
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Click a position on the gun screen,The ball machine screen will turn to the gun machine screen Position to view details Linkage correction Camera linkage When you click a position on the gun screen, the ball screen will turn to the gun screen When there is an error in the corresponding position of the screen. Using the camera linkage function Correction position Linkage correction Function settingsCamera linkage 1、Find the device Bluetooth, and click "Connect." 2、Click "+Add," the page jumps to figure 2. 2-1、Find the device Bluetooth, and click Connect." Connection method--Bluetooth 3、Upon hearing a sound or seeing the indicator light flashing, check and click "Next." 4、Select WiFi, enter the correct password, and click "Next." 1、Click "+" to add device. 2、Scan the QR code on the camera label. Connection method--Scan the QR code 3、Select WiFi, enter the correct password, and click "Next." 4、Waiting for connection. 5、Align the QR code with the camera. 6、Click on the input box, customize the device name, and click "Get started." 05 0910111213131415 060708 Instruction Manual
FCC Caution. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -Reorient or relocate the receiving antenna. -Increase the separation between the equipment and receiver. -Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. -Consult the dealer or an experienced radio/TV technician for help. This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator & your body.
ReportNo.:PTC26042111801E-FC01 Page48of80 9MaximumPeakOutputPower TestRequirement:FCCCFR47Part15Section15.247 TestMethod:ANSIC63.10-2020 TestLimit: Regulation15.247(b)(3),Forsystemsusingdigitalmodulationinthe 902-928MHz,2400-2483.5MHz,and5725-5850MHzbands:1Watt.As analternativetoapeakpowermeasurement,compliancewiththeone Wattlimitcanbebasedonameasurementofthemaximumconducted outputpower. 9.1TestProcedure 1.TheRFoutputofEUTwasconnectedtothespectrumanalyzerbyRFcableandattenuator.The pathlosswascompensatedtotheresultsforeachmeasurement. 2.SettothemaximumpowersettingandenabletheEUTtransmitcontinuously. 3.Measuretheconductedoutputpowerandrecordtheresultsinthetestreport. 9.2TestSetup 9.3TestResult TestModeAntennaFrequency[MHz] ConductedPeak Power[dBm] Conducted Limit[dBm] Verdict BLE_1MAnt124021.88≤30PASS BLE_1MAnt124400.84≤30PASS BLE_1MAnt12480-0.75≤30PASS BLE_2MAnt124021.84≤30PASS BLE_2MAnt124400.46≤30PASS BLE_2MAnt12480-0.61≤30PASS ReportNo.:PTC26042111801E-FC01 Page49of80 TestGraphs: BLE_1M-Ant1-2402-PASS BLE_1M-Ant1-2440-PASS BLE_1M-Ant1-2480-PASS ReportNo.:PTC26042111801E-FC01 Page50of80 BLE_2M-Ant1-2402-PASS BLE_2M-Ant1-2440-PASS ReportNo.:PTC26042111801E-FC01 Page51of80 BLE_2M-Ant1-2480-PASS ReportNo.:PTC26042111801E-FC01 Page52of80 10PowerSpectraldensity TestRequirement:FCCCFR47Part15Section15.247 TestMethod:ANSIC63.10-2020 TestLimit:Regulation15.247(f)Thepowerspectraldensityconductedfromthe intentionalradiatortotheantennaduetothedigitalmodulation operationofthehybridsystem,withthefrequencyhoppingoperation turnedoff,shallnotbegreaterthan8dBminany3kHzbandduring anytimeintervalofcontinuoustransmission. 10.1TestProcedure 1.RemovetheantennafromtheEUTandthenconnectalowRFcablefromtheantennaporttothe spectrum. 2.Setthespectrumanalyzer:RBW=3kHz.VBW=10kHz,Span=1.5timestheDTSchannelbandwidth(6 dBbandwidth).Sweep=auto;DetectorFunction=Peak.Trace=Maxhold. 3.Allowthetracetostabilize.Usethemarker-deltafunctiontodeterminetheseparationbetweenthepeaksof theadjacentchannels.ThelimitisspecifiedinoneofthesubparagraphsofthisSectionSubmitthisplot. 10.2TestSetup 10.3TestResult TestModeAntennaFrequency[MHz]Result[dBm/3kHz]Limit[dBm/3kHz]Verdict BLE_1MAnt12402-14.34≤8.00PASS BLE_1MAnt12440-16.22≤8.00PASS BLE_1MAnt12480-16.76≤8.00PASS BLE_2MAnt12402-17.96≤8.00PASS BLE_2MAnt12440-19.67≤8.00PASS BLE_2MAnt12480-20.84≤8.00PASS ReportNo.:PTC26042111801E-FC01 Page53of80 TestGraphs: BLE_1M-Ant1-2402-PASS BLE_1M-Ant1-2440-PASS BLE_1M-Ant1-2480-PASS ReportNo.:PTC26042111801E-FC01 Page54of80 BLE_2M-Ant1-2402-PASS BLE_2M-Ant1-2440-PASS ReportNo.:PTC26042111801E-FC01 Page55of80 BLE_2M-Ant1-2480-PASS ReportNo.:PTC26042111801E-FC01 Page56of80 11AntennaApplication 11.1AntennaRequirement Forintentionaldevice,accordingtoFCC47CFRSection15.203,anintentional radiatorshallbedesignedtoensurethatnoantennaotherthanthatfurnishedbythe responsiblepartyshallbeusedwiththedevice.AndaccordingtoFCC47CFRSection 15.247(b),iftransmittingantennasofdirectionalgaingreaterthan6dBiareused,the powershallbereducedbytheamountindBthatthedirectionalgainoftheantenna exceeds6dBi. 11.2Result TheEUT’Santenna,permanentattachedantenna,isFPCantenna.Theantenna’s gainis3.89dBiandmeetstherequirement. ReportNo.:PTC26042111801E-FC01 Page57of80 12TestSetup ConductedEmissions RadiatedSpuriousEmissions TestFrequencyFrom30MHzto1GHz ReportNo.:PTC26042111801E-FC01 Page58of80 TestfrequencyfromAbove1GHz
FCCID:2BTFE-QZ5-W ConductedEmissions RadiatedSpuriousEmissions From30MHz-1000MHz FCCID:2BTFE-QZ5-W TestfrequencyfromAbove1GHz RFConductedtestsetupphotos
Manufacture's Address: 6th Floor, Building 4, Jianlong Science and Technology Park, Qinghutou, Tan gxia Town, Dongguan City 承认书 SPECIFICATIONFORAPPROVAL 客户名称 CUSTOMERNAME: 客户料号 CUSTOMERP/N: 产品料号 PRODUCTP/N:Z1C80F3D51A 产品名称 PRODUCTNAME: 规格描述: Description 2400-2500MHz ANT : 版本 REV:A Z1C80F3D51A/2.4GHzFPCANT 版 出厂签章 S I G N 核准 APPROVEDBY 审核 CHECKEDBY 制作 DRAMN 客户签章 S I G N 品质 QE 开发 R&D 工程 PE 三、成品图(Productdrawing): 四、测试报告(Testreport): 5.1:网络分析仪测试报告 5.2:2D、3D Raditation Pattern 2450MHz 2500MHz 2500MHz 2400-2500MHZ-Phi0 2400-2500MHz-Phi90 2400-2500MHz-Theta90 五、产品实物图(Productdrawing 5.3:Antenna gain and efficiency ) ANT Gain(dBi Operation Frequency ( MHZ ) ) 240 Efficiency ( % ) 02.4352.31 24503.8161.38 25003.8963.1
ReportNo.:PTC26042111801E-FC02 Page 74 of 95 14EUTPHOTOS ReportNo.:PTC26042111801E-FC02 Page 75 of 95 ReportNo.:PTC26042111801E-FC02 Page 76 of 95 ReportNo.:PTC26042111801E-FC02 Page 77 of 95 ReportNo.:PTC26042111801E-FC02 Page 78 of 95 ReportNo.:PTC26042111801E-FC02 Page 79 of 95 ReportNo.:PTC26042111801E-FC02 Page 80 of 95 ReportNo.:PTC26042111801E-FC02 Page 81 of 95 ReportNo.:PTC26042111801E-FC02 Page 82 of 95 TestModel: ReportNo.:PTC26042111801E-FC02 Page 83 of 95 ReportNo.:PTC26042111801E-FC02 Page 84 of 95 ReportNo.:PTC26042111801E-FC02 Page 85 of 95 ReportNo.:PTC26042111801E-FC02 Page 86 of 95 ReportNo.:PTC26042111801E-FC02 Page 87 of 95 AdditionalModel: ReportNo.:PTC26042111801E-FC02 Page 88 of 95 ReportNo.:PTC26042111801E-FC02 Page 89 of 95 ReportNo.:PTC26042111801E-FC02 Page 90 of 95 ReportNo.:PTC26042111801E-FC02 Page 91 of 95 ReportNo.:PTC26042111801E-FC02 Page 92 of 95 ReportNo.:PTC26042111801E-FC02 Page 93 of 95 ReportNo.:PTC26042111801E-FC02 Page 94 of 95 ReportNo.:PTC26042111801E-FC02 Page 95 of 95 ******THEENDREPORT******
ReportNo.:PTC26042111801E-FC02 Page 47 of 95 11N40SISO-Ant1-2452-0~Reference-PASS 11N40SISO-Ant1-2452-30~1000-PASS ReportNo.:PTC26042111801E-FC02 Page 48 of 95 11N40SISO-Ant1-2452-1000~26500-PASS ReportNo.:PTC26042111801E-FC02 Page 49 of 95 8BandEdgeMeasurement TestRequirement:Section15.247(d)Inaddition,radiatedemissionswhichfallinthe restrictedbands.asdefinedinSection15.205(a),mustalsocomplywith theradiatedemissionlimitsspecifiedinSection15.209(a)(seeSection 15.205(c)). TestMethod:ANSIC63.10-2020 TestLimit:Regulation15.247(d),Inany100kHzbandwidthoutsidethe frequencybandinwhichthespreadspectrumordigitallymodulated intentionalradiatorisoperating,theradiofrequencypowerthatis producedbytheintentionalradiatorshallbeatleast20dBbelowthatin the100kHzbandwidthwithinthebandthatcontainsthehighestlevelof thedesiredpower,basedoneitheranRFconductedoraradiated measurement,providedthetransmitterdemonstratescompliancewiththe peakconductedpowerlimits.Ifthetransmittercomplieswiththe conductedpowerlimitsbasedontheuseofRMSaveragingoveratime interval,aspermittedunderparagraph(b)(3)ofthissection,the attenuationrequiredunderthisparagraphshallbe30dBinsteadof20 dB.Attenuationbelowthegenerallimitsspecifiedin§15.209(a)isnot required.Inaddition,radiatedemissionswhichfallintherestrictedbands, asdefinedin§15.205(a),mustalsocomplywiththeradiatedemission limitsspecifiedin§15.209(a)(see§15.205(c)). 8.1TestProcedure 1.RemovetheantennafromtheEUTandthenconnectalowRFcablefromtheantennaporttothe spectrum; 2.Setthespectrumanalyzer:RBW=100kHz,VBW=300kHz,Sweep=auto Detectorfunction=peak,Trace=maxhold 8.2TestSetup 8.3TestResult TestModeAntennaChNameFrequency[MHz]RefLevel[dBm]Result[dBm]Limit[dBm]Verdict 11BAnt1Low2412-6.72-39.98≤-26.72PASS 11BAnt1High2462-5.42-42.04≤-25.42PASS 11GAnt1Low2412-10.43-39.6≤-30.43PASS 11GAnt1High2462-12.20-42.76≤-32.2PASS 11N20SISOAnt1Low2412-11.43-38.03≤-31.43PASS 11N20SISOAnt1High2462-11.17-42.75≤-31.17PASS ReportNo.:PTC26042111801E-FC02 Page 50 of 95 11N40SISOAnt1Low2422-15.28-42.06≤-35.28PASS 11N40SISOAnt1High2452-15.18-42.13≤-35.18PASS ReportNo.:PTC26042111801E-FC02 Page 51 of 95 TestGraphs: 11B-Ant1-2412-PASS 11B-Ant1-2462-PASS 11G-Ant1-2412-PASS ReportNo.:PTC26042111801E-FC02 Page 52 of 95 11G-Ant1-2462-PASS 11N20SISO-Ant1-2412-PASS ReportNo.:PTC26042111801E-FC02 Page 53 of 95 11N20SISO-Ant1-2462-PASS 11N40SISO-Ant1-2422-PASS ReportNo.:PTC26042111801E-FC02 Page 54 of 95 11N40SISO-Ant1-2452-PASS ReportNo.:PTC26042111801E-FC02 Page 55 of 95 96dBBandwidthMeasurement TestRequirement:FCCCFR47Part15Section15.247 TestMethod:ANSIC63.10-2020 TestLimit Systemsusingdigitalmodulationtechniquesmayoperateinthe902-928 MHz,2400-2483.5MHz,and5725-5850MHzbands.Theminimum6dB bandwidthshallbeatleast500kHz. 9.1TestProcedure 1.RemovetheantennafromtheEUTandthenconnectalowRFcablefromtheantennaporttothe spectrum; 2.Setthespectrumanalyzer:RBW=100kHz,VBW=300kHz 9.2TestSetup 9.3TestResult TestModeAntennaFrequency[MHz] DTSBW [MHz] FL[MHz]FH[MHz]Limit[MHz]Verdict 11BAnt124129.5602407.0002416.5600.5PASS 11BAnt1243710.0002432.0402442.0400.5PASS 11BAnt1246210.0402457.0002467.0400.5PASS 11GAnt1241215.9202403.8802419.8000.5PASS 11GAnt1243715.1202429.4802444.6000.5PASS 11GAnt1246215.0802454.4802469.5600.5PASS 11N20SISOAnt1241215.1202404.4802419.6000.5PASS 11N20SISOAnt1243715.0402429.4802444.5200.5PASS 11N20SISOAnt1246215.4402454.4802469.9200.5PASS 11N40SISOAnt1242236.0002403.9202439.9200.5PASS 11N40SISOAnt1243733.6802419.6402453.3200.5PASS 11N40SISOAnt1245234.2402434.4802468.7200.5PASS ReportNo.:PTC26042111801E-FC02 Page 56 of 95 TestGraphs: 11B-Ant1-2412-PASS 11B-Ant1-2437-PASS 11B-Ant1-2462-PASS ReportNo.:PTC26042111801E-FC02 Page 57 of 95 11G-Ant1-2412-PASS 11G-Ant1-2437-PASS ReportNo.:PTC26042111801E-FC02 Page 58 of 95 11G-Ant1-2462-PASS 11N20SISO-Ant1-2412-PASS ReportNo.:PTC26042111801E-FC02 Page 59 of 95 11N20SISO-Ant1-2437-PASS 11N20SISO-Ant1-2462-PASS ReportNo.:PTC26042111801E-FC02 Page 60 of 95 11N40SISO-Ant1-2422-PASS 11N40SISO-Ant1-2437-PASS ReportNo.:PTC26042111801E-FC02 Page 61 of 95 11N40SISO-Ant1-2452-PASS ReportNo.:PTC26042111801E-FC02 Page 62 of 95 10Maximumconductedoutputpower TestRequirement:FCCCFR47Part15Section15.247 TestMethod:ANSIC63.10-2020 TestLimit: Regulation15.247(b)(3),Forsystemsusingdigitalmodulationinthe902- 928MHz,2400-2483.5MHz,and5725-5850MHzbands:1Watt.Asan alternativetoapeakpowermeasurement,compliancewiththeoneWatt limitcanbebasedonameasurementofthemaximumconductedoutput power. 10.1TestProcedure 1.AccordingtoANSIC63.10-2020clause11.9.1.3PKPM1Peakpowermetermethod.Themaximum peakconductedoutputpowermaybemeasuredusingabroadbandpeakRFpowermeter.The powermetershallhaveavideobandwidththatisgreaterthanorequaltotheDTSbandwidthand shalluseafast-respondingdiodedetector. 10.2TestSetup 10.3TestResult TestModeAntennaFrequency[MHz] Set Power PeakPower[dBm] Conducted Limit[dBm] Verdict 11BAnt12412---5.33≤30.00PASS 11BAnt12437---6.68≤30.00PASS 11BAnt12462---6.10≤30.00PASS 11GAnt12412---6.76≤30.00PASS 11GAnt12437---6.33≤30.00PASS 11GAnt12462---5.68≤30.00PASS 11N20SISOAnt12412---6.33≤30.00PASS 11N20SISOAnt12437---5.95≤30.00PASS 11N20SISOAnt12462---5.47≤30.00PASS 11N40SISOAnt12422---5.61≤30.00PASS 11N40SISOAnt12437---5.15≤30.00PASS 11N40SISOAnt12452---5.23≤30.00PASS EUT Powermeter Attenuator ReportNo.:PTC26042111801E-FC02 Page 63 of 95 11PowerSpectraldensity TestRequirement:FCCCFR47Part15Section15.247 TestMethod:ANSIC63.10-2020 TestLimit:Regulation15.247(e)Thepowerspectraldensityconductedfromthe intentionalradiatortotheantennaduetothedigitalmodulation operationofthehybridsystem,withthefrequencyhoppingoperation turnedoff,shallnotbegreaterthan8dBminany3kHzbandduring anytimeintervalofcontinuoustransmission. 11.1TestProcedure 1.Connecttheantennaport(s)tothespectrumanalyzerinput. 2.Configurethespectrumanalyzerasshownbelow: Centerfrequency=DTSchannelcenterfrequency Span=1.5timestheDTSbandwidth RBW=3KHz,VBW=10KHz Sweeptime=autocouple Detector=peak Tracemode=maxhold 3.Placetheradioincontinuoustransmitmode,allowthetracet…
Text truncated - open the document above for the full version.
Page 1 of 95 FCCTESTREPORT FCCID:2BTFE-QZ5-W Product:SmartCamera ModelName:QZ5-W AdditionalModel: QB5-W,QB5-B,QZ5-B,Q102,QC5 Brand:/ ReportNo.:PTC26042111801E-FC02 Preparedfor ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. 1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu)IndustrialPark,Dipu StreetAnjiCounty,HuzhouCity,ZhejiangProvince,China Preparedby PreciseTesting&CertificationCo.,Ltd Building1,No.6,TongxinRoad,DongchengStreet,Dongguan,Guangdong,China ReportNo.:PTC26042111801E-FC02 Page 2 of 95 1TESTRESULTCERTIFICATION Applicant’sname:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Address:1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu) IndustrialPark,DipuStreetAnjiCounty,HuzhouCity,Zhejiang Province,China Manufacture'sname:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Address:1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu) IndustrialPark,DipuStreet,AnjiCounty,HuzhouCity,Zhejiang Province,China Productname:SmartCamera Modelname:QZ5-W AdditionalModel:QB5-W,QB5-B,QZ5-B,Q102,QC5 Standards:FCCCFR47Part15Section15.247 Testprocedure:ANSIC63.10-2020 TestDate:May09,2026toMay25,2026 DateofIssue:May25,2026 TestResult:Pass ThisdevicedescribedabovehasbeentestedbyPTC,andthetestresultsshowthattheequipmentunder test(EUT)isincompliancewiththeFCCrequirements.Anditisapplicableonlytothetestedsample identifiedinthereport. Thisreportshallnotbereproducedexceptinfull,withoutthewrittenapprovalofPTC,thisdocumentmaybe alteredorrevisedbyPTC,personalonly,andshallbenotedintherevisionofthedocument. TestEngineer: Jackzhou/Engineer TechnicalManager: SimonPu/Manager ReportNo.:PTC26042111801E-FC02 Page 3 of 95 Contents Page 1TESTRESULTCERTIFICATION...............................................................................................................................2 2TESTSUMMARY..........................................................................................................................................................5 3GENERALINFORMATION..........................................................................................................................................6 3.1GENERALDESCRIPTIONOFE.U.T.....................................................................................................................6 3.2CHANNELLIST.....................................................................................................................................................7 3.3TESTSITE............................................................................................................................................................8 4EQUIPMENTDURINGTEST......................................................................................................................................9 4.1EQUIPMENTSLIST...............................................................................................................................................9 4.2MEASUREMENTUNCERTAINTY.........................................................................................................................11 4.3DESCRIPTIONOFSUPPORTUNITS...................................................................................................................12 5CONDUCTEDEMISSION..........................................................................................................................................13 5.1E.U.T.OPERATION............................................................................................................................................13 5.2EUTSETUP.......................................................................................................................................................13 5.3TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION).................................................................................14 5.4MEASUREMENTPROCEDURE............................................................................................................................14 5.5CONDUCTEDEMISSIONLIMIT...........................................................................................................................14 5.6MEASUREMENTDESCRIPTION..........................................................................................................................14 5.7CONDUCTEDEMISSIONTESTRESULT.............................................................................................................14 6RADIATEDSPURIOUSEMISSIONS......................................................................................................................17 6.1EUTOPERATION...............................................................................................................................................17 6.2TESTSETUP......................................................................................................................................................18 6.3SPECTRUMANALYZERSETUP..........................................................................................................................19 6.4TESTPROCEDURE.............................................................................................................................................20 6.5SUMMARYOFTESTRESULTS...........................................................................................................................21 7CONDUCTEDSPURIOUSEMISSION....................................................................................................................29 7.1TESTPROCEDURE.............................................................................................................................................29 7.2TESTSETUP......................................................................................................................................................29 7.3TESTRESULT....................................................................................................................................................29 8BANDEDGEMEASUREMENT.…
Text truncated - open the document above for the full version.
ReportNo.:PTC26042111801E-FC01 Page59of80 13EUTPhotos ReportNo.:PTC26042111801E-FC01 Page60of80 ReportNo.:PTC26042111801E-FC01 Page61of80 ReportNo.:PTC26042111801E-FC01 Page62of80 ReportNo.:PTC26042111801E-FC01 Page63of80 ReportNo.:PTC26042111801E-FC01 Page64of80 ReportNo.:PTC26042111801E-FC01 Page65of80 ReportNo.:PTC26042111801E-FC01 Page66of80 ReportNo.:PTC26042111801E-FC01 Page67of80 TestModel: ReportNo.:PTC26042111801E-FC01 Page68of80 ReportNo.:PTC26042111801E-FC01 Page69of80 ReportNo.:PTC26042111801E-FC01 Page70of80 ReportNo.:PTC26042111801E-FC01 Page71of80 ReportNo.:PTC26042111801E-FC01 Page72of80 ReportNo.:PTC26042111801E-FC01 Page73of80 AdditionalModel: ReportNo.:PTC26042111801E-FC01 Page74of80 ReportNo.:PTC26042111801E-FC01 Page75of80 ReportNo.:PTC26042111801E-FC01 Page76of80 ReportNo.:PTC26042111801E-FC01 Page77of80 ReportNo.:PTC26042111801E-FC01 Page78of80 ReportNo.:PTC26042111801E-FC01 Page79of80 ReportNo.:PTC26042111801E-FC01 Page80of80 ******THEENDREPORT******
ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. CoveredEquipmentCertificationAttestationLetter 6/4/2026 NemkoNorthAmerica,Inc. 303RiverRoad Ottawa K1V1H2 Canada ATTN.:ReviewingEngineer FCCID:2BTFE-QZ5-W ZhejiangBiaofangIntelligentTechnologyCo.,Ltd.(“theapplicant”)certifiesthatthe equipmentforwhichauthorizationissoughtisnot“covered”equipmentprohibitedfrom receivinganequipmentauthorizationpursuanttosection2.903oftheFCCrules. Note:Iftheequipmentforwhichtheapplicantseeksauthorizationisproducedby anyoftheentitiesidentifiedonthecurrentCoveredList,theapplicantshould includeanexplanationonwhytheequipmentisnot“covered”equipment. ZhejiangBiaofangIntelligentTechnologyCo.,Ltd.(“theapplicant”)certifiesthat,asof thedateofthefilingoftheapplication,theapplicantisnotidentifiedontheCoveredList asanentityproducing“covered”equipment. ZhejiangBiaofangIntelligentTechnologyCo.,Ltd.(“theapplicant”)certifiesthatthe equipmentforwhichauthorizationissoughtdoesnotincludecybersecurityoranti-virus softwareproducedorprovidedbyKasperskyLab,Inc.oranyofitssuccessorsand assignees,includingequipmentwithintegratedKasperskyLab,Inc.(oranyofits successorsandassignees)cybersecurityoranti-virussoftwarepursuanttoDA-24-886 andKDB986446D01CoveredEquipmentGuidancesectionB(2a). Signed: Printedname:dajunWu Title:Manager CompanyName:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Date:6/4/2026
Page1of80 FCCTESTREPORT FCCID:2BTFE-QZ5-W Product:SmartCamera ModelName:QZ5-W AdditionalModel: QB5-W,QB5-B,QZ5-B,Q102,QC5 Brand:/ ReportNo.:PTC26042111801E-FC01 Preparedfor ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. 1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu)IndustrialPark,DipuStreetAnji County,HuzhouCity,ZhejiangProvince,China Preparedby PreciseTesting&CertificationCo.,Ltd Building1,No.6,TongxinRoad,DongchengStreet,Dongguan,Guangdong,China ReportNo.:PTC26042111801E-FC01 Page2of80 1TESTRESULTCERTIFICATION Applicant’sname:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Address:1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu)Industrial Park,DipuStreetAnjiCounty,HuzhouCity,ZhejiangProvince,China Manufacture'sname:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Address:1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu)Industrial Park,DipuStreet,AnjiCounty,HuzhouCity,ZhejiangProvince,China Productname: SmartCamera Modelname:QZ5-W AdditionalModel:QB5-W,QB5-B,QZ5-B,Q102,QC5 Standards:FCCCFR47Part15Section15.247 Testprocedure:ANSIC63.10-2020 TestDate:May09,2026toMay25,2026 DateofIssue:May25,2026 TestResult:Pass ThisdevicedescribedabovehasbeentestedbyPTC,andthetestresultsshowthatthe equipmentundertest(EUT)isincompliancewiththeFCCrequirements.Anditisapplicableonlyto thetestedsampleidentifiedinthereport. Thisreportshallnotbereproducedexceptinfull,withoutthewrittenapprovalofPTC,thisdocument maybealteredorrevisedbyPTC,personalonly,andshallbenotedintherevisionofthedocument. TestEngineer: Jackzhou/Engineer TechnicalManager: SimonPu/Manager ReportNo.:PTC26042111801E-FC01 Page3of80 Contents Page 1TESTRESULTCERTIFICATION...............................................................................................................................2 2TESTSUMMARY..........................................................................................................................................................5 2.1TESTSITE............................................................................................................................................................6 3GENERALINFORMATION.......................................................................................................................................7 3.1GENERALDESCRIPTIONOFE.U.T.....................................................................................................................7 3.2CHANNELLIST.....................................................................................................................................................8 4EQUIPMENTDURINGTEST....................................................................................................................................9 4.1EQUIPMENTSLIST.............................................................................................................................................9 4.2MEASUREMENTUNCERTAINTY.........................................................................................................................11 4.3DESCRIPTIONOFSUPPORTUNITS...................................................................................................................12 5CONDUCTEDEMISSION..........................................................................................................................................13 5.1E.U.T.OPERATION............................................................................................................................................13 5.2EUTSETUP.......................................................................................................................................................13 5.3TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION).................................................................................14 5.4MEASUREMENTPROCEDURE............................................................................................................................14 5.5CONDUCTEDEMISSIONLIMIT...........................................................................................................................14 5.6MEASUREMENTDESCRIPTION..........................................................................................................................14 5.7CONDUCTEDEMISSIONTESTRESULT.............................................................................................................14 6RADIATEDSPURIOUSEMISSIONS......................................................................................................................17 6.1EUTOPERATION...............................................................................................................................................17 6.2TESTSETUP......................................................................................................................................................18 6.3SPECTRUMANALYZERSETUP..........................................................................................................................19 6.4TESTPROCEDURE.............................................................................................................................................20 6.5SUMMARYOFTESTRESULTS...........................................................................................................................22 7CONDUCTBANDEDGEANDSPURIOUSEMISSIONSMEASUREMENT....................................................30 7.1TESTPROCEDURE.............................................................................................................................................30 7.2TESTSETUP......................................................................................................................................................30 7.3TESTRESULT....................................................................................................................................................31 86DBBANDWIDTHMEASUREMENT.........................................................…
Text truncated - open the document above for the full version.
Page1of7 FCCTESTREPORT FCCID:2BTFE-QZ5-W Product:SmartCamera ModelName:QZ5-W AdditionalModel:QB5-W,QB5-B,QZ5-B,Q102,QC5 Brand:/ ReportNo.:PTC26042111801E-FC03 Preparedfor ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. 1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu)IndustrialPark,Dipu StreetAnjiCounty,HuzhouCity,ZhejiangProvince,China Preparedby PreciseTesting&CertificationCo.,Ltd. Building1,No.6,TongxinRoad,DongchengStreet,Dongguan,Guangdong,China. ReportNo.:PTC26042111801E-FC03 Page2of7 TESTRESULTCERTIFICATION Applicant’sname:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Address:1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu) IndustrialPark,DipuStreetAnjiCounty,HuzhouCity,Zhejiang Province,China Manufacture'sname:ZhejiangBiaofangIntelligentTechnologyCo.,Ltd. Address:1-3F,Building8,LiangshanHigh-techSmallandMicro(Gongfu) IndustrialPark,DipuStreet,AnjiCounty,HuzhouCity,Zhejiang Province,China Productname:SmartCamera Modelname:QZ5-W AdditionalModel:QB5-W,QB5-B,QZ5-B,Q102,QC5 Testprocedure:FCCCFR47Part1.1307(b)(1) TestDate: May09,2026toMay25,2026 DateofIssue:May25,2026 TestResult:PASS ThisdevicedescribedabovehasbeentestedbyPTC,andthetestresultsshowthatthe equipmentundertest(EUT)isincompliancewiththeFCCrequirements.Anditisapplicable onlytothetestedsampleidentifiedinthereport. Thisreportshallnotbereproducedexceptinfull,withoutthewrittenapprovalofPTC,this documentmaybealteredorrevisedbyPTC,personalonly,andshallbenotedinthe revisionofthedocume…
Text truncated - open the document above for the full version.
19 GEORGETOWN, IRVINE · IRVINE, California, 92612 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 1.54 mW |
| 2 | 15C | 2.41 GHz - 2.46 GHz | 4.74 mW |
Smart Camera
Equipment Class
DTS - Digital Transmission SystemSmart Camera
Equipment Class
DTS - Digital Transmission System