FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shenzhen Flamma Innovation Co., Ltd./
  3. 2BA4I-E1000

2BA4I-E1000Intelligent Guitar

Shenzhen Flamma Innovation Co., Ltd.
Intelligent Guitar - FCC ID 2BA4I-E1000 - Shenzhen Flamma Innovation Co., Ltd.
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Mar 27, 2024
Application Purpose
Original Equipment
Date of Application
Mar 27, 2024
Equipment Note
Intelligent Guitar
Frequency Range
2402.00000000 - 2480.00000000
Company
Shenzhen Flamma Innovation Co., Ltd.
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

ShenzhenFlammaInnovationCo.,Ltd.www.flammainnovation.com E1000 QUICKGUIDE 快速指导 E1000ENMANUAL Thisisaquickguide.Foramoredetailedmanual,pleaseenterwww.flammainnovation.com todownload.Ifyouneedanyhelpandtechsupport,pleasecontact:[email protected] 感谢您选择富了么公司的产品,该使用指南将帮助您快速了解如何使用本产品,如需了解更详细的信息, 请登陆富了么官网www.flammainnovation.com下载完整版说明书。 智能吉他 IntelligentGuitar E1000中文说明书 ShenzhenFlammaInnovationCo.,Ltd.www.flammainnovation.com PRECAUTION----------------------------------------------------------------------------------01-03 LAYOUT------------------------------------------------------------------------------------------04 QUICKTOUR-----------------------------------------------------------------------------------05-06 INSTRUCTIONS------------------------------------------------------------------------------------07-09 SPECIFICATIONS-----------------------------------------------------------------------------------10 CONTENT PRECAUTION ThanksforchoosingFLAMMAguitar,pleasereadthisinstructionscarefullybeforestarting. Toavoidelectricshock,shortcircuit,injury,firehazard,oranyotherdangerousfactors causingdamageordeath,pleasereadtheinstructionscarefullybeforeusingthedevice: PowerSupply ●PleaseusethepowersupplythatmeetsthepowerrequirementsoftheFLAMMAdevice.The powersupplyshouldbeapprovedbyrelevantauthoritiesandmeetsthelocalregulatory requirements(UL,CSA,VDE,CCC). ●Pleasecheckthejackplugandpowercordisworkingproperlyafterusingthemforaperiod. Removethedustandsmudginessintimetoavoidunexpecteddamage. ●Pleaseunplugthepowersupplyfromthesocketifitisidleforalongtimeorduringa thunderstorm.9 Battery ●PleasedonotpowerOnorchargetheunitinahumidenvironment. ●Pleasedonotchargetheunitinextremetemperature. ShenzhenFlammaInnovationCo.,Ltd.01www.flammainnovation.com ●Ifthereisapeculiarsmellorstrangenoiseduringcharging,pleasestopchargingassoonas possibleandcontacttheafter-salesteamforrepairorreplacement. ●Ifthereisliquidleakage,pleasedonottouchtheliquidwithyourskinoreye.Ifanytouch happens,recommendcontactingthedoctorassoonaspossibleformoredetailedsuggestions. ●Toavoidfire,orexplosion,pleasedonotdisassembleit,squeezeit,orthrowitintofireor