FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. China Aerospace Telecommunications (Shenzhen) Limited/
  3. N66-MPIP-619

N66-MPIP-619MPIP-619 GPS tracker

China Aerospace Telecommunications (Shenzhen) Limited
MPIP-619 GPS tracker - FCC ID N66-MPIP-619 - China Aerospace Telecommunications (Shenzhen) Limited
Click to zoom

Application Details

Equipment Class
PCB - PCS Licensed Transmitter
Date of Grant
Aug 29, 2014
Application Purpose
Original Equipment
Date of Application
Aug 29, 2014
Equipment Note
MPIP-619 GPS tracker
Frequency Range
1850.20000000 - 1909.80000000
Company
China Aerospace Telecommunications (Shenzhen) Limited
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

Parts List/Tune Up Info

↗

RF Exposure Info

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

                                                                                                  ! !  "  # $ %     &'   ()     * +   $ +        !  "       )*'$,#,)-)$    +   &''   #     "       "')  &  "). )    "&     "/   "  " '-'. "  " $  0 1 !0 *23  4  ""5 2  4  "4 6 ! 4  " -7 '  4             $   % ! &    '   4'     4-7    '  ( )   *+      ,   ,     -           "  (. *)  !                                                                                                                  !    "#             !                     !                                                      !   !   $                                                                            …

Text truncated - open the document above for the full version.

External Photos

Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 26 of 32 8 EUT Constructional Details Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 27 of 32 Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 28 of 32 Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 29 of 32

ID Label/Location Info

Label Label location Label location

Parts List/Tune Up Info

CASIL Telecommunications Equipment Manufacturing (ShenZhen) Limited FCC ID: N66-MPIP-619 Product Name: MPIP-619 GPS tracker TUNE UP PROCEDURE The output power setting was done by modular manufacturer, installer and end user has no possibility to change this setting later on.

RF Exposure Info

Prediction of MPE limit at a given distance Equation from page 18 of OET Bulletin 65, Edition 97-01 where:S = power density P = power input to the antenna G = power gain of the antenna in the direction of interest relative to isotropic R = distance to the center of radiation of the antenna Maximum peak output power at antenna input terminal:22.30(dBm) Maximum peak output power at antenna input terminal:169.8(mW) Antenna gain(typical):0(dBi) Maximum antenna gain:1.000(numeric) Prediction distance:20(cm) Sourse Based Time Average Duty Cycle:100(%) Prediction frequency:1880(MHz) MPE limit for uncontrolled exposure at prediction frequency:1.000(mW/cm^2) Power density at prediction frequency:0.03379(mW/cm^2) Power density at prediction frequency:0.3379(W/m^2) Margin of Compliance:14.71(dB) 2 4R PG S p =

