
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Document Name: MBSC1900-040-RU Revision: 001.01A Effective Date: 4/15/2013 USER MANUAL Fiber Optic MBSC Platform MBSC1900-040-RU High-Power In-Building Coverage Solution 6185 Phyllis Drive Cypress, CA 90630 USA PH: 714.230.8333 Visit our Website at www.BTIwireless.com MBSC1900-040-RU Copyright © 2015 BTI Wireless All rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior written permission from BTI Wireless. All copyright, confidential information, patents, design rights and all other intellectual property rights of whatsoever nature contained herein are and shall remain the sole and exclusive property of BTI Wireless. The information furnished herein is believed to be accurate and reliable. However, no responsibility is assumed by BTI Wireless for its use, or for any infringements of patents or other rights of third parties resulting from its use. The BTI Wireless name and BTI Wireless logo are trademarks or registered trademarks of BTI Wireless All other trademarks are the property of their respective owners BTI Wireless 6185 Phyllis Drive Unit D, Cypress, CA 90630 Phone: 1-714-230-8333 Website: www.btiwireless.com MBSC0800-040-RU MBSC1900-040-RU Document History Paper copies are valid only on the day they are printed. Contact the author if you are in any doubt about the accuracy of this document. Revision History Revision Number Revision Date Summary of Changes 001.00A 2/28/2013 Initial Release for NA 001.01A 4/15/2013 Updated for new EMS GENERAL SAFETY PRECAUTIONS Warning: Wet conditions increase the potential for receiving an electrical shock when installing or using electrically-powered equipment. To prevent electrical shock, never install or use electrical equipment in a wet location or during a lighting storm. Improper installation and operation of this equipment outside of the recommended installation procedures, and operation beyond the designed operating specifications, and/or not in compliance with regulatory requirements, will revoke any warranty and may: Prevent the equipment from performing properly Violate regulatory RF emissions requirements Require removal of the equipment from service. ©1999-2013 Bravo Tech Inc. MBSC1900-040-RU TABLE OF CONTENTS 1 INTRODUCTION 1 1.1 SYSTEM SOLUTION BLOCK DIAGRAM 1 1.1.1 Host Unit 1 1.1.2 Remote Node 2 2 SAFETY 3 3 SYSTEM OVERVIEW AND UNIT DESCRIPTION 4 3.1 SYSTEM OVERVIEW 4 3.1.1 Interface with BTS 4 3.1.2 Interface with Cellular Phones 5 3.1.3 Fiber Optic Transport 5 3.1.4 Powering 5 3.1.5 Cooling 5 3.1.6 Fault Detection and Alarm Reporting 5 3.2 HOST UNIT DESCRIPTION 5 3.2.1 Host Unit Components 6 3.2.2 Mounting 9 3.2.3 Fault Detection and Alarm Reporting 9 3.2.4 RF Signal Connections 9 3.2.5 Optical Connections 9 3.2.6 Powering 10 3.2.7 Host Unit Interface 10 3.3 REMOTE NODE DESCRIPTION 12 3.3.1 CM-BTS/ANT Enclosure 12 3.3.2 Single-band RUEnclosure 17 3.3.3 Power Supply Junction Box 20 3.3.4 Shroud& Bracket 21 4 SYSTEM INSTALLATION 23 4.1 UNPACKING AND INSPECTION 23 4.2 INSTALLATION PREPARATION 23 4.2.1 Required Tools 23 4.2.2 Installation Location 23 4.2.3 Anti-corrosion and Shock-protection 24 4.2.4 Lighting, Ventilation and Fire Protection 24 4.2.5 Power Requirements 24 ©1999-2013 Bravo Tech Inc. MBSC1900-040-RU 4.2.6 Lightning Protecting and Grounding 24 4.3 HOST UNIT INSTALLATION 24 4.3.1 Rack Mounting 24 4.3.2 Cable Connections 26 4.4 REMOTE NODE INSTALLATION 30 4.4.1 Bracket and Shroud Installation 30 4.4.2 Cable Connections 33 4.5 INSTALLATION FINAL INSPECTION 38 4.5.1 Host Unit Connection Overview 39 4.5.2 Remote Node Connection Overview 40 4.5.3 mBSC-C Inspection Checklist 41 4.5.4 Cabling Inspection 41 4.6 SYSTEM TEST 41 5 SYSTEM MONITORING &CONFIGURATION 43 5.1 ACCESSING EMS LOCAL GUI 43 5.1.1 Using Ethernet Port 43 5.1.2 Using USB Port 44 5.1.3 Login to EMS Local GUI 45 5.2 NAVIGATING THE EMS LOCAL GUI 47 5.2.1 Topology Tool Bar 48 5.2.2 Upgrade/Password Functions 49 5.3 INSTALLATION & CONFIGURATION 49 5.3.1 Network & Communications 49 5.3.2 System Installation 51 5.3.3 Alarms 56 5.4 SYSTEM TUNING 58 5.4.1 BTS Signal Conditioning 58 5.4.2 Set Downlink Gain 58 5.4.3 Set Uplink Gain 61 5.4.4 Link Verification 63 5.5 MONITORING AND ALARMS 65 5.5.1 Operational Status 65 5.5.2 System Alarms 67 5.6 SYSTEM UPGRADE 68 5.6.1 Verify Software Versions 68 5.6.2 Upgrade component software 68 ©1999-2013 Bravo Tech Inc. MBSC1900-040-RU 6 MAINTENANCE 70 6.1 ELECTROSTATIC DISCHARGE PRECAUTIONS 70 6.2 PREVENTATIVE MAINTENANCE 70 6.3 FAULT DETECTION AND ALARM REPORTING 70 6.4 TROUBLESHOOTING QUICK GUIDE 71 6.4.1 Host Unit Trouble Shooting 72 6.4.2 Remote Unit Trouble Shooting 73 7 TERMS, ACRONYMS & ABBREVIATIONS 74 8 PACKING LIST 75 ©1999-2013 Bravo Tech Inc. MBSC1900-040-RU LIST OF FIGURES FIGURE 1BLOCK DIAGRAM OF HOST UNIT ................................................................................................................................. 1 FIGURE 2 BLOCK DIAGRAM OF REMOTE NODE .......................................................................................................................... 2 FIGURE 3MBSC SYSTEM FUNCTIONAL OVERVIEW ..................................................................................................................... 4 FIGURE 4 HOST UNIT .................................................................................................................................................................. 6 FIGURE 5BIU ............................................................................................................................................................................. 7 FIGURE 6FIU .............................................................................................................................................................................. 7 FIGURE 7 PS…
Text truncated - open the document above for the full version.
