FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shanghai shengzhen commercial & trade Ltd company/
  3. 2ANHJGDGNE

2ANHJGDGNEGarage Door Control

Shanghai shengzhen commercial & trade Ltd company
Garage Door Control - FCC ID 2ANHJGDGNE - Shanghai shengzhen commercial & trade Ltd company
Click to zoom

Application Details

Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
Date of Grant
Apr 20, 2021
Application Purpose
Original Equipment
Date of Application
Apr 20, 2021
Equipment Note
Garage Door Control
Frequency Range
315.00000000 - 315.00000000
Company
Shanghai shengzhen commercial & trade Ltd company
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

Setting PIN on Keypad: 1. Confirm that the keypad backlight is off (do not press any buttons) 2. Press 3 5 7 on the keypad then press the PROGRAM button 3. LED will blink, now enter a unique 3‐8 digit PIN number 4. Press the PROGRAM button 5. The keypad will blink twice and shut off confirming successful programming Keypad to Opener Programming: 1. Enter programming mode on your garage door opener (use the steps below) 2. Confirm that the keypad backlight is off (do not press any buttons) 3. Enter your PIN (from above) into the keypad 4. Press the UP or Down key on the opener 3‐4 times until it operates to confirm successful programming Opener Programming Mode Option 1 A) Press and hold the program button as shown below until the LED button illuminates, then release B) The round LED will turn off and the long LED will begin flashing C) Return to step 2 in Keypad to Opener Programming above Opener Programming Mode Option 2 A) Press then release the learn code button B) The LED will flash indicating programming mode (30 seconds) C) Return to step 2 in Keypad to Opener Programming above FCC Statement: Any Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However,there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: —Reorient or relocate the receiving antenna. —Increase the separation between the equipment and receiver. —Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. —Consult the dealer or an experienced radio/TV technician for help.

Cover Letter(s)

QA-FR-172-A FCC Confidential Authorization 2021-03-03 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mi lls Road Columbia, MD 21046 Subject: Confidentiality Request regarding application for certification of FCC ID: 2ANHJGDGNE In accordance with Sections 0.457 and 0.459 of the Commission’s Rules, Shanghai shengzhen commercial & trade Ltd company hereby requests long-term confidential treatment of information accompanying this application as outlined below: Block Diagram Schematics Operation Description As well as short-term confidential (end to 2021-09-03) treatment of information accompanying this application as outlined below: Internal Photos User’s Manual External Photos Test Set-up Photos The above materials contain proprietary and confidential information not customarily released to the public. The public disclosure of these materials provides unjustified benefits to its competitors in the market. Sincerely, Company Name: Shanghai shengzhen commercial & trade Ltd company Add: Xinlong road No.1373 Room 606 Minhang Distirct, Shanghai, China Tel: 13817143296 Fax: 02157849721 E-mail: [email protected] Sincerely Yours, Signature: Typed or Printed Name: Pristine Zhu Title: G.M.