Test Report

Authorized Bruc Labora This report de samples of the products in ser This report m a the report, the This documen falsification of Unless other w only. 1. Cove Applican Address Equipme Produc Model FCC ID: Applica b Date of s Date of T Date of Test Re s * In the co S d Signature: e Zhang tory Manag e etails the results e same product ries production ay only be repro manufacturer m t cannot be rep the content or wise stated the r er Page nt: s of Applic ent Under ct Name: No.: ble standa sample re Test: report iss sult: onfiguration t Shenzhe er s of the testing t and does not p are in conformit oduced and distr must ensure the produced excep appearance of results shown in e FC C (S cant: 9 S r Test (EU M M N ards: F F F eceipt: 0 1 ued: 1 P tested, the E en Zhon g carried out on permit the use o ty with the prod ributed in full. I e new system co pt in full, without f this document n this test report CC CASIL Tele ShenZhen 9F, Building Shiyan Stre T) MPIP-619 G MPIP-619 N66-MPIP- FCC CFR T FCC CFR T FCC CFR T 08 Aug., 20 1 Aug., to 9 Aug., 20 PASS * UT complied ngjian N n one sample. of the CCIS pro uct sample deta f the product in omplies with all t prior written a t is unlawful an t refer only to th RE ecommunic ) Limited g A2, Long eet, Baoan GPS tracke 619 Title 47 Pa Title 47 Pa Title 47 Pa 014 19 Aug., 2 014 d with the sta Nanfang The results co oduct certificatio ailed in this repo this report is us relevant standa pproval of the C nd offenders ma he sample(s) te PO cations Equ gMa Indust District, S er rt 2 rt22 Subp a rt24 Subpa 2014 andards spec Testing Report N ontained in this on mark. The m ort. sed in any confi ards. Company. Any ay be prosecute sted and such s RT uipment M trial Park, S Shenzhen, art H art E cified above. g Co., L No: CCIS1 test report do manufacturer sh iguration other t unauthorized a ed to the fulles sample(s) are r Manufacturi Shixin Com China 518 Ltd. 140800660 not relate to o ould ensure tha than that detaile alteration, forger t extent of the retained for 90 d ng mmunity, 8108 001 other at all ed in ry or law. days Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 2 of 31 2. Version Version No. Date Description 00 19 Aug., 2014 This report was based on the FCC ID:UDV-2013072401 differences test. Prepared by: Date: 19 Aug., 2014 Report Clerk Reviewed by: Date: 19 Aug., 2014 Project Engineer Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 3 of 31 3. Contents Page 1. COVER PAGE .............................................................................................................................................................. 1 2. VERSION ....................................................................................................................................................................... 2 3. CONTENTS ................................................................................................................................................................... 3 4. TEST SUMMARY ......................................................................................................................................................... 4 5. GENERAL INFORMATION ........................................................................................................................................ 5 5.1 CLIENT INFORMATION ............................................................................................................................................ 5 5.2 GENERAL DESCRIPTION OF E.U.T. ....................................................................................................................... 5 5.3 TEST MODES .......................................................................................................................................................... 8 5.4 RELATED SUBMITTAL(S) / GRANT (S) .................................................................................................................... 8 5.5 TEST METHODOLOGY ............................................................................................................................................ 8 5.6 LABORATORY FACILITY.......................................................................................................................................... 8 5.7 LABORATORY LOCATION ....................................................................................................................................... 8 5.8 DESCRIPTION OF SUPPORT UNITS ........................................................................................................................ 8 5.9 TEST INSTRUMENTS LIST ....................................................................................................................................... 9 6. SYSTEM TEST CONFIGURATION ........................................................................................................................ 10 6.1 EUT CONFIGURATION ......................................................................................................................................... 10 6.2 EUT EXERCISE .................................................................................................................................................... 10 6.3 CONFIGURATION OF TESTED SYSTEM ................................................................................................................ 10 6.4 DESCRIPTION OF TEST MODES .........................................................................................................…

Text truncated - open the document above for the full version.

Test Report

  FCC RF Test Report Product Name : GSM/GPRS Wireless Data Module Model No. : SIM800H FCC ID : UDV-2013072401 Applicant : Shanghai Simcom Ltd. Address : Building A,SIM Technology Building,No.633 Jinzhong Road,Changning District,Shanghai R.R.China Date of Receipt : 30/07/2013 Test Date : 20/07/2013~30/07/2013 Issued Date : 30/07/2013 Report No. : UL15820130723FCC24-3 Report Version : V1.0 The test results relate only to the samples tested. The test results shown in the test report are traceable to the national/international standard through the calibration of the equipment and evaluated measurement uncertainty herein. This report must not be used to claim product endorsement by TAF, CNAS or any agency of the Government. The test report shall not be reproduced except in full without the written approval of Unilab Corporation. Unilab(Shanghai) Co.,Ltd.  Report No. : UL15820130723FCC24-3 Page 2 of 68  Page: 2 of 68 Test Report Certification Issued Date : 30/07/2013 Report No. : UL15820130723FCC24-3 Product Name : GSM/GPRS Wireless Data Module Applicant : Shanghai Simcom Ltd. Address : Building A,SIM Technology Building,No.633,Jinzhong Road, Changning District,Shanghai R.R.China Manufacturer : Shanghai Simcom Ltd. Address : Building A,SIM Technology Building,No.633,Jinzhong Road, Changning District,Shanghai R.R.China Model No. : SIM800H EUT Voltage : MIN: 3.6V, NOR: 3.8V, MAX: 4.2V Brand Name : SIMCom Applicable Standard : ANSI/TIA-603-D-2010 FCC CFR Title 47 Part 2 FCC CFR Title 47 Part 22 Subpart H FCC CFR Title 47 Part24 Subpart E Test Result : Complied Performed Location : Unilab (Shanghai) Co.,Ltd. FCC 2.948 register number is 714465 No.1350, Lianxi Road, Pudong New District, Shangha,China TEL:+86-21-5027-5125/FAX:+86-21-5027-5126-876 Documented By : ( Technical Engineer: Andy Wei) Reviewed By : (Senior Engineer: Forest Cao) Approved By : (Supervisor: Eva Wang) Unilab(Shanghai) Co.,Ltd.  Report No. : UL15820130723FCC24-3 Page 3 of 68  Page: 3 of 68 TABLE OF CONTENTS Description Page SUMMARY OF TEST RESULT......................................................................................5 1. General Information....................................................................................................6 1.1. EUT Description.......................................................................................................6 1.2. Mode of Operation...................................................................................................6 1.3. Tested System Details.............................................................................................7 1.4. Configuration of Tested System...............................................................................7 1.5. EUT Exercise Software............................................................................................8 1.6. Test Environment.....................................................................................................9 2. Peak Output Power ...................................................................................................10 2.1. Test Equipment.......................................................................................................10 2.2. Test Setup...............................................................................................................10 2.3. Limit.........................................................................................................................11 2.4. Test Procedure.......................................................................................................12 2.5. Uncertainty..............................................................................................................12 2.6. Test Result..............................................................................................................13 2.7. Test Photograph......................................................................................................16 3. Modulation Characteristic...........................................................................................18 3.1. Test Equipment.......................................................................................................18 3.2. Test Setup...............................................................................................................18 3.3. Limit.........................................................................................................................19 3.4. Test Procedure........................................................................................................19 3.5. Uncertainty...............................................................................................................19 3.6. Test Result...............................................................................................................20 3.7. Test Photograph.......................................................................................................21 4. Occupied Bandwidth...................................................................................................22 4.1. Test Equipment........................................................................................................22 4.2. Test Setup................................................................................................................22 4.3. Limit..........................................................................................................................22 4.4. Test Procedure.........................................................................................................23 4.5. Uncertainty......................................................…

Text truncated - open the document above for the full version.

Test Setup Photos

Report No: CCIS14080066001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800660RF No.B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 25 of 31 7 Test Setup Photo Radiated Spurious Emission

Contact Information

Applicant

Km kang
[email protected]0755-86185127Fax: 0755-86018712

Test Firm

Shenzhen Zhongjian Nanfang Testing Co.,LtdBruce Zhang
[email protected]86-755-23118282Fax: 86-755-23116366

Technical Specifications

#Rule PartsFrequency RangePower OutputEmissionTolerance
224E1.85 GHz - 1.91 GHz169.80 mW275KGXW0.05 ppm
Confidentiality
Long Term
Grant Notes
Power listed is ERP for part 22 and EIRP for part 24. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other transmitter. End-users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance.

Other Applications from China Aerospace Telecommunications (Shenzhen) Limited

GPS Tracker - FCC ID N66PT-718-3 - China Aerospace Telecommunications (Shenzhen) Limited
N66PT-718-3

GPS Tracker

Nov 19, 2015

Equipment Class

PCT - PCS Licensed Transmitter worn on body