
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
English Version 01-12 Deutsche Fassung 13-25 Version française 26-38 Versione italiana 39-50 Version espagnole 51-62 1 / 65 CONTENTS [English Version] 1. Warm Tips ......................................................................................................................... 3 2. Technical Specifications ..................................................................................................... 3 3. Hardware Overview ........................................................................................................... 4 4. Initial Setup........................................................................................................................ 5 5. Software Overview ............................................................................................................ 6 5.1. Home Screen ......................................................................................................... 6 5.2. Navigation bar ....................................................................................................... 7 6. Google Services - Quick Setup ........................................................................................... 8 7. Factory Settings ................................................................................................................. 8 8. Managing Kid's Place ......................................................................................................... 9 8.1. Entering Kid’s Place ............................................................................................... 9 8.2. Enable/Disable Internet Access for Kid’s Place Apps ........................................... 10 8.3. Time Management .............................................................................................. 11 9. Trouble Shooting ............................................................................................................. 12 2 / 65 Welcome! Thank you for purchasing your new CWOWDEFU Kids Tablet. This User Manual will provide step-by-step instructions to help you learn to use your new device. After opening the box, please make sure the package contents are available for you. Package Contents: • 1* Kid Tablet 10.1 Inch • 1*Quick Start Guide • 1*AC Charger • 1*Type-C USB Cable • 1*Protective case • 1*Screen Protector 3 / 65 1. Warm Tips 1) Do not disassemble the product or accessories. 2) Do not use alcohol, thinner, or benzene to clean the surface of the device. 3) The device should be charged for about 4 hours during the first three charge cycles. 4) Do not store the device in places with high temperature, humidity, or dust. Avoid dropping or strong impact. 5) Use an appropriate volume setting. High volume may cause hearing damage when using headphones. 6) To charge the device, use the included Type-C USB cable and AC adapter. 7) When transferring data to/from a computer, do not suddenly disconnect the cable; this may cause the device to malfunction. Use a "Safely Remove Hardware" or "Eject" function on the computer. 8) Obey all local laws and regulations when using the device, such as when driving or aboard an aircraft. 9) The device and included accessories are not water resistant or waterproof. 2. Technical Specifications Operating System Android Display 10.1" HD IPS display Resolution 1280x 800 Storage 128GB RAM 4GB+4GB Expand CPU Allwinner A523 Octa-core Battery 6000 mAh, Li-Ion Polymer Battery life 4-8 hours Ports Type-C Camera 5MP front camera, 8MP rear camera Cart Slot Micro SD card slot, supports up to 512GB Speakers Box Speaker Voltage AC 110~240V 50/60Hz; DC 5V/2A Network Access WiFi 2.4GHz (802.11b/g/n)+WiFi6(AX) +BT5.0 Language Multi-language supportive 4 / 65 3. Hardware Overview 5 / 65 Language selection: scroll through the list of languages to choose your preferred language then tap Start. 4. Initial Setup To get started with your new tablet, ensure that your tablet has been fully charged before the first use. Press and hold the power button for 5 seconds until you see the CWOWDEFU logo on screen. Allow 10 seconds for the tablet to power on. You will be prompted to start the initial setup process. Step 1: Note: If the touch screen becomes unresponsive, insert a small pin or paperclip in the reset hole to restart the tablet. Step 2: Wi-Fi setup: A list of Wi-Fi networks will appear. Tap your network name. If your Wi-Fi network is password protected, you will be prompted to enter the password. Tap Continue. 6 / 65 Step 3: Enter the username and click “Next”. Protect Your Tablet: Create password or select "Not now" and set it later. Tap/Click ”SKIP ANYWAY”. Click “MORE”, and then click ”ACCEPT”. Wait a few seconds to get into the desktop. 5. Software Overview 5.1. Home Screen Your Learning Tab features the Android operating system, version 11.0. The included Google Play gives you access to a catalog of over one million apps. This is the default home screen in Grown-up mode. To learn about using Kid's Place, refer to the chapter, “Managing Kid's Place”. 7 / 65 Swipe down from top of screen to access quick settings. 5.2. Navigation bar The navigation bar along the bottom of the screen allows you to switch between apps. In some apps, the navigation bar becomes hidden. To reveal it, swipe up from the bottom edge of the screen. The left button, back, takes you back one screen. The center button, home, takes you to the home screen. The right button, recent apps, brings up thumbnails of recently used apps; tap one to Switch to it. 8 / 65 Back Home Recent 6. Google Services - Quick Setup 1) Wi-Fi connection required to access Google Services. First connect to a network. 2) Sign in with an existing account or create one. You can create a new account for the child that is linked to an existing adult account; this allows the parent to be notified when changes occur or a new device is logged into. 3) The Account Added screen provides conformation the account has been added. 4) Additional services s…
Text truncated - open the document above for the full version.
