FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. GuangDong NaoNao Smart Technology Company/
  3. 2BULQ-Y1

2BULQ-Y1Air Purifier

GuangDong NaoNao Smart Technology Company
Air Purifier - FCC ID 2BULQ-Y1 - GuangDong NaoNao Smart Technology Company
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Feb 02, 2026
Application Purpose
Original Equipment
Equipment Note
Air Purifier
Frequency Range
2412.00000000 - 2462.00000000
Company
GuangDong NaoNao Smart Technology Company
Country
China

Documents & Files

Select a file to view

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

RF Exposure Info

↗

Test Report

↗
↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Attestation Statements

GuangDong NaoNao Smart Technology Company 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China U.S. Agent Letter of Attestation To: Federal Communications Commission 7435 Oakland Mills Road, Columbia, MD 21046, USA Date: Jan. 27, 26 Ref: Attestation Statement – Part 2.911(d)(7) filing FCC ID: 2BULQ-Y1 [GuangDong NaoNao Smart Technology Compan] (“the applicant”) certifies that, as of the date of the filing of the application, [MIRAMONT SOLUTIONS LLC] (“the agent”) is our designated U.S. agent for service of process for the above reference FCC ID. The applicant accepts to maintain an agent for service of process in the United States for no less than one year after either the grantee has permanently terminated all marketing and importation of the applicable equipment within the U.S., or the conclusion of any Commission-related administrative or judicial proceeding involving the equipment, whichever is later. The applicant further acknowledges it is our responsibility to inform the FCC whenever the agent information changes. [MIRAMONT SOLUTIONS LLC] ("the agent) understand it is the agent's obligation to accept service of process in the United States for matters related to the applicable equipment, and at the physical U.S. address and email address. Designated U.S. Agent Company Name: MIRAMONT SOLUTIONS LLC FRN: 0036313369 Address:19 GEORGETOWN, IRVINE, CA92612 United States Signature: Contact Person: Wenyi Wang Tel: 951 401 3633 Email: [email protected] Applicant Company Name: GuangDong NaoNao Smart Technology Company FRN: 0037921079 Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Signature: Contact Person: Jane Sun Tel: +86 18100265582 Email: [email protected]

Attestation Statements

GuangDong NaoNao Smart Technology Company 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Attestation Statements Not Covered Entity Applicant & Not Covered Equipment To: Federal Communications Commission Date: Jan. 27, 26 7435 Oakland Mills Road, Columbia, MD 21046, USA Ref: Information Required by Section 2.911(d)(5)(i) & (ii) FCC ID: 2BULQ-Y1 GuangDong NaoNao Smart Technology Company (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List, established pursuant to § 1.50002 of reference chapter, as an entity producing “covered” communication equipment. The equipment for which authorization is sought is not “covered” telecommunications equipment and video surveillance equipment produced by entities identified on the Commission’s Covered List that prohibited from receiving an equipment authorization pursuant to section § 2.903 of the FCC rules. Sincerely yours, Applicant Signature Printed Name: Jane sun Title: Manager Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Tel.: +86 18100265582 Email: [email protected]

Attestation Statements

1 | P a g e GuangDong NaoNao Smart Technology Company 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Attestation Statements To: Federal Communications Commission Date: Jan. 27, 26 7435 Oakland Mills Road, Columbia, MD 21046, USA Subject: Attestation of Compliance with FCC Covered List Software Requirements FCC ID: [2BULQ-Y1] Product Name: [Air Purifier] This letter serves as an attestation that the equipment identified above ☐ is / ☒ is not (select one) "covered" software as defined under the Federal Communications Commission (FCC) Covered List requirements, as outlined in FCC 22-84 and KDB 986446. Specifically, the undersigned certifies that the equipment for which authorization is sought: 1. Does not contain cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors, assignees, parents, subsidiaries, affiliates, or any entity that has rebranded or relabeled software produced by the aforementioned entities. 2. Does not have the capability to store, run, or deliver any software identified on the FCC Covered List, including but not limited to cybersecurity and anti-virus software. To support this attestation, the appendix evaluation documentation has been prepared and is included in the certification filing. This attestation is based on a thorough evaluation of the device's design, functionality, and software environment. The undersigned affirms that the information provided is accurate and complete to the best of their knowledge. Sincerely yours, Applicant Signature Printed Name: Jane sun Title: Manager Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Tel.: +86 18100265582 Email: [email protected] 2 | P a g e Evaluation regarding to the Covered List Software: Compliance Methodology Evaluation Process Results Device is Inherent compliance ☒ The Chipset(s) used is limited to run the Cybersecurity or anti-virus software. Compliance ☒ The Memory used is limited to run the Cybersecurity or anti-virus software. Compliance ☒ There is storage capacity limitation for store or install the Cybersecurity or anti-virus software. Compliance ☒ Operating system used is limited to run, install or deliver the Cybersecurity or anti-virus software. Compliance Device is not Inherent compliance ☐ Evaluation Based on Software Bill of Materials (SBoM) ☐ Evaluation Based on Scan for Software on the device ☐ Evaluation Based on Filesystem scan ☐ Evaluation Based on Running software check

Cover Letter(s)

GuangDong NaoNao Smart Technology Company 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China 1/27/2026 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Confidentiality Request for: FCC ID: 2BULQ-Y1 Pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request permanent confidential treatment of the exhibits accompanying this certification application as outlined below : ⎯ Block Diagram ⎯ Schematics ⎯ Operational Description The above exhibits contain trade secrets and/or proprietary information that are not publicly available and materials that the Applicant has spent considerable efforts in developing. Public disclosure of these may be harmful to the Applicant and give an unfair advantage to competitors on the market. Pursuant to DA 04-1705, the applicant also requests temporary confidential treatment of the exhibits outlined below for a period of (up to 180) days from the date of equipment authorization and prior to marketing in the United States to prevent the premature release of any sensitive information. Applicant is aware of their responsibility to notify DERYCOM in the event information regarding the product or the product is made available to the public before the requested period has expired. ⎯ User Manual ⎯ Internal Photos ⎯ Test Setup Photos Sincerely, (Signature) Applicant Signature: Printed Name: Jane sun Title: Manager Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Tel.: +86 18100265582 Email: [email protected]

Cover Letter(s)

GuangDong NaoNao Smart Technology Company 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Date: Jan. 27, 26 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization for FCC ID: 2BULQ-Y1 I, the undersigned, hereby authorize (Shenzhen DL Testing Technology Co., Ltd.) to act on our behalf in all matters relating to this application for equipment certification. Any act carried out by (Shenzhen DL Testing Technology Co., Ltd.) shall have the same effect as our own and I acknowledge that all responsibility for complying with the terms and conditions of certification, as specified by DERYCOM CERTIFICATION SERVICES, INC., still resides with (hen Zhen Bale Electronics Co.,Ltd). We certify that we are not subject to a denial of federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. §862, and that no party to the application, as defined in 47 CFR §1.2002(b), is subject to a denial of federal benefits that includes FCC benefits pursuant to that section. Sincerely, Applicant Signature: Printed Name: Jane sun Title: Manager Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China Tel.: +86 18100265582 Email: [email protected]

Cover Letter(s)

GuangDong NaoNao Smart Technology Company Model Difference Product description: Air Purifier Model name: Y1, Y1, Y2, Y3, Y4, Y5, Y6 Trade Name: N/A All the model are the same circuit and RF module, except model names and appearance color. Regards Sincerely Client’s signature: Jane sun Client’s name / title: Manager Contact information / address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province, China

