FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shenzhen CTV Int Cloud Technology Co., Ltd/
  3. 2AZL7-ZS-GX5S

2AZL7-ZS-GX5SSecurity Camera

Shenzhen CTV Int Cloud Technology Co., Ltd
Security Camera - FCC ID 2AZL7-ZS-GX5S - Shenzhen CTV Int Cloud Technology Co., Ltd
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Apr 14, 2022
Application Purpose
Original Equipment
Date of Application
Apr 14, 2022
Equipment Note
Security Camera
Frequency Range
2412.00000000 - 2462.00000000
Company
Shenzhen CTV Int Cloud Technology Co., Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

Service Email: [email protected] Manufacturer: Shen Zhen Zhi Yun Kan Jia Technology Co., Ltd Address: 6th floor B Building 10 Eastern Zone Shangxue S&T city, Ban Tian,Long Gang District,Shen Zhen,China 51800 www.zeetopincam.com [email protected] This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -- Reorient or relocate the receiving antenna. -- Increase the separation between the equipment and receiver. -- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. -- Consult the dealer or an experienced radio/TV technician for help. Warning: changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment Radiation Exposure Statement This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator and your body.

Cover Letter(s)

ShenzhenCTVIntCloudTechnologyCo.,Ltd. AgentAuthorization Company:ShenzhenCTVIntCloudTechnologyCo.,Ltd. Address:601,BBuilding,No.10,EastDistrict,ShangxueIndustrialCity, XinxueCommunity,BantianStreet,Shenzhen,China ProductName:SecurityCamera ModelNumber(s):ZS-GX5S,ZS-GX1S,ZS-GX2S,ZS-GX3S,ZS-GX4S,ZS-GX6S, ZS-GX7S,ZS-GX8S,ZS-GQ1,ZS-GQ2,ZS-GQ3,ZS-GQ4,ZS-GQ5 ProductDescription:SecurityCamera WeauthorizeMiCOMLabsInc.,575BoulderCourt,Pleasanton,California94566,USA, toactonourbehalfonallmattersconcerningthecertificationofabovenamed equipment. WedeclarethatMiCOMLabsInc.isallowedtoforwardallinformationrelatedtothe approvalandcertificationofequipmenttotheregulatoryagenciesasrequiredandto discussanyissuesconcerningtheapprovalapplication.Anyandallactscarriedoutby MiCOMLabsonourbehalfshallhavethesameeffectasactsofourown. Signature:Date:04/07/2022 Name: Liuguangqing Title: Manager Company: ShenzhenCTVIntCloudTechnologyCo.,Ltd.

Cover Letter(s)

ShenzhenCTVIntCloudTechnologyCo.,Ltd. OfficeofEngineeringTechnology FederalCommunicationsCommission 7435OaklandMillsRoad Columbia,MD21046 USA Date:04/07/2022 Subject;RequestforConfidentiality FCCID:2AZL7-ZS-GX5S ToWhomItMayConcern, PursuanttotheprovisionsoftheCommission’srulesTitle47Sections§0.457and§0.459,we arerequestingtheCommissiontowithholdthefollowingattachment(s)asconfidential documentsfrompublicdisclosureindefinitely. Thesedocumentscontaindetailedsystemandequipmentdescriptionsandareconsideredas proprietaryinformationinoperationoftheequipment.Thepublicdisclosureofthesedocuments mightbeharmfultoourcompanyandwouldgivecompetitorsanunfairadvantageinthemarket. SchematicDiagram BlockDiagram PartsList OperationalDescription Tune-upProcedure Inadditionaltoabovementioneddocuments,inordertocomplywiththemarketingregulations inTitle47CFR§2.803andtheimportationrulesinTitle47CFR§2.1204,whileensuringthat businesssensitiveinformationremainsconfidentialuntiltheactualmarketingofnewly authorizeddevices,werequestShortTermConfidentialityofthefollowingattachment(s); ExternalPhotos TestSetupPhotos InternalPhotos UserManual For45days,pursuanttoPublicNoticeDA04-1705. OR For180dayspursuanttoKDB726920D01. Itisourunderstandingthatallmeasurementtestreports,FCCIDlabelformatand correspondenceduringthecertificationreviewprocesscannotbegrantedasconfidential documentsandthisinformationwillbeavailableforpublicreviewoncethegrantofequipment authorizationisissued. Sincerely, Signature: Name:Liuguangqing Title:Manager

Cover Letter(s)

Modeldifferencedeclarationletter DifferencesDescription WeShenzhenCTVIntCloudTechnologyCo.,Ltd.state: Product:SecurityCamera ModelName: ZS-GX5S,ZS-GX1S,ZS-GX2S,ZS-GX3S,ZS-GX4S,ZS-GX6S, ZS-GX7S,ZS-GX8S,ZS-GQ1,ZS-GQ2,ZS-GQ3,ZS-GQ4, ZS-GQ5 Theaboveproductwithsamecircuit,PCBlayout,electricalparts,materialsand wiringstructures,Appearanceshape,thematerialsofdecorativeaccessoriesis same,onlydifferentcolor. Signatory Date:04-07-2022 <Signature> Name:Liuguangqing Title:manager Company:ShenzhenCTVIntCloudTechnologyCo.,Ltd. Address:601,BBuilding,No.10,EastDistrict,ShangxueIndustrialCity,XinxueCommunity,Bantian Street,Shenzhen,China

External Photos

Page1of3ReportNo.:FCS202203174 Externalphotos Photo1 Photo2 Page2of3ReportNo.:FCS202203174 Photo3 Photo4 Page3of3ReportNo.:FCS202203174 Photo5 Photo6

ID Label/Location Info

LabelandLabelLocation FCCID:2AZL7-ZS-GX5S L*W:10mm*5mm labelandWhitefont

Internal Photos

Page1of5ReportNo.:FCS202203174 Internalphotos Photo1 Photo2 Page2of5ReportNo.:FCS202203174 Photo3 ANT Photo4 Page3of5ReportNo.:FCS202203174 Photo5 Photo6 Page4of5ReportNo.:FCS202203174 Photo7 Photo8 Page5of5ReportNo.:FCS202203174 Photo9

RF Exposure Info

Page1of2ReportNo.:FCS202203174W02 FluxComplianceServiceLaboratory Room105FloorBaohaoTechnologyBuilding1NO.15GongyeWestRoadHi-TechIndustrial,SongshanlakeDongguan Tel:769-27280901Fax:769-27280901http://www.FCS-lab.com FCCRFExposure EUTDescription:SecurityCamera ModelNo.:ZS-GX5S,ZS-GX1S,ZS-GX2S,ZS-GX3S,ZS-GX4S,ZS-GX6S,ZS-GX7S,ZS-GX8S,ZS-GQ1,ZS-GQ2,ZS-GQ3, ZS-GQ4,ZS-GQ5 FCCID:2AZL7-ZS-GX5S Equipmenttype:fixedequipment 1.Limits Thecriterialistedinthefollowingtableshallbeusedtoevaluatetheenvironmentimpactofhuman exposuretoradiofrequency(RF)radiationasspecifiedin1.1307(b) LimitsforMaximumPermissibleExposure(MPE) F=frequencyinMHz Formula:Pd=(P out *G)/(4*π*r 2 ) Where: Pd=powerdensityinmW/cm 2 , Pout=outputpowertoantennainmW; G=gainofantennainlinearscale, π=3.14; R=distancebetweenobservationpointandcenteroftheradiatorincm PdidthelimitofMPE,1mW/cm2.Ifweknowthemaximumgainoftheantennaandthetotalpower inputtotheantenna,throughthecalculation,wewillknowthedistancerwheretheMPElimitis reached. 2.TestProcedure SoftwareprovidedbyclientenabledtheEUTtotransmitandreceivedataatlowest,middleandhighest channelindividually. Page2of2ReportNo.:FCS202203174W02 FluxComplianceServiceLaboratory Room105FloorBaohaoTechnologyBuilding1NO.15GongyeWestRoadHi-TechIndustrial,SongshanlakeDongguan Tel:769-27280901Fax:769-27280901http://www.FCS-lab.com 3.TestResultofRFExposureEvaluation Outputpower (dBm/mW) Antenna Gain(dBi) PowerDensity atR=20cm (mW/cm 2 ) Limit (mW/cm 2 ) Result 802.11b2.42/1.74581.00.0004371.0Pass 802.11g2.27/1.68661.00.0004231.0Pass 802.11n(20MHz)2.64/1.83651.00.0004601.0Pass 802.11n(40MHz)2.47/1.76601.00.0004431.0Pass Turn-uppower ModePeakpowerrange(dBm) WIFI2.00-3.00 WIFI Outputpower (dBm/mW) Antenna Gain(dBi) PowerDensity atR=20cm (mW/cm 2 ) Limit (mW/cm 2 ) Result 3.0/1.99531.00.0005001.0Pass

