FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shanghai SINAP Membrane Tech Co., Ltd/
  3. 2BUGR-SINAPACK-200

2BUGR-SINAPACK-200PACKAGE MBR SEWAGE TREATMENT PLANT

Shanghai SINAP Membrane Tech Co., Ltd
PACKAGE MBR SEWAGE TREATMENT PLANT - FCC ID 2BUGR-SINAPACK-200 - Shanghai SINAP Membrane Tech Co., Ltd
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Mar 13, 2026
Application Purpose
Original Equipment
Equipment Note
PACKAGE MBR SEWAGE TREATMENT PLANT
Frequency Range
2412.00000000 - 2462.00000000
Company
Shanghai SINAP Membrane Tech Co., Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

SINAPACK 200 PLC SINAPACK 200 User Manual SINAPACK 200 User Manual 2 This manual applies to the following models, and the corresponding networks supported by the models are listed in the table below: Model Network SINAPACK 200 WIFI and WAN cable networks, use WAN by default SINAPACK 200 User Manual 3 Table of Contents 1. Product Introduction .................................................................................................................. 4 1.1 Brief Introduction ............................................................................................................. 4 1.2 Product Outlook................................................................................................................. 6 1.3 Standard Accessories ...................................................................................................... 7 1.4 Dimension ............................................................................................................................ 8 1.5 Working Mechanism ........................................................................................................ 9 1.6 Specifications ................................................................................................................... 10 1.6.1 Technical Parameters ........................................................................................ 10 1.6.2 Indicator Light Description .............................................................................. 10 1.6.3 Serial Port Definition ......................................................................................... 11 1.6.4 RESET Button ....................................................................................................... 12 1.7 Typical Usecases ............................................................................................................. 12 2. Device Configurations ............................................................................................................. 14 2.1 Configurations .................................................................................................................. 14 2.1.1 Preparation ............................................................................................................ 14 2.1.2 Configuring SINAPACK 200............................................................................. 14 2.2 Configuration Parameters ........................................................................................... 24 2.3 Restore to Default .......................................................................................................... 25 2.4 Firmware Update ............................................................................................................ 26 2.5 Remote Configurations ................................................................................................. 28 Appendix 1: Use SINAPACK 200 Virhub Functionality to Implement PLC Program Remote Update ............................................................................................................................... 31 Appendix 2: Use SINAPACK 200 Serial Functionality to Implement PLC Program Remote Update ............................................................................................................................... 41 Appendix 3: Configure SINAPACK 200 to Access Internet via Cable/WIFI .............. 47 Appendix 4: Use VNC and SINAPACK 200 to Access and Control Devices Remotely .............................................................................................................................................................. 58 Appendix 5: Use SINAPACK 200 IP Virtual Mapping together with Virhub to Distinguish Devices with Same IP............................................................................................ 67 Appendix 6: SINAPACK 200’s MODBUS TCP Interface Description ............................. 72 Appendix 7: SINAPACK 200’s Enhanced DMZ Function .................................................. 74 SINAPACK 200 User Manual 4 1. Product Introduction This chapter mainly introduces the outlook, accessories, dimension, specifications and mechanism of SINAPACK 200. 1. Brief Introduction 2. Product Outlook 3. Accessories 4. Dimension 5. Working Mechanism 6. Specifications 7. Typical Usecases 1.1 Brief Introduction SINAPACK 200 is an industrially designed product, and is especially used with PLCs. SINAPACK 200 provides program download and data acquisition functionalities for PLCs that have RJ-45 Ethernet interface, or RS232/RS485 serial interfaces. It supports PLCs from Siemens, Mitsubishi, Omron, Panasonic, Delta, Fatek, etc. SINAPACK 200 connects with WIFI/WAN network, and with PLC programming tools or SCADA software to implement remote program download and data acquisition. SINAPACK 200 is an enhanced version of PLC-505. Compared with PLC-505, its panel is more compact, and has stand-up shape in response to customers’ request that can massively save installation space. SINAPACK 200 has two RJ-45 Ethernet interfaces, one of which (LAN1) can be used as WAN as well, one RS232 and one RS485 serial interfaces. Ethernet interfaces and serial interfaces can be used at the same time. SINAPACK 200 has WIFI functionality, and supports 802.11b/g/n protocol. In theory the highest speed can be 150Mbps. Mobile phones, PCs or other devices that have WIFI functionality can bind SINAPACK 200’s WIFI access point and share Internet access via SINAPACK 200. SINAPACK 200 User Manual 5 This greatly extends the number of devices that can connect with SINAPACK 200 at the same time. SINAPACK 200 can use WAN or WIFI network: in case cable network is available, WAN (LAN1) port can be used to access cable network; and in case WIFI is available, SINAPACK 200 can be configured to access internet via WIFI. WAN and WIFI are all supported by SINAPACK 200, this greatly facilitates customer’s project deployment that cus…

Text truncated - open the document above for the full version.