1/1 US Agent for Service of Process LETTER OF ATTESTATION TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 US Agent for Service of Process: Company Name: UGK-LVMUNITEDINC FRN: 0033476375 Contact Name: Jimmychen Address: 6547NAcademyBlvd#2266,ColoradoSprings,CO80918 Telephone No: 001-323-51 04660 Email: [email protected] Applicant: Company name: Shenzhen Cheng Fong Digital-Tech Ltd Grantee code: 2BHF6 FCC ID: 2BHF6-C18W FRN: 0035660737 Contact Name: Jack bu Address: 1-4/F, Building A, Weihua Industrial Zone, Huaxing Road, Tongsheng Community Dalang Street, Longhua New District, Shenzhen Telephone: 18906679427 Fax: 18906679427 E-mail: [email protected] [Shenzhen Cheng Fong Digital-Tech Ltd] certifies that, as of the date of this filing of the application with the TCB, [UGK-LVMUNITEDINC] is our designated US agent for service of process for the above referenced FCC ID. [Shenzhen Cheng Fong Digital- Tech Ltd] accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any commission related proceeding involving equipment. [UGK-LVMUNITEDINC] accepts, as of the date of the filing of the application, the obligation of the designated US agent for service of process for the above reference FCC ID. The US Agent for Service of Process is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. The Applicant is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. Date: 2024/07/08 Applicant’s Name: Jack bu US Agent’s Name: Jimmychen Title: Manager Title: Manager Signature Signature
C5266091_X24_Ed.2 1/1 “Attestation Statements” TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 The Commission adopted rules that prohibit equipment authorization for “covered” telecommunications equipment and video surveillance equipment produced by entities identified on the Commission’s Covered List 1 , which is periodically updated. See the Covered List for more details. This Attestation Statement is to confirm that we follow the Section 2.911(d)(5)(i)-(ii) Applicant Company name: Shenzhen Cheng Fong Digital-Tech Ltd Grantee code: 2BHF6 FCC ID: 2BHF6-C18W FRN: 0035660737 Contact Name: Jack bu Address: 1-4/F, Building A, Weihua Industrial Zone, Huaxing Road, Tongsheng Community Dalang Street, Longhua New District, Shenzhen Telephone: 18906679427 Fax: 18906679427 E-mail: [email protected] i. [Shenzhen Cheng Fong Digital-Tech Ltd] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. The applicant must sign this certification. ii. [Shenzhen Cheng Fong Digital-Tech Ltd] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant [is not] (as a specifically named entity or any of its subsidiaries or affiliates) identified on the Covered List as an entity producing “covered” equipment. The applicant must sign this certification. [Shenzhen Cheng Fong Digital-Tech Ltd] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant [ is not] identified on the Covered List as an entity producing “covered”equipment . Date: 2024/07/08 Applicant’s Name: Jack bu Title: Manager Signature 1 The Commission’s Covered List is published by the Public Safety and Homeland Security Bureau and posted on the Commission’s website. This Covered List, which is periodically updated, identifies particular equipment, produced by particular entities, that constitutes “covered” equipment. https://www.fcc.gov/supplychain/coveredlist
Shenzhen Cheng Fong Digital-Tech Ltd Product Similarity Declaration Company: Shenzhen Cheng Fong Digital-Tech Ltd Address: 1-4/F, Building A, Weihua Industrial Zone, Huaxing Road, Tongsheng Community Dalang Street, Longhua New District, Shenzhen Product Name: Tablet Model Number: C18W, C19W, P35W, P36W, P25W, P26W, P50L, P51L, P25L, P26L, C28, C29, C58, C59, P15, P16, P55, P56, P65, P66, P75, P76 FCC Identifier: 2BHF6-C18W We (Shenzhen Cheng Fong Digital-Tech Ltd) hereby state that all the models are electrical identical including the same software parameter and hardware design (i.e., circuit design, PCB Layout, RF module/circuit, antenna type(s) and antenna location, components on PCB, etc.,), same mechanical structure and design (including product enclosure, materials, etc.,), the only difference is the model name and appearance color. Client’s signature Name: Jack bu Date: 2024-07-08 Title: Manager Signature of applicant:
Shenzhen Cheng Fong Digital-Tech Ltd 1/1 Letter of Authorization Company: Shenzhen Cheng Fong Digital-Tech Ltd Address: 1-4/F, Building A, Weihua Industrial Zone, Huaxing Road, Tongsheng Community Dalang Street, Longhua New District, Shenzhen Product Name: Tablet Model Number: C18W, C19W, P35W, P36W, P25W, P26W, P50L, P51L, P25L, P26L, C28, C29, C58, C59, P15, P16, P55, P56, P65, P66, P75, P76 FCC Identifier: 2BHF6-C18W We authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, to act on our behalf on all matters concerning the above named equipment. Any individual within LGAI Technological Center S.A. is authorized to act on our behalf and take action on the application. We declare that authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, is allowed to forward all information related to the approval project to the Federal Communication Commission and to discuss any issues concerning the approval application. Any and all acts carried out by LGAI Technological Center S.A. on our behalf shall have the same effect as acts of our own. Name: Jack bu Date: 2024-07-08 Title: Manager Signature of applicant:
Shenzhen Cheng Fong Digital-Tech Ltd 1/1 Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Date: 2024-07-08 Subject: Request for Confidentiality FCC ID: 2BHF6-C18W To Whom It May Concern, Pursuant to the provisions of Sections 0.457 and 0.459 of Commission's rules (47CFR0.457, 0.459), we are requesting the Commission to withhold the following attachment(s) as confidential document from public disclosure. Exhibits Long-Term Confidentiality Short-Term Confidentiality NOTE 2 ID Label/Location No No Attestation Statement No No External Photos No ☐ Block Diagram ☒ ☐ Schematics ☒ ☐ Test Report No No Test Setup Photos No ☐ User’s Manual No ☐ Internal Photos No ☐ Parts List / Tune Up ☐ ☐ RF Exposure Info No No Operational Description ☒ ☐ Cover Letter(s) No No SDR Software / Security Info ☒ No NOTE 1: Long-Term Confidentiality may be permitted under special conditions (See II. LONG-TERM CONFIDENTIALITY, Section 3 of KDB 726920, use last in force) NOTE 2: Short-Term Confidentiality can be requested for a maximum of 180 days from the date of the grant. Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: Jack bu Title: Manager
C5266091_X13_Ed.1 1/1 Shenzhen Cheng Fong Digital-Tech Ltd FCC Software Configuration Control Declaration Date: 2024-07-08 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Attn: OET Dept. Product/ Model Number: Tablet / C18W, C19W, P35W, P36W, P25W, P26W, P50L, P51L, P25L, P26L, C28, C29, C58, C59, P15, P16, P55, P56, P65, P66, P75, P76 Regarding FCC Country Code Selection guidelines identified in KDB 594280. “All applications for equipment authorization for transmitters that can have radio parameters, or other technical parameters, reported to the Commission set by software must have an attestation indicating that no third party will have software, or configuration control, to program the device out of compliance of the technical rules under which it has been certified.” We declare that no third party will have software, or configuration control, to program the device out of compliance of the technical rules under which it has been certified. Name: Jack bu Date: 2024-07-08 Title: Manager Signature of applicant:
Shenzhen DL Testing Technology Co., Ltd. EUT PHOTO(External Photos) Model Number: C18W Shenzhen DL Testing Technology Co., Ltd. Shenzhen DL Testing Technology Co., Ltd. Shenzhen DL Testing Technology Co., Ltd. Shenzhen DL Testing Technology Co., Ltd. ※※※※※ END OF REPORT ※※※※※
Size: 16*12mm M/N: C18W FCC ID: 2BHF6-C18W Label location
Shenzhen DL Testing Technology Co., Ltd. EUT PHOTO(Internal Photos) Shenzhen DL Testing Technology Co., Ltd. ANT Shenzhen DL Testing Technology Co., Ltd. Shenzhen DL Testing Technology Co., Ltd. ※※※※※ END OF REPORT ※※※※※
FCC ID: 2BHF6-C18W RF Exposure Evaluation According to KDB 447498 D01v06 and part 2.1093,Unless specifically required by the published RF exposure KDB procedures, standalone 1-g head or body and 10-g extremity SAR evaluation for general population exposure conditions, by measurement or numerical simulation, is not required when the corresponding SAR Test Exclusion Threshold condition(s), listed below, is (are) satisfied. For 100 MHz to 6 GHz and test separation distances ≤ 50 mm, the 1-g and 10-g SAR test exclusion thresholds are determined by the following: [(max. power of channel, including tune-up tolerance, mW) / (min. test separation distance, mm)] · [√f (GHz) ] ≤ 3.0 for 1-g SAR, and ≤ 7.5 for 10-g extremity SAR, where f (GHz) is the RF channel transmit frequency in GHz Power and distance are rounded to the nearest mW and mm before calculation The result is rounded to one decimal place for comparison EIRP=E Meas +20log(d Meas )-104.7 EIRP is the equivalent isotropically radiated power, in dBm E Meas is the field strength of the emission at the measurement distance, in dBμV/m d Meas is the measurement distance, in m Here, For wifi 2.4G Max Power(dBm) Max Power(mW) Frequency(MHz) Min. distance(mm) Calc. thresholds limit 6.875 4.9 2437 5 1.5 3.0 For wifi 5G Max Power(dBm) Max Power(mW) Frequency(MHz) Min. distance(mm) Calc. thresholds limit 3.501 2.2 5745 5 1.1 3.0 For BT Field strength (dBuV/m) EIRP (dBm) Max tune-up (mW) Frequency (MHz) Min. distance(mm) Calc. thresholds limit 92.05 -3.1 0.5 2480 5 0.2 3.0 For Simultaneous transmitting, 1): The sum of the ratios of the spatially averaged results to the applicable frequency dependent MPE limits = 1.5/3+1.1/3+0.2/3 = 0.97< 1 Since the sum of the MPE ratios for all simultaneously transmitting antennas incorporated in the device is ≤ 1.0, the EUT is considered to satisfy MPE compliance for simultaneous transmission operations. So a SAR test is not required
Shenzhen Xinuo Mountain communication Technology Co., LTD contents 鑫辉数码 规 格 承 认 书 APPROVAL SHEET 供应商: 信诺山 CUSTOMER: 品 名: Antenna DISCRIPTION: 型 号: WIFI/BT MODEL NO: 供应商料号: WBP700-1B-A CUSTOMER P/N: 机 种: 平板 CUSTOMER MODEL: 承认部门 项目 硬件 软件 测试 fae,结构 技术中心 经理 确 认 审 核 结 果: 合格 不合格 说 明: REMARK: 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第2页- CONTENTS ........................................................................................................................................................ 1 1. PROJECT INFORMATION AND ELECTRICAL SPECIFICATION ................................. 3 1-1 PROJECT PICTURE .................................................................................................................................... 3 1-2 FREQUENCY BAND: .................................................................................................................................. 3 1-3 IMPEDANCE MATCHING ........................................................................................................................... 3 2. VSWR .............................................................................................................................. 3 2-1 MEASURING METHOD: .............................................................................................................................. 3 2-2 S11 PARAMETER VALUES ..................................................................................................................... 3 3. EFFICIENCY AND GAIN .............................................................................................. 4 3-1 EFFICIENCY/PEAKGAIN- /WIFI/BT ........................................................................................................... 5 4. ICTIVE TEST RESULT ...................................................................... 错误!未定义书签。 5. THE PRODUCTION INDEX ............................................................................................. 8 6. STRUCTURAL DRAWINGS ........................................................................................... 9 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第3页- 1. Project information and Electrical Specification Those specifications were specially defined forWIFI/BTmodel, and all characteristics were measured under the model’s handset testing jig . 1-1 Project picture 1-2 Frequency Band: Frequency Band MHz GPS/Wi-Fi/BT 1575/2400-2500/5050-5850 1-3 Impedance matching 天线原匹配无更改 2. VSWR 2-1 Measuring Method: 1. A 50Ωcoaxial cable is connected to the antenna. Then this cable is connected to a network analyzer to measure the VSWR, 2. Keeping this jig away from metal at least 20cm. 测试示意图如下: 2-2 S11 parameter values 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第4页- 频率(MHZ) 2400 2500 5050 5400 5850 驻波 1.37 1.39 1.72 1.31 1.80 3. Efficiency and Gain *measuring and test instruments: 微波暗室,Agilent网络分析仪,Agilent频谱分析仪,8960综合测试仪,标准天线 *test method: equipment以H面放于转台中心位置固定,与喇叭天线中心位置在同一个水平线上。 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第5页- 3-1 Efficiency/Gain- WIFI/BT 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第6页- 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第7页- 深圳信诺山通信技术有限公司 连通你我 · 有信如山 第8页- 5. The production index 天线量产时,以驻波比作为量产测试标准。 根据项目本身的差异,给出如下标准: 频率(MHZ) 量产标准 1575/2400-2500/5050-5850 VSWR(量产产品)<VSWR(设计样品)+0.5 深圳信诺山通信技术有限公司连通你我 · 有信如山 第9页- 6.structural drawings
Shenzhen DL Testing Technology Co., Ltd. Report No.: DL-240612041ER Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 1 of 49 FCC Part 15E Test Report FCC ID: 2BHF6-C18W Applicant: Shenzhen Cheng Fong Digital-Tech Ltd Address: 1-4/F, Building A, Weihua Industrial Zone, Huaxing Road, Tongsheng Community Dalang Street, Longhua New District, Shenzhen Manufacturer: Shenzhen Cheng Fong Digital-Tech Ltd Address: 1-4/F, Building A, Weihua Industrial Zone, Huaxing Road, Tongsheng Community Dalang Street, Longhua New District, Shenzhen EUT: Tablet Trade Mark: N/A Model Number: C18W C19W, P35W, P36W, P25W, P26W, P50L, P51L, P25L, P26L, C28, C29, C58, C59, P15, P16, P55, P56, P65, P66, P75, P76 Date of Receipt: Jun. 12, 2024 Test Date: Jun. 12, 2024 - Jul. 10, 2024 Date of Report: Jul. 10, 2024 Prepared By: Shenzhen DL Testing Technology Co., Ltd. Address: 101-201, Building C, Shuanghuan, No.8, Baoqing Road, Baolong Industrial Zone, Baolong Street, Longgang District, Shenzhen, Guangdong, China Applicable Standards: FCC PART 15 E 15.407 ANSI C63.10:2013 Test Result: Pass Report Number: DL-240612041ER Prepared (Test Engineer): Pxing Huang Reviewer (Supervisor): Jack Bu Approved (Manager): Jade Yang This test report is based on a single evaluation of one sample of above mentioned products. It is not permitted to be duplicated in extracts without written approval of Shenzhen DL Testing Technology Co., Ltd. Shenzhen DL Testing Technology Co., Ltd. Report No.: DL-240612041ER Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 2 of 49 Table of Contents Page 1 . SUMMARY OF TEST RESULTS 5 1.1 MEASUREMENT UNCERTAINTY 5 2 . GENERAL INFORMATION 6 2.1 GENERAL DESCRIPTION OF EUT 6 2.2 DESCRIPTION OF TEST MODES 7 2.3 BLOCK DIGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 8 2.4 DESCRIPTION OF SUPPORT UNITS(CONDUCTED MODE) 8 2.5 TABLE OF PARAMETERS OF TEST SOFTWARE SETTING 8 2.6 EQUIPMENTS LIST FOR ALL TEST ITEMS 9 3 . EMC EMISSION TEST 10 3.1 CONDUCTED EMISSION MEASUREMENT 10 3.1.1 POWER LINE CONDUCTED EMISSION LIMITS 10 3.1.2 TEST PROCEDURE 10 3.1.3 DEVIATION FROM TEST STANDARD 10 3.1.4 TEST SETUP 11 3.1.5 EUT OPERATING CONDITIONS 11 3.1.6 TEST RESULTS 11 3.2 RADIATED EMISSION MEASUREMENT 14 3.2.1 RADIATED EMISSION LIMITS 14 3.2.2 TEST PROCEDURE 15 3.2.3 DEVIATION FROM TEST STANDARD 15 3.2.4 