
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
CEILING FAN REMOTE CONTROLLER OPERATION AND INSTALLATION INSTRUCTIONS (Please keep this instruction pamphlet.) IMPORTANT YOU MUST SET CEILING FAN MANUAL SWITCH TO HIGH SPEED AND LIGHT KIE (IF ANY) TO BE ON POSITION BEFORE OPERATING REMOTE CONTROL. IMPORTANT POINTS TO REMEMBER: 1. Read and save these instructions. 2. Please note that all fixed wiring appliances should be installed by a qualified electrician. 3. Turn power supply off at fuse box before working on remote control receiver or ceiling fan. 4. Before installing the receiver into the fan canopy set code on receiver (see Code Set Up) 5. Install receiver into the ceiling fan canopy of the fan to ensure proper protection. 6. This unit is to be used for the control of ceiling fan and in an AC110/120V 60Hz power supply only. 7. Do not pull on or cut leads shorter on receiver. 8. Do not drop or bump the unit. 9. PLEASE NOTE: The battery will weaken with age and should be replaced before leaking takes place as this will damage the transmitter. Dispose of used battery properly; keep the battery out of reach of children. CAUTION: To reduce the risk of fire or injury, do not use this product in conjunction with any variable (rheostat) wall control. INSTALLATION INSTRUCTIONS CAUTION: INCORRECT WIRE CONNECTION WOULD DAMAGE THIS RECEIVER. 1. Ceiling fan must be set a HIGH speed and light kit (If any) at ON position by pulling the “Pull Switch” after installation. 2. Once the connection has been made, the receiver inserts into the drop rod hanging bracket. The canopy comes up to cover the receiver and bracket. ANTENNA (Leave unconnected and do not cut) AC POWER SUPPLY VIEW AFTER INSTALLATION Code Set Up 1. Codes are set by pushing dip switches up or down. It is imperative that the code used for both transmitter and receiver is exactly the same; otherwise the remote controller will not work. Please note the code switch will enable you to operate a second remote controller independently. For example, if you have two ceiling fans with 2 remote control units, set 2 different codes for each set of transmitter/receivers. This means you can operate each ceiling fan independently. 2. Your remote control is ready for use after battery installation.Require one 9-Volt battery (not included). TO OPEN BATTERY HOUSING COVER BY PRESS DOWN AND SLIDE OUT FUNCTIONS OF TRANSMITTER FAN/OFF: Turn off the ceiling fan. HI : Turn on the fan at high speed MED : Turn on the fan at medium speed LOW : Turn on the fan at low speed LIGHT ON/OFF : Turn on/off the lamp Ceiling Fan Remote Control Wiring Connection ANTENNA FAN MOTOR AC POWER INPUT Installation of Transmitter Wall Mount Holder with two screws. FCC STATEMENT 1. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. 2. Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.
January 9, 2012 To: SIEMIC, INC. 2206 Ringwood Avenue, San Jose, CA 95131 USA Dear Sir/Madam, Re: Project and Product Certification Representative Authorization Letter We, ______ SHENZHEN ASIA BRIGHT INDUSTRY CO LTD ___hereby authorize SIEMIC, INC. to act as a Certification Body for certifying for the following project(s): Product Description: REMOTE CONTROL UNIT Model name: AS-CF001 We affirm that between SIEMIC and _ SHENZHEN ASIA BRIGHT INDUSTRY CO LTD __, any difference in understanding, including test plan, measurement methods, applicable standards and relevant procedures and processes have been resolved prior to commencement of testing activities. Sincerely, Client’s signature: Client’s name / title: Guoliang Li / Engineer Contact information / address: BLDG 10, ASIA IND PARK, GANGTOU BANTIAN, LONGGANG, SHENZHEN, GUANGDONG, 518129, CHINA 深圳市亚晔实业有限公司 Shenzhen Asia Bright Industry Co., Ltd
SCS-F19: Confidentiality Request Letter Page 1 of 1 Rev 2.0 January 9, 2012 To: Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD Confidentiality Request regarding application for certification of FCC ID: AMVAS-CF001 We hereby request confidential treatment of information accompanying this application as outlined below: - Block Diagram - Operational Description - Schematic The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. The applicant understands that pursuant to Section 0.457 & 0.459 of the Rules, disclosure of this application and all accompanying documentation will not be made before the date of the Grant for this application. Sincerely, Client’s signature: Client’s name / title: Guoliang Li / Engineer Contact information / address: BLDG 10, ASIA IND PARK, GANGTOU BANTIAN, LONGGANG, SHENZHEN, GUANGDONG, 518129, CHINA 深圳市亚晔实业有限公司 Shenzhen Asia Bright Industry
FCC Certification label Sample FCC ID: AMVAS-CF001 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired o peration.
FCC Certification label location Sample Label location
Antenna Antenna
Page 1 of 32 FCC ID: AMVAS-CF001 ACCURATE TECHNOLOGY CO., LTD REPORT NO. ATE20112851 APPLICATION CERTIFICATION On Behalf of SHENZHEN ASIA BRIGHT INDUSTRY CO LTD REMOTE CONTROL UNIT Model No.: AS-CF001 FCC ID: AMVAS-CF001 Prepared for : SHENZHEN ASIA BRIGHT INDUSTRY CO LTD Address : BLDG 10, ASIA IND PARK, GANGTOU BANTIAN, LONGGANG, SHENZHEN, GUANGDONG, 518129, CHINA Prepared by : ACCURATE TECHNOLOGY CO., LTD Address : F1, Bldg. A, Changyuan New Material Port, Keyuan Rd. Science & Industry Park, Nanshan, Shenzhen, Guangdong P.R. China Tel: (0755) 26503290 Fax: (0755) 26503396 Report Number : ATE20112851 Date of Test : January 1-10, 2012 Date of Report : January 10, 2012 Page 2 of 32 FCC ID: AMVAS-CF001 ACCURATE TECHNOLOGY CO., LTD REPORT NO. ATE20112851 TABLE OF CONTENTS Description Page Test Report Certification 1. GENERAL INFORMATION .......................................................................................................... 4 1.1. Description of Device (EUT)....................................................................................................................4 1.2. Description of Test Facility ......................................................................................................................5 1.3. Measurement Uncertainty.........................................................................................................................5 2. MEASURING DEVICE AND TEST EQUIPMENT ..................................................................... 6 3. SUMMARY OF TEST RESULTS................................................................................................... 7 4. THE FIELD STRENGTH OF RADIATION EMISSION ............................................................ 8 4.1. Block Diagram of Test Setup....................................................................................................................8 4.2. The Field Strength of Radiation Emission Measurement Limits..............................................................9 4.3. Configuration of EUT on Measurement ...................................................................................................9 4.4. Operating Condition of EUT ....................................................................................................................9 4.5. Test Procedure ........................................................................................................................................10 4.6. The Field Strength of Radiation Emission Measurement Results ..........................................................11 5. 20DB OCCUPIED BANDWIDTH ................................................................................................ 13 5.1. Block Diagram of Test Setup..................................................................................................................13 5.2. The Bandwidth of Emission Limit According To FCC Part 15 Section 15.231(c) ................................13 5.3. EUT Configuration on Measurement .....................................................................................................14 5.4. Operating Condition of EUT ..................................................................................................................14 5.5. Test Procedure ........................................................................................................................................14 5.6. Measurement Result ...............................................................................................................................15 6. RELEASE TIME MEASUREMENT............................................................................................ 16 6.1. Block Diagram of Test Setup..................................................................................................................16 6.2. Release Time Measurement According To FCC Part 15 Section 15.231(a) ..........................................16 6.3. EUT Configuration on Measurement .....................................................................................................17 6.4. Operating Condition of EUT ..................................................................................................................17 6.5. Test Procedure ........................................................................................................................................17 6.6. Measurement Result ...............................................................................................................................18 7. AVERAGE FACTOR MEASUREMENT .................................................................................... 19 7.1. Block Diagram of Test Setup..................................................................................................................19 7.2. Average factor Measurement according to ANSI 63.4: 2003.................................................................19 7.3. EUT Configuration on Measurement .....................................................................................................20 7.4. Operating Condition of EUT ..................................................................................................................20 7.5. Test Procedure ........................................................................................................................................20 7.6. Measurement Result ...............................................................................................................................21 APPENDIX I ( TEST CURVES) (10 pages) Page 3 of 32 FCC ID: AMVAS-CF001 ACCURATE TECHNOLOGY CO., LTD REPORT NO. ATE20112851 Test Report Certification Applicant : SHENZHEN ASIA BRIGHT INDUSTRY CO LTD Manufacturer : SHENZHEN ASIA BRIGHT INDUSTRY CO LTD EUT Description : REMOTE CONTROL UNIT (A) MODEL NO.: AS-CF001 (B) SERIAL NO.: N/A (C) POWER SUPPLY: DC 9V (“6F22” batteries 1×) Measurement Procedure …
Text truncated - open the document above for the full version.
Radiated emissions test < 1GHz Radiated emissions test > 1GHz
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15.231 | 433.92 MHz - 433.92 MHz | - |