
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
The “Hai Jie”electronic energy instructions FCC ID:ZGGYPZ120182U Model:YPZ 220/18-2U.RR.D-F This device complies with Part 18 of the FCC Rules. Operation is Subject to the conditions that this device does not cause harmful Interference. This product may cause interference to radio equipment and should not be installed near maritime safety communications equipment or other critical navigation or communication equipment operating between 0.45–30 MHz. Advanced Card Systems Limited First ,Application: Electronic energy is the use of the brand energy-saving lamps electronic ballast made of technology, "since ZhenLiu fluorescent lamp", is a new type of energy-saving lighting source, can be easily replace incandescent lamp, widely used in the family, restaurant, hotel, restaurant, shopping malls and similar cases lighting. Second, Features: Green lighting products, energy efficiency rating for level 2, with the advanced precision electronic components, lightsome and design, a open that is light, the light can be no flash, in the same lighting effect power consumption is only about 20% of incandescent lamp, life is incandescent light bulb 5-8 times, the light is downy, favorable visual, use it directly. As a saving electricity and promoting the green lighting project, since ZhenLiu fluorescent lamp is a kind of ideal lighting source. Third, Tips : 1, The use of voltage range, can be in 180 V-250 V ac voltage, frequency frequency 50 Hz / 60 Hz. 2, Not be installed in the rain, and wet places, not used for dimmer circuit. 3, Shall not apply to closed type lamps and lanterns. 4, When installation is plastic parts it, be careful tubes and broken, not allowed to tear open outfit repair, in case of an accident. 5, Installation, when wiping, should first cut off power supply. Our company has passed the ISO9001 quality management system certification Beijing HaiJieMingRui Technology Co., Ltd. Address: 95-038,TaiZhouWu Haidian District Beijing Phone:86- 10-62406466 Fax: 86-10-62408320
BeiJing HaiJieMingRui Technology Co.,Ltd. 95-038 Taizhouwu Haidian District Beijing Telephone: 86-10-62406466 091010 – 5 Authority to Act as Agent Date: __2012- 1- 6______ American Certification Body, Inc. 6731 Whittier Avenue Suite C110 McLean, VA 22101 To Whom It May Concern: ______Washington Laboratories, LTD______ is authorized to act on our behalf, until otherwise notified, for applications to American Certification Body, Inc. (ACB). We certify that we are not subject to denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. Further, no party, as defined in 47 CFR 1.2002 (b), to the application is subject to denial of federal benefits, that includes FCC benefits. Thank you, Agency Agreement Expiration Date: _____12 months_____ By: __________________________ ___Xiaoming Qi_ (Signature 1 ) (Print name) Title: _International Business Manager On behalf of: _BeiJing HaiJieMingRui Technology Co.,Ltd. (Company Name) Telephone: 1 - Must be signed by applicant contact given for applicant on the FCC site, or by the authorized agent if an appropriate authorized agent letter has been provided. Letters should be placed on appropriate letterhead. _+86-10-62406466_ BeiJing HaiJieMingRui Technology Co.,Ltd. 95-038 Taizhouwu Haidian District Beijing Telephone: 86-10-62406466 091010 – 5 Request for Confidentiality Date: ___2012- 1- 6____ Subject: Confidentiality Request for: ______ZGGYPZ120182U_____ Pursuant to FCC 47 CRF 0.457(d) and 0.459 and IC RSP-100, Section 10, the applicant requests that a part of the subject FCC application be held confidential. Type of Confidentiality Requested Exhibit Short Term Permanent Block Diagrams Short Term Permanent External Photos Short Term Permanent* 2 Internal Photos Short Term Permanent Operation Description/Theory of Operation Short Term Permanent Parts List & Placement/BOM Short Term Permanent Tune-Up Procedure Short Term Permanent Schematics Short Term Permanent Test Setup Photos Short Term Permanent* User’s Manual *Note: ______(Insert Explanation as Necessary)______ BeiJing HaiJieMingRui Technology Co.,Ltd. has spent substantial effort in developing this product and it is one of the first of its kind in industry. Having the subject information easily available to "competition" would negate the advantage they have achieved by developing this product. Not protecting the details of the design will result in financial hardship. Permanent Confidentiality: The applicant requests the exhibits listed above as permanently confidential be permanently withheld from public review due to materials that contain trade secrets and proprietary information not customarily released to the public. Sincerely, By: _ Xiaoming Qi___ (Signature/Title 3 2 - The asterisked items (*) require further justification before permanent confidentiality will be allowed. These also currently require review by the FCC under their Permit-But-Ask policy before the grant is issued and can delay completion of an application. Further justification should be added to the note above. One such example for a potted device would be: “The EUT is FULLY potted using a non-removable epoxy based material. Removal of potting material causes irreparable damage to internal circuitry. See photographs exhibits that outline the device before and after potting.” ) (Print name) 3 - Must be signed by applicant contact given for applicant on the FCC site, or by the authorized agent if an appropriate authorized agent letter has been provided. Letters should be placed on appropriate letterhead.
EUT Photo-Front Side: EUT Photo-Back Side:
Laber and Lacotion Label Size: L15mm*W10mm BeiJing HaiJieMingRui Technology Co.,Ltd. Product Name: Energy-Saving Lamp Model No.: YPZ220/18-2U.RR.D-F AC Input Voltage Range 110V-230V Operating Frequency : 50-60Hz FCC ID: ZGGYPZ120182U
EUT Photo-Remove PCB: EUT Photo-Lamp Tube: EUT Photo-PCB Front View: EUT Photo- PCB Back View:
FCC Certification Test Report (FCC Part18 Subpart C) Product Name : Separated Energy-Saving Lamp Trade Name : HAIJIE Model No. : YPZ 120/18-2U.RR.D-F FCC ID : ZGGYPZ120182U Applicant: BeiJing HaiJieMingRui Technology Co.,Ltd. 95-038 Taizhouwu Haidian District Beijing Manufacturer: BeiJing HaiJieMingRui Technology Co.,Ltd. 95-038 Taizhouwu Haidian District Beijing Test Lab Name: Inventec (Pudong) Corporation 699 Pu-xing Road, Minhang District, Shanghai 201114, China Date of Receipt : 4/6/2011 Date of Test : 4/8/2011~4/12/2011 Issued Date : 4/12/2011 Report No. : LABE100101-ROF Version No. : 01 Release No. : 01 The test results are only related to the sample under test. The measurement traceability is based on all test equipments calibration, directly or indirectly traced to SI. The test report shall not be reproduced except in full without the written approval of Inventec (Pudong) Corporation. This report contains data that are not covered by the NVLAP accreditation. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP.NIST, or any agency of the Federal Government. Inventec (Pudong) Corporation 699, Pu-xing Road, Minhang District, Shanghai, 201114, China TEL. +86-21-6429-8888 ext. 65429 EMC Test Report (V1.0) Page 1 of 18 Report No.: LABE100101-ROF (01) TABLE OF CONTENTS Description Page 1. General Information .......................................................................................................... 2 1.1 EUT Description ................................................................................................. 2 1.2 Mode of Operation.............................................................................................. 2 2. Test Facility ....................................................................................................................... 3 3. Technical Information of Testing........................................................................................ 4 3.1 Summary of Test Result ..................................................................................... 4 3.2 Measurement Uncertainty .................................................................................. 4 3.3 Test Environment................................................................................................ 4 4. Conducted Emission......................................................................................................... 5 4.1 Test Standard ..................................................................................................... 5 4.2 Limits for Conducted Emission ........................................................................... 5 4.3 Test setup at SR5 CE Test Site .......................................................................... 5 4.4 Configuration of EUT and Peripherals ................................................................ 6 4.5 Test Equipment................................................................................................... 6 4.6 Test Procedure ................................................................................................... 7 4.7 Test Results........................................................................................................ 8 4.8 Test Photograph ............................................................................................... 10 5. Radiated Emission (9 kHz-30MHz)................................................................................. 11 5.1 Test Standard ................................................................................................... 11 5.2 Limits for Radiated Emission ............................................................................ 11 5.3 Test setup at SAC2 3m-18G Chamber ............................................................. 11 5.4 Configuration of EUT and Peripherals .............................................................. 12 5.5 Test Equipment................................................................................................. 12 5.6 Test Procedure ................................................................................................. 13 5.7 Test Results...................................................................................................... 14 5.8 Test Photograph ............................................................................................... 15 6. Attachment (EUT Photograph)........................................................................................ 16 Inventec (Pudong) Corporation 699, Pu-xing Road, Minhang District, Shanghai, 201114, China TEL. +86-21-6429-8888 ext. 65429 EMC Test Report (V1.0) Page 2 of 18 Report No.: LABE100101-ROF (01) 1. General Information 1.1 EUT Description Product Name : Separated Energy-Saving Lamp Trade Name : HAIJIE Model No. : YPZ 120/18-2U.RR.D-F FCC ID : ZGGYPZ120182U EUT Rated Voltage : AC 120V, 150mA,18W 1.2 Mode of Operation Item Test Mode 1 Normal Inventec (Pudong) Corporation 699, Pu-xing Road, Minhang District, Shanghai, 201114, China TEL. +86-21-6429-8888 ext. 65429 EMC Test Report (V1.0) Page 3 of 18 Report No.: LABE100101-ROF (01) 2. Test Facility The Test site used by Inventec (Pudong) Corporation to collect test data is located in 699 Pu-xing Road, Minhang District, Shanghai, 201114, China. Test site at Inventec (Pudong) Corporation has been fully described in reports submitted to the Federal Communication Commission (FCC). The details of these reports have been found to be in compliance with the requirements of Section 2.948 of the FCC Rules on September 24, 2007. The facility also complies with the radiated and AC line conducted test site criteria set forth in ANSI C63.4:2003. The Federal Communications Commission has the reports on file and is listed under FCC Registration No.: 156746. The test site has been approved by the FCC for public use and is listed in the FCC Public Access Link (PAL) database. A…
Text truncated - open the document above for the full version.
FCC ID: ZGGYPZ120182U Front View of Conducted Emission Test Setup: Back View of Conducted Emission Test Setup: Front View of Radiated Emission (9 kHz-30MHz) Test Setup: Back View of Radiated Emission (9 kHz-30MHz) Test Setup:
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 18 | 0.045 MHz - 0.045 MHz | - |