FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. SHENZHEN POWEROAK NEWENER CO., LTD/
  3. 2AYT3-EB200

2AYT3-EB200ESS(Energy Storage System)

SHENZHEN POWEROAK NEWENER CO., LTD
ESS(Energy Storage System) - FCC ID 2AYT3-EB200 - SHENZHEN POWEROAK NEWENER CO., LTD
Click to zoom

Application Details

Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
Date of Grant
May 13, 2021
Application Purpose
Original Equipment
Date of Application
May 13, 2021
Equipment Note
ESS(Energy Storage System)
Frequency Range
0.12500000 - 0.15200000
Company
SHENZHEN POWEROAK NEWENER CO., LTD
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

ᶞᥥ঄ᶞᥥ঄ $ ޻ᇯᴪ᯦θᶆ䍞᭯ѰJ Solar Charging MC4 Connecting Solar Panel Power Station DC Charging Port Connecting Cable PV- Connecting Cable PV+ Solar Panel PV- Solar Panel PV+ Aviation Plug XT90 Plug 2000Wh &44 &OFSHZ4UPSBHF4ZTUFN  User Manual Safety instructions Safety instructions Please observe the following instructions to ensure safe usage: Do not alter or disassemble this product. Do not move during charging or using it, because the vibration and impact during moving will lead to poor contact of output interface. In case of fire, use dry powder fire extinguishers for this product. Do not use water fire extinguisher,which may cause electric shock. Close supervision is required when using this product near children. Please confirm the rated specification of your load, and do not use it beyond the specification. Do not place the product near heat sources, such as electric furnace and heaters. Not permitted on aricrafts because the battery capacity exceeds 100Wh.Do not touch the product or the plug-in points if your hands are wet.Check the product and accessories prior to every use. Do not use if it is damaged or broken.Please unplug the AC adapter from the wall outlet immediately in case of lightning stroke, which may cause heating, fire and other accidents. Use original charger and cables. 01 010203040506 070809101112 02030405060708091011 Please read this manual before use and follow its guidance. Keep this manual for future reference. Rated Output power Typical Capacity Battery Type Net Weight Dimensions Working Humidity Working Noise 2000Wh,50VDC,40Ah 2000Wh Lithium-ion Battery About 27.5KG/60.6lbs (The weight may subject to 2000W<load<2500W,2min; 2500W<load,immediately slightly change without notice) 440x296x387.5mm (17.3 x 11.6 x 15.3 inches) 10%-90% ”G% Charging Temperature General Specs 0-40 㷄 32-104 㷊 Discharge Temperature -20-40 㷄 -4-104 㷊 Estimated operating time Smartphone :Kî'2'îȘ· WKHFXUUHQWORDGSRZHU:  DYDLODEOHWLPH unit: hrs/times) 175-200Times 10W Note 䋺 DOD is the battery discharge depth 䋬 Ș is the local inverter efficiency,DOD 90%, Ș 90% 㪅 LED Light Bulb Television Electronic Tools Around 19-20hrs 80W Refrigerator Around 17-19hrs 90W Slow Cooker Around 8-9hrs 200W User Manual User Manual User Manual QUICK GUIDE DC 12V/10A cigarette lighter port DC 12V/10A output x 2pcs DC 12V/25A output USB-A 18W output x 2pcs USB-C 100W output USB-A 5V/3A output x 2pcs Adapter input port PV/Car input port Wireless charging 15W x 2pcs Touchable interaction LCD display Power button a.PV/Car charging displayb.BMS Infoc.Date/Timed.DC load Infoe.DC ON/OFF Switchf.AC ON/OFF Switchg.Adapter charging displayh.AC load Info 1 2 3 5 6 7 0102030405060708 09101112 AC-DC Adapter Power Station What`s In The Box Optional Warranty Card User Manual Solar charging cable (MC4 to XT90) 12V/25A Plug to XT60 Cable(Output) Female DC7909 to XT90 (For 2nd Adapter Input) XT60 to Anderson Plug (Output) Lead-acid Battery Clamps to XT90 (Input) Car Charging Cable (Car Plug to XT90) XT90 to Aviation Plug (input) User Manual Warranty Card FREQUENTLY ASKED QUESTIONS It’s totally normal for the adapter gets warm, because of the heat produced in circuit during charging. A The adapter (power brick) got hot when I charge it, is that alright? Abbreviation Explain: 1 The“ECO MODE”(press then hold for 4s to launch) is set to shut down the unit when the AC output of the unit is lower than 50W in 4 hours for power saving. A Why the unit shutdown automatically with my appliance connecting? 2 With the excellent heat dissipation design, cooling fan will only launch when the total loads exceeds 30% of the rated output. A What cause the cooling fan not to launch? 3 Please refer to the warranty card or the official website for further warranty policy. A How to claim the warranty? 5 Yes, it is supported but not recommended in order to protect the lifespan of battery '&$& 'LUHFW&XUUHQW$OWHUQDWLQJ&XUUHQW%06 %DWWHU\0DQDJHPHQW6\VWHP 39 3KRWR9ROWDLF 6RODUSRZHU &6 &KDUJLQJ6WDWH A Can I charge and discharge the power station simultaneously? 4 Around 75-85hrs 20W Around 20-22hrs 75W User Manual User Manual User Manual US AC output x 6 pcs(EU/UK AC output x 4pcs) AC USB-A x2 USB-C x1 Cigarette Lighter 5521 x2 x1 Wireless Charging Pad x2 100-120VAC ×6220-240VAC ×4 2000W 5-12VDC, 3A,36W Total 5VDC,3A 15W Total 5-15VDC,3A 20VDC,5A 12VDC,10A Total 12VDC,25A 5-15W Output Specs Car Charging Battery Charging Solar Charging Input Specs 35V-150V/12A 12-30V/8.2A USB-A x2 RV x1 AC-DC Adapter 58.8VDC,8A :DUQLQJ&KDQJHVRUPRGLILFDWLRQVWRWKLVXQLWQRWH[SUHVVO\DSSURYHGE\ WKHSDUW\UHVSRQVLEOHIRU FRPSOLDQFHFRXOGYRLGWKHXVHU¶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²5HRULHQWRUUHORFDWHWKHUHFHLYLQJDQWHQQD²,QFUHDVHWKHVHSDUDWLRQEHWZHHQWKHHTXLSPHQWDQGUHFHLYHU²&RQQHFWWKHHTXLSPHQWLQWRDQRXWOHWRQDF…

Text truncated - open the document above for the full version.

Cover Letter(s)

Date:04/17/2018VCB_F-01:OperatingProceduresForm–FCCAuthorizationv02Page1of1 SHENZHENPOWEROAKNEWENERCO.,LTD FederalCommunicationsCommission AuthorizationandEvaluationDivision 1435OaklandMillsRoad Columbia,MD21046 Date:2021/4/26 SUBJECT:FCCApplicationfor(FCCID:2AYT3-EB200) ToWhomItMayConcern: We,theundersigned,herebyauthorizeAlisaFengin ShenzhenHuaxiaTesting TechnologyCo.,Ltdat1F.,BlockAofTongshengTechnologyBuilding,HuahuiRoad, DalangStreet,LonghuaDistrict,Shenzhen,Chinaonourbehalf,toapplytotheFederal CommunicationsCommissiononourequipment.Anyandallactscarriedoutby ShenzhenHuaxiaTestingTechnologyCo.,Ltd onourbehalfshallhavethesame effectasactsofourown. ThisistoadvisethatweareinfullcompliancewiththeAnti-DrugAbuseAct.We, theapplicant,arenotsubjecttoadenialoffederalbenefitspursuanttoSection 5301oftheAnti-DrugActof1988,21USC853a,andnopartytotheapplicationis subjecttoadenialoffederalbenefitspursuanttothatsection. Sincerely, (MustbesignedbythepersonthatislistedontheFCCWebsite) Signature: Contactname:LibingZeng Companyname:SHENZHENPOWEROAKNEWENERCO.,LTD Address:Room701-3,BuildingB,CADREBuilding,TongshaRoad,NanshanDistrict, ShenzhenCity,GuangdongProvince,P.R.China

Cover Letter(s)

Date:04/17/2018VCB_F-01:OperatingProceduresForm–FCCConfidentialityv02Page1of1 SHENZHENPOWEROAKNEWENERCO.,LTD FederalCommunicationsCommission AuthorizationandEvaluationDivision ConfidentialityRequestregardingapplicationforcertificationofFCCID:2AYT3-EB200 PursuanttoSections0.457and0.459oftheCommission’sRules,weherebyrequest confidentialtreatmentofinformationaccompanyingthisapplicationasoutlinedbelow: ExhibitTypeFileName 1.BlockDiagram, 2.Schematics, 3.OperationalDescription 1.2AYT3-EB200-Blockdiagram 2.2AYT3-EB200-SCH 3.2AYT3-EB200-Operationaldescription Theabovematerialscontaintradesecretsandproprietaryinformationnotcustomarily releasedtothepublic.Thepublicdisclosureofthesematerialsmaybeharmfultothe applicantandprovideunjustifiedbenefitstoitscompetitors. TheapplicantunderstandsthatpursuanttoSection0.457oftheRules,disclosureofthis applicationandallaccompanyingdocumentationwillnotbemadebeforethedateofthe Grantforthisapplication. PursuanttoDA04-1705June15,2004oftheCommission’spublicnotice,wealso requesttemporaryconfidentialtreatmentofinformationaccompanyingthisapplication asoutlinedbelowforaninitialperiodofxxxx(ie-“45”,“90”or“180”)days: ExhibitTypeFileName N/AN/A Signature: Contactname:LibingZeng Companyname:SHENZHENPOWEROAKNEWENERCO.,LTD Address:Room701-3,BuildingB,CADREBuilding,TongshaRoad,NanshanDistrict, ShenzhenCity,GuangdongProvince,P.R.China

External Photos

FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200

ID Label/Location Info

Label:120*90mm

Internal Photos

FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200 FCCID:2AYT3-EB200

RF Exposure Info

ShenzhenHuaxiaTestingTechnologyCo.,Ltd 1F.,BlockAofTongshengTechnologyBuilding,HuahuiRoad,DalangStreet,LonghuaDistrict, Shenzhen,China Telephone:+86-755-26648640 Fax:+86-755-26648637 Website:www.cqa-cert.com ReportTemplateVersion:V04 ReportTemplateRevisionDate:2018-07-06 RFExposureEvaluationReport ReportNo.: CQASZ20210400024EX-02 Applicant: SHENZHENPOWEROAKNEWENERCO.,LTD AddressofApplicant:Room701-3,BuildingB,CADREBuilding,TongshaRoad,NanshanDistrict, ShenzhenCity,GuangdongProvince,P.R.China Manufacturer: SHENZHENPOWEROAKNEWENERCO.,LTD Addressof Manufacturer: Room701-3,BuildingB,CADREBuilding,TongshaRoad,NanshanDistrict, ShenzhenCity,GuangdongProvince,P.R.China EquipmentUnderTest(EUT): Product:ESS(EnergyStorageSystem) AllModelNo.:EB200,S2000 TestModelNo.:EB200 BrandName:/ FCCID:2AYT3-EB200 Standards: 47CFRPart1.1307 47CFRPart1.1310 KDB680106D01RFExposurewirelesschargingbaseAppV03 DateofTest:Apr.02,2021--Apr.22,2021 DateofIssue:Apr.22,2021 TestResult:PASS TestedBy: (JunLi) ReviewedBy: (AresLiu) ApprovedBy: (Sheekluo) ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-02 1Version RevisionHistoryOfReport ReportNo.Version Description IssueDate CQASZ20210400024EX-02Rev.01 Initialreport Apr.22,2021 ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-02 2Contents 1VERSION......................................................................................................................................................................2 2CONTENTS..................................................................................................................................................................3 3GENERALINFORMATION........................................................................................................................................4 3.1CLIENTINFORMATION................................................................................................................................................4 3.2GENERALDESCRIPTIONOFEUT................................................................................................................................4 3.3TESTENVIRONMENT...................................................................................................................................................5 3.4DESCRIPTIONOFSUPPORTUNITS...............................................................................................................................5 3.5TESTLOCATION..........................................................................................................................................................5 3.6TESTFACILITY............................................................................................................................................................6 3.7EQUIPMENTLIST.........................................................................................................................................................6 4RFEXPOSUREEVALUATION.................................................................................................................................7 4.1RFEXPOSURECOMPLIANCEREQUIREMENT..............................................................................................................7 4.1.1Limits................................................................................................................................................................7 4.1.2TestProcedure...............................................................................................................................................7 4.1.3TestSetup.......................................................................................................................................................8 4.1.4TestResults....................................................................................................................................................8 APPENDIXA:PHOTOGRAPHSOFTESTSETUP.....................................................................................................10 ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-02 3GeneralInformation 3.1ClientInformation Applicant: SHENZHENPOWEROAKNEWENERCO.,LTD AddressofApplicant: Room701-3,BuildingB,CADREBuilding,TongshaRoad,Nanshan District,ShenzhenCity,GuangdongProvince,P.R.China Manufacturer: SHENZHENPOWEROAKNEWENERCO.,LTD AddressofManufacturer: Room701-3,BuildingB,CADREBuilding,TongshaRoad,Nanshan District,ShenzhenCity,GuangdongProvince,P.R.China 3.2GeneralDescriptionofEUT ProductName: ESS(EnergyStorageSystem) TestModelNo.: EB200 TradeMark: N/A HardwareVersion: V2.0 SoftwareVersion: V1.0 OperationFrequency:125kHz-152kHz ModulationType:MSK AntennaType: Loopcoilantenna AntennaGain: 0dBi Information: Capacity:2000Wh50VDC,40Ah Input:DC12-150VDC,12A Inputadapter:58.8VDC,8A Output: AC*6:110-120VAC50/60Hz,2000WTotal AviationSockets*1:12VDC,25A USB-A*2:5-12VDC,3A,36WTotal USB-A*2:5VDC,3A,15WTotal USB-C*1:5-15VDC,3A,20VDC,5A Cigarettelighter*1:12VDC,10A DC5521*2:12VDC,10A WirelessCharging*2:5/7/7.5/10/15W Note:Formoredetailsfeaturesdescription,pleaserefertothemanufacture’sspecificationsortheusermanual. ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-02 3.3Testenvironment OperatingEnvironment: Temperature: 25.0  C Humidity:53%RH AtmosphericPressure:1010mbar TestMode: Mode1Charging(DCport) Mode2Charging(adapter) Mode3AC*6(2000Wmax) Mode4DC12V*3 Mode5USB*5 Mode6Wirelesscharging*2(5W*2) Mode7Wirelesscharging*2(7.5W*2) Mode8Wirelesscharging*2(10W*2) Mode9Wirelesscharging*2(15W*2) Mode10Mode3+Mode4+Mode5+Mode9 Note: Themode10wastheworstcaseandonlythedataoftheworstcaserecordinthisreport 3.4DescriptionofSupportUnits TheEUThasbeentestedwithassociatedequipmentbelow. DescriptionManufacturerModelNo.emarkFCCcertification Adapter// Provideby applicant sdoc Wireless electronicLoad -- Provideby laboratory - 3.5Testlocation ShenzhenHuaxiaTestingTechnologyCo.,Ltd, 1F.,BlockAofTongshengTechnolog…

Text truncated - open the document above for the full version.

Test Report

ShenzhenHuaxiaTestingTechnologyCo.,Ltd 1F.,BlockAofTongshengTechnologyBuilding,HuahuiRoad,DalangStreet,LonghuaDistrict, Shenzhen,China Telephone:+86-755-26648640 Fax:+86-755-26648637 Website:www.cqa-cert.com ReportTemplateVersion:V03 ReportTemplateRevisionDate:Mar.1st,2017 TestReport *Intheconfigurationtested,theEUTcompliedwiththestandardsspecifiedabove. Thetestreportiseffectiveonlywithbothsignatureandspecializedstamp,Theresult(s)showninthisreportreferonly tothesample(s)tested.WithoutwrittenapprovalofCQA,thisreportcan’tbereproducedexceptinfull. ReportNo.: CQASZ20210400024EX-01 Applicant: SHENZHENPOWEROAKNEWENERCO.,LTD AddressofApplicant:Room701-3,BuildingB,CADREBuilding,TongshaRoad,NanshanDistrict, ShenzhenCity,GuangdongProvince,P.R.China Manufacturer: SHENZHENPOWEROAKNEWENERCO.,LTD Addressof Manufacturer: Room701-3,BuildingB,CADREBuilding,TongshaRoad,NanshanDistrict, ShenzhenCity,GuangdongProvince,P.R.China EquipmentUnderTest(EUT): Product:ESS(EnergyStorageSystem) AllModels:EB200,S2000 TestModelNo.:EB200 BrandName:/ FCCID:2AYT3-EB200 Standards:47CFRPart15,SubpartC DateofTest:Apr.02,2021--Apr.22,2021 DateofIssue: Apr.22,2021 TestResult:PASS TestedBy: (JunLi) ReviewedBy: (AresLiu) ApprovedBy: (Sheekluo) ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-01 Page: 2 of 31 1Version RevisionHistoryOfReport ReportNo.Version Description IssueDate CQASZ20210400024EX-01Rev.01 Initialreport Apr.22,2021 ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-01 Page: 3 of 31 2TestSummary TestItemTestRequirementTestmethodResult AntennaRequirement 47CFRPart15,SubpartCSection 15.203/15.247(c) ANSIC63.102013PASS ACPowerLine Conducted Emission 47CFRPart15,SubpartCSection 15.207 ANSIC63.102013PASS 20dBOccupied Bandwidth 47CFRPart15,SubpartCSection 15.215(c) ANSIC63.102013PASS RadiatedSpurious Emissions 47CFRPart15,SubpartCSection 15.209 ANSIC63.102013PASS Restrictedbandsaround fundamentalfrequency (RadiatedEmission) 47CFRPart15,SubpartCSection 15.209 ANSIC63.102013PASS ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-01 Page: 4 of 31 3Contents Page 1VERSION..........................................................................................................................................................................2 2TESTSUMMARY............................................................................................................................................................3 3CONTENTS......................................................................................................................................................................4 4GENERALINFORMATION...........................................................................................................................................5 4.1CLIENTINFORMATION.................................................................................................................................................5 4.2GENERALDESCRIPTIONOFEUT.................................................................................................................................5 4.3TESTENVIRONMENT....................................................................................................................................................6 4.4OPERATIONCHANNELLIST..........................................................................................................................................6 4.5DESCRIPTIONOFSUPPORTUNITS................................................................................................................................6 4.6STATEMENTOFTHEMEASUREMENTUNCERTAINTY....................................................................................................7 4.7TESTLOCATION...........................................................................................................................................................8 4.8TESTFACILITY.............................................................................................................................................................8 4.9DEVIATIONFROMSTANDARDS....................................................................................................................................8 4.10OTHERINFORMATIONREQUESTEDBYTHECUSTOMER............................................................................................8 4.11EQUIPMENTLIST........................................................................................................................................................9 5TESTRESULTSANDMEASUREMENTDATA......................................................................................................10 5.1ANTENNAREQUIREMENT..........................................................................................................................................10 5.2CONDUCTEDEMISSIONS............................................................................................................................................11 5.320DBOCCUPYBANDWIDTH......................................................................................................................................14 5.4RADIATEDSPURIOUSEMISSION.................................................................................................................................15 6PHOTOGRAPHS-EUTTESTSETUP......................................................................................................................19 7PHOTOGRAPHS-EUTCONSTRUCTIONALDETAILS.......................................................................................21 ShenzhenHuaxiaTestingTechnologyCo.,Ltd ReportNo.:CQASZ20210400024EX-01 Page: 5 of 31 4GeneralInformation 4.1ClientInformation Applicant: SHENZHENPOWEROAKNEWENERCO.,LTD AddressofApplicant: Room701-3,BuildingB,CADREBuilding,TongshaRoad,Nanshan District,ShenzhenCity,GuangdongProvince,P.R.China Manufacturer: SHENZHENPOWEROAKNEWENERCO.,LTD AddressofManufacturer: Room701-3,BuildingB…

Text truncated - open the document above for the full version.

Test Setup Photos

FCCID:2AYT3-EB200 1Photographs-EUTTestSetup ConductedEmissionsTestSetup RadiatedEmissionbelow1GHz FCCID:2AYT3-EB200 Below30MHzTestSetup

Contact Information

Applicant

Cara Zou(Manager)
[email protected]+86-752-5192099Fax: n/a

Test Firm

Shenzhen Huaxia Testing Technology Co., LtdJack Ai
[email protected]+8613902988375

Technical Specifications

#Rule PartsFrequency RangePower Output
115C0.125 MHz - 0.152 MHz-
Confidentiality
Long Term

Other Applications from SHENZHEN POWEROAK NEWENER CO., LTD

DC-DC Charger - FCC ID 2AYT3-CHARGER2 - SHENZHEN POWEROAK NEWENER CO., LTD
2AYT3-CHARGER2

DC-DC Charger

Dec 02, 2025

Equipment Class

DTS - Digital Transmission System
2AYT3-FRIDGEPOWER

Portable Power Station

Nov 27, 2025

Equipment Class

DTS - Digital Transmission System
2AYT3-F045D

Refrigerator

Nov 28, 2024

Equipment Class

DTS - Digital Transmission System
2AYT3-CHARGER1

DC-DC Charger

Jul 16, 2024

Equipment Class

DTS - Digital Transmission System
2AYT3-EB3A01

Portable Power Station

Apr 07, 2024

Equipment Class

DTS - Digital Transmission System