street, Shenzhen Model:FS-2.4G-178-AA