
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -- Reorient or relocate the receiving antenna. -- Increase the separation between the equipment and receiver. -- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. -- Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. The distance between user and device should be no less than 20cm.
Differences Declaration To whom concern, We company Foshan Topday Optoelectromics Technology Co., Ltd hereby declares: The product models TBL-070, ZELO-DTS-1 are identical in the same PCB layout, interior structure and electrical circuits, the only difference is the model name for commercial purpose. Authorized signature: Date: 2021-04-27
Foshan Topday Optoelectromics Technology Co., Ltd Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 USA Date: 2021-04-26 Subject; Request for Confidentiality FCC ID: 2AZRK-TBL070 To Whom It May Concern, Pursuant to the provisions of the Commissionβs rules Title 47 Sections Β§0.457 and Β§0.459, we are requesting the Commission to withhold the following attachment(s) as confidential documents from public disclosure indefinitely. These documents contain detailed system and equipment descriptions and are considered as proprietary information in operation of the equipment. The public disclosure of these documents might be harmful to our company and would give competitors an unfair advantage in the market. Schematic Diagram Block Diagram Parts List Operational Description Tune-up Procedure In additional to above mentioned documents, in order to comply with the marketing regulations in Title 47 CFR Β§2.803 and the importation rules in Title 47 CFR Β§2.1204, while ensuring that business sensitive information remains confidential until the actual marketing of newly authorized devices, we request Short Term Confidentiality of the following attachment(s); External Photos Test Setup Photos Internal Photos User Manual For 45 days, pursuant to Public Notice DA 04-1705. OR For 180 days pursuantto KDB 726920 D01. It is our understanding that all measurement test reports, FCC ID label format and correspondence during the certification review process cannot be granted as confidential documents and this information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: TaoFei Kuang Title: Certification director
Foshan Topday Optoelectromics Technology Co., Ltd Letter of Authorization Company: Foshan Topday Optoelectromics Technology Co., Ltd Address: Huansheng Heng Road, Guicheng Eastern Industrial Zone B, Sanshan Nanhai District, FOSHAN Guangdong 528200,China Product Name: LED Portable Luminaires Model Number(s): TBL-070, ZELO-DTS-1 Product Description: LED Portable Luminaires We authorize MiCOM Labs Inc., 575 Boulder Court, Pleasanton, California 94566, USA, to act on our behalf on all matters concerning the certification of above named equipment. We declare that MiCOM Labs Inc. is allowed to forward all information related to the approval and certification of equipment to the regulatory agencies as required and to discuss any issues concerning the approval application. Any and all acts carried out by MiCOM Labs on our behalf shall have the same effect as acts of our own. Signature: Date: 2021-04-26 Name: TaoFei Kuang Title: Certification director Company: Foshan Topday Optoelectromics Technology Co., Ltd
Test Model No.: TBLβ070
Label location
ZELO LED Portable Luminaires Model: ZELO-DTS-1 Input Voltage: 24Vdc; 1A Power: 20W FCC ID:2AZRK-TBL070 Warning This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. III
Test Model No.: TBLβ070
FCC ID: 2AZRK-TBL070 RF Exposure Evaluation Limits The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in 1.1307(b) Limits for Maximum Permissible Exposure (MPE) Frequency range (MHz) Electric field strength (V/m) Magnetic field strength (A/m) Power density (mW/cm 2 ) Averaging time (minutes) (A) Limits for Occupational/Controlled Exposures 0.3β3.0 614 1.63 *(100) 6 3.0β30 1842/f 4.89/f *(900/f 2 ) 6 30β300 61.4 0.163 1.0 6 300β1500 f/300 6 1500β100,000 5 6 (B) Limits for General Population/Uncontrolled Exposure 0.3β1.34 614 1.63 *(100) 30 1.34β30 824/f 2.19/f *(180/f 2 ) 30 30β300 27.5 0.073 0.2 30 300β1500 f/1500 30 1500β100,000 1.0 30 f = frequency in MHz Friis transmission formula: Pd = (Pout*G)/(4*pi*r 2 ) Where Pd = power density in mW/cm 2 , Pout = output power to antenna in mW; G = gain of antenna in linear scale, Pi = 3.1416; R = distance between observation point and center of the radiator in cm Pd id the limit of MPE, 1 mW/cm 2 . If we know the maximum gain of the antenna and the total power input to the antenna, through the calculation, we will know the distance r where the MPE limit is reached. Test Procedure Software provided by client enabled the EUT to transmit and receive data at lowest, middle and highest channel individually. FCC ID: 2AZRK-TBL070 Test Result of RF Exposure Evaluation WIFI: Channel Output power to antenna (mW) Power Density at R=20cm (mW/cm 2 ) Limit (mW/cm 2 ) Result Lowest (2412MHz) 27.42 0.0093 1.0 PASS Middle (2437MHz) 27.61 0.0093 1.0 PASS Highest (2462MHz) 30.06 0.0102 1.0 PASS Remark: antenna gain=2.3dBi BLE: Channel Output power to antenna (mW) Power Density at R=20cm (mW/cm 2 ) Limit (mW/cm 2 ) Result Lowest (2402MHz) 6.49 0.0022 1.0 PASS Middle (2440MHz) 4.37 0.0015 1.0 PASS Highest (2480MHz) 3.83 0.0013 1.0 PASS Remark: antenna gain=2.3dBi
Global United Technology Services Co., Ltd. Report No.: GTS202102000051F01 Authorized Signature: Robinson Luo Laboratory Manager This results shown in this test report refer only to the sample(s) tested, this test report cannot be reproduced, except in full, without prior written permission of the company. The report would be invalid without specific stamp of test institute and the signatures of compiler and approver. Page 1 of 33 TEST REPORT Applicant: Foshan Topday Optoelectromics Technology Co., Ltd Address of Applicant: Huansheng Heng Road, Guicheng Eastern Industrial Zone B, Sanshan Nanhai District, FOSHAN Guangdong 528200,China Manufacturer/Factory: Foshan Topday Optoelectromics Technology Co., Ltd Address of Manufacturer/Factory: Huansheng Heng Road, Guicheng Eastern Industrial Zone B, Sanshan Nanhai District, FOSHAN Guangdong 528200,China Equipment Under Test (EUT) Product Name: LED Portable Luminaires Model No.: TBL-070, ZELO-DTS-1 FCC ID: 2AZRK-TBL070 Applicable standards: FCC CFR Title 47 Part 15 Subpart C Section 15.247 Date of sample receipt: February 24, 2021 Date of Test: February 25, 2021-April 25, 2021 Date of report issued: April 25, 2021 Test Result : PASS * * In the configuration tested, the EUT complied with the standards specified above. Report No.: GTS202102000051F01 Global United Technology Services Co., Ltd. No. 123-128, Tower A, Jinyuan Business Building, No.2, Laodong Industrial Zone, Xixiang Road, Baoan District, Shenzhen, Guangdong, China 518102 Telephone: +86 (0) 755 2779 8480 Fax: +86 (0) 755 2779 8960 Page 2 of 33 2 Version Version No. Date Description 00 April 25, 2021 Original Prepared By: Date: April 25, 2021 Project Engineer Check By: Date: April 25, 2021 Reviewer Report No.: GTS202102000051F01 Global United Technology Services Co., Ltd. No. 123-128, Tower A, Jinyuan Business Building, No.2, Laodong Industrial Zone, Xixiang Road, Baoan District, Shenzhen, Guangdong, China 518102 Telephone: +86 (0) 755 2779 8480 Fax: +86 (0) 755 2779 8960 Page 3 of 33 3 Contents Page 1 COVER PAGE ........................................................................................................................................... 1 2 VERSION ...................................................................................................................................................2 3 CONTENTS ...............................................................................................................................................3 4 TEST SUMMARY ......................................................................................................................................4 5 GENERAL INFORMATION .......................................................................................................................5 5.1 GENERAL DESCRIPTION OF EUT ..........................................................................................................5 5.2 TEST MODE .........................................................................................................................................7 5.3 DESCRIPTION OF SUPPORT UNITS ........................................................................................................7 5.4 DEVIATION FROM STANDARDS ..............................................................................................................7 5.5 ABNORMALITIES FROM STANDARD CONDITIONS ....................................................................................7 5.6 TEST FACILITY ....................................................................................................................................7 5.7 TEST LOCATION ..................................................................................................................................7 5.8 ADDITIONAL INSTRUCTIONS ..................................................................................................................7 6 TEST INSTRUMENTS LIST ......................................................................................................................8 7 TEST RESULTS AND MEASUREMENT DATA .....................................................................................10 7.1 ANTENNA REQUIREMENT ....................................................................................................................10 7.2 CONDUCTED EMISSIONS ....................................................................................................................11 7.3 CONDUCTED OUTPUT POWER ............................................................................................................14 7.4 CHANNEL BANDWIDTH .......................................................................................................................16 7.5 POWER SPECTRAL DENSITY ..............................................................................................................18 7.6 BAND EDGES .....................................................................................................................................20 7.6.1 Conducted Emission Method ......................................................................................................20 7.6.2 Radiated Emission Method .........................................................................................................21 7.7 SPURIOUS EMISSION .........................................................................................................................24 7.7.1 Conducted Emission Method ......................................................................................................24 7.7.2 Radiated Emission Method .........................................................................................................26 8 TEST SETUP PHOTO .............................................................................................................................33 9 EUT CONSTRUCTIONAL DETAILS ...................................................β¦
Text truncated - open the document above for the full version.
