
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
EUT Photographs [Label and Label position]
Project No. : LBE030678 Page 1 of 13 Project No. :LBE030678 Product :PDP Monitor Model No. :AX42S3 Date of test :April. 11, 2003 ~ April. 12, 2003 Issued Date :April. 15, 2003 Tested by: Tae Young,JANG / Test Engineer Reviewed by: No Cheon, PARK / Manager of EMC Lab. Authorized by: Kyu Baek, CHUNG / Chief of EMC Lab. SAMSUNG ELECTRONICS Co., Ltd. EMC Test Laboratory 416 Maetan-3 Dong, Paldal-Ku, Suwon City, Kyungki-Do, Korea,442-742 Tel. : 81-31-200-2185 Fax. : 81-31-200-2189 This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. EMC TEST REPORT Project No. : LBE030678 Page 2 of 13 Table of Contents 1. Introduction & Summary 1.1 Description of the EUT 1.2 Test facility 1.3 Test equipment 2. Test Set-up 2.1 Test mode 2.2 Justification 2.3 Test equipment setup 2.4 Tested System Details 2.5 System Block Diagram of Test Configuration 2.6 Test rule and Procedure 2.7 Test Summary 3. Test Results 3.1 AC POWERLINE CONDUCTED EMISSION MEASUREMENT 3.2 RADIATED EMISSION MEASUREMENT This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. Project No. : LBE030678 Page 3 of 13 1. Introduction & Summary 1.1 Description of the EUT Applicant Project Number Equipment Under Test Trade Name Model Number Variant Model Operating Frequency FCC ID Number Mains input 1.2 Test facility The EMI/EMS measurement facilities used to collect the tested data are located at 416 Maetan 3 Dong, Paldal-Ku, Suwon City, Kyungki Do, Korea. The sites are constructed in conformance with the requirements of ANSI C63.4 and CISPR 16-1 & 16-2. SAMSUNG Electronics Co.,Ltd is accredited by Korea Laboratory Accreditation Scheme(KOLAS) which signed the International Laboratory Accreditation Cooperation (ILAC) Mutual Recognition Arrangement (MRA) for the above test item(s) and test method(s). Measured in Semi-anechoic chamber #1 that is FCC Registration Number 98856. This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. 60Hz A3LPPM42S3 120V - AX42S3 SAMSUNG SAMSUNG ELECTRONICS Co., Ltd. LBE030678 PDP Monitor Project No. : LBE030678 Page 4 of 13 1.3 Test equipment EquipmentModel No.Serial No.Makers Last calibration and Interval 8566B3340A21744H.P02/04/18, 12Months Firmware versions : Rev.29.9.86 Quasi-peak adapter85650A2521A00687H.P02/10/09, 12Months RF Preselector85685A2602A00224H.P02/10/09, 12Months ESCS30839809/022R & S02/06/27, 12Months Firmware versions : Main 1.08, OTP 02.01, GRA 02.03 Field strength meterESVP880726/042R & S02/09/10, 12Months L.I.S.NESH3-Z5847265/028R & S02/10/09, 12Months Bi-Log AntennaCBL6112B2767SCHAFFNER02/04/26, 12Months This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. Spectrum analyzer Field strength meter Project No. : LBE030678 Page 5 of 13 2. Test Set-up 2.1 Test mode The EUT was tested in the following operating modes for the tests mention in this report: Description of Testing operating mode & Tested Resolution Measured each about 2 input(PC VIDEO INPUT mode & Digital Video Interface)of EUT. Further details of cabling and configuration are shown in the test system configuration. The EUT exercise program used during radiated and conducted testing was designed to exercise the various system components in a manner similar to typical use. 2.2 Justification The system was configured for testing in typical fashion use. Cable were attached to each of the available I/O Ports. The mode of operation utilized for testing was selected to best simulate typical EUT use. 2.3 Test equipment setup The explanation of measuring equipment setup when respective function is used in any frequency band is as following: DetectorResolutionVideo functionBandwidthBandwidth Quasi-Peak9kHz- Peak100kHz1MHz Quasi-Peak120kHz- Peak1MHz1MHz This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. EMI Test receiverAbove 1000 0.45 to 30EMI Test receiver Spectrum analyzer EMI Test receiver 30 to 1000 1024x768 32bits Frequency Band [MHz] Equipment Horizontal F.: 60kHz Vertical F. : 75Hz "H" Pattern display Operating ModeResolutionsRefresh ratesColors Project No. : LBE030678 Page 6 of 13 2.4 Tested System Details 1) Configuration of EUT and peripherals MarkItemModel No.Serial No.ManufacturerFCC ID A PDP MonitorAX42S3 -Samsung- BPersonal ComputerM6050812092FRC00328Samsung CPrinterLQ-580HCG2Y014537EPSONDoc DPS/2 Keyboard7800K1C111343BTCDoc EPS/2 MouseScroll Mouse P8011205148Key SystemsDoc FSpeaker--Samsung- * DOC : FCC Declaration of Conformity 2) Used Cable Description No.ItemLength[m]Shielded(Y/N) 1PS/2 Mouse Cable1.8N 2PS/2 Keyboard Cable1.6N 3Video Cable(Analog)1.5Y 4Video Cable(Digital)1.5Y 5Speaker Cable1.2N 6 AC Power Cable(Monitor) 1.8N 7AC Power Cable(PC)1.8N 8 AC Power Cable(Printer) 1.8N 9Printer Cable1.5Y 10A/V In Cable1.2N 11S-Video In Cable1.2N 12BNC Cable1.2N This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. Remark Project No. : LBE030678 Page 7 of 13 2.5 System Block Diagram of Test Configuration 2.6 Test rule and Procedure FCC Rule Part 15, Subpart B : Unintentional Radiators Test Procedure : ANSI C63.4-1992 2.7 Test Summary Result Pass Pass * N/A : Test not applicable This reports shall not be reproduced except in full, without the written approval of SEC EMC Testing laboratory. RADIATED EMISSIONANSI C63.4-1992 Test itemTest Procedure AC POWERLINE CONDUCTED EMISSION ANSI C63.4-1992 ED A B C FF 1 2 3 4 5 5 6 7 8 9 10 11 12 Project No. : LBE030678 Page 8 of 13 3. Test Results 3.1 AC POWERLINE CONDUCTED EMISSION MEASUREMENT 3.1.1 Test Procedure Configurate the EUT System in accordance with ANSI C63.4-1992 section 7 and 12.2. Connect the EUT's AC line cord to the EUT port of LISN. All input terminals are terminated in the proper impedance. The output ports are connected to the cable pโฆ
Text truncated - open the document above for the full version.
Test Set up Photographs [AC POWERLINE CONDUCTED EMISSION MEASUREMENT] [RADIATED EMISSION MEASUREMENT]
6660-B Dobbin Road ยท Columbia, Maryland ยท United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15B | - | - |
Portable Handset
Equipment Class
6VL - 15E 6 GHZ Very Low Power DeviceBT,BLE Tablet DTS,UNII a,b,g,n,ac,ax,be and digitizer
Equipment Class
DTS - Digital Transmission SystemPortable Handset
Equipment Class
6CD - 15E 6 GHz Low Power Dual ClientBT,BLE Tablet DTS,UNII a,b,g,n,ac,ax and Digitizer
Equipment Class
DSS - Part 15 Spread Spectrum TransmitterWCDMA, LTE, 5G NR Tablet BT,BLE, DTS,UNII a b g n ac ax and Digitizer
Equipment Class
JBP - Part 15 Class B Computing Device Peripheral