Bravo Tech (Shenzhen) Co. Ltd. No. 8 Building, The 3rd Zone, Tangtou Industrial Park Shiyan, Baoan District, Shenzhen, China DATE :2014-12-30 Nemko Canada Inc 303 River Road Ottawa, Ontario, Canada K1V 1H2 Attn: Director of Certification Authority to Act as Agent On our behalf, I appoint Hank.Yan of Global United Technology Services Co., Ltd. 2nd Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District Shenzhen Guangdong to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in the Federal Communications Commission’s regulations will have affixed to it a label identical to that submitted for approval with this application. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by Nemko Canada Inc, still resides with Bravo Tech (Shenzhen) Co. Ltd. and No. 8 Building, The 3rd Zone, Tangtou Industrial Park Shiyan, Baoan District, Shenzhen, China Dated this / Day of 12/30/2014 / Agency agreement expiration date: 12/30/2015 By: Bailey Zheng Signature Printed Title: COO On behalf of : Bravo Tech (Shenzhen) Co. Ltd. Telephone: +1-714-230-8333
Bravo Tech (Shenzhen) Co. Ltd. No. 8 Building, The 3rd Zone, Tangtou Industrial Park Shiyan, Baoan District, Shenzhen, China 2014-12-30 Equipment Authorization Division Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 FCC ID: WBKMBSC1900040RUC Product Name: mBSC-C RU Request for Confidentiality Pursuant to Sections 0.457 and 0.459 of the commissions rules, we hereby request that the following documents be held confidential: Schematics Block diagram Operational Description Tune up procedure These materials contain trade secrets and proprietary information and are not customarily released to the public. The public disclosure of this information might be harmful to the company and provide unjustified benefits to our competitors. Dated this 12/30/2014 By: Bailey Zheng Si gnature Printed Title: COO On behalf of : Bravo Tech (Shenzhen) Co. Ltd. Telephone: +1-714-230-8333
Bravo Tech (Shenzhen) Co. Ltd. No. 8 Building, The 3rd Zone, Tangtou Industrial Park Shiyan , Baoan District, Shenzhen, China DATE: 2015/02/03 Nemko Canada Inc 303 River Road Ottawa, Ontario, Canada K1V 1H2 Attn: Director of Certification Statement letter We, Bravo Tech, Inc.declare on our sole responsibility for the product of mBSC1900-040-RUC11, mBSC1900-020-RUC11 FCC ID: WBKMBSC1900040RUC For FCC appliance will be sold as one single package which does not contain antenna system(antenna, coupler,etc). these accessories will be provided by solution provider(operator), according to site conditions. Sincerely yours, 2015-02-03 Company: Bravo Tech (Shenzhen) Co. Ltd.
RUM- Front view RUM- Rear view RUM- Top view RUM- Bottom view RUM- Left view RUM- Right view
3M7818 PRINTING: LABEL MUST BE PRINTED WITH INDELIBLE BLACK INK THAT IS COMPATIBLE WITH LABEL STOCK. DIECUTTING. EXCESS FACE STOCK SHALL NOT BE REMOVED. RF Frequency, -DL: 1930-1995 MH z -UL: 1850-1915 MH z IC: 10753B-MBSC1940RUC FCC ID: WBKMBSC1900040RUC RF Power for ANT: 40Watts, Max AC Power: 100-240 VAC, 50-60Hz, 5A Max mBSC1900-040-RUC11 01 ࡍ⡸ᵜ 2014-12-08 ᴩ㔗Ⓚ TUV /2*2ս㖞ቪረྲമᡰ皮/2*2ቪረѪ
Label location
Label location
Prediction of MPE limit at a given distance Equation from page 18 of OET Bulletin 65, Edition 97-01 where:S = power density P = power input to the antenna G = power gain of the antenna in the direction of interest relative to isotropic R = distance to the center of radiation of the antenna Maximum peak output power at antenna input terminal:46.26(dBm) Maximum peak output power at antenna input terminal:42266.9(mW) Antenna gain(typical):16(dBi) Maximum antenna gain:39.811(numeric) Prediction distance:550(cm) Sourse Based Time Average Duty Cycle:100(%) Prediction frequency:1962.5(MHz) MPE limit for uncontrolled exposure at prediction frequency:1.000(mW/cm^2) Power density at prediction frequency:0.44265(mW/cm^2) Power density at prediction frequency:4.4265(W/m^2) Margin of Compliance:3.54(dB) 2 4R PG S p =
Global United Technology Services Co., Ltd. Report No.: GTSE14120218801 Authorized Signature: Robinson Lo Laboratory Manager This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other samples of the same product and does not permit the use of the GTS product certification mark. The manufacturer should ensure that all products in series production are in conformity with the product sample detailed in this report. This report may only be reproduced and distributed in full. If the product in this report is used in any configuration other than that detailed in the report, the manufacturer must ensure the new system complies with all relevant standards. Any mention of GTS or testing done by GTS in connection with, distribution or use of the product described in this report must be approved by GTS in writing. This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Unless otherwise stated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 90 days only FCC REPORT Applicant: Bravo Tech (Shenzhen) Co. Ltd. Address of Applicant: No. 8 Building, The 3rd Zone, Tangtou Industrial Park Shiyan, Baoan District, Shenzhen, China Equipment Under Test (EUT) Product Name: mBSC-C RU Model No.: mBSC1900-040-RUC11, mBSC1900-020-RUC11 FCC ID: WBKMBSC1900040RUC Applicable standards: FCC CFR Title 47 Part 2:2014 FCC CFR Title 47 Part 15:2014 FCC CFR Title 47 Part24 Subpart E:2014 Date of sample receipt: December 10, 2014 Date of Test: December 10-18, 2014 Date of report issued: December 19, 2014 Test Result : PASS * * In the configuration tested, the EUT complied with the standards specified above. Report No.: GTSE14120218801 Global United Technology Services Co., Ltd. Project No.: GTSE141202188RF 2nd Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Telephone: +86 (0) 755 2779 8480 Fax: +86 (0) 755 2779 8960 Page 2 of 131 2 Version Version No. Date Description 00 December 19, 2014 Original Prepared By: Date: December 19, 2014 Project Engineer Check By: Date: December 19, 2014 Reviewer Report No.: GTSE14120218801 Global United Technology Services Co., Ltd. Project No.: GTSE141202188RF 2nd Floor, Block No.2, Laodong Industrial Zone, Xixiang Road Baoan District, Shenzhen, China 518102 Telephone: +86 (0) 755 2779 8480 Fax: +86 (0) 755 2779 8960 Page 3 of 131 3 Contents Page 1 COVER PAGE ............................................................................................................................................ 1 2 VERSION ....................................................................................................................................................2 3 CONTENTS ................................................................................................................................................3 4 TEST SUMMARY .......................................................................................................................................5 5 GENERAL INFORMATION ........................................................................................................................6 5.1 CLIENT INFORMATION............................................................................................................................6 5.2 GENERAL DESCRIPTION OF EUT ...........................................................................................................6 5.3 RELATED SUBMITTAL(S) / GRANT (S) .....................................................................................................7 5.4 TEST METHODOLOGY............................................................................................................................7 5.5 TEST FACILITY......................................................................................................................................7 5.6 TEST LOCATION....................................................................................................................................7 5.7 TEST INSTRUMENTS LIST.......................................................................................................................8 6 TEST CONFIGURATION AND CONDITIONS...........................................................................................9 6.1 EUT CONFIGURATION...........................................................................................................................9 6.2 CONFIGURATION OF TESTED SYSTEM..................................................................................................10 6.3 TEST ENVIRONMENTS.........................................................................................................................12 6.4 TEST SIGNAL......................................................................................................................................12 6.5 TEST FREQUENCY SELECTION..............................................................................................................13 6.6 DESCRIPTION OF TEST MODES...................................................................................................15 7 RF POWER OUTPUT MEASUREMENT .................................................................................................16 7.1 STANDARD APPLICABLE......................................................................................................................16 7.2 TEST SETUP.......................................................................................................................................16 7.3 MEASUREMENT PROCEDURE..........................................................................................…
Text truncated - open the document above for the full version.
Radiated Emission
| # | Rule Parts | Frequency Range | Power Output | Emission | Tolerance |
|---|---|---|---|---|---|
| 4 | 24E | 1.93 GHz - 2.00 GHz | 42.17 W | GXW | Amp |

Remote Radio Unit
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
Remote Radio Unit
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
5G Integrated Base Station
Equipment Class
TNT - Licensed Non-Broadcast Transmitter Worn on Body5G NR Femtocell
Equipment Class
TNT - Licensed Non-Broadcast Transmitter Worn on Body
Remote Radio Unit
Equipment Class
CBD - Citizens Band Category A and B Devices