Global United Technology Services Co., Ltd. Report No.: GTS202102000051F02 Authorized Signature: Robinson Luo Laboratory Manager This results shown in this test report refer only to the sample(s) tested, this test report cannot be reproduced, except in full, without prior written permission of the company. The report would be invalid without specific stamp of test institute and the signatures of compiler and approver. Page 1 of 51 TEST REPORT Applicant: Foshan Topday Optoelectromics Technology Co., Ltd Address of Applicant: Huansheng Heng Road, Guicheng Eastern Industrial Zone B, Sanshan Nanhai District, FOSHAN Guangdong 528200,China Manufacturer/Factory: Foshan Topday Optoelectromics Technology Co., Ltd Address of Manufacturer/Factory: Huansheng Heng Road, Guicheng Eastern Industrial Zone B, Sanshan Nanhai District, FOSHAN Guangdong 528200,China Equipment Under Test (EUT) Product Name: LED Portable Luminaires Model No.: TBL-070, ZELO-DTS-1 FCC ID: 2AZRK-TBL070 Applicable standards: FCC CFR Title 47 Part 15 Subpart C Section 15.247 Date of sample receipt: February 24, 2021 Date of Test: February 25, 2021-April 25, 2021 Date of report issued: April 25, 2021 Test Result : PASS * * In the configuration tested, the EUT complied with the standards specified above. Report No.: GTS202102000051F02 Global United Technology Services Co., Ltd. No. 123-128, Tower A,Jinyuan Business Building, No.2, Laodong Industrial Zone, Xixiang Road, Baoan District, Shenzhen, Guangdong, China 518102 Telephone: +86 (0) 755 2779 8480 Fax: +86 (0) 755 2779 8960 Page 2 of 51 2 Version Version No. Date Description 00 April 25, 2021 Original Prepared By: Date: April 25, 2021 Project Engineer Check By: Date: April 25, 2021 Reviewer Report No.: GTS202102000051F02 Global United Technology Services Co., Ltd. No. 123-128, Tower A,Jinyuan Business Building, No.2, Laodong Industrial Zone, Xixiang Road, Baoan District, Shenzhen, Guangdong, China 518102 Telephone: +86 (0) 755 2779 8480 Fax: +86 (0) 755 2779 8960 Page 3 of 51 3 Contents Page 1 COVER PAGE ........................................................................................................................................... 1 2 VERSION ...................................................................................................................................................2 3 CONTENTS ...............................................................................................................................................3 4 TEST SUMMARY ......................................................................................................................................4 5 GENERAL INFORMATION .......................................................................................................................5 5.1 GENERAL DESCRIPTION OF EUT ..........................................................................................................5 5.2 TEST MODE .........................................................................................................................................7 5.3 DESCRIPTION OF SUPPORT UNITS ........................................................................................................7 5.4 DEVIATION FROM STANDARDS ..............................................................................................................7 5.5 ABNORMALITIES FROM STANDARD CONDITIONS ....................................................................................7 5.6 TEST FACILITY ....................................................................................................................................7 5.7 TEST LOCATION ..................................................................................................................................7 5.8 ADDITIONAL INSTRUCTIONS ..................................................................................................................7 6 TEST INSTRUMENTS LIST ......................................................................................................................8 7 TEST RESULTS AND MEASUREMENT DATA .....................................................................................10 7.1 ANTENNA REQUIREMENT ....................................................................................................................10 7.2 CONDUCTED EMISSIONS ....................................................................................................................11 7.3 CONDUCTED PEAK OUTPUT POWER ...................................................................................................14 7.4 CHANNEL BANDWIDTH .......................................................................................................................17 7.5 POWER SPECTRAL DENSITY ..............................................................................................................20 7.6 BAND EDGES .....................................................................................................................................23 7.6.1 Conducted Emission Method ......................................................................................................23 7.6.2 Radiated Emission Method .........................................................................................................26 7.7 SPURIOUS EMISSION .........................................................................................................................31 7.7.1 Conducted Emission Method ......................................................................................................31 7.7.2 Radiated Emission Method .........................................................................................................34 8 TEST SETUP PHOTO .............................................................................................................................51 9 EUT CONSTRUCTIONAL DETAILS .........................................................β¦
Text truncated - open the document above for the full version.
Test Model No.: TBLβ070 Radiated Emission Conducted Emission
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 2 | 15C | 2.41 GHz - 2.46 GHz | 30.06 mW |

2.4GRemote control
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter