
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
WHAT’S IN THE BOX quick start guide ENUT 511 SWT how to wear First time use Charging SML led behaviors ON R Pairing SML Manual Controls power onRECONNECTING LEFT & RIGHTpower on & connect to device + 5S × 3 2 S L/R L/R L R power off 5 S BUTTON COMMAND 1. Stereo Mode 2. Mono Mode L R ×2 ×1 ×2 ×1 ×1 VOICE ASSISTANT SUPPORTED VOICE ASSISTANT SUPPORTED Seamless automatic switch power off LRL/R power on & connect TECH SPEC Choose "JBL TUNE115TWS" to connect 2 S 2 S L/R ×2 ×1 ×1 L/R SettingsBluetooth Bluetooth DEVICES Now Discoverable Connected JBL TUNE115TWS Model: TUNE115TWS Driver size: 5.8 mm / 0.023” Dynamic driver Power supply: 5 V 1 A Weight: 61.3 g / 0.135 lbs Earpiece: 10 g / 0.022 lbs / pc (20 g / 0.044 lbs combined) Charging case: 41.3 g / 0.091 lbs Headset battery type: Lithium-ion Battery (55 mA / 3.7 V) Charging case battery type: Lithium-ion B attery (410 mA / 3.8 V) Charging time: < 2 hrs from empty Music playtime with BT on: up t o 5.0 hrs Frequency Response: 20 Hz – 20 kHz Impedance: 14 ohm Sensitivity: 103 dB SPL@1 kHz / 1 mW Maximum SPL: 93 dB Microphone sensitivity: - 38 dBV@1 kHz / Pa Bluetooth version: 5.0 Bluetooth profile version: A2DP 1.3, AVRCP 1.5, HFP 1.7 Bluetooth transmitter frequency range: 2.4 GHz - 2.4835 GHz Bluetooth transmitter power: < 12 dBm Bluetooth transmitter modulation: GFSK , π/-4DQPSK, 8DPSK Maximum operation temperature: 45 °C HP_JBL_TUNE115T WS_QSG_PV_V3 技术规格 技術仕様 驱动单元尺寸:5.8 mm 动圈驱动单元 频率响应:20 Hz – 20 kHz 灵敏度:96 dB SPL @ 1 kHz 1 mW 最大 SPL:96 dB 麦克风灵敏度:- 38 dBV / Pa @ 1 kHz 阻抗:14 ohm 蓝牙发射功率:< 12 dBm 蓝牙发射调制:GFSK、 π /4 DQPSK、8DPSK 蓝牙频率:2.402 GHz - 2.480 GHz 蓝牙配置文件版本:A2DP 1.3、AVRCP 1.5、HFP V1.7 蓝牙版本:5.0 耳机电池类型:锂离子电池 (85 mAh / 3.7 V DC) 充电盒电池类型:锂离子电池 (850 mAh / 3.7 V DC) 电源: 5 V 1.0 A 充电时间:2 小时以内(从空电量到充满) 开启蓝牙时的音乐播放时间:8 小时 重量:73 g ドライ バーサイズ:5.8mmダイナミックドライバー 周波数特性:20Hz~20kHz 出力音圧レベル:96dB SPL@1kHz 1mW 最大音圧レベル:96dB マイク出力音圧レベル:-38dBV / Pa @ 1 kHz インピーダンス:14 Ω Bluetooth 対応トランスミッター出力 :12dBm未満 Bluetooth 対応トランスミッター変調 :GFSK、 π /4 DQPSK、8DPSK Bluetooth周波数:2.402 GHz~2.480 GHz Bluetooth プロファイルバージョン:A2DP 1.3、AVRCP 1.5、HFP V1.7 Bluetoothバージョン:5.0 イヤホン本体のバッテリータイプ:リチウムイオンバッテリー (85mA h/3.7V DC) 充電ケースのバッテリータイプ:リチウムイオンバッテリー (850mAh / 3.7 V DC) 電源: 5 V 1.0 A 充電時間:約2時間 再生時間:最大約8時間 重量:約73g 内容清单 佩戴方法 首次使用 开启和连接 配对 其他 ANDROID 6.0+ 选择“JBL TUNE115T WS”以连接 关闭 手动控制 开启和连接到设备 重新连接左侧和右侧耳机 开启 关闭 按钮命令 1. 立体声模式 2. 单声道模式 无缝自动切换 充电 LED 指示灯模式 电量低 / 正在充电 / 电量已充满 / 开机 / 蓝牙正在连接 / 蓝牙已连接 / 电量低 / 正在充电 / 电量已充满 同梱品 装着方法 初めての使用 電源オンと接続 ペアリング その他 ANDROID +6.0 「JBL TUNE115TWS」を選択 して接続 電源オフ 手動でのコントロール 電源オンとデバイスに接続 左右のイヤホンを再接続中 電源オン 電源オフ ボタンコマンド 1.ステレオモード 2.モノラルモード «シームレスな自動スイッチ» 充電中 LEDの動作 バッテリー残量少 / 充電状態 / 充電完了 / 電源オン / BTに接続中 / BTに接続済み / バッテリー残量少 / 充電状態 / 充電完了 TEKNISKE SPECIFIKATIONER ESPECIFICACIONES TÉCNICAS MŰSZAKI SPECIFIKÁCIÓ TEKNISKE SPESIFIKASJONER TEKNISKA SPECIFIKATIONER TECHNISCHE DATEN TEKNISET TIEDOT SPECIFICHE TECNICHE DANE TECHNICZNE TEKNİK ÖZELLİKLER 技術規格 HVAD ER DER I ÆSKEN SÅDAN BÆRES DE BRUG FØRSTE GANG TÆND OG FORBIND PARRING ANDRE ANDROID 6.0+ VÆLG “JBL TUNE115TWS” FOR AT FORBINDE SLUK MANUEL STYRING TÆND OG OPRET FORBINDELSE TIL ENHEDEN TILSLUT VENSTRE OG HØJRE IGEN TÆND SLUK STYRING MED KNAP 1. STEREOTILSTAND 2. MONOTILSTAND NEMT AUTOMATISK SKIFTE OPLADER LED-SIGNALER LAVT BATTERI / OPLADER / HELT OPLADET / TÆNDT / BLUETOOTH OPRETTER FORBINDELSE / BLUETOOTH FORBUNDET / LAVT BATTERI / OPLADER / HELT OPLADET CONTENIDO DE LA CAJA CÓMO SE LLEVAN USO POR PRIMERA VEZ ENCENDER Y CONECTAR EMPAREJAMIENTO OTROS ANDROID 6.0+ SELECCIONA “JBL TUNE115TWS” PARA CONECTAR APAGAR CONTROLES MANUALES ENCENDER Y CONECTAR DISPOSITIVO RECONECTAR IZQUIERDO Y DERECHO ENCENDER APAGAR COMANDOS DE LOS BOTONES 1. MODO ESTÉREO 2. MODO MONO ENCENDIDO Y APAGADO AUTOMÁTICO TOTALMENTE INTEGRADO CARGA COMPORTAMIENTOS DE LOS LED BATERÍA BAJA / CARGA / CARGA COMPLETA / ENCENDER / CONECTANDO BT / BLUETOOTH CONECTADO / BATERÍA BAJA / CARGA / CARGA COMPLETA A DOBOZ TARTALMA A HASZNÁLAT MÓDJA ELSŐ HASZNÁLAT BEKAPCSOLÁS ÉS CSATLAKOZÁS PÁROSÍTÁS EGYEBEK ANDROID 6.0+ A CSATLAKOZÁSHOZ VÁLASSZA A „JBL TUNE115TWS” LEHETŐSÉGET KIKAPCSOLÁS KÉZI VEZÉRLŐK BEKAPCSOLÁS ÉS CSATLAKOZTATÁS AZ ESZKÖZHÖZ A BAL ÉS JOBB OLDAL ÚJRA-CSAT- LAKOZTATÁSA BEKAPCSOL KIKAPCSOLÁS GOMB PARANCS 1. SZTEREÓ MÓD 2. MONÓ MÓD ÉSZREVÉTLEN AUTOMATIKUS ÁTVÁLTÁS TÖLTÉS LED TULAJDONSÁGAI ALACSONY AKKUMULÁTOR / TÖLTÉS / TEL- JESEN FELTÖLTVE / BEKAPCSOL / BLUETOOTH CSATLAKOZIK / BT CSATLAKOZTATVA / ALACSONY AKKUMULÁTOR / TÖLTÉS / TELJESEN FELTÖLTVE DETTE ER I ESKEN SLIK BRUKES PRODUKTET FØRSTE GANGS BRUK SLÅ PÅ OG KOBLE TIL PARING ANNET ANDROID 6.0+ VELG “JBL TUNE115TWS” FOR Å KOBLE TIL STRØM AV MANUELLE KONTROLLER SLÅ PÅ OG KOBLE TIL ENHET KOBLE TIL VENSTRE OG HØYRE PÅ NYTT SLÅ PÅ STRØM AV KNAPPEKOMMANDO 1. STEREOMODUS 2. MONOMODUS SØMLØS AUTOMATISK BRYTER LADER LED-ATFERD LAVT BATTERINIVÅ / LADER / FULLADET / SLÅ PÅ / BT TILKOBLING / BT TILKOBLET / LAVT BATTERINIVÅ / LADER / FULLADET DETTA FINNS I LÅDAN HUR DE SKA SITTA FÖRSTA ANVÄNDNINGEN SLÅ PÅ & ANSLUT PARKOPPLING ÖVRIGA ANDROID 6.0+ VÄLJ “JBL TUNE115TWS” FÖR ATT ANSLUTA STÄNG AV MANUELLA KONTROLLER SLÅ PÅ OCH ANSLUT TILL ENHET ÅTERANSLUTA VÄNSTER OCH HÖGER STRÖM PÅ STÄNG AV KNAPPKOMMANDO 1. STEREO-LÄGE 2. MONO-LÄGE SÖMLÖS AUTOMATISK OMKOPPLING LADDNING LED-FUNKTION LÅG BATTERINIVÅ / LADDNING / FULLADDAD / STRÖM PÅ / ANSLUTER TILL BT / ANSLUTEN TILL BT / LÅG BATTERINIVÅ / LADDNING / FULLADDAD DA ES HU NO SV ZH- CN JP VERPACKUNGSINHALT TRAGEMÖGLICHKEITEN ERSTMALIGE VERWENDUNG EINSCHALTEN UND VERBINDEN KOPPLUNG WEITERE ANDROID 6.0+ “JBL TUNE115TWS” ZUM VERBINDEN WÄHLEN AUSSCHALTEN MANUELLE BEDIENELEMENTE EINSCHALTEN UND VERBINDEN MIT GERÄT LINKS UND RECHTS WIEDER VERBINDEN EINSCHALTEN AUSSCHALTEN TASTENBEFEHL 1. STEREO-MODUS 2. MONO-MODUS NAHTLOSER AUTOMATISCHER WECHSEL WIRD AUFGELADEN LED-VERHALTEN SCHWACHER AKKU / WIRD AUFGELADEN / VOLLSTÄNDIG GELADEN / EINSCHALTEN / BT WIRD VERBUNDEN / BT VERBUNDEN / SCHWACHER AKKU / WIRD AUFGELADEN / VOLLSTÄNDIG GELADEN PAKKAUKSEN SISÄLTÖ KÄYTTÖOHJEET ENSIMMÄINEN KÄYTT…
Text truncated - open the document above for the full version.
and FCC limits may The equipment et États-Unis
Harman International Industries, Inc. 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES DATE : Jun. 17, 2020 Harman International Industries, Inc. 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Attn: Director of Certification Authority to Act as Agent On our behalf, I appoint below company and person: Name Damon Hu Position Manager Company Name Dongguan Dongdian Testing Service Co.,Ltd. Address 17, Zongbu Road 2, Songshan Lake Sci&Tech, Industry Park, Dongguan City, Guangdong Province, China, 523808 Tel / Fax Tel: +86-0769-38826678-850 E-Mail [email protected] to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in the Federal Communications Commission’s regulations will have affixed to it a label identical to that submitted for approval with this application. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by CETECOM GmbH, still resides with: Applicant name Harman International Industries, Inc. Address 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Yours sincerely, Signatory Name Tim Song Position Manager, Compliance Company Name Harman International Industries, Inc. Address 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Tel / Fax 818-895-8173/818-892-0325 E-Mail [email protected]
CONFIDENTIALITY REQUEST for Certification Service in USA Federal Communication Commission Equipment Authorization Division, Application Processing Branch 7435 Oakland Mills Road Columbia, MD 21048 <06/17/2020> TO WHOM IT MAY CONCERN Pursuant to Paragraphs §0.457 and 0.459 of the Commission’s Rules (47 C.F.R.) and Section §552(b) (4) of the Freedom of Information Act, we requests confidentiality for the following products: FCC ID Model name APITUNE115TWS TUNE115TWS, C115TWS For the product stated above, we request that the following information be held confidential; Exhibits Long-Term Confidentiality Short-Term Confidentiality Short-Term Confidentiality Days External Photos 180 days Internal Photos 180 days Block Diagram Schematics Test Setup Photos 180 days User’s Manual 180 days Parts List Tune Up Operational Descriptions The long-term confidentiality exhibits contain our trade secrets and proprietary information that could be of benefit to our competitors. The short-term confidentiality on the basis of ensuring that business sensitive information remains confidential until the actual marketing of our new device. If you have any questions, please feel free to contact me at the address shown below. Sincerely, (Signed) Name: Tim Song Company: Harman International Industries, Inc Address: 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Phone:818-895-8173 Fax: 818-892-0325 E-Mail: [email protected]
Harman International Industries, Inc. Declaration of difference June 18, 2020 Date: The product: Bluetooth Headset Model No.: TUNE115TWS, C115TWS Dear Examiner, There are two kinds of model numbers in this report, the main PCB of the products, software and hardware versions of the products and antenna type and RF module are the same, only the model number is different. I attest that the certified device will not be capable of ad-hoc mode operation outside of the grant conditions. Signature: Sincerely. Name: Tim Song
Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 105 of 117 16. Photos of the EUT Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 106 of 117 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 107 of 117 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 108 of 117 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 109 of 117 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 110 of 117 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 111 of 117
Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 110 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 111 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 112 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 113 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 114 of 118 BT Antenna Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 115 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 116 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 117 of 118 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 118 of 118 END OF REPORT
AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Page 1 of 32 SAR TEST REPORT for Harman International Industries, Inc. Bluetooth Headset Model No.: TUNE115TWS; C115TWS FCC ID: APITUNE115TWS IC: 6132A -TUNE115TWS The MAX SAR(1g) Head SAR 0. 197W/Kg Prepared for : Harman International Industries, Inc. 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Prepared By : Audix Technology (Shenzhen) Co., Ltd. No. 6, Kefeng Road, Science & Technology Park, Nan shan District, Shenzhen, Guangdong, China Tel: (0755) 26639496 Fax: (0755) 26632877 Report Number : ACS-SF20015 Date of Test : Jun.05, 2020 Date of Report : Jun.15, 2020 AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Page 2 of 32 TABLE OF CONTENTS Description Page Test Report Verification 3 1. GENERAL INFORMATION ...................................................................................................... 4 1.1. Description of Equipment Under Test ............................................................................................... 4 1.2. Feature of Equipment Under Test ..................................................................................................... 5 2. GENERAL DESCRIPTION ........................................................................................................ 6 2.1. Product Description For EUT ............................................................................................................ 6 2.2. Applied Standards ............................................................................................................................. 6 2.3. Device Category and SAR Limits ..................................................................................................... 6 2.4. Test Conditions .................................................................................................................................. 6 2.5. Exposure Positions Consideration ..................................................................................................... 7 2.6. Standalone SAR Test Exclusion Considerations ............................................................................... 8 2.7. EUT Configuration and operation conditions for test. .................................................................... 10 2.8. Test Equipments .............................................................................................................................. 10 2.9. Laboratory Environment ................................................................................................................. 12 2.10. Measurement Uncertainty ............................................................................................................... 12 3. MEASURE PROCEDURES ...................................................................................................... 15 3.1. General description of test procedures ............................................................................................ 15 4. SAR MEASUREMENTS SYSTEM .......................................................................................... 16 4.1. SAR Measurement Set-up ............................................................................................................... 16 4.2. ELI Phantom .................................................................................................................................... 17 4.3. Device Holder for SAM Twin Phantom .......................................................................................... 18 4.4. DASY5 E-field Probe System ......................................................................................................... 19 4.5. E-field Probe Calibration ................................................................................................................. 20 4.6. Scanning procedure ......................................................................................................................... 21 5. DATA STORAGE AND EVALUATION ................................................................................. 23 5.1. Data Storage .................................................................................................................................... 23 5.2. Data Evaluation by SEMCAD ......................................................................................................... 23 6. SYSTEM CHECK ...................................................................................................................... 25 7. TEST RESULTS ......................................................................................................................... 27 7.1. Output power ................................................................................................................................... 27 7.2. System Check for Head Tissue simulating liquid ........................................................................... 29 7.3. Test Results ..................................................................................................................................... 30 ANNEX A: SYSTEM CHECK RESULTS ANNEX B: TEST PLOTS ANNEX C: DASY CABLIBRATION CERTIFICATE ANNEX D: TEST SETUP PHOTOS AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Page 4 of 32 1. GENERAL INFORMATION 1.1. Description of Equipment Under Test Applicant Harman International Industries, Inc. 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Manufacturer Harman International Industries, Inc. 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Product Bluetooth Headset Model No. TUNE115TWS; C115TWS (Only the model name is different.) Test Model TUNE115TWS FCC ID APITUNE115TWS IC 6132A-TUNE115TWS Sample Type Prototype production Date of Receipt Jun.05 , 2020 Date of Test Jun.05, 2020 AUDIX Technology (Shenzhen) C…
Text truncated - open the document above for the full version.
AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex A ANNEX A: SYSTEM CHECK RESULTS AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B ANNEX B: TEST PLOTS Left: (BDR+EDR) AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B Left: (BLE) AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B Right: (BDR+EDR) AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B Right: (BLE) AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex B AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C ANNEX C: DASY CABLIBRATION CERTIFICATE AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex C
Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 1 of 102 FCC ID AND ISED CERTIFICATION TEST REPORT FOR Issued By: Dongguan Dongdian Testing Service Co., Ltd. Add.: No. 17, Zongbu Road 2, Songshan Lake Sci&Tech, Industry Park, Dongguan City, Guangdong Province, China, 523808 Tel.: +86-0769-38826678, E-mail: [email protected], http://www.dgddt.com Applicant : Harman International Industries, Inc. Address : 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES Equipment under Test : Bluetooth Headset Model No. : TUNE115TWS, C115TWS Trade Mark : JBL FCC ID : APITUNE115TWS IC : 6132A-TUNE115TWS Manufacturer : Harman International Industries, Inc. Address : 8500 Balboa Boulevard, Northridge, CA 91329, UNITED STATES ■Report No.: DDT-R20042213-1E4 ■Issued Date: May 29, 2020 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 2 of 102 Table of Contents Test report declares.......................................................................................................4 1. Summary of Test Results ............................................................................................... 6 2. General Test Information ............................................................................................... 7 2.1. Description of EUT ......................................................................................................... 7 2.2. Accessories of EUT ........................................................................................................ 8 2.3. Assistant equipment used for test .................................................................................. 8 2.4. Block diagram of EUT configuration for test .................................................................. 8 2.5. Deviations of test standard............................................................................................. 8 2.6. Test environment conditions .......................................................................................... 9 2.7. Test laboratory ............................................................................................................... 9 2.8. Measurement uncertainty ............................................................................................... 9 3. Equipment Used During Test ....................................................................................... 10 4. Maximum Peak Output Power ..................................................................................... 12 4.1. Block diagram of test setup .......................................................................................... 12 4.2. Limits ............................................................................................................................ 12 4.3. Test procedure ............................................................................................................. 12 4.4. Test result ..................................................................................................................... 12 4.5. Original test data .......................................................................................................... 13 5. 20dB Bandwidth and 99% Bandwidth .......................................................................... 20 5.1. Block diagram of test setup .......................................................................................... 20 5.2. Limits ............................................................................................................................ 20 5.3. Test procedure ............................................................................................................. 20 5.4. Test result ..................................................................................................................... 20 5.5. Original test data .......................................................................................................... 21 6. Carrier Frequency Separation ...................................................................................... 28 6.1. Block diagram of test setup .......................................................................................... 28 6.2. Limits ............................................................................................................................ 28 6.3. Test procedure ............................................................................................................. 28 6.4. Test result ..................................................................................................................... 28 6.5. Original test data .......................................................................................................... 29 7. Number of Hopping Channel ....................................................................................... 31 7.1. Block diagram of test setup .......................................................................................... 31 7.2. Limits ............................................................................................................................ 31 7.3. Test procedure ............................................................................................................. 31 7.4. Test result ..................................................................................................................... 31 7.5. Original test data .......................................................................................................... 32 8. Dwell Time .................................................................................................................... 34 Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 3 of 102 8.1. Block diagram of test setup .......................................................................................... 34 8.2. Limits ............................................…
Text truncated - open the document above for the full version.
AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex D ANNEX D: TEST SETUP PHOTOS Left Cochlea Side Front Side AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex D Top Side Bottom Side AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex D Left Side Right Side AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex D Right Cochlea Side Front Side AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex D Top Side Bottom Side AUDIX Technology (Shenzhen) Co., Ltd. Audix Technology (Shenzhen) Co., ltd.. Report No. ACS-SF20015 Annex D Left Side Right Side THE END
Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 103 of 120 15. Test Setup Photograph Dongguan Dongdian Testing Service Co., Ltd. Report No.: DDT-R20042213-1E4 Page 104 of 120
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 11.10 mW |
BLUETOOTH HEADSET
Equipment Class
DSS - Part 15 Spread Spectrum TransmitterHEADSET CHARGING CASE
Equipment Class
DTS - Digital Transmission SystemCHARGING CASE
Equipment Class
DTS - Digital Transmission SystemBLUETOOTH HEADSET
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter3.1.2 Channel Soundbar with True Dolby Atmos and Wireless Subwoofer
Equipment Class
DTS - Digital Transmission System