External Photos

EXHIBIT A - EUT EXTERNAL PHOTOGRAPHS

ID Label/Location Info

Product Name: Garage Door Control Model: GD GNE PAD FCC ID: 2ANHJGDGNE

Internal Photos

EXHIBIT B- EUT INTERNAL PHOTOGRAPHS Antenna

Test Report

FCC PART 15.231 TEST REPORT For Shanghai shengzhen commercial & trade Ltd company Xinlong road No.1373 Room 606 Minhang Distirct, Shanghai, China FCC ID: 2ANHJGDGNE Report Type: Original Report Product Type: Garage Door Control Project Engineer: Tyrone Wang Report Number: RSHA210303006-00A Report Date: 2021-03-17 Reviewed By: Oscar Ye EMC Manager Prepared By: Bay Area Compliance Laboratories Corp. (Kunshan) No.248 Chenghu Road,Kunshan,Jiangsu province,China Tel: +86-0512-86175000 Fax: +86-0512-88934268 www.baclcorp.com.cn Bay Area Compliance Laboratories Corp. (Kunshan) Report No.: RSHA210303006-00A FCC Part 15.231 Page 2 of 25 TABLE OF CONTENTS GENERAL INFORMATION ....................................................................................................................................... 3 PRODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) ..................................................................................... 3 OBJECTIVE ................................................................................................................................................................... 3 TEST METHODOLOGY .................................................................................................................................................. 3 MEASUREMENT UNCERTAINTY .................................................................................................................................... 4 TEST FACILITY ............................................................................................................................................................. 4 SYSTEM TEST CONFIGURATION .......................................................................................................................... 5 JUSTIFICATION ............................................................................................................................................................. 5 EUT EXERCISE SOFTWARE .......................................................................................................................................... 5 EQUIPMENT MODIFICATIONS ....................................................................................................................................... 5 SUPPORT EQUIPMENT LIST AND DETAILS .................................................................................................................... 5 EXTERNAL I/O CABLE .................................................................................................................................................. 5 BLOCK DIAGRAM OF TEST SETUP ................................................................................................................................ 6 SUMMARY OF TEST RESULTS ............................................................................................................................... 7 TEST EQUIPMENT LIST ........................................................................................................................................... 8 FCC§15.203 - ANTENNA REQUIREMENT .............................................................................................................. 9 APPLICABLE STANDARD .............................................................................................................................................. 9 ANTENNA CONNECTED CONSTRUCTION ...................................................................................................................... 9 FCC §15.205, §15.209, §15.231 (B) - RADIATED EMISSIONS ............................................................................. 10 APPLICABLE STANDARD ............................................................................................................................................ 10 EUT SETUP ................................................................................................................................................................ 11 EMI TEST RECEIVER SETUP ....................................................................................................................................... 12 TEST PROCEDURE ...................................................................................................................................................... 12 CORRECTED AMPLITUDE & MARGIN CALCULATION ................................................................................................. 12 TEST RESULTS SUMMARY .......................................................................................................................................... 12 TEST DATA ................................................................................................................................................................ 13 FCC §15.231(A) (1) - DEACTIVATION TESTING ................................................................................................. 19 APPLICABLE STANDARD ............................................................................................................................................ 19 TEST PROCEDURE ...................................................................................................................................................... 19 TEST DATA ................................................................................................................................................................ 19 FCC §15.231(C) - 20DB EMISSION BANDWIDTH TESTING ............................................................................. 22 APPLICABLE STANDARD ............................................................................................................................................ 22 TEST PROCEDURE ...................................................................................................................................................... 22 TEST DATA ........................................................…

Text truncated - open the document above for the full version.

Test Setup Photos

EXHIBIT C- TEST SETUP PHOTOGRAPHS Radiated Emissions (Below 1GHz) Radiated Emissions (Above 1GHz)

Contact Information

Applicant

Pristine Zhu
[email protected]13817143296Fax: 02157849721

Test Firm

Bay Area Compliance Laboratories Corp. (Kunshan)Mr. John Chan
[email protected]+86 0512 86175000

Technical Specifications

#Rule PartsFrequency RangePower Output
215.231315 MHz - 315 MHz-
Confidentiality
Long Term

Other Applications from Shanghai shengzhen commercial & trade Ltd company

Remote Control - FCC ID 2ANHJGDR42 - Shanghai shengzhen commercial & trade Ltd company
2ANHJGDR42

Remote Control

Apr 13, 2022

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter
Garage Remote Control - FCC ID 2ANHJGDR12PW - Shanghai shengzhen commercial & trade Ltd company
2ANHJGDR12PW

Garage Remote Control

Apr 13, 2022

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter
Remote Control - FCC ID 2ANHJGDLINPAD - Shanghai shengzhen commercial & trade Ltd company
2ANHJGDLINPAD

Remote Control

Apr 13, 2022

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter
Remote Control - FCC ID 2ANHJGDR39 - Shanghai shengzhen commercial & trade Ltd company
2ANHJGDR39

Remote Control

Apr 22, 2021

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter
Remote Control - FCC ID 2ANHJGDR40 - Shanghai shengzhen commercial & trade Ltd company
2ANHJGDR40

Remote Control

Apr 22, 2021

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter