
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
4K UHD Integrated Dual-Lens USB Camera SCAN ME For User Manual of the Camera 079.79.11010224 Part No. Setup Guide Step 1 Connect the camera to the network using the network cable, switch or router. Step 2 Check the default IP address, username and password on the camera's label. Step 3 Visit the VLC website (http://www.videolan.org/vlc/) to download and install the VLC media player. Step 4 Click “Media > Open Network Stream”. Step 5 Enter the URL to stream via VLC. Step 6 Please visit the web settings page for more settings . rtsp://ip: port number/1 (First Stream); rtsp://ip: port number/2 (Second Stream); When the rtsp is the default value of 554, the port number can be omitted. ? Open Media File Disc Network Capture Device Network Protocol Please enter a network URL: rtsp://192.168.100.88/1 http://www.examp1e.com/stream.avi rtp://@:1234 mms://mms.examp1es.com/stream. asx rtsp://server. example.org:8080/test.sdp http://www.yourtube.com/watch?v=gg64x Show more options PlayCancel Note FCC warning statements: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: • Reorient or relocate the receiving antenna. • Increase the separation between the equipment and receiver. • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. • Consult the dealer or an experienced radio/TV technician for help. Caution: Any changes or modifications to this device not explicitly approved by manufacturer could void your authority to operate this equipment. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. The device has been evaluated to meet general RF exposure requirement This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator & your body.
1/1 USAgentforServiceofProcessLETTEROFATTESTATION TO: OfficeofEngineeringTechnology FederalCommunicationsCommission 7435OaklandMillsRoad Columbia,MD21046 USAgentforServiceofProcess: Companyname:HOPEKCORPORATIONINC FRN:0034562900 ContactName:PeterDavis Address:4358SBANNOCKSTENGLEWOOD,CO80110UnitedStates TelephoneNo:561-235-6113 Email:[email protected] Applicant: Companyname:RocwareCorporation GranteeCode:2BKN3 FCCID:2BKN3-RB20 FRN:0035882398 ContactName:QinqiongLi Address:3/F-1,No.2,HonghuiIndustrialPark,Xin’anStreet,Bao’anDistrict, Shenzhen,China TelephoneNo: 18123623531 FaxNo: / Email: [email protected] RocwareCorporationcertifiesthat,asofthedateofthisfilingoftheapplicationwiththeTCB, [HOPEKCORPORATIONINC]isourdesignatedUSagentforserviceofprocessfortheabove referencedFCCID.RocwareCorporationacceptstomaintainanagentfornolessthanone yearafterthegranteehasterminatedallmarketingandimportationortheconclusionofany commissionrelatedproceedinginvolvingequipment.[HOPEKCORPORATIONINC]accepts, asofthedateofthefilingoftheapplication,theobligationofthedesignatedUSagentfor serviceofprocessfortheabovereferenceFCCID. TheUSAgentforServiceofProcessisawareofandagreestocomplywiththerequirements outlinedintheFCCEquipmentAuthorizationProgram,ReportandOrderFCC22-84,and clause§2.911. TheApplicantisawareofandagreestocomplywiththerequirementsoutlinedintheFCC EquipmentAuthorizationProgram,ReportandOrderFCC22-84,andclause§2.911. Date:2025-07-11 Applicant’sName:QinqiongLiUSAgent’sName:PeterDavis Title:ManagerTitle:CEO Signature:Signature:
Rocware Corporation July 8, 2025 Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: Attestation Statements Part 2.911(d)(5)(i) request for 2BKN3-RB20 [Rocware Corporation] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. We also certify that, as of the date of the filing of the application, the equipment does not utilize cyber-security or anti-virus software from Kaspersky Lab, Inc, or any of its successors and assignees, which is also on the “covered list”. Sincerely, Qinqiong Li Rocware Corporation July 8, 2025 Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: Attestation Statements Part 2.911(d)(5)(ii) request for 2BKN3-RB20 [Rocware Corporation] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Sincerely, Qinqiong Li
