
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
1/1 USAgentforServiceofProcessLETTEROFATTESTATION TO: OfficeofEngineeringTechnology FederalCommunicationsCommission 7435OaklandMillsRoad Columbia,MD21046 USAgentforServiceofProcess: Companyname:HOPEKCORPORATIONINC FRN:0034562900 ContactName:PeterDavis Address:16755CoyoteBushDrUnit84,SanDiego,CA92127UnitedStates TelephoneNo:561-235-6113 Email:[email protected] Applicant: Companyname:ShenzhenFMOUSETechnologyCo.,Ltd. GranteeCode:2BSOG FCCID:2BSOG-M303 FRN:0037558020 ContactName:JiongFanHuang Address:Room402,AerospaceScienceandIndustryPark,No.8MinhuanRoad, FukangCommunity,LonghuaStreet,LonghuaDistrict,Shenzhen,China TelephoneNo:13424389293 FaxNo:13424389293 Email:[email protected] ShenzhenFMOUSETechnologyCo.,Ltd.certifiesthat,asofthedateofthisfilingofthe applicationwiththeTCB,[HOPEKCORPORATIONINC]isourdesignatedUSagentforservice ofprocessfortheabovereferencedFCCID.ShenzhenFMOUSETechnologyCo.,Ltd. acceptstomaintainanagentfornolessthanoneyearafterthegranteehasterminatedall marketingandimportationortheconclusionofanycommissionrelatedproceedinginvolving equipment.[HOPEKCORPORATIONINC]accepts,asofthedateofthefilingoftheapplication, theobligationofthedesignatedUSagentforserviceofprocessfortheabovereferenceFCCID. TheUSAgentforServiceofProcessisawareofandagreestocomplywiththerequirements outlinedintheFCCEquipmentAuthorizationProgram,ReportandOrderFCC22-84,and clause§2.911. TheApplicantisawareofandagreestocomplywiththerequirementsoutlinedintheFCC EquipmentAuthorizationProgram,ReportandOrderFCC22-84,andclause§2.911. Date:2025-11-20 Applicant’sName:JiongFanHuangUSAgent’sName:PeterDavis Title:CEOTitle:Manager Signature:Signature:
Attestation Statement. Old Code: C5266091 24 New Code: 00015544 Ed.3 Change reason: FRN is added to the Applicant information section. 1/1 Shenzhen FMOUSE Technology Co., Ltd. TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 The Commission adopted rules that prohibit equipment authorization for “covered” telecommunications equipment and video surveillance equipment produced by entities identified on the Commission’s Covered List 1 , which is periodically updated. See the Covered List for more details. This Attestation Statement is to confirm that we follow the Section 2.911(d)(5)(i)-(ii) Applicant Company name: Shenzhen FMOUSE Technology Co., Ltd. Grantee code: 2BSOG FCC ID: 2BSOG-M303 FRN: 0037558020 Contact Name: JiongFan Huang Address: Room 402, Aerospace Science and Industry Park, No.8 Minhuan Road, Fukang Community, Longhua Street, Longhua District, Shenzhen, China Telephone No: 13424389293 Fax No: 13424389293 Email: [email protected] i. [Shenzhen FMOUSE Technology Co., Ltd.] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. The applicant must sign this certification. ii. [Shenzhen FMOUSE Technology Co., Ltd.] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant [is not] (as a specifically named entity or any of its subsidiaries or affiliates) identified on the Covered List as an entity producing “covered” equipment. The applicant must sign this certification. [Shenzhen FMOUSE Technology Co., Ltd.] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant [is not] identified on the Covered List as an entity producing “covered” equipment . Date: 2025/11/20 Applicant’s Name: JiongFan Huang Title: CEO Signature 1 The Commission’s Covered List is published by the Public Safety and Homeland Security Bureau and posted on the Commission’s website. This Covered List, which is periodically updated, identifies particular equipment, produced by particular entities, that constitutes “covered” equipment. https://www.fcc.gov/supplychain/coveredlist
