FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shenzhen Zooyo Electronic Technology Co., Ltd/
  3. 2BSZ7-FC02

2BSZ7-FC02ANC Wireless Earbuds

Shenzhen Zooyo Electronic Technology Co., Ltd
ANC Wireless Earbuds - FCC ID 2BSZ7-FC02 - Shenzhen Zooyo Electronic Technology Co., Ltd
Click to zoom

Application Details

Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Date of Grant
Dec 12, 2025
Application Purpose
Original Equipment
Equipment Note
ANC Wireless Earbuds
Frequency Range
2402.00000000 - 2480.00000000
Company
Shenzhen Zooyo Electronic Technology Co., Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

Little Koi ZOOYO Little Koi ANC Wireless Earbuds Shenzhen Zooyo Electronic Techno logy Co., Ltd WWW.ZOOYO.CLUB ZOOYO Little Koi wireless earbuds Tap twice(R) Tap twice(L or R) Next track Tap 3 times(R) 3 2 Wake up the voice assistant Tap twice(L) Previous track Tap 3 times(L) Answer a third-party call (during an active call) Tap twice(L or R) Charging: the orange light will turn on for 20 seconds and then turn off. Fully charged: the white light will stay on. Battery > 25%: The white light stays on for 10 seconds and then turns off. Battery < 25%: The orange light flashes for 10 seconds and then turns off. a.Close the case Place the earbuds into the charging case and close the case to start charging. Press and hold BOTH unpaired earbuds for 5 secondsto clear TWS pairing records and automatically re-pair them as a left-right pair. When using both earbuds Press and hold BOTH earbuds for 5 seconds to clear all pairing records with previously connected devices. When the earbuds are unpaired (not connected as a pair) Little Koi ZOOYO Little Koi ANC Wireless Earbuds Shenzhen Zooyo Electronic Techno logy Co., Ltd WWW.ZOOYO.CLUB Auto-reconnect (after initial pairing) When the earbuds are in the charging case, open the case, the earbuds will automatically reconnect to the last paired device. BLUETOOTH PAIRING First-time use Open the charging case, keep the earbuds in it ,the earbuds will automatically enter pairing mode. Pair with your phone Enable Bluetooth on your phone, search for "ZOOYO-FC02" , select it, and complete the pairing. ZOOYO-FC02 Musician Poster FCC STATEMENT This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. Warning: Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: • Reorient or relocate the receiving antenna. • Increase the separation between the equipment and receiver. • Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. • Consult the dealer or an experienced radio/TV technician for help. FCC Radiation Exposure Statement: This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter.

Attestation Statements

Shenzhen Zooyo Electronic Technology Co., Ltd Add: 543-A,R2-B,High-Tech Village,206 S 7th Rd,Nanshan,Shenzhen,China. Tel: +86-18516920743 Fax: N/A Email: [email protected] Date: 2025-11-21 FEDERAL COMMUNICATIONS COMMISSION Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Dear Sir/Madam, We, Shenzhen Zooyo Electronic Technology Co., Ltd, hereby authorize Bay Area Compliance Laboratories Corp(Dongguan). to act as a laboratory for testing and test report generation for the following project(s): (Product description: ANCWireless Earbuds, Model name: FC02, FCC ID: 2BSZ7-FC02) The product supports BT(GFSK, π/4-DQPSK), The other functions, bands and modes were disabled to use by manufacturer in the software, the end user has no capability to activate it. The right headset and left headset have the same circuit diagram, PCB layout and key components. Front Board Back Board Sincerely, Sig nature: Printed name: Xiao Chen Title: CEO

Attestation Statements

Shenzhen Zooyo Electronic Technology Co., Ltd Add: 543-A,R2-B,High-Tech Village,206 S 7th Rd,Nanshan,Shenzhen,China. Tel: +86-18516920743 Fax: N/A Email: [email protected] A tte station Letter Date: 2025-11-21 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Ref: Attestation Statements CFR 47 §2.911(d)(5)(i)(ii) Filing FCC ID:2BSZ7-FC02 Shenzhen Zooyo Electronic Technology Co., Ltd(“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. Shenzhen Zooyo Electronic Technology Co., Ltd(“the applicant”) certifies that as of date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Shenzhen Zooyo Electronic Technology Co., Ltd (“the applicant”) certifies that our product does not use Kaspersky's software information. Sincerely, Signature Printed Name: Xiao Chen Title: CEO CFR 47 §2.911(d)(5)(i)(ii) Attestation Letter

Attestation Statements

U.S. AGENT LETTER OF ATTESTATION Date: 2025-11-21 FEDERAL COMMUNICATIONS COMMISSION Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Ref: Attestation Statements CFR 47 §2.911(d)(7) Filing FCC ID: 2BSZ7-FC02 Shenzhen Zooyo Electronic Technology Co., Ltd certifies that, as of the date of the filing of the application, Iconsigh Inc is our designated U.S. agent for service of process for the above referenced FCC ID.Shenzhen Zooyo Electronic Technology Co., Ltd accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any Commission-related proceeding involving the equipment. Iconsigh Inc. accepts, as of the date of the filing of the application, the obligation of the designated U.S. agent for service of process for the above referenced FCC ID. Designated U.S. Agent Information: Company Name: Iconsigh Inc. Address: 2310 Homestead Road, Suite C1, Los Altos, CA, 94024, USA FRN: 0033398652 Tel.: +1 (408) 320-9867 Email: [email protected] Signed by (printed name): Benjamin Kaur Signature: Shenzhen Zooyo Electronic Technology Co., Ltd Add: 543-A,R2-B,High-Tech Village,206 S 7th Rd,Nanshan,Shenzhen,China. Tel:+86-18516920743 FRN:0037635976 Email:[email protected] Printed name: Xiao Chen Printed Name: CEO Signature:

Cover Letter(s)

Shenzhen Zooyo Electronic Technology Co., Ltd Add: 543-A,R2-B,High-Tech Village,206 S 7th Rd,Nanshan,Shenzhen,China. Tel: +86-18516920743 Fax: N/A Email: [email protected] FCC Authorization Date: 2025-11-21 FEDERAL COMMUNICATIONS COMMISSION Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization To whom it may concern: We, Shenzhen Zooyo Electronic Technology Co., Ltd, Hereby authorizes Bay Area Compliance Laboratories Corp.(Dongguan) to act on its behalf in all matters relating to application for Equipment authorization, including the signing of all documents relating to these matters. All acts carried out by Bay Area Compliance Laboratory Corp. (Dongguan) on our behalf shall have the same effect as our own action. We, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. This authorization is valid until further written notice from the applicant. Sincerely, signature QA-FR-170-B Printed Name: Xiao Chen Title: CEO

Cover Letter(s)

Shenzhen Zooyo Electronic Technology Co., Ltd Add: 543-A,R2-B,High-Tech Village,206 S 7th Rd,Nanshan,Shenzhen,China. Tel: +86-18516920743 Fax: N/A Email: [email protected] FCC Confidential Authorization Date: 2025-11-21 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Confidentiality Request regarding application for certification of FCC ID: 2BSZ7-FC02, In accordance with Sections 0.457 and 0.459 of the Commission’s Rules, (Shenzhen Zooyo Electronic Technology Co., Ltd) hereb y requests long-term confidential treatment of information accompanying this application as outlined below: •Block Diagram •Schematics •Operation Description The above ma terials contain proprietary and confidential information not customarily released to the public. The public disclosure of these materials provides unjustified benefits to its competitors in the market. Sincerely , Signature: Printed Name: Xiao Chen Title: CEO QA-FR-171- A

Cover Letter(s)

Shenzhen Zooyo Electronic Technology Co., Ltd Add: 543-A,R2-B,High-Tech Village,206 S 7th Rd,Nanshan,Shenzhen,China. Tel: +86-18516920743 Fax: N/A Email:[email protected] label placement Date: 2025-11-21 Sincerely, Signature: Printed Name: Xiao Chen Title: CEO FEDERAL COMMUNICATIONS COMMISSION Authorization and Evaluation Division 7 435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization To whom it may concern: We, Shenzhen Zoo yo Electronic Technology Co., Ltd , FCC ID: 2BSZ7-FC02 , hereby submits justification for placing the ID label to the charging box. Because the surface of this device is very smooth, the processing technology is difficult and the device is too small so the ID label cannot to be printed on this device. The measurement of Earphone: Length (36.66mm)*Width (21.65mm)*High (24.83mm), The Charging box: Length (61.98mm)*High (53.44mm), so the label will be moved to the Charging Case. Below photo will show the detail: Unit:mm Label Bluetooth headset Charging box

External Photos

Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-EXP Page 1 / 4 EUT EXTERNAL PHOTOS Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-EXP Page 2 / 4 Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-EXP Page 3 / 4 Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-EXP Page 4 / 4 *****END *****

ID Label/Location Info

Model:FC02 FCC ID:2BSZ7-FC02 Capacity:450mAh-1.665Wh INPUT: 5V-1A Made in China Shenzhen Shenzhen Zooyo Electronic Technology Co., Ltd 543-A,R2-B,High-Tech Village,206S 7th Rd,Nanshan,Shenzhen,China. 14.0 5 mm 10 . 77 mm

Internal Photos

Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-INP Page 1 / 3 EUT INTERNAL PHOTOS Left Right Left Right Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-INP Page 2 / 3 Antenna Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-INP Page 3 / 3 *****END *****

RF Exposure Info

Bay Area Compliance Laboratories Corp. (Dongguan) Report No.: 2502X23270E-RF-00A Report Template Version: FCC-BT-V2.1 Page 59 of 59 EXHIBIT C - RF EXPOSURE EVALUATION Applicable Standard According to§15.247(i) and §1.1310, systems operating under the provisions of this section shall be operated in a manner that ensure that the public is not exposed to radio frequency energy level in excess of the Commission’s guideline. According to KDB447498 D01 General RF Exposure Guidance v06: The 1-g and 10-g SAR test exclusion thresholds for 100 MHz to 6 GHz at test separation distances ≤ 50 mm are determined by: [(max. power of channel, including tune-up tolerance, mW)/(min. test separation distance, mm)] · [√f(GHz)] ≤ 3.0 for 1-g SAR and ≤ 7.5 for 10-g extremity SAR, where • f(GHz) is the RF channel transmit frequency in GHz • Power and distance are rounded to the nearest mW and mm before calculation • The result is rounded to one decimal place for comparison • 3.0 and 7.5 are referred to as the numeric thresholds in the step 2 below The test exclusions are applicable only when the minimum test separation distance is ≤ 50 mm and for transmission frequencies between 100 MHz and 6 GHz. When the minimum test separation distance is < 5 mm, a distance of 5 mm according to 5) in section 4.1 is applied to determine SAR test exclusion. Measurement Result The max conducted power including tune-up tolerance is 4.0 dBm (2.51 mW). [(max. power of channel, mW)/(min. test separation distance, mm)][√f(GHz)] =2.51/5*(√2.480) = 0.8< 3.0 Note: the max conducted power including tune-up tolerance was declared by manufacturer. Result: Compliant. The stand-alone SAR evaluation is not necessary. ***** END OF REPORT *****

Test Report

承 認 書 SPECIFICATION FOR APPROVAL 客戶名稱 CUSTOMER : 客戶料號 CUSTOMER’S P/N : 料號 PART NUMBER : WAN2012F245C0X 規格 DESCRIPTION : Chip Antenna 2012 L Ant 2.45G Type 02,04,06 版本 VERSION : V2.3 日期 ISSUE DATE : 2018/01/30 客 戶 承 認 CUSTOMER APPROVED 工 程 部 R&D CENTER 承 認 APPROVAL 確 認 CHECKED 製 作 DRAWN Ray James Thor 萬誠科技股份有限公司 OneWave Electronic Co., Ltd. 112台北市北投區中央南路二段36號3樓 2F., No.163, Sec. 1, Xi'an St., Beitou Dist., Taipei City 112, Taiwan 電話: (02) 2898-2220 TEL: +886 2 2898-2220 傳真: (02) 2898-5055 FAX: +886 2 2898-5055 2/11 ONEWAVE TECHNOLOGY CO., LTD. 2012 Chip antenna For Bluetooth / WLAN Applications Dimension (mm) L 2.05 ± 0.20 W 1.23 ± 0.20 T 0.45 ± 0.20 P/N: WAN2012F245C02 WAN2012F245C04 WAN2012F245C06 3/11 ONEWAVE TECHNOLOGY CO., LTD. Part Number Information WAN 2012 F 245 C 0X A B C D E F A Product Series Antenna B Dimension L x W 2.05X1.23mm ( ± 0.2mm) C Material High K material D Working Frequency 2.4 ~ 2.5GHz E Feeding mode PIFA & Single Feeding F Antenna type 0X=02,04,06 / Type=02,04,06 1. Electrical Specification Remark : Bandwidth & Peak Gain was measured under evaluation board of next page Specification Part Number WAN2012F245C02 WAN2012F245C04 WAN2012F245C06 Central Frequency 2450 MHz Bandwidth 85 (Min.) MHz Return Loss -6.5 (Max) dB Peak Gain 1.72 dBi Impedance 50 Ohm Operating Temperature -40~+85 °C Maximum Power 4 W Resistance to Soldering Heats 10 ( @ 260°C) sec. Polarization Linear Azimuth Beamwidth Omni-directional Termination Ni / Au (Leadless) 4/11 ONEWAVE TECHNOLOGY CO., LTD. 2.Recommended PCB Pattern Evaluation Board Dimension (board size 80x40mm) 2 nd Evaluation Board Dimension Evaluation Board Dimension (board size 80x40mm) Suggested Matching Circuit 1.0pF 5/11 ONEWAVE TECHNOLOGY CO., LTD. Layout Dimensions in Clearance area( Size=3.0*5.0mm) FootPrint (Unit : mm)  2 nd Layout Dimensions in Clearance area( Size=8.0*2.5mm) Matching circuit Tuning Component Matching circuit Tuning Component 6/11 ONEWAVE TECHNOLOGY CO., LTD. 3. Measurement Results Return Loss 7/11 ONEWAVE TECHNOLOGY CO., LTD. Radiation Pattern Efficiency Peak Gain Directivity 2450MHz 70.56 % 1.72dBi 2.26 dBi Chamber Coordinate System Z X Y 8/11 ONEWAVE TECHNOLOGY CO., LTD. 4.Reliability and Test Condictions ITEM REQUIREMENTS TEST CONDITION Solderability 1. Wetting shall exceed 90% coverage 2. No visible mechanical damage Pre-heating temperature:150°C/60sec. Solder temperature:230±5°C Duration:4±1sec. Solder:Sn-Ag3.0-Cu0.5 Flux for lead free: rosin Solder heat Resistance 1. No visible mechanical damage 2. Central Freq. change :within ± 6% 10±0.5 sec. 60sec .. TEMP (°C) 150°C 260°C Pre-heating temperature:150°C/60sec. Solder temperature:260±5°C Duration:10±0.5sec. Solder:Sn-Ag3.0-Cu0.5 Flux for lead free: rosin Component Adhesion (Push test) 1. No visible mechanical damage The device should be reflow soldered(230±5°C for 10sec.) to a tinned copper substrate A dynometer force gauge should be applied the side of the component. The device must with-ST-F 0.5 Kg without failure of the termination attached to component. Component Adhesion (Pull test) 1. No visible mechanical damage Insert 10cm wire into the remaining open eye bend ,the ends of even wire lengths upward and wind together. Terminal shall not be remarkably damaged. Thermal shock 1. No visible mechanical damage 2. Central Freq. change :within ±6% Phase Temperature(°C) Time(min) 1 +85±5°C 30±3 2 Room Temperature Within 3sec 3 -40±2°C 30±3 4 Room Temperature Within 3sec +85°C=>30±3min -40°C=>30±3min Test cycle:10 cycles The chip shall be stabilized at normal condition for 2~3 hours before measuring. Resistance to High Temperature 1. No visible mechanical damage 2. Central Freq. change :within ±6% 3. No disconnection or short circuit. Temperature: 85±5°C Duration: 1000±12hrs The chip shall be stabilized at normal condition for 2~3 hours before measuring. Resistance to Low Temperature 1. No visible mechanical damage 2. Central Freq. change :within ±6% 3. No disconnection or short circuit. Temperature:-40±5°C Duration: 1000±12hrs The chip shall be stabilized at normal condition for 2~3 hours before measuring. Humidity 1. No visible mechanical damage 2. Central Freq. change :within ±6% 3. No disconnection or short circuit. Temperature: 40±2°C Humidity: 90% to 95% RH Duration: 1000±12hrs The chip shall be stabilized at normal condition for 2~3 hours before measuring. 4±1 sec. 60sec TEMP (°C) 150°C 230°C 9/11 ONEWAVE TECHNOLOGY CO., LTD. 5.Soldering and Mounting Mildly activated rosin fluxes are preferred. The minimum amount of solder can lead to damage from the stresses caused by the difference in coefficients of expansion between solder, chip and substrate. The terminations are suitable for all wave and re-flow soldering systems. If hand soldering cannot be avoided, the preferred technique is the utilization of hot air soldering tools. Recommended temperature profiles for re-flow soldering in Figure 1. Products attachment with a soldering iron is discouraged due to the inherent process control limitations. In the event that a soldering iron must be employed the following precautions are recommended. ‧Preheat circuit and products to 150°C ‧Never contact the ceramic with the iron tip ‧Use a 20 watt soldering iron with tip diameter of 1.0mm ‧280°C tip temperature (max) ‧1.0mm tip diameter (max) ‧Limit soldering time to 3 sec. SOLDERING COOLING NATURAL PRE-HEATING TEMPERATURE(°C) 60~120 s 10s max. 30~60s 250~260 230 180 150 TIME(sec.) Reflow Soldering SOLDERING COOLING NATURAL PRE-HEATING TEMPERATURE(°C) within 3s Gradualcooling 150 TIME(sec.) Iron Soldering Over 60s 350 300 10/11 ONEWAVE TECHNOLOGY CO., LTD. 6.Packaging Information Tape Specification: Reel Specification: (7’’, Φ180 mm) Tape Width(mm) A(mm) B(mm) C(mm) D(mm) Chip/Reel(pcs) 8 9.0±0.5 60±2 13.5±0.5 178±2 3000 11/11 ONEWAVE TECHNOLOGY CO., LTD. 7.Storage and Transportation Information Storage Conditions To maintain the solderability of terminal electrodes: 1. Temperature and humidity conditions: -1…

Text truncated - open the document above for the full version.

Test Report

TEST REPORT Applicant: Shenzhen Zooyo Electronic Technology Co., Ltd Address: 543-A,R2-B,High-Tech Village,206 S 7th Rd, Nanshan, Shenzhen, China. P r o d u c t N a m e : ANC Wireless Earbuds F C C I D : 2BSZ7-FC02 Standard(s): 47 CFR Part 15, Subpart C(15.247) ANSI C63.10-2020 KDB 558074 D01 15.247 Meas Guidance v05r02 Report Number: 2502X23270E-RF-00A Report Date: 2025/12/7 The above device has been tested and found compliant with the requirement of the relevant standards by Bay Area Compliance Laboratories Corp. (Dongguan). Reviewed By: Alice Tan Approved By: Pedro Yun Title: RF Engineer Title: RF Supervisor Bay Area Compliance Laboratories Corp. (Dongguan) No.12, Pulong East 1 st Road, Tangxia Town, Dongguan, Guangdong, China Tel: +86-769-86858888 Fax: +86-769-86858891 www.baclcorp.com.cn Note: The information marked ▲ is provided by the applicant, the laboratory is not responsible for its authenticity and this information can affect the validity of the result in the test report. Unless otherwise stated the results shown in this test report refer only to the sample(s) tested. This report cannot be reproduced except in full, without prior written approval of the Company. This report is valid only with a valid digital signature. The digital signature may be available only under the Adobe software above version 7.0. This report may contain data that are not covered by the accreditation scope and shall be marked with ★.This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Government. Each test item follows the test standard(s) without deviation. Bay Area Compliance Laboratories Corp. (Dongguan) Report No.: 2502X23270E-RF-00A Report Template Version: FCC-BT-V2.1 Page 2 of 59 CONTENTS DOCUMENT REVISION HISTORY ................................................................................................. 4 1. GENERAL INFORMATION ........................................................................................................... 5 1.1 GENERAL DESCRIPTION OF EQUIPMENT UNDER TEST ............................................................................. 5 1.2 ACCESSORY INFORMATION ........................................................................................................................ 5 1.3 ANTENNA INFORMATION DETAIL▲ .......................................................................................................... 5 1.4 EQUIPMENT MODIFICATIONS ..................................................................................................................... 5 2. SUMMARY OF TEST RESULTS ................................................................................................... 6 3. DESCRIPTION OF TEST CONFIGURATION ............................................................................ 7 3.1 OPERATION FREQUENCY DETAIL .............................................................................................................. 7 3.2 EUT OPERATION CONDITION .................................................................................................................... 7 3.3 SUPPORT EQUIPMENT LIST AND DETAILS ................................................................................................. 7 3.4 SUPPORT CABLE LIST AND DETAILS .......................................................................................................... 7 3.5 BLOCK DIAGRAM OF TEST SETUP .............................................................................................................. 8 3.6 TEST FACILITY ............................................................................................................................................ 9 3.7 MEASUREMENT UNCERTAINTY .................................................................................................................. 9 4. REQUIREMENTS AND TEST PROCEDURES ......................................................................... 10 4.1 AC LINE CONDUCTED EMISSIONS ........................................................................................................... 10 4.1.1 Applicable Standard ............................................................................................................................................ 10 4.1.2 EUT Setup ........................................................................................................................................................... 11 4.1.3 EMI Test Receiver Setup .................................................................................................................................... 11 4.1.4 Test Procedure ..................................................................................................................................................... 12 4.1.5 Corrected Amplitude & Margin Calculation ....................................................................................................... 12 4.1.6 Test Result ........................................................................................................................................................... 12 4.2 RADIATED SPURIOUS EMISSIONS ............................................................................................................. 13 4.2.1 Applicable Standard ............................................................................................................................................ 13 4.2.2 EUT Setup ........................................................................................................................................................... 13 4.2.3 EMI Test Receiver & Spectrum Analyzer Setup ................................................................................................. 15 4.2.4 Test Procedure ..................................................................................................................................................... 16 4.2.5 Corrected Re…

Text truncated - open the document above for the full version.

Test Setup Photos

Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-00A-TSP Page 1 / 5 TEST SETUP PHOTOGRAPHS Radiated Emission 9k-30MHz Parallel View Radiated Emission 9k-30MHz Perpendicular View Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-00A-TSP Page 2 / 5 Radiated Emission 9k-30MHz Ground-parallel View Radiated Emission 30M-1GHz View Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-00A-TSP Page 3 / 5 Radiated Emission Below 1GHz View Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-00A-TSP Page 4 / 5 Radiated Emission 1-18GHz View Radiated Emission 18-25GHz View Bay Area Compliance Laboratories Corp. (Dongguan) EXHIBIT No.: 2502X23270E-RF-00A-TSP Page 5 / 5 Radiated Emission Above 1GHz View RF Conducted View *****END *****

Contact Information

Applicant

Xiao Chen(CEO)
[email protected]Fax: N/A

Test Firm

Bay Area Compliance Laboratories Corp. (Dongguan)David Zhang
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz2.40 mW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted.