
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Set Up Home Energy System 1 Home Energy System Every effort has been made in providing for the safe; secure installation of the Home Energy System, including the Energy Assistant®, Sensor Plugs, Transmitters, and Sensor Clamps. The installation of the Sensor Clamps requires the cover of the main electrical circuit breaker panel to be removed. When this is done, there exists the potential hazard of shock, burn, or even electrocution. DO NOT attempt to complete this installation unless you are VERY familiar with the electrical components and operation of the circuit breaker panel. Even when the MAIN circuit breaker has been turned to the “OFF” position, there may still be areas within the circuit breaker panel that may be electrified. DO NOT attempt installation unless you know where these areas are. Professional installation is highly recommended. WARNING – These servicing instructions are for use by Qualified Personnel ONLY. To reduce the risk of electric shock, DO NOT perform any servicing other than that which is contained in these operational instructions, unless you are qualified to do so. WARNING – If the equipment is used in a manner not specified in these instructions, the protection provided by the equipment may be impaired. This symbol will be found throughout the instructions where there is a potential for electric shock, burn, or even electrocution. DO NOT attempt to complete the noted section if you are not an electrician, or qualified installer. Energy Assistant® Buttons and Display Screens WARNING – If the equipment is used in a manner not specified in these instructions, the protection provided by the equipment may be impaired. The Energy Assistant® is the control and display element of a set of tools that allow you to create a simple and powerful Home Energy System. The Energy Assistant® shows you how you are using electricity, what it is costing you, and gives you information to lower your energy cost and increase your conservation efforts. This information can be seen on the three (3) display screens available on the Energy Assistant®; these display screens are the Home, Conservation, and Energy Management pages. Energy Assistant® Buttons ß The Energy Assistant® is designed for simplicity and ease-of-use. Buttons are arranged at the bottom of the Energy Assistant® and will be used on a regular basis to configure, control, and monitor your Home Energy Management System. o LINK Used for configuration and pairing of the Energy Assistant® with devices, including Sensor Plug(s) and Transmitter(s) o OK Acts as an enter key with mulitple functions o H Returns to the Home or default display screen. o á Scroll up o à Scroll down and Power On/Off (press and hold à for 5 seconds to power on/off) + LINK OK H á à LINK OK H á à Set up Albert 2 Energy Assistant® Presentation Page The Energy Assistant® Home Segment shows energy data from the entire residence. Usage and Cost Consumption totals are derived from one (1) of two (2) sources: 1) The Transmitter and Sensor(s) connected to the utility meter; OR 2) IF there is no connection to the utility meter, than total of ALL configured Channels. Home Segment Navigation: ß Energy Now- Displays current energy usage as described above in W/kW. ß Cost Now- Scrolls every 10 seconds to display cost of energy usage in dollars ($) and carbon emissions (kg CO2) The Energy Assistant® Conservation Segment has two sections, a History and a Forecast of energy cost, usage and environmental impact to allow for comparison by day and by month. Similar to the Usage and Cost Segment, the Conservation Segment values are derived from one (1) or two (2) sources: 1) The Transmitter and Sensor Clamps) connected to the utility meter; OR 2) IF there is no connection to the utility meter, than total of ALL configured Channels. Conservation Segment Navigation (Last and Forecast): ß Last (Day/Month)- Scrolls every 10 seconds to display the history of your energy usage (W/kW0, cost of that usage in dollars ($), and carbon emissions (kg CO 2 ). ß Forecast (Day/Month)- Scrolls every 10 seconds to display a forecast of your energy usage (W/kW0, cost of that usage in dollars ($), and carbon emissions (kg CO 2 ). The Energy Assistant® Energy Management Segment serves two (2) purposes: 1) Configuring, or adding, individual channel(s) (Sensor Plug(s) and/or Transmitter(s) to the Home Energy System (please see the Set-Up Home Energy System section of this manual for details); AND 2) Displaying individual channel (Sensor Plug(s) and/or Transmitter(s) consumption data. Energy Management Segment Navigation: ß Channel numbers (CH X) scroll every 40 seconds to display device usage. ß Within each channel number (CH X), scrolls every 10 seconds to display the power draw (W/kW), energy usage (kWh), cost of that usage in dollars ($), and carbon emissions (kg CO 2 ) LINK OK H á à LINK OK H á à RAG (red/amber/green) LED Signal Strength Indoor Temp Time (24h clock) Date Home Energy Now:Energy Use (W/kW) Cost Now:Energy Cost ($) Environmental Cost (kg/CO 2 ) Conservation Forecast Scroll Day:cost($), usage(kWh), enviro(kg/CO 2 ) Month:cost($), usage(kWh), enviro(kg/CO 2 ) Conservation Last (history) Scroll Day:cost($), usage(kWh), enviro(kg/CO 2 ) Month:cost($), usage(kWh), enviro(kg/CO 2 ) Channel Connectivity Indicator Energy Management ALBERT LINK Schedule Configured Budget Configured Albert Mail Energy Management Channel Scroll Current cost($), usage(kWh), enviro(kg/CO2) LINK OK H á à LINK OK H á à RAG (red/amber/green) LED Signal Strength Indoor Temp Time (24h clock) Date RAG (red/amber/green) LEDRAG (red/amber/green) LED Signal Strength Signal Strength Indoor Temp Indoor Temp Time (24h clock) Time (24h clock) DateDate Home Energy Now:Energy Use (W/kW) Cost Now:Energy Cost ($) Environmental Cost (kg/CO 2 ) Home Energy Now:Energy Use (W/kW) Cost Now:Energy Cost ($) Environmental Cost (kg/CO 2 ) Conservation Forecast Scroll Day:cost($), usage(kWh), enviro(kg/CO 2 ) Month:cost($), usage(k…
Text truncated - open the document above for the full version.