water.Pleasedonotusethebattery.Ifitswells, ●Pleasedonotexposeittoheat,anddonotuseitafterbeingsoaked. Cleaning ●Cleanonlywithasoft,drycloth.Ifnecessary,slightlymoistenthecloth.Donotuseabrasive cleaners,cleaningalcohol,paintthinners,wax,solvents,cleaningfluids,orchemical- impregnatedwipingcloths. Location ●Toavoiddeformation,discoloration,orotherseriousdamage,donotexposethisunittothe followingconditions: ShenzhenFlammaInnovationCo.,Ltd.02www.flammainnovation.com ShenzhenFlammaInnovationCo.,Ltd.03www.flammainnovation.com ●Directsunlight ●Extremetemperatureorhumidity ●Excessivedustyordirtylocation●Magneticfields ●Highhumidityormoisture ●Strongvibrationsorshocks Operating ●Pleasedonotpressthepowerswitchorcontrolknobsheavily. ●Pleasedonotletscrapsofpaper,metaloranyotherobjectsbethrownintothedevice. ●Pleasedonotletthedevicefallfromheight,push,orhitthedeviceheavily. Warning Pleasedonotdisassemble,modifytheunittoavoidwarranty.PleasecontacttheFLAMMA supportteamdirectlyforrepairingservice. LAYOUT Intelligentknob USBType-Cport 3.5mmheadphoneoutput 6.35mmguitarline/headphoneoutput Chargingindicator Batterycompartment 1 2 3 4 5 6 6 1 ShenzhenFlammaInnovationCo.,Ltd.04www.flammainnovation.com 5 4 3 2 QUICKTOUR 1.Connection Pleasesetuptheconnectionaccordingtothediagrambelow,connectyourFLAMMAguitartothe amplifier/audiointerface/mobiledevice. ShenzhenFlammaInnovationCo.,Ltd.05www.flammainnovation.com oror PowerOn/Off Rotatetheintelligentknobclockwiseuntila"click′′ishearedtoturnOntheguitar,theknob LEDwillilluminate;rotatetheintelligentknobcounterclockwiseuntila"click′′isheardto turnOfftheguitar,theknobLEDwillbeOff. Batterymaintaining Charging:IftheLEDoftheintelligentknobblinksquicklyorturnsOffimmediatelyduringplaying, pleasechargetheFLAMMAguitarassoonaspossible.Apowersupplywhichcanmeetsthepower requirementoftheguitarisrecommendedforpluggingintothetype-CUSBportforcharging.The chargingindicatorwillturnREDduringcharging,andturnGREENwhenthechargingiscomplete. Replacement:Thebatteryisremoveable.Rotatethescrewonthebatterycompartment counterclockwisetolooseitandremovethebattery.Thereplacementbatterymeetingthepower requirementoftheguitarisrecommendedinstalling. ShenzhenFlammaInnovationCo.,Ltd.06www.flammainnovation.com INSTRUCTIONS ●FLAMMAApp FLAMMAintelligentguitarcomeswiththeAppforpreseteditingandaccessingtheFLAMMACloud. PleasedownloadtheAppfromAppstore(iOS),Playstore(Android),ortheFLAMMAofficial downloadpage. ●Bluetoothplayback OpentheBluetoothmenuofyourmobiledevice,searchfortheFLAMMAintelligentguitarto connectit.ThenuserscanplayaudiotracksfromamobiledevicemixedwiththeFLAM…

Text truncated - open the document above for the full version.

Attestation Statements

Rev 1/26/2023 Shenzhen Flamma Innovation Co., Ltd. Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 USA Date: 3/21/2024 Ref: Attestation Statements Part 2.911(d)(5)(i) Filing FCC ID: 2BA4I-E1000 [Shenzhen Flamma Innovation Co., Ltd.] certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. Sincerely, Signed: Printed name: Jason Zhang Title: General manager Company Name: Shenzhen Flamma Innovation Co., Ltd. Rev 1/26/2023 Shenzhen Flamma Innovation Co., Ltd. Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 USA Date: 3/21/2024 Ref: Attestation Statements Part 2.911(d)(5)(ii) Filing FCC ID: 2BA4I-E1000 [Shenzhen Flamma Innovation Co., Ltd.] certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List(as a specifically named entity or any of its subsidiaries or affiliates) as an entity producing “covered” equipment. Sincerely, Signed: Printed name: Jason Zhang Title: General manager Company Name: Shenzhen Flamma Innovation Co., Ltd.

Attestation Statements

Shenzhen Flamma Innovation Co., Ltd. U.S. Agent Letter of Attestation To: Federal Communications Commission 7435 Oakland Mills Road, Columbia, MD 21046, USA Date: Mar-22-2024 Ref: Attestation Statement – Part2.911(d)(7) filing FCC ID: 2BA4I-E1000 Shenzhen Flamma Innovation Co., Ltd. (“the applicant”) certifies that, as of the date of the filing of the application, THREE STONES MEDIA LLC(“the agent”) is our designated U.S. agent for service of process for the abovereference FCC ID. The applicant accepts to maintain an agent for service of process in the United States forno less than one year after either the grantee has permanently terminated all marketing and importation of theapplicable equipment within the U.S., or the conclusion of any Commission-related administrative or judicialproceeding involving the equipment, whichever is later. The applicant further acknowledges it is ourresponsibility to inform the FCC whenever the agent information changes. THREE STONES MEDIA LLC ("the agent) understand it is the agent's obligation to accept service of process in the United States for matters related to the applicable equipment, and at the physical U.S. address and email address. Designated U.S. Agent Company Name: THREE STONES MEDIA LLC FRN: 0033401761 GC: 2A99E Address: 1200 Broadway St. APT 329, Los Angeles, CA90015 Signature: Contact Person: Sijie Zhang Tel: +1 267 909 3692 Email: [email protected] Signature: Applicant Company Name: Shenzhen Flamma Innovation Co., Ltd. FRN: 0033745316 Address: 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin'an Street, Bao'an, Shenzhen, China Contact Person:Jason Zhang Tel: 18682315284 Email:[email protected]

Cover Letter(s)

Shenzhen Flamma Innovation Co., Ltd. 2024-03-21 Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 FCC ID: 2BA4I-E1000 Attn: Director of Certification Authority to Act as Agent On our behalf, I appoint Shenzhen Alpha Product Testing Co., Ltd. Address: Building i, No.2, Lixin Road, Fuyong Street, Bao’an District, 518103, Shenzhen, Guangdong, China Person: Mark Zhu (Name: Shenzhen Alpha Product Testing Co., Ltd. and address: Building i, No.2, Lixin Road, Fuyong Street, Bao’an District, 518103, Shenzhen, Guangdong, China). to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in the Federal Communications Commission’s regulations will have affixed to it a label identical to that submitted for approval with this application. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by TMICO still resides with Shenzhen Flamma Innovation Co., Ltd. Address: 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin’an Street, Bao’an, Shenzhen, China (applicant name and address). Signature: Name Jason Zhang Position General manager Company Name Shenzhen Flamma Innovation Co., Ltd. Address 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin’an Street, Bao’an, Shenzhen, China Tel +86-15999576346 Fax / Email [email protected]

Cover Letter(s)

Shenzhen Flamma Innovation Co., Ltd. Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Date: March 21, 2024 Subject; Request for Long Term Confidentiality FCC ID: 2BA4I-E1000 To Whom It May Concern, Pursuant to the provisions of the Commission’s rules Title 47 Sections §0.457 and §0.459, we are requesting the Commission to withhold the following attachment(s) as confidential documents from public disclosure indefinitely. These documents contain detailed system and equipment descriptions and are considered as proprietary information in operation of the equipment. The public disclosure of these documents might be harmful to our company and would give competitors an unfair advantage in the market. Schematic Diagram Block Diagram Operational Description It is our understanding that all measurement test reports, FCC ID label format and correspondence during the certification review process cannot be granted as confidential documents and this information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: March 21, 2024 Name Jason Zhang Position General manager Company Name Shenzhen Flamma Innovation Co., Ltd. Address 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin’an Street, Bao’an, Shenzhen, China Tel +86-15999576346 Fax / Email [email protected]

Cover Letter(s)

Differences Description We Shenzhen Flamma Innovation Co., Ltd. state: Product name: Intelligent Guitar Model: F100, E1000, E1100, E1200, E1010, E1110, E1210, E1020, E1120, E1220, E1030, E1130, E1230, E1040, E1140, E1240, E1050, E1150, E1250, SR1000, SR1100, SR1200, SR1010, SR1110, SR1210, SR1020, SR1120, SR1220, SR1030, SR1130, SR1230, SR1040, SR1140, SR1240, SR1050, SR1150, SR1250, WA1000, WA1100, WA1200, WN1000, WN1100, WN1200, WE1000, WE1100, WE1200, QA1000, QA1100, QA1200, QN1000, QN1100, QN1200, QE1000, QE1100, QE1200 There is no difference except the appearance. All circuits, power supplies, and components are the same Signature: March 21, 2024 Name Jason Zhang Position General manager Company Name Shenzhen Flamma Innovation Co., Ltd. Address 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin’an Street, Bao’an, Shenzhen, China Tel +86-15999576346 Fax / Email [email protected]