Cover Letter(s)

SHANGHAI SINAP MEMBRANE TECH CO.,LTD. Date: 2026-03-05 Declaration Letter about Limited Use To whom it may concern, WE (SHANGHAI SINAP MEMBRANE TECH CO.,LTD.) HEREBY DECLARED THAT Our product Product Description: PACKAGE MBR SEWAGE TREATMENT PLANT Model No: SINAPACK 200 FCC ID: 2BUGR-SINAPACK-200 The BT and 5G WIFI function integrated in BL-M8821CS1 module in this device has been disabled by software. Any modification will be highlighted on the release letter, and the impact analysis will also have a review. Verification procedure and verification results will be performed based on the release letter and impact analysis report. Name (Printed): Jeffery Ye Signature: Title: President On behalf of Company: SHANGHAI SINAP MEMBRANE TECH CO.,LTD. Telephone: 021-66032657

Cover Letter(s)

Shanghai SINAP Membrane Tech Co., Ltd To: SGS North America Inc. 620 Old Peachtree Road SUITE 100 Suwanee, Georgia United States From: Shanghai SINAP Membrane Tech Co., Ltd U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Regarding: Confidentiality Request regarding application for FCC ID: 2BUGR-SINAPACK-200 LONG TERM CONFIDENTIALITY Pursuant to 47 CFR Section 0.459 and 0.457 of the commission’s rules, the applicant hereby request confidential treatment of the documents listed below, associated with the certification application referenced above. Schematic(s) Block Diagrams Operational Descriptions The documents above contain proprietary information not released to the public. Public disclosure of this information may prove harmful to the business of the applicant. Sincerely, Signature: Printed Name (on file with the FCC associated with the Grantee Code): Jeffery Ye Title: President Company Name: Shanghai SINAP Membrane Tech Co., Ltd

External Photos

Compliance Certification Services (Kunshan) Inc. Page: 1 of 8 Appendix Photographs of External for KSCR2511002584MD Test Model No.: SINAPACK 200 Compliance Certification Services (Kunshan) Inc. Page: 2 of 8 EUT Constructional Details (EUT Photos) Compliance Certification Services (Kunshan) Inc. Page: 3 of 8 Compliance Certification Services (Kunshan) Inc. Page: 4 of 8 Compliance Certification Services (Kunshan) Inc. Page: 5 of 8 Compliance Certification Services (Kunshan) Inc. Page: 6 of 8 Compliance Certification Services (Kunshan) Inc. Page: 7 of 8 Compliance Certification Services (Kunshan) Inc. Page: 8 of 8 - End of the Appendix -

ID Label/Location Info

Page 1 of 1

Internal Photos

Compliance Certification Services (Kunshan) Inc. Page: 1 of 5 Appendix Photographs of Internal for KSCR2511002584MD Test Model No.: SINAPACK 200 Compliance Certification Services (Kunshan) Inc. Page: 2 of 5 EUT Constructional Details (EUT Photos) Compliance Certification Services (Kunshan) Inc. Page: 3 of 5 Compliance Certification Services (Kunshan) Inc. Page: 4 of 5 Compliance Certification Services (Kunshan) Inc. Page: 5 of 5 - End of the Appendix -

RF Exposure Info

Report No.: KSCR251100258402 Page: 1 of 12 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 1 Cover Page RF Exposure Evaluation Report Application No.: KSCR2511002584MD FCC ID: 2BUGR-SINAPACK-200 Applicant: Shanghai SINAP Membrane Tech Co., Ltd Address of Applicant: U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Manufacturer: Shanghai SINAP Membrane Tech Co., Ltd Address of Manufacturer: U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Factory: Shanghai SINAP Membrane Tech Co., Ltd Address of Factory: U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Equipment Under Test (EUT): EUT Name: PACKAGE MBR SEWAGE TREATMENT PLANT Model No.: SINAPACK 200 Trade Mark: SINAPACK Standard(s) : FCC Rules 47 CFR §2.1091 KDB 447498 D04 interim General RF Exposure Guidance v01 Date of Receipt: 2025-11-27 Date of Test: 2025-12-15 to 2025-12-29 Date of Issue: 2026-01-04 Test Result: Pass* * In the configuration tested, the EUT complied with the standards specified above. Report No.: KSCR251100258402 Page: 2 of 12 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 Revision Record Version Description Date Remark 00 Original 2026-01-04 / Authorized for issue by: Tested By Kass Gao /Project Engineer Approved By Terry Hou /Reviewer Report No.: KSCR251100258402 Page: 3 of 12 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 2 Contents Page 1 Cover Page ........................................................................................................................................ 1 2 Contents ............................................................................................................................................ 3 3 General Information .......................................................................................................................... 4 3.1 General Description of E.U.T. .................................................................................................... 4 3.2 Technical Specifications ............................................................................................................. 4 3.3 Separation Distance ................................................................................................................... 5 3.4 Test Location .............................................................................................................................. 6 3.5 Test Facility ................................................................................................................................ 6 4 RF Exposure Test Exemptions ........................................................................................................ 7 4.1 FCC RF Exposure Test Exemptions for single RF sources ....................................................... 7 4.2 RF Exposure Test Exemptions for Simultaneous Transmission ................................................ 9 5 asurement and Calculation ............................................................................................................ 11 5.1 Maximum transmit power ......................................................................................................... 11 5.2 RF Exposure Calculation ......................................................................................................... 12 Report No.: KSCR251100258402 Page: 4 of 12 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 3 General Information 3.1 General Description of E.U.T. Power supply: DC 12V 3.2 Technical Specifications 2.4GHz WiFi Operation Frequency: 802.11b/g/n(HT20): 2412MHz to 2462MHz; 802.11n(HT40): 2422MHz to 2452MHz Modulation Type: 802.11b: DSSS (DBPSK, DQPSK, CCK); 802.11g/n: OFDM (BPSK, QPSK, 16QAM, 64QAM) Number of Channels: 802.11b/g/n(HT20):11; 802.11n(HT40):7 Channel Spacing: 5MHz Antenna Type: Dipole Antenna Antenna Gain: 6dBi (Provided by the manufacturer) Antenna Number: 1 Report No.: KSCR251100258402 Page: 5 of 12 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 3.3 Separation Distance Separation distance between the antenna to person (R): >20cm Remark: This minimum test separation distance is determined by the smallest distance from the antenna and radiating structures or outer surface of the device, according to the host form factor, exposure conditions and platform requirements, to any part of the body or extremity of a user or bystander. R has been stated in user manual. Report No.: KSCR251100258402 Page: 6 of 12 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 3.4 Test Location Lab A: Compliance Certification Services (Kunshan) Inc. No.10 Weiye Rd, Innovation park, Eco&Tec, Development Zone, Kunshan City, Jiangsu, China. Tel: +86 512 5735 5888 Fax: +86 512 5737 0818 Lab B: Radiated Emissions which fall in the restricted bands, Radiated Spurious Emissions Above 1GHz test at: SGS-CSTC Standards Technical Services (Suzhou) Co., Ltd. South of No. 6 Plant, No. 1, Runsheng Road, Suzhou Industrial Park, Suzhou Area, China (Jiangsu) Pilot Free Trade Zone Note: 1.SGS is not responsible for wrong test results due to incorrect information (e.g. max. clock frequency, highest internal frequency, antenna gain, cable loss, etc ) is provided by the applicant. (if applicable). 2.SGS is not responsible for the authenticity, integrity and the validity of the conclusion based on results of the data provided by applicant. (if applicable). 3. Sample source: sent by customer. 3.5 Test Facility The test facility is recognized, certified, or accredited by the following organizations: Lab A: • A2LA (Certificate No. 2541.01) Compliance Certification Services (Kunshan) Inc. is accredited by the American Association for Laboratory Accreditation (A2LA). • FCC (Designation Number: CN1172) Compliance Certification Services (Kunshan) Inc. has been recognized as an accredited testing laboratory. • ISED (CAB Identifier: CN0072) Compliance Certification Services (Kunshan) Inc. has been recognized by Innovation, Science and Economic Development Canada (ISED) as an accredited testing laboratory. Company Number: 2324E • VCCI (Member No:1938) The 3m and 10m Semi-…

Text truncated - open the document above for the full version.

Test Report

Beijing Affite Technology Co., Ltd. Page 1 of 6 Beijing Affite Technology Co., Ltd. WIFI 2.4G Suction Antenna Specification Customer name Amphite model ANT-2458-22S Customer part num- ber Version/ Change V2.1 Remarks Date 2023.09.20 2nd/Floor No.216, 3rd Building Beike Industrial Park, Haidian District, Beijing, China Beijing Affite Technology Co., Ltd. Page 2 of 6 1. Product Images: Beijing Affite Technology Co., Ltd. Page 3 of 6 II. Product Description: This product is a WiFi dual-band 2.4G high-performance external antenna developed by the company's antenna R&D center. The antenna features excellent standing wave bandwidth and stable gain performance. With a professional design, it offers aesthetic appeal,sophistication, and easy installation. Application areas:WiFi2.4G wireless terminals, data communication services, wireless equipment, and 2.4G intelligent Internet of Things and related industries. 3. Specifications: Antenna specifications Electrical performance pa- rameters Frequency range 2400-2500MHz Polarization mode Linear polar- ization Nominal impeda- nce 50 Ω Radiation direc- tion Omnidi- rectional Standing-wave ratio ≤2.0 Power capacity 10W Maximum gain 6.0 dBi Tape width 850MHZ Mechanical parame- ter External dimen- sions 158*36mm Cable model/length RG174/3m Interface model SMA–J internal thread needle Product color Black Working temper- ature -30~80°C Product Label WiFi 2.4G Beijing Affite Technology Co., Ltd. Page 4 of 6 IV. Measured S11/Stationary Wave Beijing Affite Technology Co., Ltd. Page 5 of 6 5. Structural Dimension Drawings: Beijing Affite Technology Co., Ltd. Page 6 of 6 2.4GHz Directional Pattern Total 5 0 -5 -10 -15 -20 -25 Azimuth=0.0 Elevation = -90.0 Roll = 180.0 Z X Y Power (dBm)