Aclarity, LLC 2012-03-31 Nemko Canada Inc 303 River Road Ottawa, Ontario, Canada K1V 1H2 Attn: Director of Certification Authority to Act as Agent On our behalf, I appoint China Certification & Inspection Services Co., Ltd.; 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China; Bruce.Zhang , to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in the Federal Communications Commission’s regulations will have affixed to it a label identical to that submitted for approval with this application. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by Nemko Canada Inc, still resides with Aclarity, LLC; 13061 E. Jenan Dr Scottsdale, AZ 85259, USA Dated this 2012-03-31 By: Amanda Davis Signature Printed Title: General Manager On behalf of : Aclarity, LLC Telephone: (480) 993 2204
Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 26 of 33 8 Photographs - EUT Constructional Details Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 27 of 33 Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 28 of 33
Label
Label Location
Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 29 of 33 Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 30 of 33 Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 31 of 33 Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 32 of 33 Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 33 of 33 ------End------
China Certification & Inspection Services Co., Ltd. Report No: CCIS12030003701 Authorized Signature: Stephen Guo Laboratory Manager This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other samples of the same product and does not permit the use of the CCIS product certification mark. The manufacturer should ensure that all products in series production are in conformity with the product sample detailed in this report. This report may only be reproduced and distributed in full. If the product in this report is used in any configuration other than that detailed in the report, the manufacturer must ensure the new system complies with all relevant standards. Any mention of CCIS International Electrical Approvals or testing done by CCIS International Electrical Approvals in connection with, distribution or use of the product described in this report must be approved by CCIS International Electrical Approvals in writing. This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Unless otherwise stated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 90 days only.” 1 Cover PageFCC REPORT Applicant: Aclarity, LLC Address of Applicant: 13061 E. Jenan Dr Scottsdale, AZ 85259, USA Equipment Under Test (EUT) Product Name: Energy Assistant Model No.: RCS-J34B Trade mark: Aclarity, LLC FCC ID: G9ORCS-J34B Applicable standards: FCC CFR Title 47 Part 15 Subpart C Section 15.231:2010 Date of sample receipt: Mar. 19, 2012 Date of Test: Mar. 21, to Apr.09 , 2012 Date of report issue: Apr.10, 2012 Test Result : PASS * * In the configuration tested, the EUT complied with the standards specified above. Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 2 of 33 2 Version Version No. Date Description 00 Apr.10, 2012 Original Prepared By: Date: Apr.10, 2012 Project Engineer Check By: Date: Apr.10, 2012 Reviewer Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 3 of 33 3 Contents Page 1 COVER PAGE......................................................................................................................................................... 1 2 VERSION.................................................................................................................................................................. 2 3 CONTENTS.............................................................................................................................................................. 2 4 TEST SUMMARY.................................................................................................................................................... 4 5 GENERAL INFORMATION................................................................................................................................... 5 5.1 CLIENT INFORMATION....................................................................................................................................... 5 5.2 GENERAL DESCRIPTION OF E.U.T................................................................................................................... 5 5.3 TEST MODE....................................................................................................................................................... 5 5.4 TEST FACILITY................................................................................................................................................... 6 5.5 TEST LOCATION................................................................................................................................................ 6 5.6 OTHER INFORMATION REQUESTED BY THE CUSTOMER.................................................................................. 6 5.7 TEST INSTRUMENTS LIST.................................................................................................................................. 7 6 TEST RESULTS AND MEASUREMENT DATA................................................................................................ 8 6.1 ANTENNA REQUIREMENT:................................................................................................................................. 8 6.2 RADIATED EMISSION....................................................................................................................................... 12 6.2.1 Field Strength Of The Fundamental Signal......................................................................................... 14 6.2.2 Spurious Emissions................................................................................................................................. 16 6.3 20DB BANDWIDTH........................................................................................................................................... 18 6.4 DWELL TIME:................................................................................................................................................... 20 6.5 SILENT PERIOD:............................................................................................................................................... 22 7 PHOTOGRAPHS-TEST SETUP PHOTO.......................................................................................................... 24 8 PHOTOGRAPHS - EUT CONSTRUCTIONAL DETAILS........................................................................…
Text truncated - open the document above for the full version.
Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 24 of 33 7 Photographs-test setup photo Radiated Emission(below 1G) Radiated Emission(above 1G) Report No: CCIS12030003701 China Certification & Inspection Services Co., Ltd. Project No.: CCIS120300037RF 1st Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Page 25 of 33 Conducted emissions
1st Floor, Block No.2, Laodong Industrial Zone, · Shenzhen · China
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15.231(e) | 433.92 MHz - 433.92 MHz | - |