Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
’
Instruction of Remote Control Light Contents. 1. How to change the battery of controller. 2. How to change the battery of lamp. 3. How to installing the light on the surface. 4. How to operating the lamp. 1 1. How to change the battery of controller. To change the battery, slide off the back cover and replace with new battery (6V camera). The “On/Off button is underneath the front cover. Slides open the front cover to press the On/Off button. To turn on the remote light press the remote button and hold for one second. 2. How to change the battery of Lamp. To change the battery, slide off the front side bottom cover and insert two AA batteries. Match the negative/ positive marking shown in the battery compartment to the batteries. 2 3. How to installing light on the surface of tent. First step - Find Velcro strips sewn inside on the tent ceiling and out side next to the front door. Second step – Mount the light to the Velcro by pressing the back of the light firmly against the strips. 4. How to operating the lamp. First step - Press the lights switch to the on position. Second step -If slide out of front cover on the controller, it may can see red button. And press the red button for one second to turn it on the light. When you press again, that the light is back to off position. If you not turn the light switch to on position, the remote controller is not operating. Note: *Always remove the lights from tent before folding it up. *Always remove the batteries after each camping season. *Batteries for the remote lights are not included. 3
Compliance Test Report for FCC Company name Address Telephone Product name Model No. Serial No. Test date2003-03-17~ Testing location Standard □Class A□Class BTest resultN/A □Class A■Class BTest resultOK Tested by Reviewed by Abbreviation * Note - This test report is not permitted to copy partly without our permission - This test result is dependent on only equipment to be used - This test result based on a single evaluation of one sample of the above mentioned OK, Pass = Passed, Fail = Failed, N/A = not applicable POONG HAN ENGINEERING CO., LTD. 5-10, ONGJUNG-LI, TONGJIN-MYON, KIMPO-SI, KYOUNGGI- DO, KORE A 82-31-988-9006 Measurement facility registration number Senior Engineer J.M. Yang Director T.K. Lee 94696 (Signature) (Signature) Date of issue2003-03-20 ESTECH. Co., Ltd. 97-1 Hoiuk-Ri Majang-Myon, Icheon-city, KyungKi-Do, Korea Test item □ Conducted Emission ■ Radiated Emission FCC PART 15.231 Subpart C -Intentional Radiator PH-TL001 NONE Xiamen Poong Han En gineering Co.,Ltd. China Report Number : ESTF150303-002 , Web : www. estech. co. kr Page 1 of 13 Report NumberESTF150303-002 Manufacturer Country of origin Applicant Product 2003-03-24 REMOTE CONTROL LIGHT 3 4 5 6 8 8 8 8 9 10 10 10 11 12 13 Report Number : ESTF150303-002 , Web : www. estech. co. kr Page 2 of 13 5.4 Occupied Bandwidth Measurement Graph......................................................... 6.4 Photographs of test setup ........................................................................... 7. Photographs of EUT ....................................................................................... 6. Measurement of radiated emission (30MHz - 3GHz) .......................................... 6.3 Test data ................................................................................................ ... 4. Measurement condition .................................................................................... Contents 1. Laboratory Information .................................................................................... 2. Description of EUT .......................................................................................... 3. Test Standards ................................................................................................ 5. Occupied Bandwidth Measurement..................................................................... 6.2 Environmental conditions ........................................................................... 5.1 Test procedure .......................................................................................... 5.2 Test instruments and measurement setup ...................................................... 5.3 Measurement results .................................................................................... 6.1 Measurement equipment .............................................................................. 1. Laboratory Information 1.1 General 1.2 Test Lab. Corporation Name : ESTECH Co. Ltd Head Office : 3 rd Fl., Chungdam Bldg., 119-1 Chungdam-dong Kangnam-gu , Seoul, Korea (Safety & Telecom. Test Lab) EMC Test Lab : 58-1 Osan-Ri, GaNam-Myon, YeoJoo-Gun, KyungKi-Do, Korea 97-1 Hoiuk-Ri Majang-Myon, Icheon-city, KyungKi-Do, Korea 1.3 Official Qualification(s) MIC : Granted Accreditation from Ministry of Information & Communication for EMC, Safety and Telecommunication KOLAS : Accredited Lab By Korea Laboratory Accreditation Schema base on CENELEC requirements FCC : Filed Laboratory at Federal Communications Commission VCCI : Granted Accreditation from Voluntary Control Council for Interference from ITE This EUT (Equipment Under Test) has been shown to be capable of compliance with the applicable technical standards and is tested in accordance with the measurement procedures as indicated in this report. ESTECH Lab attests to accuracy of test data. All measurement reported herein were performed by ESTECH Co., Ltd. ESTECH Lab assume full responsibility for the completeness of these measurements and vouch for the qualifications of all persons taking them. Report Number : ESTF150303-002 , Web : www. estech. co. kr Page 3 of 13 2. Description of EUT 2.1 Summary of Equipment Under Test Product: Model Number: Serial Number: Manufacturer: Country of origin: Rating : Out put Frequency: Receipt Date: 2.2 General descriptions of EUT Report Number : ESTF150303-002 , Web : www. estech. co. kr Page 4 of 13 Remote Control Light REMOTE CONTROL LIGHT PH-TL001 NONE Xiamen Poong Han Engineering Co.,Ltd. China 6V DC(Battery) 2003-02-05 300 MHz 3. Test Standards Test Standard : FCC PART 15 (2002) Test Method : ANSI C 63.4 (2001) This standard sets forth uniform methods of measurement of radio-frequency (RF) signals and noise emitted from both unintentional and intentional emitters of RF energy in the frequency range 9 kHz to 40 GHz. Methods for the measurement of radiated and AC power-line conducted radio noise are covered and may be applied to any such equipment unless otherwise specified by individual equipment requirements. These methods cover measurement of certain decides that deliberately radiate energy, such as intentional emitters, but does not cover licensed transmitters. This standard is not intended for certification/approval of avionic equipment or for industrial, scientific, and medical (ISM) equipment These method apply to the measurement of individual units or systems comprised of multiple units This Standard sets out the regulations under which an intentional, unintentional, or incidental radiator may be operated without an individual license. It also contains the technical specifications, administrative requirements and other conditions relating to the marketing of Part 15 devices. Report Number : ESTF150303-002 , Web : www. estech. co. kr Page 5 of 42 4. Measurement Condition 4.1 EUT Operation. 4.2 Configuration and Peripherals * The EUT was in the following operation mode during all testing * The operational conditions of the EUT was determined …
Text truncated - open the document above for the full version.
6.4 Setup for Radiated Test : 30 ~ 3 GHz [ Front ] [ Rear ] Report Number : ESTF150303-002 , Web : www. estech. co. kr Page 12 of 13
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15.231 | 300 MHz - 300 MHz | - |