Neutron Engineering Inc. Project No.: 1011C267 Page 2 of 12 MS-191OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 2 of 12 MS-191OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 3 of 12 MS-157OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 3 of 12 MS-157OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 4 of 12 MS-183OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 4 of 12 MS-183OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 5 of 12 MS-150OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 5 of 12 MS-150OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 6 of 12 MS-173OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 6 of 12 MS-173OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 7 of 12 MS-148OR Neutron Engineering Inc. Project No.: 1011C267 Page 7 of 12 MS-148OR Neutron Engineering Inc. Project No.: 1011C267 Page 8 of 12 MS-162OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 8 of 12 MS-162OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 9 of 12 MS-158OR 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 9 of 12 MS-158OR 1011C267 1011C267
Neutron Engineering Inc. Project No.: 1011C267 Page 10 of 12 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 10 of 12 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 11 of 12 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 11 of 12 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 12 of 12 1011C267 1011C267 Neutron Engineering Inc. Project No.: 1011C267 Page 12 of 12 1011C267 1011C267
Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 2 of 59 Declaration Neutron represents to the client that testing is done in accordance with standard procedures as applicable and that test instruments used has been calibrated with the standards traceable to National Measurement Laboratory (NML) of R.O.C., or National Institute of Standards and Technology (NIST) of U.S.A. Neutron's reports apply only to the specific samples tested under conditions. It is manufacture’s responsibility to ensure that additional production units of this model are manufactured with the identical electrical and mechanical components. Neutron shall have no liability for any declarations, inferences o r generalizations drawn by the client or others from Neutron issued reports. Neutron’s reports must not be used by the client to claim product endorsement by the authorities or any agency of the Government. This report is the confidential property of the client. As a mutual protection to the clients, the public and Neutron-self, extracts from the test report shall not be reproduced except in full with Neutron’s authorized written approval. Neutron’s laboratory quality assurance procedures are in compliance with the ISO Guide 17025 requirements, and accredited by the conformity assessment authorities listed in this test report. Limitation For the use of the authority's logo is limited unless the Test Standard(s)/Scope(s)/Item(s) mentioned in this test report is (are) included in the conformity assessment authorities acceptance respective. Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 3 of 59 Table of Contents Page 1 . CERTIFICATION 6 2 . SUMMARY OF TEST RESULTS 7 2.1 TEST FACILITY 8 2.2 MEASUREMENT UNCERTAINTY 8 3 . GENERAL INFORMATION 9 3.1 GENERAL DESCRIPTION OF EUT 9 3.2 DESCRIPTION OF TEST MODES 12 3.3 TABLE OF PARAMETERS OF TEXT SOFTWARE SETTING 12 3.4 BLOCK DIGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 13 3.5 DESCRIPTION OF SUPPORT UNITS(CONDUCTED MODE) 14 4 . EMC EMISSION TEST 15 4.1 CONDUCTED EMISSION MEASUREMENT 15 4.1.1 POWER LINE CONDUCTED EMISSION LIMITS 15 4.1.2 MEASUREMENT INSTRUMENTS LIST AND SETTING 15 4.1.3 TEST PROCEDURE 16 4.1.4 DEVIATION FROM TEST STANDARD 16 4.1.5 TEST SETUP 16 4.1.6 EUT OPERATING CONDITIONS 16 4.1.7 TEST RESULTS 17 4.2 RADIATED EMISSION MEASUREMENT 18 4.2.1 RADIATED EMISSION LIMITS 18 4.2.2 MEASUREMENT INSTRUMENTS LIST ANS SETTING 19 4.2.3 TEST PROCEDURE 22 4.2.4 DEVIATION FROM TEST STANDARD 22 4.2.5 TEST SETUP 23 4.2.6 EUT OPERATING CONDITIONS 23 4.2.7 TEST RESULTS (BETWEEN30 – 1000 MHZ) 24 4.2.8 TEST RESULTS (ABOVE 1000 MHZ) 26 5 . NUMBER OF HOPPING CHANNEL 38 5.1 APPLIED PROCEDURES / LIMIT 38 5.1.1 MEASUREMENT INSTRUMENTS LIST AND SETTING 38 5.1.2 TEST PROCEDURE 38 5.1.3 DEVIATION FROM STANDARD 38 5.1.4 TEST SETUP 38 5.1.5 EUT OPERATION CONDITIONS 38 5.1.6 TEST RESULTS 39 Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 4 of 59 Table of Contents Page 6 . AVERAGE TIME OF OCCUPANCY 40 6.1 APPLIED PROCEDURES / LIMIT 40 6.1.1 MEASUREMENT INSTRUMENTS LIST 40 6.1.2. TEST PROCEDURES 40 6.1.3. TEST SETUP LAYOUT 40 6.1.4. TEST DEVIATION 40 6.1.5. EUT OPERATION DURING TEST 40 6.1.6. TEST RESULTS 41 7 . HOPPING CHANNEL SEPARATION MEASUREMENT 43 7.1 APPLIED PROCEDURES / LIMIT 43 7.1.1 MEASUREMENT INSTRUMENTS LIST AND SETTING 43 7.1.2 TEST PROCEDURE 43 7.1.3 DEVIATION FROM STANDARD 43 7.1.4 TEST SETUP 43 7.1.5 EUT OPERATION CONDITIONS 43 7.1.6 TEST RESULTS 44 8 . BANDWIDTH TEST 46 8.1 APPLIED PROCEDURES / LIMIT 46 8.1.1 MEASUREMENT INSTRUMENTS LIST AND SETTING 46 8.1.2 TEST PROCEDURE 46 8.1.3 DEVIATION FROM STANDARD 46 8.1.4 TEST SETUP 46 8.1.5 EUT OPERATION CONDITIONS 46 8.1.6 TEST RESULTS 47 9 . PEAK OUTPUT POWER TEST 49 9.1 APPLIED PROCEDURES / LIMIT 49 9.1.1 MEASUREMENT INSTRUMENTS LIST AND SETTING 49 9.1.2 TEST PROCEDURE 49 9.1.3 DEVIATION FROM STANDARD 49 9.1.4 TEST SETUP 49 9.1.5 EUT OPERATION CONDITIONS 49 9.1.6 TEST RESULTS 50 10 . ANTENNA CONDUCTED SPURIOUS EMISSION 52 10.1 APPLIED PROCEDURES / LIMIT 52 10.1.1 MEASUREMENT INSTRUMENTS LIST AND SETTING 52 10.1.2 TEST PROCEDURE 52 10.1.3 DEVIATION FROM STANDARD 52 10.1.4 TEST SETUP 52 10.1.5 EUT OPERATION CONDITIONS 52 Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 5 of 59 Table of Contents Page 10.1.6 TEST RESULTS 53 11 . EUT TEST PHOTO 59 Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 6 of 59 1. CERTIFICATION E q u i p m e n t : Mouse Brand Name : NEWMEN Model Name : MS-191OR;MS-148OR;MS-150OR;MS-157OR;MS-158OR; MS-162OR;MS-173OR;MS-183OR A p p l i c a n t : Shenzhen Fuyeda Industry Development Corp.,Ltd. Date of Test : Nov. 26, 2010 ~ Dec. 10, 2010 T e s t I t e m : ENGINEERING SAMPLE Standards : FCC Part15, Subpart C(15.247) / ANSI C63.4 : 2003 The above equipment has been tested and found compliance with the requirement of the relative standards by Neutron Engineering Inc. EMC Laboratory. The test data, data evaluation, and equipment configuration contained in our test report (Ref No. NEI-FCCP-1-1011C267) were obtained utilizing the test procedures, test instruments, test sites that has been accredited by the Authority of NVLAP and TAF according to the ISO-17025 quality assessment standard and technical standard(s). Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 7 of 59 2. SUMMARY OF TEST RESULTS Test procedures according to the technical standards: FCC Part15 (15.247) , Subpart C Standard Section Test Item Judgment Remark 15.207 Conducted Emission N/A 15.247(d) Antenna conducted Spurious EmissionPASS 15.247 (a)(1) Hopping Channel Separation PASS 15.247 (b)(1) Peak Output Power PASS 15.247(d) 15.209 Radiated Spurious Emission PASS 15.247 (a)(1)(iii) Number of Hopping Frequency PASS 15.247 (a)(1)(iii) Dwell Time PASS 15.205 Restricted Bands PASS 15.203 Antenna Requirement PASS 1.1307 1.1310 2.1091 2.1093 RF Exposure Compliance PASS NOTE: (1)” N/A” denotes test is not applicable in this Test Report Neutron Engineering Inc. Report No.: NEI…
Text truncated - open the document above for the full version.
Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 59 of 59 11. EUT TEST PHOTO Radiated Measurement Photos Neutron Engineering Inc. Report No.: NEI-FCCP-1-1011C267 Page 59 of 59 11. EUT TEST PHOTO Radiated Measurement Photos
No.3 Jinshagang 1st Rd · Dongguan City · China
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.41 GHz - 2.48 GHz | 150.00 µW |

Full-size Wireless Keyboard
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Dongle
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Wireless Mouse
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Bluetooth Number Pad
Equipment Class
DTS - Digital Transmission System
dongle
Equipment Class
DTS - Digital Transmission System