
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
INTRODUCTION Package Contents ............................................................................................................5 Product Overview ............................................................................................................6 GETTINGSTARTED Charging the Battery .......................................................................................................7 Powering the Device On / O.......................................................................................9 Powering the Device On.................................................................................................9 Powering the Device O............................................................................................... 9 Connecting to Your Smart Phone.............................................................................10 Install Wi-Watch S1 Smart Watch APP .................................................................. 10 Connect via Bluetooth................................................................................................. 11 SYNC THE WATCH WITH APP Reminder Interval Setup ............................................................................................ 12 Email Setup...................................................................................................................... 12 Social Networking Setup ........................................................................................... 13 General Reminder Setup ........................................................................................... 15 CONTENTS Bluetooth Connection Verication ....................................................................... 16 Weather Location Setup............................................................................................. 16 USING THE WATCH Using the Touch Screen ............................................................................................. 17 Page Flow Diagram ...................................................................................................... 18 Understanding the Home Screen ........................................................................... 19 General Operations ...................................................................................................... 20 SMS Android ................................................................................................................... 21 Dial ..................................................................................................................................... 22 Notication ..................................................................................................................... 25 APPS .................................................................................................................................. 27 Calendar .......................................................................................................................... 28 Settings ............................................................................................................................ 29 (Siri) Voice Control ...................................................................................................... 35 Multimedia ...................................................................................................................... 36 Pedometer ...................................................................................................................... 37 Phonebook ..................................................................................................................... 40 Calls ................................................................................................................................... 41 Heart Rate..........................................................................................................................41 To prevent injury to yourself and others or damage your device, please read the safety information carefully prior using your device. • Keep the device dry. Humidity and liquids may damage the device. • Do not expose the device to direct sunlight for extended period of time. • Do not use the device outdoor during a thunderstorm. • Avoid exposing the battery or device to high external pressure, which can lead to an internal short circuit and overheating. • Do not store the device with metal objects, such as coins, keys, and necklaces. • During charging, the battery increases its temperature substantially due to the internal resistance. Thus, the battery may feel warm when charging is completed. • Since the device is embedded with the built-in battery, please dispose it properly according to the local regulation. SAFETY PRECAUTIONS 4 INTRODUCTION Thank you for purchasing the Wi-Watch Wi-Watch S1. The Wi-Watch S1 helps to keep you updated with the new notication of text messages, emails, and incoming calls that are received by your smart phone, without the need to remove your phone from the pocket or purse. With Bluetooth connection, you can easily set up the reminder, email, and popular social networking site conguration using the Wi-Watch S1 SmartWatch APP. Package Contents Before using the device, please make sure the following items are included to the package. If any of the items is missing or are damaged, please contact the vendor or WirelessMe immediately. 5 Travel charger User Manual Product Overview Speaker Touch screen SIM card charger Power button USB cable User Manual 6 GETTING STARTED This section includes the basic information on charging the battery, powering the device on / o, and connecting the Wi-Watch S1 to your smart phone. Item Speaker Power button Rubber strap Microphone Touch screen Description Emits audio sound. • Press and hold for 3 seconds to turn on the device. • Press and hold for 2 seconds to turn off the device. Tighten around your wrist. Use for audio input. Touch-sensit…
Text truncated - open the document above for the full version.
Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 37 of 50 8. EUT Constructional Details Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 38 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 39 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 40 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 41 of 50
Label Label Location Label location
Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 42 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 43 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 44 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 45 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 46 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 47 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 48 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 49 of 50 Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 50 of 50 ------End of report------
Shenzhen Zhongjian Nanfang Testing Co., Ltd. Report No: CCIS14080073001 Authorized Signature: Bruce Zhang Laboratory Manager This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other samples of the same product and does not permit the use of the CCIS product certification mark. The manufacturer should ensure that all products in series production are in conformity with the product sample detailed in this report. This report may only be reproduced and distributed in full. If the product in this report is used in any configuration other than that detailed in the report, the manufacturer must ensure the new system complies with all relevant standards. This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Unless otherwise stated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 90 days only. 1 Cover Page FCC SAR REPORT Applicant: WirelessMe Limited Address of Applicant: B210 Languang Building,NO.7 Xinxi Road,High-tech Park North,Nanshan District, Shenzhen, China Equipment Under Test (EUT) Product Name: Smart Watch Model No.: Wi-Watch S1 Trade mark: WiMe FCC ID: 2AC3S-WI-WATCH-S1 Applicable standards: FCC 47 CFR Part 2.1093 Date of Test: 18 Sep., 2014 ~ 19 Sep., 2014 Test Result: Maximum Reported SAR (W/kg) Next to Mouth: (1-g) 0.180 Wrist-worn: (10-g extremity) 0.892 Report No: CCIS14080073001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800730RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 2 of 95 2 Version Version No. Date Description 00 25 Sep., 2014 Original Prepared by: Date: 25 Sep., 2014 Report Clerk Reviewed by: Date: 25 Sep., 2014 Project Engineer Report No: CCIS14080073001 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800730RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 3 of 95 3 Contents 1 COVER PAGE ................................................................................................................................................... 1 2 VERSION ........................................................................................................................................................... 2 3 CONTENTS ....................................................................................................................................................... 3 4 SAR RESULTS SUMMARY ............................................................................................................................. 5 5 GENERAL INFORMATION .............................................................................................................................. 6 5.1 CLIENT INFORMATION ..................................................................................................................................................................... 6 5.2 GENERAL DESCRIPTION OF EUT ................................................................................................................................................... 6 5.3 MAXIMUM RF OUTPUT POWER ...................................................................................................................................................... 7 5.4 ENVIRONMENT OF TEST SITE ......................................................................................................................................................... 7 5.5 TEST LOCATION ............................................................................................................................................................................. 7 6 INTRODUCTION ............................................................................................................................................... 8 6.1 INTRODUCTION ............................................................................................................................................................................... 8 6.2 SAR DEFINITION ............................................................................................................................................................................ 8 7 RF EXPOSURE LIMITS .................................................................................................................................... 9 7.1 UNCONTROLLED ENVIRONMENT ..................................................................................................................................................... 9 7.2 CONTROLLED ENVIRONMENT ......................................................................................................................................................... 9 7.3 RF EXPOSURE LIMITS .................................................................................................................................................................... 9 8 SAR MEASUREMENT SYSTEM ................................................................................................................... 10 8.1 E-FIELD PROBE ........................................................................................................................................................................... 11 8.2 DATA ACQUISITION ELECTRONICS (DAE) .................................................................................................................................... 11 8.3 ROBOT .................................................................................................…
Text truncated - open the document above for the full version.
Shenzhen Zhongjian Nanfang Testing Co., Ltd. Report No: CCIS14080072901 Authorized Signature: Bruce Zhang Laboratory Manager This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other samples of the same product and does not permit the use of the CCIS product certification mark. The manufacturer should ensure that all products in series production are in conformity with the product sample detailed in this report. This report may only be reproduced and distributed in full. If the product in this report is used in any configuration other than that detailed in the report, the manufacturer must ensure the new system complies with all relevant standards. This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Unless otherwise stated the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained for 90 days only. 1. Cover Page FCC REPORT Applicant: WirelessMe Limited Address of Applicant: B210 Languang Building,NO.7 Xinxi Road,High-tech Park North,Nanshan District, Shenzhen, China Equipment Under Test (EUT) Product Name: Smart Watch Model No.: Wi-Watch S1 Trade mark: WiMe FCC ID: 2AC3S-WI-WATCH-S1 Applicable standards: FCC CFR Title 47 Part 2 FCC CFR Title 47 Part 22 Subpart H FCC CFR Title 47 Part 24 Subpart E Date of sample receipt: 28 Aug., 2014 Date of Test: 29 Aug., to 17 Sep., 2014 Date of report issued: 18 Sep., 2014 Test Result: PASS* * In the configuration tested, the EUT complied with the standards specified above. Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 2 of 50 2. Version Version No. Date Description 00 18 Sep., 2014 Original Prepared by: Date: 18 Sep., 2014 Report Clerk Reviewed by: Date: 18 Sep., 2014 Project Engineer Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 3 of 50 3. Contents Page 1. COVER PAGE .............................................................................................................................................................. 1 2. VERSION ....................................................................................................................................................................... 2 3. CONTENTS ................................................................................................................................................................... 3 4. TEST SUMMARY ......................................................................................................................................................... 4 5. GENERAL INFORMATION ........................................................................................................................................ 5 5.1 CLIENT INFORMATION ............................................................................................................................................ 5 5.2 GENERAL DESCRIPTION OF E.U.T. ....................................................................................................................... 5 5.3 TEST MODES .......................................................................................................................................................... 8 5.4 RELATED SUBMITTAL(S) / GRANT (S) .................................................................................................................... 8 5.5 TEST METHODOLOGY ............................................................................................................................................ 8 5.6 LABORATORY FACILITY .......................................................................................................................................... 8 5.7 LABORATORY LOCATION ....................................................................................................................................... 8 5.8 TEST INSTRUMENTS LIST ....................................................................................................................................... 9 6. SYSTEM TEST CONFIGURATION ........................................................................................................................ 10 6.1 EUT CONFIGURATION ......................................................................................................................................... 10 6.2 EUT EXERCISE .................................................................................................................................................... 10 6.3 CONFIGURATION OF TESTED SYSTEM ................................................................................................................ 10 6.4 DESCRIPTION OF TEST MODES ........................................................................................................................... 10 6.5 CONDUCTED OUTPUT POWER ............................................................................................................................ 11 6.6 OCCUPY BANDWIDTH .......................................................................................................................................... 13 6.7 MODULATION CHARACTERISTIC .......................................................................................................................... 19 6.8 OUT OF BAND EMISSI…
Text truncated - open the document above for the full version.
Report No: CCIS14080072901 Shenzhen Zhongjian Nanfang Testing Co., Ltd. Project No.: CCIS140800729RF No. B-C, 1/F., Building 2, Laodong No.2 Industrial Park, Xixiang Road, Bao’an District, Shenzhen, Guangdong, China Telephone: +86 (0) 755 23118282 Fax: +86 (0) 755 23116366 Page 36 of 50 7. Test Setup Photo Radiated Spurious Emission
| # | Rule Parts | Frequency Range | Power Output | Emission | Tolerance |
|---|---|---|---|---|---|
| 2 | 24E | 1.85 GHz - 1.91 GHz | 30.70 mW | 244KGXW | 0.08 ppm |

Card phone
Equipment Class
PCE - PCS Licensed Transmitter held to ear