FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Telenexus, Inc/
  3. JNB9796254

JNB9796254

Telenexus, Inc
LMS - Part 90 Location & Monitoring Transmitter - FCC ID JNB9796254 - Telenexus, Inc
Click to zoom

Application Details

Equipment Class
LMS - Part 90 Location & Monitoring Transmitter
Date of Grant
Feb 13, 2000
Application Purpose
Original Equipment
Date of Application
Nov 04, 1999
Frequency Range
909.75000000 - 921.75000000
Company
Telenexus, Inc
Country
United States

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗

External Photos

↗
↗
↗
↗
↗
↗

ID Label/Location Info

↗

Internal Photos

↗
↗
↗
↗
↗
↗
↗
↗

Test Report

↗
↗

Test Setup Photos

↗
↗
↗
↗
↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

ID Label/Location Info

IDentity Flex Transceiver Telenexus, Inc. Richardson, Texas MODEL: 9796254 FCC ID: JNB9796254 This receiver compiles with Part 15 and Part 90 of the FCC Rules. Location of FCC Label FCC label at the back of the Unit as shown

Test Report

FCC ID# JNB9796254 FCC ID: JNB9796254 Prepared for: TELENEXUS, INC. P.O. Box 851265 Richardson, Texas 75085 By: Professional Testing (EMI), Inc. 1601 FM 1460, Suite B Round Rock, Texas 78664 Submitted to: Federal Communications Commission Equipment Approval Services P.O. Box 358315 Pittsburgh, Pennsylvania 15251-3315 October 1999 FCC Application for Certification of an Intentional Radiator TELENEXUS, INC. Identity Flex Transceiver FCC ID# JNB9796254 Professional Testing (EMI), Inc.3 of 24 Table of Contents Title Page ...............................................................................................................................................1 Table of Contents....................................................................................................................................3 Certificate of Compliance.......................................................................................................................4 1.0Equipment Under Test (EUT) Description...................................................................5 2.0Occupied Bandwidth Measurements.............................................................................5 2.1Test Procedure............................................................................................................6 2.2Test Criteria.................................................................................................................6 2.3Test Results.................................................................................................................6 3.0Effective Radiated Power (ERP) Measurements...........................................................6 3.1Test Procedure............................................................................................................6 3.2Test Criteria.................................................................................................................7 3.3Test Results.................................................................................................................7 4.0Antenna Port Emissions Test.......................................................................................7 4.1Test Procedure............................................................................................................7 4.2Test Criteria.................................................................................................................8 4.3Test Results.................................................................................................................8 5.0Radiofrequency Radiation Exposure Evaluation...........................................................8 5.1Evaluation Procedure...................................................................................................8 5.2Test Criteria.................................................................................................................8 5.3Evaluation Results.......................................................................................................9 6.0Frequency Stability vs. Temperature Test.....................................................................9 6.1Test Procedure............................................................................................................9 6.2Test Criteria.................................................................................................................9 6.3Test Results.................................................................................................................9 7.0Frequency Stability vs. AC Voltage Test....................................................................10 7.1Test Procedure..........................................................................................................10 7.2Test Criteria...............................................................................................................10 7.3Test Results...............................................................................................................10 8.0Form 731 Information................................................................................................10 8.1Emission Designator..................................................................................................10 8.2Output Power............................................................................................................11 8.3Frequency Band of Operation....................................................................................11 9.0Modification..............................................................................................................11 10.0List of Equipment......................................................................................................11 Appendices Appendix A - Occupied Bandwidth Test Data.....................................................................................12 Appendix B - Effective Radiated Power (ERP) Test Data...................................................................14 Appendix C – Antenna Conducted Emission Test Data.......................................................................16 Appendix D – Frequency Stability vs. Temperature Test Data.............................................................21 Appendix E – Frequency Stability vs. AC Voltage Test Data...............................................................23 FCC ID# JNB9796254 1601 FM 1460, Suite B Round Rock, Texas 78664 512/244-3371 Fax 512/244-1846 Applicant:Telenexus, Inc. Applicant’s Address:P.O. Box 851265 Richardson, Texas 75085 Model:Identity Flex Transceiver Serial Number:N/A Project Number:00162-10 Test Dates:October 20, 21, 22, 1999 I, Jeffrey A. Lenk, for Professional Testing (EMI), Inc., being familiar with the FCC rules and test procedures have reviewed the test setup, measurement data and this report. I believe them to be true and accurate. The Telenexus, Inc., Identity Flex Transceiver was te…

Text truncated - open the document above for the full version.

Test Report

FCC ID# JNB9796254 FCC ID: JNB9796254 Prepared for: TELENEXUS, INC. P.O. Box 851265 Richardson, Texas 75085 By: Professional Testing (EMI), Inc. 1601 FM 1460, Suite B Round Rock, Texas 78664 Submitted to: Federal Communications Commission Equipment Approval Services P.O. Box 358315 Pittsburgh, Pennsylvania 15251-3315 October 1999 FCC Application for Certification of an Intentional Radiator TELENEXUS, INC. Identity Flex Transceiver FCC ID# JNB9796254 Professional Testing (EMI), Inc.3 of 24 Table of Contents Title Page ...............................................................................................................................................1 Table of Contents....................................................................................................................................3 Certificate of Compliance.......................................................................................................................4 1.0Equipment Under Test (EUT) Description...................................................................5 2.0Occupied Bandwidth Measurements.............................................................................5 2.1Test Procedure............................................................................................................6 2.2Test Criteria.................................................................................................................6 2.3Test Results.................................................................................................................6 3.0Effective Radiated Power (ERP) Measurements...........................................................6 3.1Test Procedure............................................................................................................6 3.2Test Criteria.................................................................................................................7 3.3Test Results.................................................................................................................7 4.0Antenna Port Emissions Test.......................................................................................7 4.1Test Procedure............................................................................................................7 4.2Test Criteria.................................................................................................................8 4.3Test Results.................................................................................................................8 5.0Radiofrequency Radiation Exposure Evaluation...........................................................8 5.1Evaluation Procedure...................................................................................................8 5.2Test Criteria.................................................................................................................8 5.3Evaluation Results.......................................................................................................9 6.0Frequency Stability vs. Temperature Test.....................................................................9 6.1Test Procedure............................................................................................................9 6.2Test Criteria.................................................................................................................9 6.3Test Results.................................................................................................................9 7.0Frequency Stability vs. AC Voltage Test....................................................................10 7.1Test Procedure..........................................................................................................10 7.2Test Criteria...............................................................................................................10 7.3Test Results...............................................................................................................10 8.0Form 731 Information................................................................................................10 8.1Emission Designator..................................................................................................10 8.2Output Power............................................................................................................11 8.3Frequency Band of Operation....................................................................................11 9.0Modification..............................................................................................................11 10.0List of Equipment......................................................................................................11 Appendices Appendix A - Occupied Bandwidth Test Data.....................................................................................12 Appendix B - Effective Radiated Power (ERP) Test Data...................................................................14 Appendix C – Antenna Conducted Emission Test Data.......................................................................16 Appendix D – Frequency Stability vs. Temperature Test Data.............................................................21 Appendix E – Frequency Stability vs. AC Voltage Test Data...............................................................23 FCC ID# JNB9796254 1601 FM 1460, Suite B Round Rock, Texas 78664 512/244-3371 Fax 512/244-1846 Applicant:Telenexus, Inc. Applicant’s Address:P.O. Box 851265 Richardson, Texas 75085 Model:Identity Flex Transceiver Serial Number:N/A Project Number:00162-10 Test Dates:October 20, 21, 22, 1999 I, Jeffrey A. Lenk, for Professional Testing (EMI), Inc., being familiar with the FCC rules and test procedures have reviewed the test setup, measurement data and this report. I believe them to be true and accurate. The Telenexus, Inc., Identity Flex Transceiver was te…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Wilfred K Lau(President)

Technical Contact

Telenexus, Inc.Rick Swanson
[email protected]972-644-2328

Telenexus, Inc. · Richardson, Texas · United States

Non-Technical Contact

Telenexus, Inc.Wilfred K Lau
[email protected]972-644-2324

Test Firm

Professional Testing (EMI) Inc.Jeffrey Lenk
[email protected]512-244-3371Fax: 512-244-1846

Technical Specifications

#Rule PartsFrequency RangePower OutputEmissionTolerance
290.353909.75 MHz - 921.75 MHz1 W3M13A1Dppm
Confidentiality
Long Term

Other Applications from Telenexus, Inc

Handheld Reader - FCC ID JNBHHR001 - Telenexus, Inc
JNBHHR001

Handheld Reader

Sep 30, 2004

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
JNBTN2000ERU

Maximum output power: 100 mW.

Sep 02, 1993

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
JNBTN2000PCU

Maximum output power: 100 mW

Sep 02, 1993

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter