
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Shenzhen Intellirocks Tech. Co., Ltd. Address: No. 2901-2904, 3002, Block C, Section 1, Chuangzhi Yuncheng Building, Liuxian Avenue,Xili Community, Xili Street, Nanshan District, Shenzhen, Guangdong, China Email: [email protected] Tel: 0755-21010375 Date: 2022-06-22 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 To whom it may concern: The RF chip, model RTL8720CF, which installed in our product Smart Heater, Model: H7131; FCC ID: 2AQA6-H7131, supports BDR (GFSK), EDR (π/4-DQPSK, 8DPSK), BLE 1M and 2.4GWi-Fi functions. For use in America and this chip will not support/enable BDR (GFSK), EDR (π/4-DQPSK, 8DPSK). The BDR (GFSK), EDR (π/4-DQPSK, 8DPSK) function has been shielded by the manufacturer using the software. Sincerely, Eric Pan Signature: Title: Manager
Shenzhen Intellirocks Tech. Co., Ltd. Address: No. 2901-2904, 3002, Block C, Section 1, Chuangzhi Yuncheng Building, Liuxian Avenue,Xili Community, Xili Street, Nanshan District, Shenzhen, Guangdong, China Email: [email protected] Tel: 0755-21010375 FCC Confidential Authorization Date: 2022-06-22 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Confidentiality Request regarding application for certification of FCC ID: 2AQA6-H7131 In accordance with Sections 0.457 and 0.459 of the Commission’s Rules, Shenzhen Intellirocks Tech. Co., Ltd. hereby requests long-term confidential treatment of information accompanying this application as outlined below: Block Diagram Schematics Operation Description As well as short-term confidential treatment of information accompanying this application for a period of 180 days after grant is issued as outlined below: Internal Photos User’s Manual External Photos Test Set-up Photos The above materials contain proprietary and confidential information not customarily released to the public. The public disclosure of these materials provides unjustified benefits to its competitors in the market. Sincerely, Eric Pan Signature: Title: Manager
Shenzhen Intellirocks Tech. Co., Ltd. Address: No. 2901-2904, 3002, Block C, Section 1, Chuangzhi Yuncheng Building, Liuxian Avenue,Xili Community, Xili Street, Nanshan District, Shenzhen, Guangdong, China Email: [email protected] Tel: 0755-21010375 QA-FR-170-B 7/29/2014 FCC Authorization Date: 2022-06-22 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization To whom it may concern: We Shenzhen Intellirocks Tech. Co., Ltd., the undersigned, hereby authorizes Shenzhen Accurate Technology Co., Ltd. to act on its behalf in all matters relating to application for Equipment authorization, including the signing of all documents relating to these matters. All acts carried out by Shenzhen Accurate Technology Co., Ltd. on our behalf shall have the same effect as our own action. We, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. This authorization is valid until further written notice from the applicant. Sincerely, Eric Pan Signature: Title: Manager
Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF External Photos Page 1 of 3 External Photos Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF External Photos Page 2 of 3 Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF External Photos Page 3 of 3
Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220517-21013E-RF LABEL AND LOCATION Page 1 of 1 FCC ID Label FCC ID Label Location Information The label shown shall be permanently affixed at a conspicuous location on the device and be readily visible to the user at the time purchase (Labeling requirements per 2.925)
Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF Internal Photos Page 1 of 6 Internal photos Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF Internal Photos Page 2 of 6 Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF Internal Photos Page 3 of 6 Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF Internal Photos Page 4 of 6 Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF Internal Photos Page 5 of 6 Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220428-17186E-RF Internal Photos Page 6 of 6 Antenna
Shenzhen Accurate Technology Co., Ltd. Report No.: SZNS220517-21013E-RF-00 Version 12: 2021-11-09 Page 15 of 53 FCC- BLE&2.4G Wi-Fi FCC §15.247 (i) & §1.1307 (b) (3) & §2.1091- MAXIMUM PERMISSIBLE EXPOSURE (MPE) Applicable Standard According to subpart 15.247 (i) and subpart 2.1091 systems operating under the provisions of this section shall be operated in a manner that ensures the public is not exposed to RF energy level in excess of the communication guidelines. According to KDB 447498 D04 Interim General RF Exposure Guidance MPE-Based Exemption: General frequency and separation-distance dependent MPE-based effective radiated power(ERP) thresholds are in Table B.1 [Table 1 of § 1.1307(b)(3)(i)(C)] to support an exemptionfrom further evaluation from 300 kHz through 100 GHz. Ris the minimum separation distance in meters f = frequency in MHz Result Mode Frequency (MHz) Tune up conducted power Antenna GainERP Evaluation Distance (m) ERP Limit (W) (dBm) (dBi)(dBd)(dBm)(W) BLE 2402-24804.5 2 -0.15 4.35 0.003 0.2 0.768 Wi-Fi 2412-247212.0 2 -0.15 11.85 0.015 0.2 0.768 Note: 1. The tune up conducted power and antenna gain was declared by the applicant. 2. The BLE and Wi-Fi cannot transmit at same time. To maintain compliance with the FCC’s RF exposure guidelines, place the equipment at least 20cm from nearby persons. Result: Compliant.
★ Note: This report may contain data that are not covered by the A2LA accreditation and are marked with an asterisk “ ”. Shenzhen Accurate Technology Co., Ltd. is not responsible for the authenticity of any test data provided by the applicant. Data included from the applicant that may affect test results are marked with an asterisk ’*’. Customer model name, addresses, names, trademarks etc. are not considered data. This report cannot be reproduced except in full, without prior written approval of the Company. Unless otherwise stated the results shown in this test report refer only to the sample(s) tested. This report is valid only with a valid digital signature. The digital signature may be available only under the Adobe software above version 7.0. Shenzhen Accurate Technology Co., Ltd. 1/F., Building A, Changyuan New Material Port, Science & Industry Park, Nanshan District, Shenzhen, Guangdong, P.R. China Tel: +86 755-26503290 Fax: +86 755-26503396 Web: www.atc-lab.com Version 12: 2021-11-09 Page 1 of 53 FCC- BLE&2.4G Wi-Fi TEST REPORT Applicant Name : Shenzhen Intellirocks Tech. Co., Ltd. Address : No.2901-2904, 3002, Block C, Section 1, Chuangzhi Yuncheng Building, Liuxian Avenue,Xili Community, Xili Street, Nanshan District, Shenzhen, Guangdong, China Report Number : SZNS220517-21013E-RF-00 FCC ID: 2AQA6-H7131 Test Standard (s) FCC PART 15.247 Sample Description Product Type: Smart Heater Model No.: H7131 Multiple Model(s) No.: N/A Trade Mark: Govee Date Received: 2022/05/17 Report Date: 2022/06/15 Test Result: Pass* * In the configuration tested, the EUT complied with the standards above. Prepared and Checked By: Approved By: Andy Yu Robert Li EMC Engineer EMC Engineer Shenzhen Accurate Technology Co., Ltd. Report No.: SZNS220517-21013E-RF-00 Version 12: 2021-11-09 Page 2 of 53 FCC- BLE&2.4G Wi-Fi TABLE OF CONTENTS GENERAL INFORMATION ....................................................................................................................................... 4 PRODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) ..................................................................................... 4 OBJECTIVE ................................................................................................................................................................... 4 TEST METHODOLOGY .................................................................................................................................................. 4 MEASUREMENT UNCERTAINTY .................................................................................................................................... 5 SYSTEM TEST CONFIGURATION .......................................................................................................................... 6 DESCRIPTION OF TEST CONFIGURATION ...................................................................................................................... 6 EQUIPMENT MODIFICATIONS ....................................................................................................................................... 7 EUT EXERCISE SOFTWARE .......................................................................................................................................... 7 DUTY CYCLE ................................................................................................................................................................ 7 SUMMARY OF TEST RESULTS ............................................................................................................................. 12 TEST EQUIPMENT LIST ......................................................................................................................................... 13 FCC §15.247 (I) & §1.1307 (B) (3) & §2.1091- MAXIMUM PERMISSIBLE EXPOSURE (MPE) ........................... 15 APPLICABLE STANDARD ............................................................................................................................................ 15 RESULT ...................................................................................................................................................................... 15 FCC §15.203 - ANTENNA REQUIREMENT ........................................................................................................... 16 APPLICABLE STANDARD ............................................................................................................................................ 16 ANTENNA CONNECTOR CONSTRUCTION .................................................................................................................... 16 FCC §15.207 (A) – AC LINE CONDUCTED EMISSIONS .................................................................................... 17 APPLICABLE STANDARD ............................................................................................................................................ 17 EUT SETUP ................................................................................................................................................................ 17 EMI TEST RECEIVER SETUP ....................................................................................................................................... 17 TEST PROCEDURE ...................................................................................................................................................... 17 TRANSD FACTOR & MARGIN CALCULATION.............................................................................................................. 18 TEST DATA ................................................................................................................................................................ 18 FCC §15.209, §15.205 & §15.247(D) - SPURIOUS EMISSIONS ............................................................................ 21 APPLICABLE STANDARD ......................................…
Text truncated - open the document above for the full version.
Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220517-21013E-RF Test Photos Page 1 of 2 Photo of Conducted Emission Measurement Shenzhen Accurate Technology Co., Ltd. Project No.: SZNS220517-21013E-RF Test Photos Page 2 of 2 Photo of Radiated Emission Measurement (Below 1G) Photo of Radiated Emission Measurement (Above 1G)
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 2 | 15C | 2.41 GHz - 2.46 GHz | 15.00 mW |
Govee RGBWW Smart LED Bulb
Equipment Class
DTS - Digital Transmission SystemWi-Fi Thermo-Hygrometer
Equipment Class
DTS - Digital Transmission System
Govee RGB Car LED Strip Light
Equipment Class
DTS - Digital Transmission SystemGovee DreamView G1S Gaming Light
Equipment Class
DTS - Digital Transmission System
Smart Plug Pro
Equipment Class
DTS - Digital Transmission System