Shenzhen FMOUSE Technology Co., Ltd. Code 00018768 Ed. 1 Device Wireless Mouse Company name Shenzhen FMOUSE Technology Co., Ltd. Grantee code 2BSOG FCC ID 2BSOG-M303 FRN 0037558020 Contact name JiongFan Huang Address Room 402, Aerospace Science and Industry Park, No.8 Minhuan Road, Fukang Community, Longhua Street, Longhua District, Shenzhen, China Telephone number 13424389293 [email protected] Chipset/module information BY6621F Operating System (if applicable) N/A Storage Capacity (hard drive or other permanent memory storage, if applicable) N/A 2 Item 1. The device is able to install software/program installation? ☐ Yes, go to Item 2. ☒ No. In this case, the rest of the items do not apply. The device cannot support installation of Kaspersky cybersecurity or anti-virus software. Item 2. Technical Requirements for Kaspersky Cybersecurity Software: # General Requirements (For all Devices) Yes / No or N/A Comments 1 Internet connection for activation and updates (For all Operating Systems) N/A # General Requirements (For Windows Devices) Yes / No or N/A Comments 1 Storage: 1500 MB free space on the hard drive N/A 2 Operating System: Microsoft Windows 8, 8.1, 10 & 11 Home / Pro / Enterprise Microsoft Windows 7 Starter / Home Basic & Premium / Professional / Ultimate SP1 or higher N/A 3 Processor: 1 GHz or higher (x86 or x64) N/A 4 Memory (RAM)1 GB (32-bit) or 2 GB (64-bit) N/A 5 Screen Resolution: Minimum resolution of 1024 x 768 N/A # General Requirements (For macOS devices) Yes / No or N/A Comments 1 Operating System macOS® 13 – 14 N/A 2 Memory (RAM)4 GB N/A 3 Storage: 3455 MB free space on the hard drive N/A 3 # General Requirements (For Android Devices) Yes / No or N/A Comments 1 Storage: 150 MB free space N/A 2 Operating System: Android™ 10 – 14 N/A 3 Screen Resolution: Minimum resolution of 320 x 480 N/A # General Requirements (for iOS devices) Yes / No or N/A Comments 1 Storage: 150 MB free space N/A 2 Operating System: iOS® 17 N/A # General Requirements (For Linux system) Yes / No or N/A Comments 1 Hard drive: 1 GB of free space N/A 2 CPU: Intel Pentium 1 GHz or higher N/A 3 RAM: 1 GB N/A 4 Minimum software requirements: AlmaLinux OS 8 or later; AlterOS 7.5 or later; Astra Linux Common Edition 2.12 or later; CentOS 6.7 or later; Debian GNU/Linux 10.0 or later; EulerOS 2.0 or later; Oracle Linux 7.3 or later ; Red Hat Enterprise Linux 6.7 or later ; Rocky Linux 8.5 or later ; SUSE Linux Enterprise Server 12.5 or later; Ubuntu 12.04 or later ; Uncom OS Home / Business / Education / Enterprise 2.2 or later; N/A 4 ALT Linux Workstaton / Workstation K / Server / Education 8 or later; ROSA Linux Workstation / Server 12 or later ; RED OS 7.3 and later ; After reviewed the technical requirements, is the device capable of supporting the installation of Kaspersky software? ☐ Yes, go to Item 3. ☒ No. In this case, the rest of the items do not apply. The device cannot support installation of Kaspersky software Item 3. Connectivity Capabilities: # Physical Interface Purpose Justification 1 1 # Wireless Interface Purpose Justification 1 1 After the review of this items, the device: ☒ Cannot support installation of any cybersecurity or anti-virus software on the covered list. ☐ Potentially can operate with any cybersecurity or anti-virus software on the covered list – additional third- party proof is provided to demonstrate compliance with requirements as of 2.911(d)5(i),(ii) – “Proof of Compliance with Covered List Software Requirements” of this document applies Signature: Name: JiongFan Huang Date: 2025/11/20 1 The justification field is used to justify why the software cannot be received through that interface. Check the annex for more indications.
TCB CALL página 1 File FCC ID: 2BSOG-M303 Please upload an exhibit that explains how does the TCB verify the new agent information: 1- Is the address of the agent a valid physical US mailing address (not a US post office box, not a virtual mailbox, not P.O. Boxes, not a vacant lot, not a public building, etc.) ○ We have checked if the address exists in a real and potential building (Google maps) + official US register, after this verification and the evidence below we can guarantee the following: not a US post office box not a virtual mailbox not P.O. Boxes not a vacant lot not a public building(note) ► We checked the FCC FRN Search based on the information provided by the grantee. On the official register from : https://www.coloradosos.gov/biz/BusinessEntityCriteriaExt.do TCB CALL página 2 TCB CALL página 3 TCB CALL página 4 TCB CALL página 5 TCB CALL página 6 TCB CALL página 7 ► CONCLUSION by TCB: The ASOP defined and provided by grantee is VALID and confirmed. Therefore the exhibit "C5266091_X23_Ed1_US_Agent_Letter" included in the file is ok. 2- Is the agent physically located at that valid US address such that the agent can be legally served at that address? Yes , check above 3- Has the listed agent clearly agreed in writing to serve as the agent for the grantee at that address? Yes, it is included in the exhibit "C5266091_X23_Ed1_US_Agent_Letter" >
C5266091_X10_Ed.2 1/1 Shenzhen FMOUSE Technology Co., Ltd. Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Date: November 20, 2025 Subject: Request for Confidentiality FCC ID: 2BSOG-M303 To Whom It May Concern, Pursuant to the provisions of Sections 0.457 and 0.459 of Commission's rules (47CFR0.457, 0.459), we are requesting the Commission to withhold the following attachment(s) as confidential document from public disclosure. Exhibits Long-Term Confidentiality Short-Term Confidentiality NOTE 2 ID Label/Location No No Attestation Statement No No External Photos No ☐ Block Diagram ☒ ☐ Schematics ☒ ☐ Test Report No No Test Setup Photos No ☐ User’s Manual ☐ NOTE 1 ☐ Internal Photos ☐ NOTE 1 ☐ Parts List / Tune Up ☐ RF Exposure Info No No Operational Description ☒ ☐ Cover Letter(s) No No SDR Software / Security Info No No NOTE 1: Long-Term Confidentiality may be permitted under special conditions (See II. LONG-TERM CONFIDENTIALITY, Section 3 of KDB 726920, use last in force) NOTE 2: Short-Term Confidentiality can be requested for a maximum of 180 days from the date of the grant. Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. In case of short-term Confidentiality, the applicant requests the exhibits selected above are withheld from public view for a period of ______ days from the date of the Grant of Equipment Authorization and prior to marketing. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Sincerely, ☐ C5266091_X10_Ed.2 1/1 Signature: November 20, 2025 Name JiongFan Huang Position CEO Company Name Shenzhen FMOUSE Technology Co., Ltd. Address Room 402, Aerospace Science and Industry Park, No.8 Minhuan Road, Fukang Community, Longhua Street, Longhua District, Shenzhen, China Tel 13424389293 Fax 13424389293 Email [email protected]
C5266091_X8_Ed.1 1/1 Letter of Authorization Shenzhen FMOUSE Technology Co., Ltd. Company: Shenzhen FMOUSE Technology Co., Ltd. Address: Room 402, Aerospace Science and Industry Park, No.8 Minhuan Road, Fukang Community, Longhua Street, Longhua District, Shenzhen, China Product Name: Wireless Mouse Model Number: M303 FCC Identifier: 2BSOG-M303 We authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, to act on our behalf on all matters concerning the above named equipment. Any individual within LGAI Technological Center S.A. is authorized to act on our behalf and take action on the application. We declare that authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, is allowed to forward all information related to the approval project to the Federal Communication Commission and to discuss any issues concerning the approval application. Any and all acts carried out by LGAI Technological Center S.A. on our behalf shall have the same effect as acts of our own. Name: Yao Liu Date: 2025.11.20 Title: CEO Signature of applicant:
Page 1 of 4 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix II external photos FCC ID: 2BSOG-M303 Page 2 of 4 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 3 of 4 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 4 of 4 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China ------End------
Label and Location Material: Silk-screen Font color: White Size: L: 1cm*W: 0.8cm Label and Location W FCC ID: 2BSOG-M303 Model No.: M303 L
Page 1 of 3 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix III internal photos FCC ID: 2BSOG-M303 Page 2 of 3 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Page 3 of 3 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China ------End------ ANT BT
Page 1 of 1 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix IV RF Exposure evaluation FCC ID: 2BSOG-M303 According to 447498 D01 General RF Exposure Guidance v06 The 1-g and 10-g SAR test exclusion thresholds for 100 MHz to 6 GHz at test separation distances ≤ 50 mm are determined by: [(max. power of channel, including tune-up tolerance, mW)/(min. test separation distance, mm)] ·[√f(GHz)] ≤ 3.0 for 1-g SAR and ≤ 7.5 for 10-g extremity SAR, where f(GHz) is the RF channel transmit frequency in GHz Power and distance are rounded to the nearest mW and mm before calculation The result is rounded to one decimal place for comparison. BLE: Worse case output power is as below: [2440MHz: -2.69dBm] Maximum output power is -2.69dBm (0.54 mW). (0.54mW /5mm)·[√2.440(GHz)]= 0.17<3.0 for 1-g SAR. 2.4G: Worse case output power is as below: [2440MHz: -2.52dBm] Maximum output power is -2.52dBm (0.56 mW). (0.56mW /5mm)·[√2.440(GHz)]= 0.17<3.0 for 1-g SAR. Then SAR evaluation is not required.
Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Page 1 of 43 Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China FCC TEST REPORT FCC ID: 2BSOG-M303 On Behalf of Shenzhen FMOUSE Technology Co., Ltd. Wireless Mouse Model No.: M303 Prepared for : Shenzhen FMOUSE Technology Co., Ltd. Address : Room 402, Aerospace Science and Industry Park, No.8 Minhuan Road, Fukang Community, Longhua Street, Longhua District, Shenzhen City Prepared By : Shenzhen PSI Testing Co., Ltd. Address : 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Report Number : psi2510082-C01-R01 Date of Receipt : October 17, 2025 Date of Test : October 17, 2025–October 29, 2025 Date of Report : October 30, 2025 Version Number : V0 Page 2 of 43 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China TABLE OF CONTENTS Description Page 1. Summary Of Standards And Results ------------------------------------------------------------------------------- 6 1.1. Description of Standards and Results ----------------------------------------------------------------------- 6 2. General Information ----------------------------------------------------------------------------------------------------- 7 2.1. Description of Device (EUT) ----------------------------------------------------------------------------------- 7 2.2. Accessories of Device (EUT) ---------------------------------------------------------------------------------- 8 2.3. Tested Supporting System Details---------------------------------------------------------------------------- 8 2.4. Block Diagram of Connection Between EUT and Simulators ------------------------------------------ 8 2.5. Test Mode Description ------------------------------------------------------------------------------------------- 9 2.6. Software test version and power setting information----------------------------------------------------- 9 2.7. Test Conditions -------------------------------------------------------------------------------------------------- 10 2.8. Test Facility ------------------------------------------------------------------------------------------------------- 10 2.9. Measurement Uncertainty ------------------------------------------------------------------------------------ 10 2.10. Test Equipment List -------------------------------------------------------------------------------------------- 11 3. Spurious Emission ----------------------------------------------------------------------------------------------------- 12 3.1. Test Limits -------------------------------------------------------------------------------------------------------- 12 3.2. Block Diagram of Test setup --------------------------------------------------------------------------------- 15 3.3. Test Procedure -------------------------------------------------------------------------------------------------- 16 3.4. Test Results ------------------------------------------------------------------------------------------------------ 17 4. Power Line Conducted Emission --------------------------------------------------------------------------------- 22 4.1. Test Limits -------------------------------------------------------------------------------------------------------- 22 4.2. Test Procedure -------------------------------------------------------------------------------------------------- 22 4.3. Test Setup -------------------------------------------------------------------------------------------------------- 22 4.4. Test Results ------------------------------------------------------------------------------------------------------ 23 5. Out-of-band Emissions ----------------------------------------------------------------------------------------------- 24 5.1. Test Limits -------------------------------------------------------------------------------------------------------- 24 5.2. Test Procedure -------------------------------------------------------------------------------------------------- 24 5.3. Test Setup -------------------------------------------------------------------------------------------------------- 24 5.4. Test Results ------------------------------------------------------------------------------------------------------ 24 6. Conducted Maximum Output Power ----------------------------------------------------------------------------- 30 6.1. Test limits --------------------------------------------------------------------------------------------------------- 30 6.2. Test Procedure -------------------------------------------------------------------------------------------------- 30 6.3. Test Setup -------------------------------------------------------------------------------------------------------- 30 6.4. Test Results ------------------------------------------------------------------------------------------------------ 30 7. Peak Power Spectral Density --------------------------------------------------------------------------------------- 31 7.1. Test limits --------------------------------------------------------------------------------------------------------- 31 7.2. Test Procedure -------------------------------------------------------------------------------------------------- 31 7.3. Test Setup -------------------------------------------------------------------------------------------------------- 31 7.4. Test Results ------------------------------------------------------------------------------------------------------ 32 8. Bandwidth ---------------------------------------------------------------------------------------------------------------- 34 8.1. …
Text truncated - open the document above for the full version.
Antenna Specification Specifications Summary ITEM SPEC. Model Name IBM 2.4 GHz Center Frequency 2402MHz -2.52 dBi 2441 MHz -2.36 dBi 2480 MHz -2.85 dBi MAX. GAIN -2.36 dBi Polarization Horizontal Azimuth Beam Pattern Omni-directional Impedance 50 Ω Antenna Photo & Length 1. Main antenna : 2402 MHz 1.1 Horizontal 1.2 Vertical 2. Main antenna : 2441 MHz 2.1 Horizontal 2.2 Vertica . 3. Main antenna : 2480 MHz 3.1 Horizontal 3.2 Vertical 4. Result Center Frequency Maximum Ant Gain 2402MHz H -2.52 dBi V -5.38 dBi 2441 MHz H -2.36 dBi V -6.27 dBi 2480 MHz H -2.85 dBi V -3.79 dBi
Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Page 1 of 43 Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China FCC TEST REPORT FCC ID: 2BSOG-M303 On Behalf of Shenzhen FMOUSE Technology Co., Ltd. Wireless Mouse Model No.: M303 Prepared for : Shenzhen FMOUSE Technology Co., Ltd. Address : Room 402, Aerospace Science and Industry Park, No.8 Minhuan Road, Fukang Community, Longhua Street, Longhua District, Shenzhen City Prepared By : Shenzhen PSI Testing Co., Ltd. Address : 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Report Number : psi2510082-C01-R02 Date of Receipt : October 17, 2025 Date of Test : October 17, 2025–October 29, 2025 Date of Report : October 30, 2025 Version Number : V0 Page 2 of 43 Report No.: psi2510082-C01-R02 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China TABLE OF CONTENTS Description Page 1. Summary Of Standards And Results ------------------------------------------------------------------------------- 6 1.1. Description of Standards and Results ----------------------------------------------------------------------- 6 2. General Information ----------------------------------------------------------------------------------------------------- 7 2.1. Description of Device (EUT) ----------------------------------------------------------------------------------- 7 2.2. Accessories of Device (EUT) ---------------------------------------------------------------------------------- 8 2.3. Tested Supporting System Details---------------------------------------------------------------------------- 8 2.4. Block Diagram of Connection Between EUT and Simulators ------------------------------------------ 8 2.5. Test Mode Description ------------------------------------------------------------------------------------------- 9 2.6. Software test version and power setting information----------------------------------------------------- 9 2.7. Test Conditions -------------------------------------------------------------------------------------------------- 10 2.8. Test Facility ------------------------------------------------------------------------------------------------------- 10 2.9. Measurement Uncertainty ------------------------------------------------------------------------------------ 10 2.10. Test Equipment List -------------------------------------------------------------------------------------------- 11 3. Spurious Emission ----------------------------------------------------------------------------------------------------- 12 3.1. Test Limits -------------------------------------------------------------------------------------------------------- 12 3.2. Block Diagram of Test setup --------------------------------------------------------------------------------- 15 3.3. Test Procedure -------------------------------------------------------------------------------------------------- 16 3.4. Test Results ------------------------------------------------------------------------------------------------------ 17 4. Power Line Conducted Emission --------------------------------------------------------------------------------- 22 4.1. Test Limits -------------------------------------------------------------------------------------------------------- 22 4.2. Test Procedure -------------------------------------------------------------------------------------------------- 22 4.3. Test Setup -------------------------------------------------------------------------------------------------------- 22 4.4. Test Results ------------------------------------------------------------------------------------------------------ 23 5. Out-of-band Emissions ----------------------------------------------------------------------------------------------- 24 5.1. Test Limits -------------------------------------------------------------------------------------------------------- 24 5.2. Test Procedure -------------------------------------------------------------------------------------------------- 24 5.3. Test Setup -------------------------------------------------------------------------------------------------------- 24 5.4. Test Results ------------------------------------------------------------------------------------------------------ 24 6. Conducted Maximum Output Power ----------------------------------------------------------------------------- 30 6.1. Test limits --------------------------------------------------------------------------------------------------------- 30 6.2. Test Procedure -------------------------------------------------------------------------------------------------- 30 6.3. Test Setup -------------------------------------------------------------------------------------------------------- 30 6.4. Test Results ------------------------------------------------------------------------------------------------------ 30 7. Peak Power Spectral Density --------------------------------------------------------------------------------------- 31 7.1. Test limits --------------------------------------------------------------------------------------------------------- 31 7.2. Test Procedure -------------------------------------------------------------------------------------------------- 31 7.3. Test Setup -------------------------------------------------------------------------------------------------------- 31 7.4. Test Results ------------------------------------------------------------------------------------------------------ 32 8. Bandwidth ---------------------------------------------------------------------------------------------------------------- 34 8.1. …
Text truncated - open the document above for the full version.
Page 1 of 2 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China Appendix I Test Setup Photo FCC ID: 2BSOG-M303 Spurious Radiation Emissions Test (<1G) Spurious Radiation Emissions Test (>1G) Page 2 of 2 Report No.: psi2510082-C01-R01 Shenzhen PSI Testing Co., Ltd. Tel: 0755-23011775 | E-mail: [email protected] | http://www.psi-lab.com Add: 1-2/F., Building 5, Yudafu Industrial Park, No.10, Xingye West Road, Shajing Subdistrict, Bao'an District, Shenzhen, Guangdong, China RF conducted test ------End------
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 540.00 µW |
| 2 | 15C | 2.40 GHz - 2.48 GHz | 560.00 µW |