TEST SETUP 15 3.2.5 EUT OPERATING CONDITIONS 16 3.2.6 TEST RESULTS (BETWEEN 9KHZ – 30 MHZ) 17 3.2.7 TEST RESULTS (BETWEEN 30MHZ – 1GHZ) 18 3.2.8 TEST RESULTS (1GHZ~40GHZ) 20 3.3 RADIATED BAND EMISSION MEASUREMENT 25 3.3.1 TEST REQUIREMENT: 25 3.3.2 TEST PROCEDURE 25 3.3.3 DEVIATION FROM TEST STANDARD 25 3.3.4 TEST SETUP 25 3.3.5 EUT OPERATING CONDITIONS 25 4 . AVERAGE OUTPUT POWER 28 4.1 APPLIED PROCEDURES / LIMIT 28 4.1.1 TEST PROCEDURE 28 4.1.2 DEVIATION FROM STANDARD 28 4.1.3 TEST SETUP 28 Shenzhen DL Testing Technology Co., Ltd. Report No.: DL-240612041ER Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 3 of 49 Table of Contents Page 4.1.4 EUT OPERATION CONDITIONS 28 4.1.5 TEST RESULTS 29 5 . POWER SPECTRAL DENSITY TEST 33 5.1 APPLIED PROCEDURES / LIMIT 33 5.1.1 TEST PROCEDURE 33 5.1.2 DEVIATION FROM STANDARD 33 5.1.3 TEST SETUP 33 5.1.4 EUT OPERATION CONDITIONS 33 5.1.5 TEST RESULTS 34 6 . 6DB BANDWIDTH TEST 38 6.1 APPLIED PROCEDURES / LIMIT 38 6.1.1 TEST PROCEDURE 38 6.1.2 DEVIATION FROM STANDARD 38 6.1.3 TEST SETUP 38 6.1.4 EUT OPERATION CONDITIONS 38 6.1.5 TEST RESULTS 39 7 . DUTY CYCLE TEST SIGNAL 43 7.1 APPLIED PROCEDURES / LIMIT 43 7.1.1 TEST PROCEDURE 43 7.1.2 DEVIATION FROM STANDARD 43 7.1.3 TEST SETUP 43 7.1.4 EUT OPERATION CONDITIONS 43 7.1.5 TEST RESULTS 44 8 . FREQUENCY STABILITY 46 8.1 APPLIED PROCEDURES / LIMIT 46 8.1.1 TEST PROCEDURE 46 8.1.2 DEVIATION FROM STANDARD 46 8.1.3 TEST SETUP 46 8.1.4 EUT OPERATION CONDITIONS 46 8.1.5 TEST RESULTS 47 9 . TRANSMISSION IN THE ABSENCE OF DATA 49 9.1 STANDARD REQUIREMENT 49 9.2 TEST RESULT 49 10 . ANTENNA REQUIREMENT 49 10.1 STANDARD REQUIREMENT 49 10.2 EUT ANTENNA 49 11 . TEST SEUUP PHOTO 49 Shenzhen DL Testing Technology Co., Ltd. Report No.: DL-240612041ER Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 4 of 49 Table of Contents Page 12 . EUT PHOTO 49 Shenzhen DL Testing Technology Co., Ltd. Report No.: DL-240612041ER Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 5 of 49 1. SUMMARY OF TEST RESULTS Test procedures according to the technical standards: FCC Part15 (15.407) , Subpart E Standard Section Test Item Judgment Remark 15.207 Conducted Emission PASS 15.407(b), 15.209 Radiated Spurious Emission PASS 15.407 (b) Band Edge Emission PASS 15.407 (a) Average Output Power PASS 15.407 (a) Power Spectral Density PASS 15.407(e) 6dB bandwidth PASS 15.407(g) Frequency Stability PASS 15.407(c) Transmission in case of Absence of Information PASS 15.203 Antenna Requirement PASS NOTE: (1)” N/A” denotes test is not applicable in this Test Report Test lab: Shenzhen DL Testing Technology Co., Ltd. Address: 101-201, Building C, Shuanghuan, No.8, Baoqing Road, Baolong Industrial Zone, Baolong Street, Longgang District, Shenzhen, Guangdong, China FCC Test Firm Registration Number: 854456 Designation Number: CN1307 IC Registered No.: 27485 CAB ID.: CN0118 1.1 MEASUREMENT UNCERTAINTY The reported uncertainty of measurement y ± U, where expended uncertainty U is based on a standard uncertainty multiplied by a coverage factor of k=2,providing a level of confidence of approximately 95 %。 No. Item Uncertainty 1 Conducted Emission Test ±2.56dB 2 RF power,conducted ±0.42dB 3 Spurious emissions,conducted ±2.76dB 4 All emissions,radiated(<1G) ±3.65dB 5 All emissions,radiated(>1G) ±4.89dB 6 Temperature ±0.5°C 7 Humidity ±2% 8 6dB Bandwidth ±0.2MHz Shenzhen DL Testing Technology Co., Ltd. Report No.: DL-240612041ER Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 6 of 49 2. GENERAL INFORMATION 2.1 …
Text truncated - open the document above for the full version.
Shenzhen DL Testing Technology Co., Ltd. EUT TEST PHOTO Radiated Measurement Photos Shenzhen DL Testing Technology Co., Ltd. Conducted Measurement Photos ※※※※※ END OF REPORT ※※※※※
Shenzhen, Guangdong · China
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15E | 5.75 GHz - 5.83 GHz | 22.00 mW |

Tablet
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter