FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Green lnova Lighting Technology (Shenzhen) Limited/
  3. 2BTW8-SLS1

2BTW8-SLS1Smart Solar Spotlight

Green lnova Lighting Technology (Shenzhen) Limited
Smart Solar Spotlight - FCC ID 2BTW8-SLS1 - Green lnova Lighting Technology (Shenzhen) Limited
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Mar 26, 2026
Application Purpose
Original Equipment
Equipment Note
Smart Solar Spotlight
Frequency Range
2402.00000000 - 2480.00000000
Company
Green lnova Lighting Technology (Shenzhen) Limited
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

1 User manual Of Eluntrix Solar Landscape Spotlight SLS1 IMPORTANT TIPS  Control Method: The light must be connected to the App for control and normal operation.  Energy-Saving Mode: After connecting to the app, the light enters Energy- Saving Mode by default, automatically adjusting brightness based on the battery level: the lower the battery level, the lower the brightness. If you prefer the light to remain at 100% brightness or any fixed brightness level, please disable Energy-Saving Mode in the App. Once disabled, the light will operate continuously at the brightness level you set.  Runtime: If the light’s runtime is shorter than expected, it may be caused by insufficient charging due to inadequate sunlight. In this case, lowering the brightness is recommended to extend the lighting duration.  Installation Location: To ensure optimal charging duration and better overall performance, install the light in a location with abundant sunlight, keeping the solar panel unshaded and fully exposed to direct sunlight.  First-Time Use: For best performance, it is recommended to charge the light continuously for 48 hours before the first use. Introduction Our smart solar spotlight features an easy, wire-free installation with a plug-and-play solar-powered design. The adjustable angles allow for flexible illumination. The light automatically detects ambient lighting—turning on at night and off at dawn. Smart control can also be achieved through the mobile app. Specifications LED QTY 96 PCS IP rating IP65 Temperature Range 14°F - 104°F (-10∞C - 40∞C) Materials ABS body + PC lens Beam Angle 90∞ Colors Warm White + Cold White + RGB 2 Installation Method 1: Wall-Mounted Installation STEP 1: Insert the ground stake vertically into the soil and ensure it is firmly secured. STEP 2: Attach the light to the ground stake using the mounting pole of the light, then adjust the lighting angle (ensure it can receive adequate sunlight). After adjustment, tighten the locking screw on the mounting pole. (Note: do not press the light with your hands to force it into the ground, as this may damage the fixture. Secure the ground stake firmly first, then gently insert the light into the stake using the mounting pole.) STEP 1 STEP 2 Method 2: Wall-Mounted Installation Step 1: If installing on a hard surface such as concrete, drill two holes first and insert the wall anchors. (If installing on softer materials like wood, this step can be skipped.) Step 2: Use screws to secure the mounting pole to the drilled positions. Step 3: Hand-tighten the screws to attach the light to the mounting pole. Step 4: Adjust the lighting angle as needed, then tighten the fixture to lock it in place. Step 1 Step 2 Step 3 Step 4 3 Download and Connect the App 1. Scan the QR code below to download the App, or search for SmartLife in the App Store or Google Play. 2. Open the App and log in or create a new account. 3. Enable Bluetooth on your phone. 4. Pair Mode: Turn on the light using the power switch. The light will enter pairing mode immediately: it will flash for 3 seconds and then remain on at low brightness for up to 10 minutes. If pairing is not completed within 10 minutes, pairing mode will end and the light will switch to steady high brightness. To re-enter pairing mode, toggle the power switch 6 times consecutively (OFF–ON–OFF–ON–OFF–ON). 5. Tap the “+” button in the App and select “Add Device” to add the light to the App. 4 6. When no obstructions, the control range of the light can reach up to 98 ft (30 m). Using the App for Control and Settings 1. You can check the battery level in the App. 2. Energy-Saving Mode: The solar light is set to Energy Saving Mode by default, as follows: 70%–100% battery: 100% brightness 50%–70% battery: 90% brightness 20%–50% battery: 70% brightness Below 20% battery: 10% brightness If you prefer the light to run at 100% brightness or any other fixed brightness level, please disable Energy Saving Mode in the App, as shown below. Once disabled, the light will operate at the brightness level you set. 3. You can adjust the brightness as needed. 5 (Note: If the lighting duration is insufficient, it is recommended to lower the brightness.) 4. Color Selection: Tap the “Colour” icon to select colors such as Red, Green, and Blue. Tap the “White” icon to select white light, with any color temperature between 3000K and 6500K. 5. Scenes Selection: Tap the icon below to choose different light effects and themes. 6 6. Music Sync: You can Sync lights with music in section below. 7. Auto On and Off: You can use the button below to enable or disable the “Solar Energy” feature. When enabled, the light will automatically detect ambient light— turning on at night and turning off at dawn. 7 8. Schedule: You can set the light to turn on or off automatically at any desired time, as shown in the images below. Please note that the scheduled on/off time may experience a tolerance of about 30 seconds.” 9. Create Group: You can add multiple lights to a group. You can control all lights in the group together and use all functions simultaneously, except scheduling. Schedules must be set individually for each light. Tap the edit icon in the upper-right corner of the App, then select “Create Group” in the pop-up window to set up a group. 8 Restoring to factory settings & Re-Pairing the light During later use, if you need to re-pair the light, or if the light has already been paired with one mobile phone and you would like to install the app and connect the light on a different phone, you must first restore the light to factory settings. Follow the steps below: 1. If the previously installed App is still accessible, you can remove the light from the device list in the app’s Device Management page, as shown below: 2. Toggle the light’s power switch consecutively to restore to factory setting. If the power switch is in the ON position, toggle the switch six times consecutively (OFF–ON–OFF–ON–OFF–ON) to restore the light to factory …

Text truncated - open the document above for the full version.

Attestation Statements

* the applicant must designate a contact located in the United States for purposes of acting as the applicant’s agent for service of process, regardless of whether the applicant is a domestic or foreign entity. An applicant located in the United States may designate itself as the agent for service of process. SC6033414 U.S. Agent Designation for Service of Process - Certification Attestation Letter 1/21/2026 TO: Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 ATTN.: Reviewing Engineer FCC ID: 2BTW8-SLS1 FRN of applicant: 0037797115 Per section 2.911(d)(7) of the FCC rules, Green lnova Lighting Technology (Shenzhen) Limited FRN:0037797115(“the applicant”) certifies that the equipment for which authorization is sought is designated to thefollowing U.S. agent* for service of process: Company Name: Global Product Services and Consultation LLC FCC Registration Number (FRN): 0033406703 Physical U.S. Company Address: 328 W Palm Ave. Monrovia, CA91016 Contact Person: Michael Chan Tel: +1 626 366 4358 Agent Email Address: [email protected] The above contact person accepts the obligation for service of process. The applicant accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any Commission-related proceeding involving the equipment. Applicant Signed:Agent Signed (if different from Applicant): Signed: Printed name: Xuefeng Zou Title: Principal Company Name: Green lnova Lighting Technology (Shenzhen) Limited Date: 1/21/2026 Signed: Printed name: Michael Chan Title: Technical Director Company Name: Global Product Services and Consultation LLC Date: 3/18/2026

Attestation Statements

Green lnova Lighting Technology (Shenzhen) Limited 2026-01-21 Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: Attestation Statements Part 2.911(d)(5)(i) request for (FCC ID: 2BTW8-SLS1) [Green lnova Lighting Technology (Shenzhen) Limited] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. We also certify that, as of the date of the filing of the application, the equipment does not utilize cyber-security or anti-virus software from Kaspersky Lab, Inc, or any of its successors and assignees, which is also on the “covered list”. Sincerely, Xuefeng Zou Principal Green lnova Lighting Technology (Shenzhen) Limited No. 901, Building 2, No. 2 Chongqing Road, Qiaotou Community, Fuhai Subdistrict, Bao 'an District, Shenzhen City, Guangdong Province, China Green lnova Lighting Technology (Shenzhen) Limited 2026-01-21 Eurofins Electrical and Electronic Testing NA, Inc. 914 West Patapsco Avenue Baltimore, MD 21230 RE: Attestation Statements Part 2.911(d)(5)(ii) request for (FCC ID: 2BTW8-SLS1) [Green lnova Lighting Technology (Shenzhen) Limited] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Sincerely, Xuefeng Zou Principal Green lnova Lighting Technology (Shenzhen) Limited No. 901, Building 2, No. 2 Chongqing Road, Qiaotou Community, Fuhai Subdistrict, Bao 'an District, Shenzhen City, Guangdong Province, China

External Photos

External Photographs 24 lighting diodes View of EUT-1 View of EUT-2 Page 2 of 4 View of EUT-3 View of EUT-4 Page 3 of 4 View of EUT-5 View of EUT-6 Page 4 of 4 48 lighting diodes View of EUT-7

ID Label/Location Info

50x25mm

Internal Photos

Internal Photographs 24 lighting diodes Internal View of EUT-1 Internal View of EUT-2 Page 2 of 7 Internal View of EUT-3 Internal View of EUT-4 Page 3 of 7 Internal View of EUT-5 Internal View of EUT-6 Page 4 of 7 Internal View of EUT-7 Internal View of EUT-8 Page 5 of 7 Internal View of EUT-9 Internal View of EUT-10 Antenna Page 6 of 7 Internal View of EUT-11 Internal View of EUT-12 Page 7 of 7 48 lighting diodes Internal View of EUT-13 Internal View of EUT-14

RF Exposure Info

RF EXPOSURE EVALUATION EUT Specification EUT Smart Solar Spotlight Model Number SLS1 Series Model / Model Difference / FCC ID 2BTW8-SLS1 Antenna gain (Max) 2.5dBi Operation Frequency 2402 MHz to 2480 MHz Power Supply DC 5.78V Battery 3.7V Classification Per Stipulated Test Standard §15.247(i), §2.1093 Modulation GFSK Max. output power 7.74dBm (0.0059W) Test Requirement: According to ß15.247(i) and ß1.1307(b)(1), systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. Page 2 of 2 Routine SAR evaluation refers to that specifically required by ß2.1093, using measurements or computer simulation. When routine SAR evaluation is not required, portable transmitters with output power greater than the applicable low threshold require SAR evaluation to quality for TCB approval. One antenna is available for the EUT. The minimum separation distance is 5mm. Measurement Result BLE: Transmit Frequency (MHz) Mode Measured Power (dBm) Tune up Power (dBm) Max tune up power (dBm) Calculation Result 1-g SAR 2402 BLE 1M 7.74 7±1 8 1.96 3 According to KDB 447498, no stand-alone required for BT antenna, and no simultaneous SAR measurement is required. Signature: Shawn Wen Date: 2026-1-21

Test Report

AntennaSpecification Manufacture:TUYA ProductName:BT3LAntenna AntennaType:PCB TestDate:2020.05.12 Testedby:YinhuaZhang Approvedby:Licco Antenna TestReport Content 1.GeneralDescription..............................................................................1 2.TestConfigurations................................................................................2 2.1TestEnvironment.........................................................................2 2.2TestEquipment............................................................................2 2.3TestPrinciple................................................................................2 3.TestResults...........................................................................................3 3.1GainandEfficiency.......................................................................3 3.2RadiationPattern.........................................................................4 4.AntennaDimensions.............................................................................5 5.EUTPhoto.............................................................................................5 6.TestSetupPhoto...................................................................................6 1 1.GeneralDescription ManufacturerHangzhouTuyaInformationTechnologyCo.,Ltd Address Room701,Building3,MoreCenter,No.87GuDunRoad, Hangzhou,Zhejiang,China TestLocation Room106,Building3,LetongSciencePark,No.500, QiuyiRoad,BinjiangDistrict,Hangzhou ProductNameBT3LAntenna Productmodel BT3L AntennaType PCBAntenna TestItems Gain;Efficiency;RadiationPattern TestFrequency 2400-2500MHz TestStandard ANSI/IEEEStd149-1979 2 2.TestConfigurations 2.1TestEnvironment Temperature(°C)25 Humidity(%RH)60 AtmosphericPressure(kPa)100.5 2.2TestEquipment TestSystemTEM24Multi-probeMicrowaveChamber TestInstrumentAgilentE5071B 2.3TestPrinciple 3 3.TestResults 3.1GainandEfficiency Frequency(MHz)PeakGain(dBi)Efficiency(%) 24001.6252.29 24101.7152.17 24201.9353.14 24301.9854.16 24402.0057.62 24502.1759.64 24602.4561.55 24702.3860.64 24802.5062.86 24902.3059.85 25002.4960.41 4 3.2RadiationPattern Phi02D Phi902D Theta902D 5 2480MHz3D 4.AntennaDimensions 5.EUTPhoto 6 6.TestSetupPhoto

Test Report

1 / 22 Duty Cycle Condition Mode Frequency (MHz) Antenna On Time (ms) Period (ms) Duty Cycle (%) Correction Factor (dB) 1/T (kHz) NVNT BLE 1M 2402 Ant1 - - 100 0 - NVNT BLE 1M 2440 Ant1 - - 100 0 - NVNT BLE 1M 2480 Ant1 - - 100 0 - 2 / 22 Test Graphs Duty Cycle NVNT BLE 1M 2402MHz Ant1 Duty Cycle NVNT BLE 1M 2440MHz Ant1 3 / 22 Duty Cycle NVNT BLE 1M 2480MHz Ant1 4 / 22 Maximum Conducted Output Power Condition Mode Frequency (MHz) Antenna Conducted Power (dBm) Limit (dBm) Verdict NVNT BLE 1M 2402 Ant1 7.74 30 Pass NVNT BLE 1M 2440 Ant1 7.66 30 Pass NVNT BLE 1M 2480 Ant1 7.65 30 Pass 5 / 22 Test Graphs Power NVNT BLE 1M 2402MHz Ant1 Power NVNT BLE 1M 2440MHz Ant1 6 / 22 Power NVNT BLE 1M 2480MHz Ant1 7 / 22 -6dB Bandwidth Condition Mode Frequency (MHz) Antenna -6 dB Bandwidth (MHz) Limit -6 dB Bandwidth (MHz) Verdict NVNT BLE 1M 2402 Ant1 0.67 0.5 Pass NVNT BLE 1M 2440 Ant1 0.67 0.5 Pass NVNT BLE 1M 2480 Ant1 0.68 0.5 Pass 8 / 22 Test Graphs -6dB Bandwidth NVNT BLE 1M 2402MHz Ant1 -6dB Bandwidth NVNT BLE 1M 2440MHz Ant1 9 / 22 -6dB Bandwidth NVNT BLE 1M 2480MHz Ant1 10 / 22 Occupied Channel Bandwidth Condition Mode Frequency (MHz) Antenna 99% OBW (MHz) NVNT BLE 1M 2402 Ant1 1.034 NVNT BLE 1M 2440 Ant1 1.029 NVNT BLE 1M 2480 Ant1 1.041 11 / 22 Test Graphs OBW NVNT BLE 1M 2402MHz Ant1 OBW NVNT BLE 1M 2440MHz Ant1 12 / 22 OBW NVNT BLE 1M 2480MHz Ant1 13 / 22 Maximum Power Spectral Density Level Condition Mode Frequency (MHz) Antenna Conducted PSD (dBm/3kHz) Limit (dBm/3kHz) Verdict NVNT BLE 1M 2402 Ant1 -5.19 8 Pass NVNT BLE 1M 2440 Ant1 -4.24 8 Pass NVNT BLE 1M 2480 Ant1 0.02 8 Pass 14 / 22 Test Graphs PSD NVNT BLE 1M 2402MHz Ant1 PSD NVNT BLE 1M 2440MHz Ant1 15 / 22 PSD NVNT BLE 1M 2480MHz Ant1 16 / 22 Band Edge Condition Mode Frequency (MHz) Antenna Max Value (dBc) Limit (dBc) Verdict NVNT BLE 1M 2402 Ant1 -62.52 -20 Pass NVNT BLE 1M 2480 Ant1 -63.09 -20 Pass 17 / 22 Test Graphs Band Edge NVNT BLE 1M 2402MHz Ant1 Ref Band Edge NVNT BLE 1M 2402MHz Ant1 Emission 18 / 22 Band Edge NVNT BLE 1M 2480MHz Ant1 Ref Band Edge NVNT BLE 1M 2480MHz Ant1 Emission 19 / 22 Conducted RF Spurious Emission Condition Mode Frequency (MHz) Antenna Max Value (dBc) Limit (dBc) Verdict NVNT BLE 1M 2402 Ant1 -54.7 -20 Pass NVNT BLE 1M 2440 Ant1 -54.31 -20 Pass NVNT BLE 1M 2480 Ant1 -56.36 -20 Pass 20 / 22 Test Graphs Tx. Spurious NVNT BLE 1M 2402MHz Ant1 Ref Tx. Spurious NVNT BLE 1M 2402MHz Ant1 Emission 21 / 22 Tx. Spurious NVNT BLE 1M 2440MHz Ant1 Ref Tx. Spurious NVNT BLE 1M 2440MHz Ant1 Emission 22 / 22 Tx. Spurious NVNT BLE 1M 2480MHz Ant1 Ref Tx. Spurious NVNT BLE 1M 2480MHz Ant1 Emission

Test Report

TRF No.: 04-E001-0B TRF Originator: GTG TRF Date: 2023-12-13 Web: www.gtggroup.com E-mail: [email protected] Tel.: 86-400 755 8988 CFR 47 FCC PART 15 SUBPART C, TEST REPORT For Smart Solar Spotlight MODEL NUMBER: SLS1 REPORT NUMBER: E04A25121063F00501 ISSUE DATE: January 21, 2026 FCC ID: 2BTW8-SLS1 Prepared for Green lnova Lighting Technology (Shenzhen) Limited No. 901, Building 2, No. 2 Chongqing Road, Qiaotou Community, Fuhai Subdistrict, Bao 'an District, Shenzhen City, Guangdong Province, China Prepared by Guangdong Global Testing Technology Co., Ltd. Room 101-105, 203-210, Building 1, No.2, Keji 8 Road, Songshan Lake Park, Dongguan city, Guangdong, People’s Republic of China, 523808 This report is based on a single evaluation of the submitted sample(s) of the above mentioned product, it does not imply an assessment of the production of the products. This report shall not be reproduced, except in full, without the written approval of Guangdong Global Testing Technology Co., Ltd. REPORT NO.: E04A25121063F00501 Page 2 of 39 TRF No.: 04-E001-0B Global Testing , Great Quality. Revision History Rev. Issue Date Revisions Revised By V0 January 21, 2026 Initial Issue REPORT NO.: E04A25121063F00501 Page 3 of 39 TRF No.: 04-E001-0B Global Testing , Great Quality. Summary of Test Results Test Item Limit/Requirement Result Antenna Requirement FCC Part 15.203/15.247 (c) Pass AC Power Line Conducted Emission FCC Part 15.207 N/A 1 Conducted Output Power FCC Part 15.247 (b)(3) Pass 6dB Bandwidth and 99% Occupied Bandwidth FCC Part 15.247 (a)(2) Pass Power Spectral Density FCC Part 15.247 (e) Pass Conducted Band edge and spurious emission FCC Part 15.247(d) Pass Radiated Band edge and Spurious Emission FCC Part 15.247 (d) FCC Part 15.205/15.209 Pass Duty Cycle None; for reporting purposes only. Pass 1.The product is charged by solar energy. *This test report is only published to and used by the applicant, and it is not for evidence purpose in China. *The measurement result for the sample received is <Pass> according to <CFR 47 FCC PART 15 SUBPART C, ISED RSS-247 ISSUE 3 (DTS)> when <Accuracy Method> decision rule is applied. REPORT NO.: E04A25121063F00501 Page 4 of 39 TRF No.: 04-E001-0B Global Testing , Great Quality. CONTENTS 1. ATTESTATION OF TEST RESULTS ..................................................................................... 5 2. TEST METHODOLOGY ......................................................................................................... 6 3. FACILITIES AND ACCREDITATION ..................................................................................... 6 4. CALIBRATION AND UNCERTAINTY ................................................................................... 7 4.1. MEASURING INSTRUMENT CALIBRATION ........................................................... 7 4.2. MEASUREMENT UNCERTAINTY ............................................................................ 7 5. EQUIPMENT UNDER TEST .................................................................................................. 8 5.1. DESCRIPTION OF EUT ........................................................................................... 8 5.2. CHANNEL LIST ........................................................................................................ 8 5.3. MAXIMUM PEAK OUTPUT POWER ........................................................................ 9 5.4. TEST CHANNEL CONFIGURATION ........................................................................ 9 5.5. THE WORSE CASE POWER SETTING PARAMETER ............................................ 9 5.6. DESCRIPTION OF AVAILABLE ANTENNAS ........................................................... 9 5.7. SUPPORT UNITS FOR SYSTEM TEST ................................................................... 9 5.8. SETUP DIAGRAM .................................................................................................. 10 6. MEASURING EQUIPMENT AND SOFTWARE USED......................................................... 11 7. ANTENNA PORT TEST RESULTS ..................................................................................... 13 7.1. Conducted Output Power ........................................................................................ 13 7.2. 6dB Bandwidth and 99% Occupied Bandwidth ....................................................... 14 7.3. Power Spectral Density ........................................................................................... 16 7.4. Conducted Band edge and spurious emission ........................................................ 17 7.5. Duty Cycle .............................................................................................................. 19 8. RADIATED TEST RESULTS ............................................................................................... 20 8.1. Radiated Band edge and Spurious Emission .......................................................... 25 9. ANTENNA REQUIREMENT ................................................................................................ 39 REPORT NO.: E04A25121063F00501 Page 5 of 39 TRF No.: 04-E001-0B Global Testing , Great Quality. 1. ATTESTATION OF TEST RESULTS Applicant Information Company Name: Green lnova Lighting Technology (Shenzhen) Limited Address: No. 901, Building 2, No. 2 Chongqing Road, Qiaotou Community, Fuhai Subdistrict, Bao 'an District, Shenzhen City, Guangdong Province, China Manufacturer Information Company Name: Green lnova Lighting Technology (Shenzhen) Limited Address: No. 901, Building 2, No. 2 Chongqing Road, Qiaotou Community, Fuhai Subdistrict, Bao 'an District, Shenzhen City, Guangdong Province, China EUT Information Product Description: Smart Solar Spotlight Model: SLS1 Series Model: / Brand: Sample Received Date: December 24, 2025 Sample Status: Normal Sample ID: A25121063 001, A25121063 005 Date of Tested: December 24, 2025 to January 9, 2026 APPLICABLE STANDARDS STANDARD TEST RESULTS C…

Text truncated - open the document above for the full version.

Test Setup Photos

Setup Photographs Radiated Band edge and Spurious Emission

Contact Information

Applicant

Xuefeng Zou(Principal)
[email protected]Fax: /

Technical Contact

Global Product Services and Consultation LLCMichael Chan
[email protected]Fax: /

328 W Palm Ave. · Monrovia, California, 91016 · United States

Test Firm

Guangdong Global Testing Technology Co., Ltd.Shawn Wen
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz5.90 mW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted.