FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Saibang (Shenzhen) Industrial Co., Ltd./
  3. 2BXB4-DY05

2BXB4-DY05AI printer Camera

Saibang (Shenzhen) Industrial Co., Ltd.
AI printer Camera - FCC ID 2BXB4-DY05 - Saibang (Shenzhen) Industrial Co., Ltd.
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Aug 10, 2026
Application Purpose
Original Equipment
Equipment Note
AI printer Camera
Frequency Range
2402.00000000 - 2480.00000000
Company
Saibang (Shenzhen) Industrial Co., Ltd.
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

AI print camera Scan All OCR PicGameMusic Se�ngs Photo Voice PicSty filtQA PicCamRec 8 7 1 3 2 4 5 6 Screen 210 1-2 Long press this button on the main interface to go to the voice raw image page with one click. FCC WARNING This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: —Reorient or relocate the receiving antenna. —Increase the separation between the equipment and receiver. —Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. —Consult the dealer or an experienced radio/TV technician for help. Note: The Grantee is not responsible for any changes or modifications not expressly approved by the party responsible for compliance. such modifications could void the user's authority to operate the equipment. The device has been evaluated to meet general RF exposure requirement. This equipment complies with FCC's RF radiation exposure limits set forth for an uncontrolled environment. This device and its antenna(s) must not be co-located or conjunction with any other antenna or transmitter. The device can be used in portable exposure conditions without restriction.

Attestation Statements

Saibang(Shenzhen)IndustrialCo.,Ltd. Address:2ndFloor,BuildingB,No.7YuzhanSecondRoad,DashuitianIndustrialZone, GuanlanSubdistrict,LonghuaDistrict,ShenzhenCity,China Date:2026-08-03 FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 Ref:AttestationStatementsPart2.911(d)(7)Filing SUBJECT:FCCApplicationforFCCID:2BXB4-DY05 FRN:0038693602 (“Saibang(Shenzhen)IndustrialCo.,Ltd.”)certifiesthat,asofthedateofthefilingofthe application,GOLDENVICTORYINTERNATIONALTRADINGCOLTDisourdesignatedU.S. agentforserviceofprocessfortheabovereferencedFCCID.(“Saibang(Shenzhen) IndustrialCo.,Ltd.”)acceptstomaintainanagentfornolessthanoneyearafterthegrantee hasterminatedallmarketingandimportationortheconclusionofanyCommission-related proceedinginvolvingtheequipment. GOLDENVICTORYINTERNATIONALTRADINGCOLTDaccepts,asofthedateofthefiling oftheapplication,theobligationofthedesignatedU.S.agentforserviceofprocessforthe abovereferencedFCCID. DesignatedU.S.AgentInformation: Name:GOLDENVICTORYINTERNATIONALTRADINGCOLTD Address:11016THSTREETSUITE1400DENVER,CO80202UnitedStates FRN:0036377570 ContactPerson:LeonHowar Tel.:(337)255-0461 Email:[email protected] Sincerely, Signedonbehalfof(Saibang(Shenzhen) IndustrialCo.,Ltd.) SignedonbehalfofGOLDENVICTORY INTERNATIONALTRADINGCOLTD Name:ChuanHeName:LeonHowar Title:ManagerTitle:Manager Date:2026-08-03Date:2026-08-03

Attestation Statements

Rev1/26/2023 (Saibang(Shenzhen)IndustrialCo.,Ltd.) FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 USA Date:8-3-2026 Ref:AttestationStatementsPart2.911(d)(5)(i)Filing FCCID:2BXB4-DY05 (“Saibang(Shenzhen)IndustrialCo.,Ltd.”)certifiesthattheequipmentforwhichauthorizationissought isnot“covered”equipmentprohibitedfromreceivinganequipmentauthorizationpursuanttosection 2.903oftheFCCrules. (“Saibang(Shenzhen)IndustrialCo.,Ltd.”)certifiesthattheequipmentforwhichauthorizationissought doesnotincludecybersecurityoranti-virussoftwareproducedorprovidedbyKasperskyLab,Inc.orany ofitssuccessorsandassignees,includingequipmentwithintegratedKasperskyLab,Inc.(oranyofits successorsandassignees)cybersecurityoranti-virussoftwarepursuanttoDA-24-886andKDB986446 D01CoveredEquipmentGuidancesectionB(2a). Deviceisinherentlycompliantbasedonhardwarelimitationsorsoftwarecontrols. or ASoftwareBillofMaterials(SBOM)isprovidedtotheTCBforreview,and Theend-userorthirdpartiescannotinstalladditionalsoftwareonthisdevice. Sincerely, (Applicantsignature): (Applicantprintedname):ChuanHe Rev1/26/2023 (Saibang(Shenzhen)IndustrialCo.,Ltd.) FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 USA Date:8-3-2026 Ref:AttestationStatementsPart2.911(d)(5)(ii)Filing FCCID:2BXB4-DY05 (“Saibang(Shenzhen)IndustrialCo.,Ltd.”)certifiesthat,asofthedateofthefilingoftheapplication, Saibang(Shenzhen)IndustrialCo.,Ltd.isnotidentifiedontheCoveredList(asaspecificallynamedentity oranyofitssubsidiariesoraffiliates)asanentityproducing“covered”equipment. Sincerely, (Applicantsignature): (Applicantprintedname):ChuanHe

Cover Letter(s)

Saibang(Shenzhen)IndustrialCo.,Ltd. Date:August3,2026 ProductModelNumber:DY05 FCCID:2BXB4-DY05 Towhomitmayconcern, Re:ProductCertificationRepresentativeAuthorizationLetter WeauthorizeQAILaboratoriesLtd.3980NorthFraserWay,BurnabyB.C. CanadaV5J5K5toactonourbehalfonallmattersconcerningtheabove namedequipment. Thisshallincludethefollowing: Testing Approvalapplicationsandprocedures WedeclarethatQAILaboratoriesLtd.isallowedtoforwardallinformation relatedtotheapprovalprojecttotheappliedcertificationbodyandtothe notificationentitiesandtodiscussanyissuesconcerningtheapproval application.AnyandallactscarriedoutbyQAILaboratoriesLtd.onour behalfshallhavethesameeffectasactsofourown. By: ContactListedonFCCWesbite Title:Manager Email:[email protected] Telephone:18682197390 Onbehalfof:Saibang(Shenzhen)IndustrialCo.,Ltd.

Cover Letter(s)

Saibang(Shenzhen)IndustrialCo.,Ltd. OfficeofEngineeringTechnology FederalCommunicationsCommission 7435OaklandMillsRoad Columbia,MD21046 USA Date:August3,2026 Subject;RequestforConfidentiality FCCID:2BXB4-DY05 ToWhomItMayConcern, PursuanttotheprovisionsoftheCommission’srulesTitle47Sections§0.457and§0.459,we arerequestingtheCommissiontowithholdthefollowingattachment(s)asconfidential documentsfrompublicdisclosureindefinitely. Thesedocumentscontaindetailedsystemandequipmentdescriptionsandareconsideredas proprietaryinformationinoperationoftheequipment.Thepublicdisclosureofthese documentsmightbeharmfultoourcompanyandwouldgivecompetitorsanunfairadvantage inthemarket. SchematicDiagram BlockDiagram PartsList OperationalDescription Tune-upProcedure SoftwareSecurityRequirementsforUNIIdevices Inadditionaltoabovementioneddocuments,inordertocomplywiththemarketingregulations inTitle47CFR§2.803andtheimportationrulesinTitle47CFR§2.1204,whileensuringthat businesssensitiveinformationremainsconfidentialuntiltheactualmarketingofnewly authorizeddevices,werequestShortTermConfidentialityofthefollowingattachment(s); ExternalPhotos TestSetupPhotos InternalPhotos UserManual For45days,pursuanttoPublicNoticeDA04-1705. OR For180dayspursuanttoKDB726920D01. Itisourunderstandingthatallmeasurementtestreports,FCCIDlabelformatand correspondenceduringthecertificationreviewprocesscannotbegrantedasconfidential documentsandthisinformationwillbeavailableforpublicreviewoncethegrantofequipment authorizationisissued. Sincerely, Signature: Name:ChuanHe Title:Manager

Cover Letter(s)

Saibang(Shenzhen)IndustrialCo.,Ltd. ModelDifference Productdescription:AIprinterCamera Modelname:DY05 FCCID:2BXB4-DY05 Theoutercasingofthisproductcomesindifferentcolors.Inthistest,weusedthe pinkEUT.ThetestdataofthepinkEUTcanrepresenttheremainingcolors. Client’ssignature: Client’sname/title:ChuanHe/Manager Contactinformation/address:2ndFloor,BuildingB,No.7YuzhanSecondRoad, DashuitianIndustrialZone,GuanlanSubdistrict,LonghuaDistrict,ShenzhenCity, China

External Photos

FCCID:2BXB4-DY05 EUTPHOTOSExternalPhotos FCCID:2BXB4-DY05 FCCID:2BXB4-DY05 FCCID:2BXB4-DY05 FCCID:2BXB4-DY05 FCCID:2BXB4-DY05 ※※※※※ENDOFREPORT※※※※※

ID Label/Location Info

Size:4mm*28mm FCCID:2BXB4-DY05

Internal Photos

FCCID:2BXB4-DY05 EUTPHOTOSInternalPhotos FCCID:2BXB4-DY05 FCCID:2BXB4-DY05 FCCID:2BXB4-DY05 BLEANT FCCID:2BXB4-DY05 2.4GWIFIANT FCCID:2BXB4-DY05 ※※※※※ENDOFREPORT※※※※※

RF Exposure Info

FCCID:2BXB4-DY05 RFExposureEvaluation AccordingtoKDB447498D01GeneralRFExposureGuidancev06andpart2.1093 , Unless specificallyrequiredbythepublishedRFexposureKDBprocedures,standalone1-gheador bodyand10-gextremitySARevaluationforgeneralpopulationexposureconditions,by measurementornumericalsimulation,isnotrequiredwhenthecorrespondingSARTest ExclusionThresholdcondition(s),listedbelow,is(are)satisfied. For100MHzto6GHzandtestseparationdistances≤50mm,the1-gand10-gSARtest exclusionthresholdsaredeterminedbythefollowing: [(max.powerofchannel,includingtune-uptolerance,mW)/(min.testseparationdistance, mm)]·[√f (GHz) ]≤3.0for1-gSAR,and≤7.5for10-gextremitySAR,where f (GHz) istheRFchanneltransmitfrequencyinGHz PoweranddistanceareroundedtothenearestmWandmmbeforecalculation Theresultisroundedtoonedecimalplaceforcomparison Here, Mode Max Power (dBm) Tune-up power (dBm) Max Power (mW) Frequency(MHz) Min. Distance (mm) Calc. thresholds limit BLE1.111±11.58248050.53.0 2.4GWIFI8.118±17.94241252.53.0 ThedevicecouldnotsupporttransmissionwithBT,2.4GWIFIsimultaneously, Remark:BLEAntennagain=1dBi,2.4GWIFIAntennagain=-0.58dBi, SoaSARtestisnotrequired.

Test Report

Summar Antenna Specification y ModelNam Antennatype PCBantenna e Center Frequenc 2.4GANT y HorizontalVertical 2400MHz2500MH2450MHzz2400MHz2500MH2450MHzz 1dBi1dBi1dBi1dBi1dBi1dBi MAX.Gain 1dBi PolarizationHorizontalandVertical AzimuthBeam Pattern Omni-directional Impedance 50Ohm AntennaLength Manufactur 10mm eZHUHAIJIELITECHNOLOGYCO.,LTD Address333KexingRoad,XiangzhouDistrict,ZhuhaiCity AntennaPhoto&Length(mm) Horizontal:2400MHz2450MHz2500MHz Power( dBi ) Frequency (MHz) Gain( dBi ) Max Min Avg 2400 1-30.0815-7.48713 2450 1-35.5605-6.88012 2500 1-26.0318-5.79139 Scale:5/divMax: 1 Min: -400 Frequency (MHz) Gain( dBi ) Max Min Avg 2400 1-24.5482-13.1354 2450 1-26.0824-10.1875 2500 1-30.7458-9.9474 Vertical:2400 MHz2450 MHz2500 MHz Power ( dBi ) Max: 1 Min: -30 Scale: 5/div

