FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shenzhen Dige Intelligent Technology Co., Ltd/
  3. 2BE5N-BW0596

2BE5N-BW0596Smart Watch

Shenzhen Dige Intelligent Technology Co., Ltd
Smart Watch - FCC ID 2BE5N-BW0596 - Shenzhen Dige Intelligent Technology Co., Ltd
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Apr 09, 2024
Application Purpose
Original Equipment
Date of Application
Apr 09, 2024
Equipment Note
Smart Watch
Frequency Range
2402.00000000 - 2480.00000000
Company
Shenzhen Dige Intelligent Technology Co., Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2 ) this device must accept any interference received, including interference that may cause undesired operation. NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -- Reorient or relocate the receiving antenna. -- Increase the separation between the equipment and receiver. -- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. -- Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. The device has been evaluated to meet general RF exposure requirement. The device can be used in portable exposure condition without restriction.

Attestation Statements

ShenzhenDigeIntelligentTechnologyCo.,Ltd CERTIFICATIONSCONCERNING“COVERED”EQUIPMENT Date:Feb.29,2024 FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,Maryland21046 FCCID: 2BE5N-BW0596 ToWhomItMayConcern: Asrequiredbysection 2.911(d)(5)(i),ShenzhenDigeIntelligentTechnologyCo.,Ltd (“the applicant”)certifiesthattheequipmentforwhichauthorizationissoughtisnot “covered”equipmentprohibitedfromreceivinganequipmentauthorizationpursuant tosection2.903oftheFCCrules. Asrequiredbysection2.911(d)(5)(ii), ShenzhenDigeIntelligentTechnologyCo.,Ltd (“theapplicant”)certifiesthat,asofthedateofthefilingoftheapplication,the applicantisnotidentifiedontheCoveredListasanentityproducing“covered” equipment. Thankyouforyourattentiontothismatter. Sincerelyyours, Signature: PrintedName:WENHUANG Company:ShenzhenDigeIntelligentTechnologyCo.,Ltd JobTitle: Manager Email:[email protected] Telephone:18824103073

Cover Letter(s)

ShenzhenDigeIntelligentTechnologyCo.,Ltd Date:Feb.29,2024 Subject:authorizationforaddingfamilymodels FCCID:2BE5N-BW0596 TowhomitMayconcern, WewouldliketoconfirmtheSmartWatchWithModels(BW0596,BW0286,BW0327,BW0548, BW0577,BW0618,BW0630,BW0653,BW0691,BW0695,BW0696,BW0701,BW0706,BW1836, BW1845,BW1850,BW1851,BW1852,BW1853,BW1854,BW1855,BW0520,BW0510,BW0569, BW0615,BW0660,BW0693,BW0703,BW0712,BW0713,BW0715,BW0723,BW0728,BW0729, BW01823,BW01837,BW0710,BW0555,BW0723,BW0536,BW0677,BW0591. )aresameinallrespects.Onlythemodelnamesaredifferentfordifferentmarketrequirement. Yourssincerely, Signature: PrintedName:WENHUANG Company:ShenzhenDigeIntelligentTechnologyCo.,Ltd JobTitle:Manager Email:[email protected] Telephone:18824103073

Cover Letter(s)

ShenzhenDigeIntelligentTechnologyCo.,Ltd RequestforConfidentialityLetter-FCC Date:Feb.29,2024 FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,Maryland21046 Re:Requestforconfidentiality FCCID:2BE5N-BW0596 Towhomitmayconcern, Weherebyrespectfullyrequestthatundertheprovisionof47CFR0.459and0.457(d)the documentslistedbelowandattachedwiththisapplicationforcertificationbeprovidedwith confidentialstatus.  Schematics.pdf OperationalDescription.pdf  FrequencyBlockDiagrams.pdf Anyexhibit/informationforwhichwehaverequestedconfidentiality,butwhichmaynotbe accordedsuchtreatmentbytheFCC,shouldbereturnedtous. Thedocumentslistedabovecontaintradesecretsthataretreatedasconfidentialbyus. Substantialcompetitiveharmtouscouldresultshouldtheybemadeavailabletothepublic. Sincerely, Signature: PrintedName: WENHUANG Company:ShenzhenDigeIntelligentTechnologyCo.,Ltd JobTitle: Manager Email:[email protected] Telephone:18824103073

External Photos

ExternalPhotos

ID Label/Location Info

0.5cm 1.5cm FCCID:2BE5N-BW0596

Internal Photos

InternalPhotos ※※※※※ENDOFREPORT※※※※※ ANT

RF Exposure Info

FCCID:2BE5N-BW0596 RFExposureEvaluation AccordingtoKDB447498D01GeneralRFExposureGuidancev06andpart2.1093, UnlessspecificallyrequiredbythepublishedRFexposureKDBprocedures,standalone 1-gheadorbodyand10-gextremitySARevaluationforgeneralpopulationexposure conditions,bymeasurementornumericalsimulation,isnotrequiredwhenthe correspondingSARTestExclusionThresholdcondition(s),listedbelow,is(are)satisfied. For100MHzto6GHzandtestseparationdistances≤50mm,the1-gand10-gSARtest exclusionthresholdsaredeterminedbythefollowing: [(max.powerofchannel,includingtune-uptolerance,mW)/(min.testseparationdistance, mm)]·[√f (GHz) ]≤3.0for1-gSAR,and≤7.5for10-gextremitySAR,where f (GHz) istheRFchanneltransmitfrequencyinGHz PoweranddistanceareroundedtothenearestmWandmmbeforecalculation Theresultisroundedtoonedecimalplaceforcomparison Here, FrequencyRange:2402-2480MHz ForBT BLE SoaSARtestisnotrequired maxtune-uppower(dBm)maxtune-uppower(mW)Min.distance(mm)Calc.thresholdslimit 0.081.0195 0.316 3.0 maxtune-uppower(dBm)maxtune-uppower(mW)Min.distance(mm)Calc.thresholdslimit 0.991.2565 0.390 3.0

Test Report

深圳市麒鑫通达科技有限公司 SHENZHENQXTDTechnologyCo.,Ltd样品承认书 PartApprovalSheet Version:V1.0 Customer : ShenzhenHaikangshengIntelligentCo.,Ltd Project:Bluetoothantenna PartName : Conductingwire PartColor:Black PartNumber: SampleDeliveryDate : April3,2021 SampleQuantity:5PCS Sampletype : Built-inBluetoothwire ReasonforSampleDelivery:○Newtooling○Newsupplier○Toolingchange○Engineeringchange○Other: Remark : Suppliersampleproductionconfirmation:(stamprequired) FormulateConfirmApproveQualityStamp 代庆蓉龙超群傅梁成曹光平 Customerapproval: Project confirmation ProjectapprovalQuality confirmation QualityapprovalConfirmationdate 深圳市麒鑫通达科技有限公司 SHENZHENQXTDTechnologyCo.,Ltd样品承认书 Page1 Confidentialdocuments 机密文件 1.Graphicforreference Figure20.8*20mmBT 2.OTA(FreeSpace) ChannelTRP(dBm)TIS(dBm) 06.3-91.1 396.5-91.3 786.6-91.2 NameANTENNA ModelLT13 Frequency 2.4Ghz Inputimpedance50Ω Allowedpower5mW Workingtemp.-25~+65°C Storagetemp. -40~+85°C Weight0.25g Antennagain天线 增益 -1dBi 深圳市麒鑫通达科技有限公司 SHENZHENQXTDTechnologyCo.,Ltd样品承认书 Page2 Confidentialdocuments 机密文件 3.Field 4.BTTest TesttermEnvironmentMaxpairingdistanceBTCalldistance BTOffice16-18m10-12m 深圳市麒鑫通达科技有限公司 SHENZHENQXTDTechnologyCo.,Ltd样品承认书 Page3 Confidentialdocuments 机密文件 5.Blueprint 深圳市麒鑫通达科技有限公司 SHENZHENQXTDTechnologyCo.,Ltd样品承认书 Page4 Confidentialdocuments 机密文件

Test Report

ProjectNo.:ZKT-240408L3513-2 Page 1 of 42 FCCTESTREPORT FCCID:BE5N-BW0596 ReportNumber. .................................... : ZKT-240408L3513-2 DateofTest ....................................................... : Jan.25,2024toFeb.02,2024 Dateofissue ......................................... : Feb.02,2024 Totalnumberofpages..........................42 TestResult .......................................... : PASS TestingLaboratory............................: ShenzhenZKTTechnologyCo.,Ltd. Address...............................................: 1/F,No.101,BuildingB,No.6,TangweiCommunityIndustrial Avenue,FuhaiStreet,Bao'anDistrict,Shenzhen,China Applicant'sname ............................. :ShenzhenDigeIntelligentTechnologyCo.,Ltd Address...............................................: 8F,BlockB,BuildingC4,ThirdIndustrialPark,Huangmabu Community,HangchengStreet,BaoanDistrict,ShenzhenChina Manufacturer'sname ...................... :ShenzhenDigeIntelligentTechnologyCo.,Ltd Address ............................................... : 8F,BlockB,BuildingC4,ThirdIndustrialPark,Huangmabu Community,HangchengStreet,BaoanDistrict,ShenzhenChina Testspecification: Standard ................................................ : FCCCFRTitle47Part15SubpartCSection15.247 ANSIC63.10:2013 Testprocedure ..................................... : / Non-standardtestmethod ................ :N/A TestReportFormNo........................: TRF-EL-111_V0 TestReportForm(s)Originator.....: ZKTTesting MasterTRF........................................: Dated:2020-01-06 ThisdevicedescribedabovehasbeentestedbyZKT,andthetestresultsshowthattheequipmentunder test(EUT)isincompliancewiththeFCCrequirements.Anditisapplicableonlytothetestedsample identifiedinthereport. Thisreportshallnotbereproducedexceptinfull,withoutthewrittenapprovalofZKT,thisdocumentmay bealteredorrevisedbyZKT,personalonly,andshallbenotedintherevisionofthedocument. Productname.....................................:SmartWatch Trademark...........................................: N/A Model/Typereference......................:Refertosection3.1ModelNo. Ratings..................................................:DC5V&DC3.7Vfrombattery ProjectNo.:ZKT-240408L3513-2 Page 2 of 42 Testingprocedureandtestinglocation: TestingLaboratory ....................................... :ShenzhenZKTTechnologyCo.,Ltd. Address ............................................................ :1/F,No.101,BuildingB,No.6,TangweiCommunity IndustrialAvenue,FuhaiStreet,Bao'anDistrict, Shenzhen,China AlenHe Testedby(name+signature).......................: JoeLiu Reviewer(name+signature) ....................... : LakeXie Approved(name+signature).......................: ProjectNo.:ZKT-240408L3513-2 Page 3 of 42 TableofContentsPage 1.VERSION....................................................................................................................5 2.SUMMARYOFTESTRESULTS...............................................................................6 2.1TESTFACILITY.................................................................................................................7 2.2MEASUREMENTUNCERTAINTY....................................................................................7 3.GENERALINFORMATION........................................................................................8 3.1GENERALDESCRIPTION................................................................................................8 3.2DESCRIPTIONOFTESTMODES..................................................................................10 3.3BLOCKDIGRAMSHOWINGTHECONFIGURATIONOFSYSTEMTESTED............10 3.4DESCRIPTIONOFSUPPORTUNITS(CONDUCTEDMODE)......................................10 3.5EQUIPMENTSLISTFORALLTESTITEMS.................................................................11 4.EMCEMISSIONTEST.............................................................................................13 4.1CONDUCTEDEMISSIONMEASUREMENT..................................................................13 4.1.1POWERLINECONDUCTEDEMISSIONLimits...................................................13 4.1.2TESTPROCEDURE...............................................................................................13 4.1.3DEVIATIONFROMTESTSTANDARD..................................................................13 4.1.4TESTSETUP...........................................................................................................14 4.1.5EUTOPERATINGCONDITIONS...........................................................................14 4.2.1RADIATEDEMISSIONLIMITS...............................................................................17 4.2.2TESTPROCEDURE...............................................................................................18 4.2.3DEVIATIONFROMTESTSTANDARD..................................................................18 4.2.4TESTSETUP...........................................................................................................18 4.2.5EUTOPERATINGCONDITIONS...........................................................................19 5.RADIATEDBANDEMISSIONMEASUREMENT.....................................................24 5.1TESTREQUIREMENT:..............................................................................................24 5.2TESTPROCEDURE..................................................................................................24 5.3DEVIATIONFROMTESTSTANDARD.....................................................................24 5.4TESTSETUP..............................................................................................................25 5.5EUTOPERATINGCONDITIONS..............................................................................25 5.6TESTRESULT...........................................................................................................26 6.POWERSPECTRALDENSITYTEST......................................................................27 6.1APPLI…

Text truncated - open the document above for the full version.

Test Report

ProjectNo.:ZKT-240408L3513-1 Page 1 of 85 FCCTESTREPORT FCCID:2BE5N-BW0596 ReportNumber.....................................: ZKT-240408L3513-1 DateofTest ....................................................... : Jan.25,2024toFeb.02,2024 Dateofissue ......................................... : Feb.02,2024 Totalnumberofpages .......................... 85 TestResult .......................................... : PASS TestingLaboratory. ........................... : ShenzhenZKTTechnologyCo.,Ltd. Address ............................................... : 1/F,No.101,BuildingB,No.6,TangweiCommunityIndustrial Avenue,FuhaiStreet,Bao'anDistrict,Shenzhen,China Applicant'sname.............................: ShenzhenDigeIntelligentTechnologyCo.,Ltd Address ............................................... : 8F,BlockB,BuildingC4,ThirdIndustrialPark,Huangmabu Community,HangchengStreet,BaoanDistrict,ShenzhenChina Manufacturer'sname......................: ShenzhenDigeIntelligentTechnologyCo.,Ltd Address ............................................... : 8F,BlockB,BuildingC4,ThirdIndustrialPark,Huangmabu Community,HangchengStreet,BaoanDistrict,ShenzhenChina Testspecification: Standard ................................................ : FCCCFRTitle47Part15SubpartCSection15.247 ANSIC63.10:2013 Testprocedure ..................................... : / Non-standardtestmethod................:N/A TestReportFormNo. ....................... : TRF-EL-111_V0 TestReportForm(s)Originator ..... : ZKTTesting MasterTRF ........................................ : Dated:2020-01-06 ThisdevicedescribedabovehasbeentestedbyZKT,andthetestresultsshowthattheequipmentunder test(EUT)isincompliancewiththeFCCrequirements.Anditisapplicableonlytothetestedsample identifiedinthereport. Thisreportshallnotbereproducedexceptinfull,withoutthewrittenapprovalofZKT,thisdocumentmay bealteredorrevisedbyZKT,personalonly,andshallbenotedintherevisionofthedocument. Productname.....................................:SmartWatch Trademark ........................................... : N/A Model/Typereference......................:Refertosection3.1ModelNo. Ratings .................................................. :DC5V&DC3.7Vfrombattery ProjectNo.:ZKT-240408L3513-1 Page 2 of 85 Testingprocedureandtestinglocation: TestingLaboratory ............................ :ShenzhenZKTTechnologyCo.,Ltd. Address ................................................. :1/F,No.101,BuildingB,No.6,TangweiCommunity IndustrialAvenue,FuhaiStreet,Bao'anDistrict, Shenzhen,China AlenHe Testedby(name+signature) ............ : JoeLiu Reviewer(name+signature).............: LakeXie Approved(name+signature)............: ProjectNo.:ZKT-240408L3513-1 Page 3 of 85 Page TableofContents Page 1.VERSION...............................................................................................................................5 2.TESTSUMMARY.................................................................................................................6 2.1TESTFACILITY......................................................................................................................7 2.2MEASUREMENTUNCERTAINTY....................................................................................7 3.GENERALINFORMATION...............................................................................................8 3.1GENERALDESCRIPTIONOFEUT................................................................................8 3.2TestSetupConfiguration.....................................................................................................9 3.3SupportEquipment..............................................................................................................10 3.4TestMode...............................................................................................................................11 3.5EQUIPMENTSLISTFORALLTESTITEMS..............................................................12 4.EMCEMISSIONTEST.....................................................................................................14 4.1Conductedemissions.........................................................................................................14 4.1.1POWERLINECONDUCTEDEMISSIONLimits....................................................14 4.1.2TESTPROCEDURE.......................................................................................................14 4.1.3DEVIATIONFROMTESTSTANDARD....................................................................14 4.1.4TESTSETUP.....................................................................................................................15 4.1.5EUTOPERATINGCONDITIONS...............................................................................15 4.1.6TestResult(Chargingmode)..............................................................................16 4.2Radiatedemissions.............................................................................................................17 4.2.1RadiatedEmissionLimits...............................................................................................18 4.2.2TESTPROCEDURE.......................................................................................................18 4.2.3DEVIATIONFROMTESTSTANDARD....................................................................19 4.2.4TESTSETUP.....................................................................................................................19 4.2.5EUTOPERATINGCONDITIONS...............................................................................20 4.2.6TESTRESULTS...............................................................................................................21 1GHZ~25GHZ..........................................................................................................................24 5.RADIATEDBANDEMISSIONMEASUREMENT.....................................................30 5.1TestRequirement:..........................…

Text truncated - open the document above for the full version.

Test Setup Photos

EUTTESTPHOTO

Contact Information

Applicant

WEN HUANG
[email protected]18824103073Fax: 18824103073

Test Firm

Shenzhen ZKT Technology Co., Ltd.Lake Xie
[email protected]0086-13620010775

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz1.30 mW
Confidentiality
Long Term
Grant Notes
RF output power is peak conducted.

Other Applications from Shenzhen Dige Intelligent Technology Co., Ltd

Smart Watch - FCC ID 2BE5N-BW0189 - Shenzhen Dige Intelligent Technology Co., Ltd
2BE5N-BW0189

Smart Watch

Mar 11, 2024

Equipment Class

DTS - Digital Transmission System