Rocware Corporation Difference Description We Rocware Corporation state: Product name: 4K Dual-lens PTZ Video Bar Model: RB20, RB2***** (*: 0~9, A~Z or Blank), VHD-M2000S, M2000S, T740 Only the name is different, and the functions, software, and circuits of all models are the same. Signed: Name: Qinqiong Li Date: July 8, 2025 Title: Manager Telephone: 18123623531 Email: [email protected]
Rocware Corporation 7/8/2025 Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: CONFIDENTIALITY REQUEST FOR Product Name: 4K Dual-lens PTZ Video Bar FCC ID: 2BKN3-RB20 Model(s): RB20 To Whom It May Concern: This letter serves as an official request for confidentiality under sections 0.457 and 0.459 of CFR 47. We have requested that the (Schematic Diagram, Block Diagram, Operational Description, Software Security Requirements For U-NII Devices) required to be submitted with this application be permanently withheld from public review. These documents contain detailed system and equipment descriptions and are considered as proprietary information in operation of the equipment. The public disclosure of these documents might be harmful to our company and would give competitors an unfair advantage in the market Please contact me if there is any information you may need. Sincerely, Signature: July 8, 2025 Name Qinqiong Li Position Manager Company Name Rocware Corporation Address 3/F-1, No. 2, Honghui Industrial Park, Xin’an Street, Bao’an District, Shenzhen, China Tel 18123623531 Fax / Email [email protected]
Rocware Corporation 7/8/2025 Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: LETTER OF AGENT AUTHORIZATION To Whom It May Concern: We, the undersigned, hereby authorize (Shenzhen PSI Testing Co., Ltd.) to act on our behalf in all matters relating to application for equipment authorization, including the signing of all documents relating to these matters. We also hereby certify that no party to the application authorized hereunder is subject to the denial of benefits, including FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 853(a). This agreement expires one year from the current date. Sincerely, Signature: July 8, 2025 Name Qinqiong Li Position Manager Company Name Rocware Corporation Address 3/F-1, No. 2, Honghui Industrial Park, Xin’an Street, Bao’an District, Shenzhen, China Tel 18123623531 Fax / Email [email protected]
Page 1 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix II external photos FCC ID: 2BKN3-RB20 Page 2 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 3 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 4 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 5 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 6 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 7 of 7 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China ------End------
Material: Silk-screen Font color: White Size: L: 5.0cm*W: 2.0cm Label Location FCC ID: 2BKN3-RB20 Model No.: RB20 Warning: This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received,
Page 1 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix III internal photos FCC ID: 2BKN3-RB20 Page 2 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 3 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 4 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 5 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 6 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 7 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 8 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 9 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 10 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 11 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 12 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 13 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 14 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 15 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China WiFi ANT 2 WiFi ANT 1 Page 16 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China BT ANT Page 17 of 17 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China ------End------
FCC ID: 2BKN3-RB20 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Prediction of MPE at a given distance 1. Limits The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in 1.1307(b) KDB Test Methodology: KDB 447498 D01 v06. 2. Test Procedure Equation from page 18 of OET Bulletin 65, Edition 97-01 Where: S = power density P = power input to the antenna G = numeric gain of the antenna in the direction of interest relative to an isotropic radiator R = distance to the centre of radiation of the antenna FCC ID: 2BKN3-RB20 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China 3. Result Mode Frequency (MHz) Prediction distance (cm) RF output power(Max) (dBm) Tune-up power (Max) MPE (mW/cm 2 ) Limit (mW/cm 2 ) SAR Test Exclusion dBm mW BT EDR 2402-2480 20 5.25 6 3.981 0.0019 1 Yes BT LE 2402-2480 20 2.94 3 1.995 0.0010 1 Yes 2.4G WIFI(ANT1) 2412-2462 20 16.17 17 50.119 0.0231 1 Yes 2.4G WIFI(ANT2) 2412-2462 20 16.27 17 50.119 0.0146 1 Yes 5G WIFI B1(ANT1) 5180-5240 20 12.52 14 25.119 0.0105 1 Yes 5G WIFI B1(ANT2) 5180-5240 20 12.27 14 25.119 0.0092 1 Yes 5G WIFI B2(ANT1) 5260-5320 20 12.87 14 25.119 0.0105 1 Yes 5G WIFI B2(ANT2) 5260-5320 20 13.06 14 25.119 0.0092 1 Yes 5G WIFI B3(ANT1) 5500-5700 20 13.72 14 25.119 0.0105 1 Yes 5G WIFI B3(ANT2) 5500-5700 20 13.78 14 25.119 0.0092 1 Yes 5G WIFI B4(ANT1) 5745-5825 20 13.68 14 25.119 0.0092 1 Yes 5G WIFI B4(ANT2) 5745-5825 20 13.30 14 25.119 0.0092 1 Yes Maximum Simultaneous transmission MPE Ratios for BT+WIFI SISO Max MPE Ratio BT /Limit Max MPE ratio WIFI /Limit ∑MPE ratios Limit Result 0.0019 0.0231 0.0250 1 PASS Maximum Simultaneous transmission MPE Ratios for BT+WIFI MIMO Max MPE Ratio BT /Limit Max MPE ratio WIFI /Limit ∑MPE ratios Limit Result 0.0019 0.0377 (0.0231+0.0146) 0.0396 1 PASS BT Antenna Gain: max gain 3.9dBi, 2.45(numeric) 2.4G WiFi Antenna 1 Gain: max gain 3.65dBi, 2.32(numeric) 2.4G WiFi Antenna 2 Gain: max gain 1.65dBi, 1.46(numeric) 5G WIFI Antenna 1 Gain: max gain 3.21dBi, 2.09(numeric) 5G WIFI Antenna 2 Gain: max gain 2.64dBi, 1.84(numeric) Then SAR evaluation is not required.
维海德 M2000SWiFi天线规格承认书 Product Specifications for Approval 物料编号:WF4528B-1131R-240(灰) 机型:M2000S Model: M2000S Customer Name: Vihade Antenna Frequency Band: WIFI 2.4G/5.8G Version: R-A 制作日期: 2024-6-17 Production date: June 17, 2024 深圳锐锋电子技术有限公司研发 Shenzhen Ruifeng Electronic Technology Co., Ltd. Research and Development 结构: structure: 陈巍 射频: RF 符学荣 审核: check: 陈强 批准: ratify 陈华明 客户确认 客户审核: client audit 客户批准: customer approval 公司地址:深圳市宝安区福永镇重庆路新福工业园 B5 栋 4 楼 电话:0755-27211658传真:0755-29485750 Company Address: 4th Floor, Building B5, Xinfu Industrial Park, Chongqing Road, Fuyong Town, Bao'an District, Shenzhen City Telephone: 0755-27211658 Fax: 0755-29485750 李瑶娜 BT4528B-1131R-270(黑) M2000S X.X ±0.5 X.XX ±0.2 XXX. ±10.0 XX. ±5.0 X. ±2.0 1 270 1 Note: For wire materials within 60mm in length, if there is no customer's specific requirement, the terminal heads will be placed facing downwards by default. SDC I1 WF 手撕位Manual tearing bit 深圳锐锋电子技术有限公司 Shenzhen Ruifeng Electronic Technology Co., Ltd. 1. ProjectinformationandElectricalSpecification Thosespecificationswerespeciallydefinedfor维海德M2000S,BT,and allcharacteristicsweremeasuredunderthemodel’s handsettestingjig. 1-1 Antennapicture 1-2FrequencyBand : FrequencyBandMHz BT 2400-2500(MHz) 1-3Impedancematching 深圳锐锋电子技术有限公司 Shenzhen Ruifeng Electronic Technology Co., Ltd. 深圳锐锋电子技术有限公司 2.VSWR MeasuringMethod: 1.A50Ωcoaxialcableisconnectedtotheantenna.Thenthiscable isconnectedtoanetworkanalyzertomeasuretheVSWR, 2.Keepingthisjigawayfrommetalatleast20cm.VSWRparametervalue 3. EfficiencyandGain *measuringandtestinstruments: 微波暗室, Agilent 网络分析仪, Agilent 频谱分析仪, 8960 综合测试仪,标准天线 *testmethod: equipment 以 H 面放于转台中心位置固定,与喇叭天线中心位置在同一个水平线上。 Efficiency/Gain-WIFI2.4G/5.8G/BT 5. Theproductionindex 天线量产时,以驻波比作为量产测试标准。 根据项目本身的差异,给出如下标准: 频率量产标准 WIFI2.4G/5.8G/BT VSWR (量产产品) <VSWR( 设计样 品 )+/-0.5 6.天线安装位置图 Antenna Installation Location Diagram 深圳锐锋电子技术有限公司 Shenzhen Ruifeng Electronic Technology Co., Ltd. 深圳锐锋电子技术有限公司 Shenzhen Ruifeng Electronic Technology Co., Ltd.
Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Page 1 of 85 Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China FCC TEST REPORT FCC ID: 2BKN3-RB20 On Behalf of Rocware Corporation 4K Dual-lens PTZ Video Bar Model No.: RB20, RB2***** (*: 0~9, A~Z or Blank), VHD-M2000S, M2000S, T740 Prepared for : Rocware Corporation Address : 3/F-1, No. 2, Honghui Industrial Park, Xin’an Street, Bao’an District, Shenzhen, China Prepared By : Shenzhen PSI Testing Co., Ltd. Address : 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Report Number : psi2502045-C01-R09 Date of Receipt : February 12, 2025 Date of Test : May 12, 2025-June 16, 2025 Date of Report : June 16, 2025 Version Number : V0 Page 2 of 85 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China TABLE OF CONTENTS Description Page 1. Summary Of Standards And Results............................................................................................ 6 1.1. Description of Standards and Results ..................................................................................... 6 2. General Information........................................................................................................................ 7 2.1. Description of Device (EUT) .................................................................................................... 7 2.2. Accessories of Device (EUT) .................................................................................................. 8 2.3. Tested Supporting System Details .......................................................................................... 8 2.4. Block Diagram of connection between EUT and simulators ................................................... 9 2.5. Test Mode Description ............................................................................................................. 9 2.6. Software test version and power setting information .............................................................. 9 2.7. Test Conditions ...................................................................................................................... 10 2.8. Test Facility ............................................................................................................................ 10 2.9. Measurement Uncertainty ..................................................................................................... 10 2.10. Test Equipment List ............................................................................................................... 11 3. Maximum Peak Output Power ..................................................................................................... 12 3.1. Limit ....................................................................................................................................... 12 3.2. Test Procedure ...................................................................................................................... 12 3.3. Test Setup .............................................................................................................................. 12 3.4. Test Result ............................................................................................................................. 12 4. Bandwidth ..................................................................................................................................... 13 4.1. Limit ....................................................................................................................................... 13 4.2. Test Procedure ...................................................................................................................... 13 4.3. Test Setup .............................................................................................................................. 13 4.4. Test Result ............................................................................................................................. 13 5. Carrier Frequency Separation ..................................................................................................... 24 5.1. Limit ....................................................................................................................................... 24 5.2. Test Procedure ...................................................................................................................... 24 5.3. Test Setup .............................................................................................................................. 24 5.4. Test Result ............................................................................................................................. 24 6. Number Of Hopping Channel ...................................................................................................... 27 6.1. Limit ....................................................................................................................................... 27 6.2. Test Procedure ...................................................................................................................... 27 6.3. Test Setup .............................................................................................................................. 27 6.4. Test Result ............................................................................................................................. 27 7. Dwell Time ...................................................................................................................…
Text truncated - open the document above for the full version.
Page 1 of 2 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix I Test Setup Photo FCC ID: 2BKN3-RB20 Spurious Radiation Emissions Test (<1G) Spurious Radiation Emissions Test (>1G) Page 2 of 2 Report No.: psi2502045-C01-R09 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Conducted emission Test RF Conducted Test ------End------
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 3.35 mW |

UHD ALL-IN-ONE USB Video Bar
Equipment Class
DTS - Digital Transmission System