Test Report

ProjectNo.:ZHT-260525119W01-1 Page 1 of 58 FCCTESTREPORT FCCID:2BXB4-DY05 ApplicantName...............:Saibang(Shenzhen)IndustrialCo.,Ltd. Address............................:2ndFloor,BuildingB,No.7YuzhanSecondRoad,DashuitianIndustrial Zone,GuanlanSubdistrict,LonghuaDistrict,ShenzhenCity,China ManufacturerName.........:Saibang(Shenzhen)IndustrialCo.,Ltd. Address............................:2ndFloor,BuildingB,No.7YuzhanSecondRoad,DashuitianIndustrial Zone,GuanlanSubdistrict,LonghuaDistrict,ShenzhenCity,China Product............................:AIprinterCamera Model(s)...........................:DY05 AdditionalModel(s)..........:/ Trademark.......................:/ ModelDifference..............:Theoutercasingofthisproductcomesindifferentcolors.Inthistest,we usedthepinkEUT.ThetestdataofthepinkEUTcanrepresentthe remainingcolors. Preparedby.....................:GuangdongZhonghanTestingTechnologyCo.,Ltd. Address............................:Room104/201,Building1,YibaolaiIndustrialPark,Qiaotou,Fuhai Subdistrict,Bao'anDistrict,Shenzhen,Guangdong,China DateofReceipt................:May25,2026 DateofTest(s).................:May25,2026toJuly23,2026 DateofIssue....................:July24,2026 TestRequested................:Selecttest(s)asrequestedbytheclient. TestStandard(s)..............:FCCCFRTitle47Part15SubpartCSection15.247 Testprocedure................:KDB558074D0115.247MeasGuidancev05r02 ANSIC63.10-2020+Cor.1-2023+C63.10a-2024+Erratato C63.10a-2024 Intheconfigurationtested,theEUTcompliedwiththestandardsspecifiedabove. Preparedby:Reviewedby:Approvedby: KimiLu/EngineerBaretWu/DirectorLeviLee/Manager Note:Theresultsshowninthistestreportreferonlytothesample(s)testedunlessotherwisestated.Thistest reportshallnotbereproducedexceptinfull,withoutpriorwrittenapprovalofZHT.Thisdocumentmaybe alteredorrevisedbyZHT,personnelonly,andshallbenotedintherevisionofthedocument. ProjectNo.:ZHT-260525119W01-1 Page 2 of 58 TableofContentsPage 1.SUMMARYOFTESTRESULTS.............................................................................................................4 2.GENERALINFORMATION.....................................................................................................................5 2.1GENERALDESCRIPTIONOFEUT...............................................................................................5 2.2DESCRIPTIONOFTESTMODES..................................................................................................6 2.3TESTSETUPCONFIGURATION....................................................................................................7 2.4DESCRIPTIONOFSUPPORTUNITS(CONDUCTEDMODE)......................................................7 3.TESTFACILITYANDTESTINSTRUMENTUSED................................................................................8 3.1TESTFACILITY...............................................................................................................................8 3.2EQUIPMENTSLISTFORALLTESTITEMS.................................................................................8 3.3TESTINGSOFTWARE....................................................................................................................9 3.4MEASUREMENTUNCERTAINTY................................................................................................10 4.EMCEMISSIONTEST..........................................................................................................................11 4.1CONDUCTEDEMISSIONMEASUREMENT................................................................................11 4.1.1POWERLINECONDUCTEDEMISSIONLimits.................................................................11 4.1.2TESTPROCEDURE.............................................................................................................11 4.1.3DEVIATIONFROMTESTSTANDARD................................................................................11 4.1.4TESTSETUP........................................................................................................................12 4.1.5EUTOPERATINGCONDITIONS.........................................................................................12 4.1.6TESTRESULTS...................................................................................................................13 4.2RADIATEDEMISSIONMEASUREMENT.....................................................................................15 4.2.1RADIATEDEMISSIONLIMITS............................................................................................15 4.2.2TESTPROCEDURE.............................................................................................................16 4.2.3DEVIATIONFROMTESTSTANDARD................................................................................16 4.2.4TESTSETUP........................................................................................................................16 4.2.5EUTOPERATINGCONDITIONS.........................................................................................17 5.RADIATEDBANDEMISSIONMEASUREMENT.................................................................................23 5.1TESTREQUIREMENT:...........................................................................................................23 5.2TESTPROCEDURE................................................................................................................23 5.3DEVIATIONFROMTESTSTANDARD...................................................................................24 5.4TESTSETUP...........................................................................................................................24 5.5EUTOPERATINGCONDITIONS............................................................................................24 5.6TESTRESULT.........................................................................................................................25 6.POWERSPECTRALDENSITYTEST...........................…

Text truncated - open the document above for the full version.

Test Report

ProjectNo.:ZHT-260525119W01-2 Page 1 of 76 FCCTESTREPORT FCCID:2BXB4-DY05 ApplicantName...............:Saibang(Shenzhen)IndustrialCo.,Ltd. Address............................:2ndFloor,BuildingB,No.7YuzhanSecondRoad,DashuitianIndustrial Zone,GuanlanSubdistrict,LonghuaDistrict,ShenzhenCity,China ManufacturerName.........:Saibang(Shenzhen)IndustrialCo.,Ltd. Address............................:2ndFloor,BuildingB,No.7YuzhanSecondRoad,DashuitianIndustrial Zone,GuanlanSubdistrict,LonghuaDistrict,ShenzhenCity,China Product............................:AIprinterCamera Model(s)...........................:DY05 AdditionalModel(s)..........:/ Trademark.......................:/ ModelDifference..............:Theoutercasingofthisproductcomesindifferentcolors.Inthistest,we usedthepinkEUT.ThetestdataofthepinkEUTcanrepresentthe remainingcolors. Preparedby.....................:GuangdongZhonghanTestingTechnologyCo.,Ltd. Address............................:Room104/201,Building1,YibaolaiIndustrialPark,Qiaotou,Fuhai Subdistrict,Bao'anDistrict,Shenzhen,Guangdong,China DateofReceipt................:May25,2026 DateofTest(s).................:May25,2026toAug.10,2026 DateofIssue....................:Aug.10,2026 TestRequested................:Selecttest(s)asrequestedbytheclient. TestStandard(s)..............:FCCCFRTitle47Part15SubpartCSection15.247 Testprocedure................:KDB558074D0115.247MeasGuidancev05r02 ANSIC63.10-2020+Cor.1-2023+C63.10a-2024+Erratato C63.10a-2024 Intheconfigurationtested,theEUTcompliedwiththestandardsspecifiedabove. Preparedby:Reviewedby:Approvedby: KimiLu/EngineerBaretWu/DirectorLeviLee/Manager Note:Theresultsshowninthistestreportreferonlytothesample(s)testedunlessotherwisestated.Thistest reportshallnotbereproducedexceptinfull,withoutpriorwrittenapprovalofZHT.Thisdocumentmaybe alteredorrevisedbyZHT,personnelonly,andshallbenotedintherevisionofthedocument. ProjectNo.:ZHT-260525119W01-2 Page 2 of 76 TableofContents Page 1.SUMMARYOFTESTRESULTS................................................................................................................4 2.GENERALINFORMATION........................................................................................................................5 2.1GENERALDESCRIPTIONOFEUT..................................................................................................5 2.3DESCRIPTIONOFTESTMODES.....................................................................................................6 2.4BLOCKDIGRAMSHOWINGTHECONFIGURATIONOFSYSTEMTESTED................................7 2.5DESCRIPTIONOFSUPPORTUNITS...............................................................................................7 3.TESTFACILITYANDTESTINSTRUMENTUSED...................................................................................8 3.1TESTFACILITY..................................................................................................................................8 3.2EQUIPMENTSLISTFORALLTESTITEMS....................................................................................8 3.3TESTINGSOFTWARE.......................................................................................................................9 3.4MEASUREMENTUNCERTAINTY...................................................................................................10 4.EMCEMISSIONTEST.............................................................................................................................11 4.1CONDUCTEDEMISSIONMEASUREMENT...................................................................................11 4.1.1POWERLINECONDUCTEDEMISSIONLimits....................................................................11 4.1.2TESTPROCEDURE................................................................................................................11 4.1.3DEVIATIONFROMTESTSTANDARD...................................................................................11 4.1.4TESTSETUP...........................................................................................................................12 4.1.5EUTOPERATINGCONDITIONS............................................................................................12 4.1.6TESTRESULT.........................................................................................................................13 4.2RADIATEDEMISSIONMEASUREMENT.......................................................................................15 4.2.1RADIATEDEMISSIONLIMITS...............................................................................................15 4.2.2TESTPROCEDURE................................................................................................................15 4.2.3DEVIATIONFROMTESTSTANDARD..................................................................................16 4.2.4TESTSETUP...........................................................................................................................16 4.2.5EUTOPERATINGCONDITIONS............................................................................................17 4.2.6TESTRESULTS......................................................................................................................17 5.RADIATEDBANDEMISSIONMEASUREMENT.....................................................................................22 5.1TESTREQUIREMENT:....................................................................................................................22 5.2TESTPROCEDURE.........................................................................................................................22 5.3DEVIATIONFROMTESTSTANDARD...........................................................................................22 5.4TESTSETUP....................................................................................................................................23 5.5EUTOPERATINGCONDITIONS.......................................................…

Text truncated - open the document above for the full version.

Test Report

ProjectNo.:ZHT-260525119W01-2 Page 51 of 76 OBWNVNTn202412MHzAnt1 OBWNVNTn202437MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 52 of 76 OBWNVNTn202462MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 53 of 76 11.5MAXIMUMPOWERSPECTRALDENSITYLEVEL ConditionModeFrequency (MHz) AntennaConductedPSD (dBm/3kHz) Limit (dBm/3kHz) Verdict NVNTb2412Ant1-14.078Pass NVNTb2437Ant1-13.518Pass NVNTb2462Ant1-16.198Pass NVNTg2412Ant1-17.828Pass NVNTg2437Ant1-17.88Pass NVNTg2462Ant1-17.848Pass NVNTn202412Ant1-17.78Pass NVNTn202437Ant1-17.568Pass NVNTn202462Ant1-18.328Pass ProjectNo.:ZHT-260525119W01-2 Page 54 of 76 TestGraphs PSDNVNTb2412MHzAnt1 PSDNVNTb2437MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 55 of 76 PSDNVNTb2462MHzAnt1 PSDNVNTg2412MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 56 of 76 PSDNVNTg2437MHzAnt1 PSDNVNTg2462MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 57 of 76 PSDNVNTn202412MHzAnt1 PSDNVNTn202437MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 58 of 76 PSDNVNTn202462MHzAnt1 ProjectNo.:ZHT-260525119W01-2 Page 59 of 76 11.6BANDEDGE ModeFrequency(MHz)AntennaMaxValue(dBc)Limit(dBc)Verdict b2412Ant1-45.99-20Pass b2462Ant1-51.41-20Pass g2412Ant1-39.55-20Pass g2462Ant1-49.85-20Pass n202412Ant1-39.87-20Pass n202462Ant1-49.21-20Pass ProjectNo.:ZHT-260525119W01-2 Page 60 of 76 TestGraphs BandEdgeNVNTb2412MHzAnt1Ref BandEdgeNVNTb2412MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 61 of 76 BandEdgeNVNTb2462MHzAnt1Ref BandEdgeNVNTb2462MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 62 of 76 BandEdgeNVNTg2412MHzAnt1Ref BandEdgeNVNTg2412MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 63 of 76 BandEdgeNVNTg2462MHzAnt1Ref BandEdgeNVNTg2462MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 64 of 76 BandEdgeNVNTn202412MHzAnt1Ref BandEdgeNVNTn202412MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 65 of 76 BandEdgeNVNTn202462MHzAnt1Ref BandEdgeNVNTn202462MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 66 of 76 11.7CONDUCTEDRFSPURIOUSEMISSION ModeFrequency(MHz)AntennaMaxValue(dBc)Limit(dBc)Verdict b2412Ant1-38.18-20Pass b2437Ant1-37.7-20Pass b2462Ant1-36.47-20Pass g2412Ant1-42.98-20Pass g2437Ant1-41.88-20Pass g2462Ant1-40.55-20Pass n202412Ant1-43.08-20Pass n202437Ant1-42.31-20Pass n202462Ant1-41.49-20Pass ProjectNo.:ZHT-260525119W01-2 Page 67 of 76 TestGraphs Tx.SpuriousNVNTb2412MHzAnt1Ref Tx.SpuriousNVNTb2412MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 68 of 76 Tx.SpuriousNVNTb2437MHzAnt1Ref Tx.SpuriousNVNTb2437MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 69 of 76 Tx.SpuriousNVNTb2462MHzAnt1Ref Tx.SpuriousNVNTb2462MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 70 of 76 Tx.SpuriousNVNTg2412MHzAnt1Ref Tx.SpuriousNVNTg2412MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 71 of 76 Tx.SpuriousNVNTg2437MHzAnt1Ref Tx.SpuriousNVNTg2437MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 72 of 76 Tx.SpuriousNVNTg2462MHzAnt1Ref Tx.SpuriousNVNTg2462MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 73 of 76 Tx.SpuriousNVNTn202412MHzAnt1Ref Tx.SpuriousNVNTn202412MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 74 of 76 Tx.SpuriousNVNTn202437MHzAnt1Ref Tx.SpuriousNVNTn202437MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 75 of 76 Tx.SpuriousNVNTn202462MHzAnt1Ref Tx.SpuriousNVNTn202462MHzAnt1Emission ProjectNo.:ZHT-260525119W01-2 Page 76 of 76 12.TESTSETUPPHOTO ReferencetotheappendixIfordetails. 13.EUTCONSTRUCTIONALDETAILS ReferencetotheappendixIIfordetails. ※※※※※ENDOFREPORT※※※※※

Test Report

Inverted F Antenna Specification Summary Antennatype PCBantenna Model Name 2.4G ANT Horizontal Vertical 2400MHz 2400MHz2500MHz2400MHz2400MHz 2500MHz Center Frequency -1.26dBi -0.76dBi -0.58dBi -5.25dBi -2.46dBi -1.86dBi MAX. Gain -0.58dBi Polarization Horizontal and Vertical Azimuth Beam Pattern Omni-directional Impedance 50 Ohm Antenna Length 15.20mm Manufacture ZHUHAI JIELI TECHNOLOGY CO.,LTD Antenna Photo & Length (mm) Address: 333KexingRoad,XiangzhouDistrict,ZhuhaiCity Horizontal: 2400 MHz 2450 MHz 2500 MHz Power (dBm) Max: 0 Min: -40 Scale: 5/div Gain(dB) Frequency (MHz) Max Min Avg 2400 -1.26174 -30.0801 -7.18716 2450 -0.765802 -36.5604 -7.48023 2500 -0.585582 -22.0315 -6.59127 Vertical: 2400 MHz 2450 MHz 2500 MHz Power (dBm) Max: 0 Min: -30 Scale: 5/div Gain(dB) Frequency (MHz) Max Min Avg 2400 -5.2537 -22.1424 -12.4294 2450 -2.4652 -24.5837 -10.4702 2500 -1.86120 -29.5214 -9.20432 ANT Test Labs:Attestation of Global Compliance Co., Ltd.

Test Setup Photos

FCCID:2BXB4-DY05 EUTTESTPHOTOS FCCID:2BXB4-DY05 ※※※※※ENDOFREPORT※※※※※

Contact Information

Applicant

Chuan He(Manager)
[email protected]Fax: 18682197390

Technical Contact

GOLDEN VICTORY INTERNATIONAL TRADING CO LTDLeon Howar
[email protected]

110 16TH STREET SUITE 1400 DENVER, · United States

Test Firm

Guangdong Zhonghan Testing Technology Co., Ltd.Alex Wang
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz1.30 mW
215C2.41 GHz - 2.46 GHz6.50 mW
Confidentiality
Long Term
Grant Notes
Power listed is the maximum conducted output power.