External Photos

FCC ID: 2BULQ-Y1 EUT PHOTO(External Photos) FCC ID: 2BULQ-Y1 FCC ID: 2BULQ-Y1 FCC ID: 2BULQ-Y1 FCC ID: 2BULQ-Y1

ID Label/Location Info

Label & label location 20mm*10mm FCC ID: 2BULQ-Y1 Label location

RF Exposure Info

FCC ID: 2BULQ-Y1 RF EXPOSURE EVALUATION Limits According KDB 447498 D01 General RF Exposure Guidance v06. The RF exposure evaluation requirements of §2.1091 for mobile device exposure conditions subject to MPE limits: Requirements of this section are a consequence of Commission responsibilities under the National Environmental Policy Act to evaluate the environmental significance of its actions. See subpart I of part 1 of this chapter, in particular § 1.1307(b). For purposes of this section, the definitions in § 1.1307(b)(2) of this chapter shall apply. A mobile device is defined as a transmitting device designed to be used in other than fixed locations and to generally be used in such a way that a separation distance of at least 20 centimeters is normally maintained between the RF source's radiating structure(s) and the body of the user or nearby persons. In this context, the term “fixed location” means that the device is physically secured at one location and is not able to be easily moved to another location while transmitting. Transmitting devices designed to be used by consumers or workers that can be easily re-located, such as wireless devices associated with a personal desktop computer, are considered to be mobile devices if they meet the 20-centimeter separation requirement. The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in 1.1307(b). Limits for Maximum Permissible Exposure (MPE) Frequency range (MHz) Electric field strength (V/m) Magnetic field strength (A/m) Power density (mW/cm 2 ) Averaging time (minutes) (A) Limits for Occupational/Controlled Exposures 0.3–3.0 614 1.63 *(100) 6 3.0–30 1842/f 4.89/f *(900/f 2 ) 6 30–300 61.4 0.163 1.0 6 300–1500 f/300 6 1500–100,000 5 6 (B) Limits for General Population/Uncontrolled Exposure 0.3–1.34 614 1.63 *(100) 30 1.34–30 824/f 2.19/f *(180/f 2 ) 30 30–300 27.5 0.073 0.2 30 300–1500 f/1500 30 1500–100,000 1.0 30 f = frequency in MHz Friis transmission formula: Pd = (Pout*G)/(4*pi*r 2 ) Where Pd = power density in mW/cm 2 , Pout = output power to antenna in mW; G = gain of antenna in linear scale, Pi = 3.1416; R = distance between observation point and center of the radiator in cm Pd id the limit of MPE, 1 mW/cm 2 . If we know the maximum gain of the antenna and the total power input to the antenna, through the calculation, we will know the distance r where the MPE limit is reached. Test Procedure Software provided by client enabled the EUT to transmit and receive data at lowest, middle and highest channel individually. Test Result of RF Exposure Evaluation WIFI2.4G: Mode Output power to antenna (dBm) Tune UP tolerance (dBm) Max Tune UP power (dBm) Max Tune UP power (mW) Power Density at R=20cm (mW/cm2) Limit (mW/cm2) Result 802.11b 12.49 13±1 14 25.12 0.07140 1.0 PASS 802.11g 12.28 13±1 14 25.12 0.07140 1.0 PASS 802.11n20 11.46 12±1 13 19.95 0.07123 1.0 PASS Antenna gain: 0dBi Remark: The ratio = ANT BLE MPE(MAX) / limit + ANT WIFI2.4G MPE(MAX) / limit= 0.00035 / 1.0 + 0.01116 / 1.0= 0.01151 < 1.0.

Test Report

AntennaSpecification Manufacture:TUYA ProductName:WBR1Antenna AntennaType:PCB TestDate:2019.05.20 Testedby:LongWang Approvedby:Licco Content 1.GeneralDescription.................................................................................1 2.TestConfigurations...................................................................................2 2.1TestEnvironment............................................................................2 2.2TestEquipment...............................................................................2 2.3TestPrinciple...................................................................................2 3.TestResults..............................................................................................3 3.1GainandEfficiency..........................................................................3 3.2RadiationPattern............................................................................4 4.AntennaDimensions................................................................................6 5.EUTPhoto................................................................................................6 6.TestSetupPhoto......................................................................................7 1 1.GeneralDescription ManufacturerHangzhouTuyaInformationTechnologyCo.,Ltd Address Room701,Building3,MoreCenter,No.87GuDunRoad, Hangzhou,Zhejiang,China TestLocation Room106,Building3,LetongSciencePark,No.500, QiuyiRoad,BinjiangDistrict,Hangzhou ProductNameWBR1Antenna Productmodel WBR1 AntennaType PCBAntenna TestItems Gain;Efficiency;RadiationPattern TestFrequency 2400-2500MHz TestStandard ANSI/IEEEStd149-1979 2 2.TestConfigurations 2.1TestEnvironment Temperature(°C)25 Humidity(%RH)60 AtmosphericPressure(kPa)100.5 2.2TestEquipment TestSystemTEM24Multi-probeMicrowaveChamber TestInstrumentAgilentE5071B 2.3TestPrinciple 3 3.TestResults 3.1GainandEfficiency Frequency(MHz)PeakGain(dBi)Efficiency(%) 24001.6252.29 24101.7152.17 24201.9353.14 24301.9854.16 24402.0057.62 24502.1759.64 24602.4561.55 24702.3860.64 24802.5462.86 24902.3059.85 25002.4960.41 4 3.2RadiationPattern Phi02D Phi902D 5 Theta902D 2480MHz3D 6 4.AntennaDimensions 5.EUTPhoto 7 6.TestSetupPhoto

Test Report

C DL-Cert ert DL-Cert DL D L-Cert DL-Cert DL-Cer D L-Cert DL-Cert DL-Cert Cert D L-Cert DL-Cert DL-Cert DL-C DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert ert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert D DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Ce DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL- DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert ert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-C DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert ert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Ce L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert D DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-C L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert rt DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Ce DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-C L-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert rt DL-Cert DL-Cert DL-Cert D L-Cert DL-Ce DL-Cert DL-Cert DL-Cert D L-Cert DL Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert D L-C L-Cert DL-Cert rt DL-Cer DL Shenzhen DL Testing Technology Co., Ltd. Report No.: DLE-251104011R Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 1 of 54 FCC Part 15C Test Report FCC ID: 2BULQ-Y1 Applicant: GuangDong NaoNao Smart Technology Company Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province Manufacturer: GuangDong NaoNao Smart Technology Company Address: 2F, Building 17, Hongji e Valley, No.23 West Tongji Road, Nantou Town, Zhongshan City, Guangdong Province EUT: Air Purifier Trade Mark: N/A Model Number: Y1, Y1, Y2, Y3, Y4, Y5, Y6 Date of Receipt: Jan. 12, 2026 Test Date: Jan. 12, 2026 to Jan. 17, 2026 Date of Report: Jan. 17, 2026 Prepared By: Shenzhen DL Testing Technology Co., Ltd. Address: 101-201, Building C, Shuanghuan, No.8, Baoqing Roa Baolong Industrial Zone, Baolong Street, Longgang Shenzhen, Guangdong, China. Applicable Standards: FCC CFR Title 47 Part 15 Subpart C Section 15.247 ANSI C63.10:2020 Test Result: Pass Report Number: DLE-251104011R Prepared (Test Engineer): Dimon Tan Reviewer (Supervisor): Jack Bu Approved (Manager): Jade Yang This test report is based on a single evaluation of one sample of above mentioned products. It is not permitted to be duplicated in extracts without written approval of Shenzhen DL Testing Technology Co., Ltd. C DL-Cert ert DL-Cert DL D L-Cert DL-Cert DL-Cer D L-Cert DL-Cert DL-Cert Cert D L-Cert DL-Cert DL-Cert DL-C DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert ert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert D DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Ce DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL- DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert ert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-C DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert ert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Ce L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert D DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-C L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert rt DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Ce DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-C L-Cert DL-Cert DL-Cert DL-Cert D L-Cert DL-Cert rt DL-Cert DL-Cert DL-Cert D L-Cert DL-Ce DL-Cert DL-Cert DL-Cert D L-Cert DL Cert DL-Cert DL-Cert D L-Cert DL-Cert DL-Cert D L-C L-Cert DL-Cert rt DL-Cer DL Shenzhen DL Testing Technology Co., Ltd. Report No.: DLE-251104011R Test Report Tel: 400-688-3552 Web:www.dl-cert.com Email: [email protected] Page 2 of 54 Table of Contents Page 1. VERSION ............................................................................................................... 4 2. SUMMARY OF TEST RESULTS ........................................................................... 5 2.1 TEST FACILITY ................................................................................................................ 6 2.2 MEASUREMENT UNCERTAINTY ................................................................................... 6 3. GENERAL INFORMATION ................................................................................... 7 3.1 GENERAL DESCRIPTION OF EUT ................................................................................. 7 3.2 DESCRIPTION OF TEST MODES ................................................................................... 8 3.3 BLOCK DIGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED ............... 9 3.4 DESCRIP…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Jane sun(Manager)
[email protected]Fax: +86 18100265582

Technical Contact

MIRAMONT SOLUTIONS LLCWenyi Wang
[email protected]

19 GEORGETOWN · IRVINE, California, 92612 · United States

Test Firm

Shenzhen DL Testing Technology Co., Ltd.Jade Yang
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.41 GHz - 2.46 GHz17.74 mW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted power. The antenna used with this transmitter must be installed to provide a minimum separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi- transmitter product procedures. End-users must be provided with operating procedures for satisfying RF exposure compliance.