External Photos

FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000

ID Label/Location Info

4.5cm 2.5cm Label Location FCC ID: 2BA4I-E1000 Shenzhen Flamma Innovation Co., Ltd. Product name: Intelligent Guitar This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

Internal Photos

FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 BT ANT 2.4G ANT FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000 FCC ID: 2BA4I-E1000

RF Exposure Info

FCC ID: 2BA4I-E1000 RF Exposure evaluation According to 447498 D01 General RF Exposure Guidance v06 The 1-g and 10-g SAR test exclusion thresholds for 100 MHz to 6 GHz at test separation distances ≤ 50 mm are determined by: [(max. power of channel, including tune-up tolerance, mW)/(min. test separation distance, mm)] ·[√f(GHz)] ≤ 3.0 for 1-g SAR and ≤ 7.5 for 10-g extremity SAR, where f(GHz) is the RF channel transmit frequency in GHz Power and distance are rounded to the nearest mW and mm before calculation The result is rounded to one decimal place for comparison Worse case is as below: [2480MHz: 0.315dBm (1.075mW) output power], [2415MHz: 1.501dBm (1.413mW) output power], (1.075mW /5mm)·[√2.480(GHz)]+(1.413mW /5mm)·[√2.415(GHz)]= 0.778<3.0 for 1-g SAR Then SAR evaluation is not required

Test Report

ALPHA's reports is using a digital certificate that is trusted on Adobe's official server. If there is no digital certificate or the digital certificate shows damaged in your report. Please do not accept the report. E-mail: [email protected] Tel: 4008-3008-95 Website: http://www.a-lab.cn FCC TEST REPORT FCC ID: 2BA4I-E1000 On Behalf of Shenzhen Flamma Innovation Co., Ltd. Intelligent Guitar Model No.: See model list Prepared for : Shenzhen Flamma Innovation Co., Ltd. Address : 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin'an Street, Bao'an, Shenzhen, China Prepared By : Shenzhen Alpha Product Testing Co., Ltd. Address : Building i, No.2, Lixin Road, Fuyong Street, Bao’an District, 518103, Shenzhen, Guangdong, China Report Number : A2304292-C01-R07 Date of Receipt : August 22, 2023 Date of Test : August 22, 2023 –March 12, 2024 Date of Report : March 12, 2024 Version Number : V0 Result Pass Page 2 of 41 Report No.: A2304292-C01-R07 TABLE OF CONTENTS Description Page _Toc161733937 1. Summary of Standards And Results ------------------------------------------------------------ 6 1.1. Description of Standards and Results ----------------------------------------------------- 6 2. General Information ---------------------------------------------------------------------------------- 7 2.1. Description of Device (EUT) ----------------------------------------------------------------- 7 2.2. Accessories of Device (EUT) ---------------------------------------------------------------- 8 2.3. Tested Supporting System Details---------------------------------------------------------- 8 2.4. Block Diagram of connection between EUT and simulators ------------------------- 8 2.5. Test Mode Description ------------------------------------------------------------------------- 8 2.6. Test Conditions ---------------------------------------------------------------------------------- 9 2.7. Test Facility --------------------------------------------------------------------------------------- 9 2.8. Measurement Uncertainty -------------------------------------------------------------------- 9 2.9. Test Equipment List--------------------------------------------------------------------------- 10 3. Spurious Emission -----------------------------------------------------------------------------------11 3.1. Test Limits --------------------------------------------------------------------------------------- 11 3.2. Test Procedure --------------------------------------------------------------------------------- 11 3.3. Test Setup --------------------------------------------------------------------------------------- 12 3.4. Test Results------------------------------------------------------------------------------------- 13 4. Power Line Conducted Emission -------------------------------------------------------------- 23 4.1. Test Limits --------------------------------------------------------------------------------------- 23 4.2. Test Procedure --------------------------------------------------------------------------------- 23 4.3. Test Setup --------------------------------------------------------------------------------------- 23 4.4. Test Results------------------------------------------------------------------------------------- 23 5. Conducted Maximum peak Output Power -------------------------------------------------- 26 5.1. Test limits ---------------------------------------------------------------------------------------- 26 5.2. Test Procedure --------------------------------------------------------------------------------- 26 5.3. Test Setup --------------------------------------------------------------------------------------- 26 5.4. Test Results------------------------------------------------------------------------------------- 26 6. Peak Power Spectral Density ------------------------------------------------------------------- 27 6.1. Test limits ---------------------------------------------------------------------------------------- 27 6.2. Test Procedure --------------------------------------------------------------------------------- 27 6.3. Test Setup --------------------------------------------------------------------------------------- 27 6.4. Test Results------------------------------------------------------------------------------------- 27 7. Bandwidth ---------------------------------------------------------------------------------------------- 30 7.1. Test limits ---------------------------------------------------------------------------------------- 30 7.2. Test Procedure --------------------------------------------------------------------------------- 30 7.3. Test Setup --------------------------------------------------------------------------------------- 30 7.4. Test Results------------------------------------------------------------------------------------- 30 8. Band Edge Check ----------------------------------------------------------------------------------- 34 8.1. Test limits ---------------------------------------------------------------------------------------- 34 8.2. Test Procedure --------------------------------------------------------------------------------- 34 8.3. Test Setup --------------------------------------------------------------------------------------- 34 8.4. Test Results------------------------------------------------------------------------------------- 34 9. Antenna Requirement ----------------------------------------------------------------------------- 38 9.1. Standard Requirement ----------------------------------------------------------------------- 38 9.2. Antenna Connected Construction -------------------------------------------------------- 38 9.3. Results ------------------------------------------------------------------------------------------- 38 Page 3 of 41 Report No.: A2304292-C01-R07 10. Test setup photo ------------------------------------------------------------------------------------- 39 10.1. Photo of Radiated Emission test --…

Text truncated - open the document above for the full version.

Test Report

ALPHA's reports is using a digital certificate that is trusted on Adobe's official server. If there is no digital certificate or the digital certificate shows damaged in your report. Please do not accept the report. E-mail: [email protected] Tel: 4008-3008-95 Website: http://www.a-lab.cn FCC TEST REPORT FCC ID: 2BA4I-E1000 On Behalf of Shenzhen Flamma Innovation Co., Ltd. Intelligent Guitar Model No.: See model list Prepared for : Shenzhen Flamma Innovation Co., Ltd. Address : 6F-2, Unit A, Jinghang Electronic, Xingdong 71 District, Xin'an Street, Bao'an, Shenzhen, China Prepared By : Shenzhen Alpha Product Testing Co., Ltd. Address : Building i, No.2, Lixin Road, Fuyong Street, Bao’an District, 518103, Shenzhen, Guangdong, China Report Number : A2304292-C01-R09 Date of Receipt : August 22, 2023 Date of Test : August 22, 2023 – March 13, 2024 Date of Report : March 13, 2024 Version Number : V0 Result Pass Page 2 of 45 Report No.: A2304292-C01-R09 TABLE OF CONTENTS Description Page 1. Summary of Standards And Results ------------------------------------------------------------ 6 1.1. Description of Standards and Results ----------------------------------------------------- 6 2. General Information ---------------------------------------------------------------------------------- 7 2.1. Description of Device (EUT) ----------------------------------------------------------------- 7 2.2. Accessories of Device (EUT) ---------------------------------------------------------------- 8 2.3. Tested Supporting System Details---------------------------------------------------------- 8 2.4. Block Diagram of connection between EUT and simulators ------------------------- 8 2.5. Test Mode Description ------------------------------------------------------------------------- 8 2.6. Test Conditions ---------------------------------------------------------------------------------- 9 2.7. Test Facility --------------------------------------------------------------------------------------- 9 2.8. Measurement Uncertainty -------------------------------------------------------------------- 9 2.9. Test Equipment List--------------------------------------------------------------------------- 10 3. Spurious Emission -----------------------------------------------------------------------------------11 3.1. Test Limits --------------------------------------------------------------------------------------- 11 3.2. Test Procedure --------------------------------------------------------------------------------- 11 3.3. Test Setup --------------------------------------------------------------------------------------- 12 3.4. Test Results------------------------------------------------------------------------------------- 13 4. Power Line Conducted Emission -------------------------------------------------------------- 27 4.1. Test Limits --------------------------------------------------------------------------------------- 27 4.2. Test Procedure --------------------------------------------------------------------------------- 27 4.3. Test Setup --------------------------------------------------------------------------------------- 27 4.4. Test Results------------------------------------------------------------------------------------- 27 5. Conducted Maximum peak Output Power -------------------------------------------------- 30 5.1. Test limits ---------------------------------------------------------------------------------------- 30 5.2. Test Procedure --------------------------------------------------------------------------------- 30 5.3. Test Setup --------------------------------------------------------------------------------------- 30 5.4. Test Results------------------------------------------------------------------------------------- 30 6. Peak Power Spectral Density ------------------------------------------------------------------- 31 6.1. Test limits ---------------------------------------------------------------------------------------- 31 6.2. Test Procedure --------------------------------------------------------------------------------- 31 6.3. Test Setup --------------------------------------------------------------------------------------- 31 6.4. Test Results------------------------------------------------------------------------------------- 31 7. Bandwidth ---------------------------------------------------------------------------------------------- 34 7.1. Test limits ---------------------------------------------------------------------------------------- 34 7.2. Test Procedure --------------------------------------------------------------------------------- 34 7.3. Test Setup --------------------------------------------------------------------------------------- 34 7.4. Test Results------------------------------------------------------------------------------------- 34 8. Band Edge Check ----------------------------------------------------------------------------------- 38 8.1. Test limits ---------------------------------------------------------------------------------------- 38 8.2. Test Procedure --------------------------------------------------------------------------------- 38 8.3. Test Setup --------------------------------------------------------------------------------------- 38 8.4. Test Results------------------------------------------------------------------------------------- 38 9. Antenna Requirement ----------------------------------------------------------------------------- 42 9.1. Standard Requirement ----------------------------------------------------------------------- 42 9.2. Antenna Connected Construction -------------------------------------------------------- 42 9.3. Results ------------------------------------------------------------------------------------------- 42 Page 3 of 45 Report No.: A2304292-C01-R09 10. Test setup photo ------------------------------------------------------------------------------------- 43 10.1. Photo of Radiated Emission test ---------------…

Text truncated - open the document above for the full version.

Test Setup Photos

FCC ID: 2BA4I-E1000 Photo of Radiated Emission test FCC ID: 2BA4I-E1000 Photo of Conducted Emission test

Contact Information

Applicant

Jason zhang
[email protected]+86-15999576346Fax: /

Test Firm

Shenzhen Alpha Product Testing Co., LTD.Real Yak
[email protected]+86 755 29766001

Technical Specifications

#Rule PartsFrequency RangePower Output
215C2.40 GHz - 2.48 GHz500.00 µW
Confidentiality
Long Term
Grant Notes
Output Power listed is conducted. This transmitter must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product.

Other Applications from Shenzhen Flamma Innovation Co., Ltd.

INTELLIGENT AMP - FCC ID 2BA4I-TONEGO - Shenzhen Flamma Innovation Co., Ltd.
2BA4I-TONEGO

INTELLIGENT AMP

Aug 13, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Guitar Multi Effect - FCC ID 2BA4I-FX10 - Shenzhen Flamma Innovation Co., Ltd.
2BA4I-FX10

Guitar Multi Effect

May 16, 2023

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter