Output power listed is the maximum conducted at antenna port. The final ERP is addressed at time of licensing when the antenna gain, antenna height, and loss are jointly considered. ERP for operations under Part 90.219(e)(1) are limited to 5 Watts. This filing contains compliance information and test data for incumbent/duly-authorized public safety narrowband operations in Public Safety Broadband (FirstNet) spectrum. RF exposure of simultaneous transmission including multiple units is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).