Test Report

FCCTestReport ReportNo:FCS202203174W01 Issuedfor Applicant: ShenzhenCTVIntCloudTechnologyCo.,Ltd. Address: 601,BBuilding,No.10,EastDistrict,Shangxue IndustrialCity,XinxueCommunity,BantianStreet, Shenzhen,China ProductName: SecurityCamera BrandName: N/A ModelName: ZS-GX5S SeriesModel: ZS-GX1S,ZS-GX2S,ZS-GX3S,ZS-GX4S,ZS-GX6S, ZS-GX7S,ZS-GX8S,ZS-GQ1,ZS-GQ2,ZS-GQ3, ZS-GQ4,ZS-GQ5 FCCID: 2AZL7-ZS-GX5S IssuedBy:FluxComplianceServiceLaboratory Add:Room105FloorBaohaoTechnologyBuilding1NO.15GongyeWestRoad Hi-TechIndustrial,SongshanlakeDongguan Tel:769-27280901Fax:769-27280901http://www.FCS-lab.com Page 2 of72ReportNo.:FCS202203174W01 FluxComplianceServiceLaboratory Room105FloorBaohaoTechnologyBuilding1NO.15GongyeWestRoadHi-TechIndustrial,SongshanlakeDongguan Tel:769-27280901Fax:769-27280901http://www.FCS-lab.com TESTRESULTCERTIFICATION Applicant’sName......................:ShenzhenCTVIntCloudTechnologyCo.,Ltd. Address ...................................... : 601,BBuilding,No.10,EastDistrict,ShangxueIndustrialCity,Xinxue Community,BantianStreet,Shenzhen,China Manufacture'sName ................ :ShenzhenCTVIntCloudTechnologyCo.,Ltd. Address......................................: 601,BBuilding,No.10,EastDistrict,ShangxueIndustrialCity,Xinxue Community,BantianStreet,Shenzhen,China ProductDescription ProductName ........................... :SecurityCamera ModelName .............................. :ZS-GX5S SeriesModel..............................: ZS-GX1S,ZS-GX2S,ZS-GX3S,ZS-GX4S,ZS-GX6S,ZS-GX7S, ZS-GX8S,ZS-GQ1,ZS-GQ2,ZS-GQ3,ZS-GQ4,ZS-GQ5 TestStandards..........................:FCCRulesandRegulationsPart15SubpartC,Section247 TestProcedure .......................... :ANSIC63.10-2013 ThisdevicedescribedabovehasbeentestedbyFluxComplianceServiceLaboratory,thetestresultsshow thattheequipmentundertest(EUT)isincompliancewiththeFCCrequirements.Anditisapplicableonlyto thetestedsampleidentifiedinthereport. Thisreportshallnotbereproducedexceptinfull,withoutthewrittenapprovalofFluxComplianceService Laboratory,thisdocumentmaybealteredorrevisedbyFluxComplianceServiceLaboratory,personalonly, andshallbenotedintherevisionofthedocument.. DateofTest .................................. : Date(s)ofperformanceoftests . :29Mar,2022~01Apr,2022 DateofIssue.................................:01Apr,2022 TestResult.....................................:Pass TableofContentsPage Testedby: (ScottShen) Reviewedby : (DukeQian) Approvedby: (JackWang) Page 3 of72ReportNo.:FCS202203174W01 FluxComplianceServiceLaboratory Room105FloorBaohaoTechnologyBuilding1NO.15GongyeWestRoadHi-TechIndustrial,SongshanlakeDongguan Tel:769-27280901Fax:769-27280901http://www.FCS-lab.com TableofContentsPage 1.SUMMARYOFTESTRESULTS..............................................................................................6 1.1TESTFACTORY................................................................................................................7 1.2MEASUREMENTUNCERTAINTY.....................................................................................7 2.GENERALINFORMATION.......................................................................................................8 2.1GENERALDESCRIPTIONOFTHEEUT..........................................................................8 2.2BLOCKDIGRAMSHOWINGTHECONFIGURATIONOFSYSTEMTESTED.............10 2.3DESCRIPTIONOFNECESSARYACCESSORIESANDSUPPORTUNITS.................11 2.4EQUIPMENTSLIST.........................................................................................................12 3.6DBBANDWIDTH..................................................................................................................13 3.1LIMIT................................................................................................................................13 3.2TESTPROCEDURE........................................................................................................13 3.3TESTSETUP....................................................................................................................13 3.4TESTRESULTS...............................................................................................................14 4CONDUCTEDOUTPUTPOWER............................................................................................21 4.1limit...................................................................................................................................21 4.2testprocedure..................................................................................................................21 4.3TESTSETUP...................................................................................................................21 4.5testresults........................................................................................................................21 5.POWERSPECTRALDENSITY..............................................................................................22 5.1LIMIT................................................................................................................................22 5.2TESTPROCEDURE........................................................................................................22 5.3TESTSETUP.................................................................................................................22 5.4TESTRESULTS...............................................................................................................23 5.5originaltestdata...............................................................................................................24 6.Bandedgeandspurious(conducted).................................................................................30 6.1LIMIT................................................................................................................................30 6.2TESTPROCEDURE........................................................................................................30 6.3TESTSETUP…

Text truncated - open the document above for the full version.

Test Setup Photos

Page1of2ReportNo.:FCS202203174 Blow1GHzforradiatedemissiontestsetup Above1GHzforradiatedemissiontestsetup Page2of2ReportNo.:FCS202203174 Conductedemissiontestsetup

Contact Information

Applicant

Liu guangqing
[email protected]+86 15814636688Fax: +86 0755-89373554

Technical Contact

Shenzhen CTV Int Cloud Technology Co., Ltd.
[email protected]

China

Test Firm

Shenzhen LCS Compliance Testing Laboratory Ltd.Gavin Liang
[email protected]0755-82591330Fax: 0755-82591132

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.41 GHz - 2.46 GHz1.84 mW
Confidentiality
Long Term
Grant Notes
Power listed is the maximum conducted output power. This device contains 20 and 40 MHz signal bandwidth. The antennas used with this transmitter must be installed to provide a minimum separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi- transmitter product procedures. End-users must be provided with operating procedures for satisfying RF exposure compliance.

Other Applications from Shenzhen CTV Int Cloud Technology Co., Ltd

Security Camera - FCC ID 2AZL7-ZS-GX1S - Shenzhen CTV Int Cloud Technology Co., Ltd
2AZL7-ZS-GX1S

Security Camera

May 05, 2021

Equipment Class

DTS - Digital Transmission System