Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
WTP-060423-01-V(U) OPERATION 1. The transmitter will enable you operate together with receiver of the fan for ABCand please read the ABC operation book 2. Transmitter 1----FAN 2----HEAT 3----TIMEFAN CONSTANT TIME 4---- TIMELIGHT CONSTANT TIME 5----LIGHT 6----POWER 7---- SET UP/SET DOWN 8---- TEMP MODEL 9---- CODE SWITCH 3. CODE SWITCH 1) CODE SWITCHKEY 9: Code are set by pushing dip switches up or down, It is imperative that the code used for both transmitter and receiver is exactly the same, otherwise remote controller will not work, Please note the code switch will enable you to operate a second remote controller independently, For example, if you have ceiling fans with 2 remote control units, set 2 different codes for each set of transmitter/ receivers, This means you can operate each ceiling fan independently. 2) You remote control is ready for use after battery installation. 4FUNCTIONS OF TRANSMITTER 1POWERKEY 6Press immediately, turn on or turn off the transmitter. 1 2 3 4 5 6 7 8 9 2FANKEY 1Press immediately, turn on the fan at high, medium or low speed, or turn off the fan. 3HEATKEY 2 Press immediatelyturn on the heat, and the fan is the low speed. 4LIGHTKEY5Press immediately, turn on or turn off the light, and press and hold to dim or brighten lights to the desired level and release.(Only for the tungsten bulb.) 5SET UP/SET DOWNKEY 7Press SET UP/SET DOWN will desired room temperature in the case without constant time 6TIMEKEY3Press immediately, then press the SET UP/SET DOWN to set the time of the fan. 7TEMP MODELKEY 8Press the key to set the temperature unit at. 8TIMEKEY4Press immediately, then press the SET UP/SET DOWN to set the time of the light. NOTEWhen is shown on the LCD, you must change new batteries because the power is shortage. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: 1) This device may not cause harmful interference, and 2) This device must accept any interference received including interference that may cause undesired operation FCC NOTE: THE MANUFACTURER IS NOT RESPONSIBLE FOR ANY RADIO OR TV INTERFERENCE CAUSED BY UNAUTHORIZED MODIFICATIONS TO THIS EQUIPMENT. SUCH MODIFICATIONS COULD VOID THE USER'S AUTHORITY TO OPERATE THE EQUIPMENT.
LCD DISPLAY CPU TRANSMITTER UNIT 315 MHz POWER SUPPLY KEY BOARD CODE SELECT ANTENNA 6V 3.3V
EUT - Front View EUT - Back View
FCC ID Label Sample for Model: F10-2041-0000, F10-2041-0100, F10-4041-0000, F10-4041-0100 FCC ID: UHOF10-2041 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation.
FCC ID Label This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:(1)this device may not cause harmful interference,and (2) this device must accept any interference received, including interference that may cause undesired operation The Label must not be a stick-on paper. The Label on these products must be permanently affixed to the product and readily visible at the time of purchase and must last the expected lifetime of the equipment not be readily detachable. Proposed Label Location on EUT EUT Bottom View/proposed FCC Mark Location FCC ID: UHOF10-2041 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:
PCB1-Front View PCB1-Back View PCB2-Front View PCB2-Back View
CIRCUIT DESCRIPTION The main part of the circuit is the CPU, it work with a clock of 4MHZ that got from a crystal Y4, and with a power supply of 3.3V, which provided by the regulator U2 and the AAAx4 alkaline battery pile. Anytime, the CPU detect the signals from those blocks below and indicate the stages and operations of them on the LCD, the temp detector which is made up of R8,R9,R21 and the low battery detector which is made up of R7,R6,Q3,Q2 and the key array S1~S9. Also, a coding array based on the key being pressed and the code being setup on the code-switch S14 will be fed to the transmit circuit if necessary. The transmit circuit is mainly made up of Y1, Q1, C1, C3, C4 and L1. When a coding array coming, the circuits oscillate and bring out a carrier wave with the frequency of 315MHz. Those coding will be modulated on the carrier, and then the being-modulated RF signal is fed through C6 to the Antenna to transmit.
电风扇遥控器1.2.sch-1 - Sat Jul 08 10:44:20 2006
FCC TEST REPORT Page 1 of 25 FCC ID : UHOF10-2041 Applicant : Air Breeze Co., Ltd. 28# Jinguan Road, Dongsheng Town, Zhongshan City, Guangdong, China Equipment Under Test (EUT) : Product description :Electric Room Heater, Fixed & Location Dedicated Model No. : F10-2041-0000, F10-2041-0100, F10-4041-0000, F10-4041-0100 Standards : FCC 15 Subpart C Paragraph 15.231 Date of Test : August 22, 2006 Test Engineer : Tiger Su Reviewed By : PERPARED BY: Waltek Services (Shenzhen) Co., Ltd. 8C,West Tower, Aidi Building, No.5003 Binhe Rd, Futian District, Shenzhen518045, Guangdong, China. Tel: 86-755-83551033 Fax: 86-755-83552400 Air Breeze Co., Ltd FCC ID: UHOF10-2041 2 Contents Page 1 COVER PAGE..........................................................................................................................................................1 2 CONTENTS..............................................................................................................................................................2 3 TEST SUMMARY....................................................................................................................................................5 4 GENERAL INFORMATION..................................................................................................................................6 4.1 CLIENT INFORMATION............................................................................................................................................6 4.2 GENERAL DESCRIPTION OF E.U.T...........................................................................................................................6 4.3 DETAILS OF E.U.T..................................................................................................................................................6 4.4 DESCRIPTION OF SUPPORT UNITS...........................................................................................................................6 4.5 STANDARDS APPLICABLE FOR TESTING..................................................................................................................6 4.6 TEST FACILITY........................................................................................................................................................7 4.7 TEST LOCATION......................................................................................................................................................7 5 EQUIPMENT USED DURING TEST...................................................................................................................8 6 CONDUCTED EMISSION TEST..........................................................................................................................9 6.1 TEST EQUIPMENT....................................................................................................................................................9 6.2 TEST PROCEDURE...................................................................................................................................................9 6.3 CONDUCTED TEST SETUP.....................................................................................................................................10 6.4 EUT OPERATING CONDITION...............................................................................................................................10 6.5 CONDUCTED EMISSION LIMITS.............................................................................................................................11 6.6 CONDUCTED EMISSION TEST RESULT...................................................................................................................11 7 RADIATION EMISSION TEST...........................................................................................................................12 7.1 TEST EQUIPMENT..................................................................................................................................................12 7.2 MEASUREMENT UNCERTAINTY.............................................................................................................................12 7.3 TEST PROCEDURE.................................................................................................................................................12 7.4 RADIATED TEST SETUP.........................................................................................................................................13 7.5 SPECTRUM ANALYZER SETUP...............................................................................................................................13 7.6 CORRECTED AMPLITUDE & MARGIN CALCULATION............................................................................................14 7.7 SUMMARY OF TEST RESULTS................................................................................................................................14 7.8 EUT OPERATING CONDITION...............................................................................................................................15 7.9 RADIATED EMISSIONS LIMIT.................................................................................................................................15 7.10 RADIATED EMISSIONS TEST RESULT................................................................................................................16 7.10.1 Radiated Emission Test Data.....................................................................................................................16 8 PERIODIC OPERATION.....................................................................................................................................18 9 BAND EDGE..........................................................................................................................................................19 9.1 TEST PROCEDURE..................................................…
Text truncated - open the document above for the full version.
Radiation Emission Test View For 30MHz-1000MHz Radiation Emission Test View For 1GHz-5GHz
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15.231 | 315 MHz - 315 MHz | - |