Test Report

Report No.: KSCR251100258401 Page: 1 of 124 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 TEST REPORT Application No.: KSCR2511002584MD FCC ID: 2BUGR-SINAPACK-200 Applicant: Shanghai SINAP Membrane Tech Co., Ltd Address of Applicant: U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Manufacturer: Shanghai SINAP Membrane Tech Co., Ltd Address of Manufacturer: U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Factory: Shanghai SINAP Membrane Tech Co., Ltd Address of Factory: U-4.No.1288.Luoning Road,Baoshan, Shanghai, 200949, China Equipment Under Test (EUT): EUT Name: PACKAGE MBR SEWAGE TREATMENT PLANT Model No.: SINAPACK 200 Trade Mark: SINAPACK Standard(s) : 47 CFR Part 15, Subpart C 15.247 Date of Receipt: 2025-11-27 Date of Test: 2025-12-15 to 2025-12-29 Date of Issue: 2026-01-04 Test Result: Pass* * In the configuration tested, the EUT complied with the standards specified above. Report No.: KSCR251100258401 Page: 2 of 124 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 Revision Record Version Description Date Remark 00 Original 2026-01-04 / Authorized for issue by: Tested By Kass Gao /Project Engineer Approved By Terry Hou /Reviewer Report No.: KSCR251100258401 Page: 3 of 124 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 2 Test Summary Radio Spectrum Technical Requirement Item Standard Method Requirement Result Test Lab* Antenna Requirement 47 CFR Part 15, Subpart C 15.247 N/A 47 CFR Part 15, Subpart C 15.203 & 15.247(b)(4) Pass N/A Radio Spectrum Matter Part Item Standard Method Requirement Result Test Lab* Conducted Emissions at AC Power Line (150kHz-30MHz) 47 CFR Part 15, Subpart C 15.247 ANSI C63.10 (2020) Section 6.2 47 CFR Part 15, Subpart C 15.207 Pass A Radiated Emissions which fall in the restricted bands ANSI C63.10 (2020) Section 6.10.5 47 CFR Part 15, Subpart C 15.205 & 15.209 Pass B Radiated Spurious Emissions Below 1GHz ANSI C63.10 (2020) Section 6.4,6.5 47 CFR Part 15, Subpart C 15.205 & 15.209 Pass A Radiated Spurious Emissions Above 1GHz ANSI C63.10 (2020) Section 6.6 47 CFR Part 15, Subpart C 15.205 & 15.209 Pass B Maximum conducted (average) output power ANSI C63.10 (2020) Section 11.9.2 47 CFR Part 15, Subpart C 15.247(b)(3) Pass A Minimum 6dB Bandwidth ANSI C63.10 (2020) Section 11.8.1 47 CFR Part 15, Subpart C 15.247a(2) Pass A Power Spectrum Density ANSI C63.10 (2020) Section 11.10.2 47 CFR Part 15, Subpart C 15.247(e) Pass A Conducted Band Edges Measurement ANSI C63.10 (2020) Section 6.10.4 47 CFR Part 15, Subpart C 15.247(d) Pass A Conducted Spurious Emissions ANSI C63.10 (2020) Section 11.11 47 CFR Part 15, Subpart C 15.247(d) Pass A Report No.: KSCR251100258401 Page: 4 of 124 CCSEM-TRF-001 Rev. 03 Dec 18, 2024 3 Contents Page 1 COVER PAGE ........................................................................................................................................... 1 2 Test Summary ......................................................................................................................................... 3 3 Contents ................................................................................................................................................... 4 4 General Information ................................................................................................................................ 5 4.1 Details of E.U.T. ............................................................................................................................... 5 4.2 Description of Support Units ............................................................................................................ 5 4.3 Power level setting using in test ....................................................................................................... 5 4.4 Measurement Uncertainty ................................................................................................................ 6 4.5 Test Location .................................................................................................................................... 7 4.6 Test Facility ...................................................................................................................................... 8 4.7 Deviation from Standards ................................................................................................................. 8 4.8 Abnormalities from Standard Conditions .......................................................................................... 8 5 Equipment List ........................................................................................................................................ 9 6 Radio Spectrum Technical Requirement ............................................................................................ 11 6.1 Antenna Requirement .................................................................................................................... 11 7 Radio Spectrum Matter Test Results .................................................................................................. 12 7.1 Conducted Emissions at AC Power Line (150kHz-30MHz) ........................................................... 12 7.2 Radiated Emissions which fall in the restricted bands ................................................................... 16 7.3 Radiated Spurious Emissions Below 1GHz ................................................................................... 43 7.4 Radiated Spurious Emissions Above 1GHz ................................................................................... 47 7.5 Maximum conducted (average) output power ................................................................................ 67 7.6 Minimum 6dB Bandwidth................................................................................................................ 69 7.7 Power Spectrum Density ................................................................................................................ 70 7.8 Conducted Band Edg…

Text truncated - open the document above for the full version.

Test Setup Photos

Compliance Certification Services (Kunshan) Inc. Page: 1 of 4 Appendix Photographs of Test Setup for KSCR2511002584MD Test Model No.: SINAPACK 200 Compliance Certification Services (Kunshan) Inc. Page: 2 of 4 Test Setup Photo Conducted Emissions at AC Power Line (150kHz-30MHz) Radiated Spurious Emissions Below 1GHz Compliance Certification Services (Kunshan) Inc. Page: 3 of 4 Radiated Spurious Emissions Above 1GHz 1GHz~18GHz 18GHz~40GHz Compliance Certification Services (Kunshan) Inc. Page: 4 of 4 RF conducted setup - End of the Appendix -

Contact Information

Applicant

Jeffery Ye(President)
[email protected]Fax: +86-21-6603 2650

Technical Contact

United Consulting Technology Services Co., Ltd.David Wu
[email protected]

17800 CASTLETON ST STE 665 · INDUSTRY, California, 91748 · United States

Test Firm

Compliance Certification Services (Kunshan) Inc.Jessica Chen
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.41 GHz - 2.46 GHz39.00 mW
Confidentiality
Long Term
Grant Notes
Power Output listed is conducted. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter evaluation procedures as documented in this filing. End-users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device supports 20MHz and 40MHz bandwidth mode.