
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
813910 NOTICE TO PERSONS RECEIVING THIS DRAWING AND/OR TECHNICAL INFORM ATION: Title: INSTALLATION PROCEDURE TPRO7100 AND TPRO7200 Checkp oint Sy st ems claims p rop riet ary right s t o t he mat erial disclosed hereon. This drawing and/or technical information is issued in confidence for engineering information only and may not be rep roduced or used to manufacture any thing shown or referred to hereon without direct written p ermission from Checkp oint Sy stems to the user. This drawing and/or technical information is the p rop erty of Checkp oint Sy st ems and is loaned for mut ual assist ance, t o be ret urned when it s p urp ose has been served. THIS DRAWING AND/OR TECHNICAL INFORMATION IS THE PROPERTY OF CHECKPOINT S YS TEMS , INC. RevisionsRevisions RevDescriptionDateEngineerRevDescriptionDateApproved *60CR2475B12/20/00P. WILHELM Doc Mgr.: J. HUGDate: 9/13/00 Dwn: P. WILHELMDate: 9/13/00 741407 Chk:Date : 280116 Eng: P.WILHELMDate: 9/13/00 Size A 813910 Us e d OnAppd: R . SALESKYD ate : 9/13/00 Scale: N/A ๏ 2000 Checkpoint Systems, Inc. Page 1 of 10 INSTALLATION PROCEDURE, TPRO7100 AND TPRO7200 ____________________________________________________________________________________________________________________________ CHECK PO IN T SYSTEMS, IN C. CO N FIDEN TIAL AN D PRO PRIETARY IN FO RMATIO N , FO R IN TERN AL USE O N LY. Dwg. No. 813910 Rev. *60Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION................................................................................................................................. 3 1.1OPERATIONAL OVERVIEW OF THE TPRO7100 AND TPRO7200 ........................................................................... 3 1.2SYSTEM CONFIGURATION ......................................................................................................................................... 3 2.0 EFFECTS OF NOISE IN THE INSTALLATION ENVIRONMENT .................................................. 4 2.1EFFECTS OF NOISE ON THE TPRO7100 AND TPRO7200 SYSTEM........................................................................ 4 2.2TYPES OF NOISE SOURCES......................................................................................................................................... 4 2.3TYPICAL ACTIVE NOISE SOURCES ........................................................................................................................... 4 2.4PASSIVE NOISE SOURCES ........................................................................................................................................... 5 3.0 PRE-INSTALLATION......................................................................................................................... 5 4.0 INSTALLATION.................................................................................................................................. 5 4.1SERVICE PERSONNEL.................................................................................................................................................. 5 4.2TOOLS FOR SET UP....................................................................................................................................................... 5 4.3TPRO7100 AND TPRO7200 CONNECTIONS............................................................................................................... 6 1.POWER CONNECTIONS ............................................................................................................................................. 6 2.BAR CODE SCANNER CONNECTIONS (TPRO7200 ONLY)...................................................................................... 6 3.NETWORK CONNECTIONS (TPRO7200 ONLY) ........................................................................................................ 6 5.0 TPRO7200 SINGLE BOARD COMPUTER........................................................................................ 6 6.0 BASEBAND SIGNALS........................................................................................................................ 6 7.0 SERVICE.............................................................................................................................................. 7 7.1MAINTENANCE............................................................................................................................................................. 7 7.2TROUBLESHOOTING.................................................................................................................................................... 7 7.3SPARE PARTS FOR SERVICE ...................................................................................................................................... 7 8.0 DIAGRAMS ......................................................................................................................................... 7 8.1 TPRO7100 WIRING DIAGRAM....................................................................................................................................... 7 8.2 TPRO7200 WIRING DIAGRAM....................................................................................................................................... 7 8.2 BASEBAND MEASUREMENT AT TP1 OF TR4090 BOARD........................................................................................ 9 9.0 OPTIONAL BARCODE SCANNER SETUP (TPRO7200 ONLY) .................................................... 9 10.0 JUMPER AND SWITCH SETTINGS FOR THE SBC (TPRO7200 ONLY)....................................... 9 10.1 JUMPER SETTINGS....................................................................................................................................................... 9 10.2 MISCELLANEOUS SETTINGS...................................................................................................................................... 9 11.0 TPRO7100 AND TPRO7200 ANTENNA TUNING PROCEDURE................................................. 10 โฆ
Text truncated - open the document above for the full version.
TECHNICAL DOCUMENTATION March 22, 2001 _______________________________________________________________________________________________________________________________________________ DIAMOND CHECKPOINT DEVELOPMENT GROUP CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY Page 1 REID TAG PAD READER FCC ID D04PRO7100 Tag Pad 741 407 Open Top TECHNICAL DOCUMENTATION March 22, 2001 _______________________________________________________________________________________________________________________________________________ DIAMOND CHECKPOINT DEVELOPMENT GROUP CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY REID TAG PAD READER FCC ID D04PRO7100 Tag Pad Antenna Close Up TECHNICAL DOCUMENTATION March 22, 2001 _______________________________________________________________________________________________________________________________________________ DIAMOND CHECKPOINT DEVELOPMENT GROUP CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY REID TAG PAD READER FCC ID D04PRO7100 Tag Pad Antenna TECHNICAL DOCUMENTATION March 22, 2001 _______________________________________________________________________________________________________________________________________________ DIAMOND CHECKPOINT DEVELOPMENT GROUP CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY REID TAG PAD READER FCC ID D04PRO7100 Tag Pad Open TECHNICAL DOCUMENTATION March 22, 2001 _______________________________________________________________________________________________________________________________________________ DIAMOND CHECKPOINT DEVELOPMENT GROUP CONFIDENTIAL AND PROPRIETARY INFORMATION, FOR INTERNAL USE ONLY REID TAG PAD READER FCC ID D04PRO7100 Tag Pad Xmitter Close Up
UNISYS PCTC Product Compliance Test Center 2476 Swedesford Road, Malvern, PA 19355 ELECTROMAGNETIC DISTURBANCE TEST REPORT Doc. No. 20010305R/Project No. 607 TEST STANDARDS: USA CFR 47 PART 15 REQUIREMENTS RFID TAG PAD READER (SERIAL) MODEL 741407 FCC ID: DO4PRO7100 DIAMOND CHECKPOINT DEVELOPMENT GROUP THOROFARE, NEW JERSEY TEST DATE: 10/20/00 TO 12/6/00 ISSUE: January 19, 2001 Prepared by: Approved: Paul BankerWallace E. Amos Technical Staff EngineerGroup Manager, PCTC/ICC The results described in this report relate only to the item(s) tested. This document shall not be reproduced except in full without written permission of Unisys - PCTC. AMERICAN ASSOCIATION FOR LABORATORY ACCREDITATION UNISYS PCTC Page 2 of 23, 3/16/2001 Product Compliance Test CenterDoc. No. 20010305R/Project No. 607 FCC ID: DO4PRO7100 PREFACE This report documents product testing conducted to verify compliance of the specified EUT with applicable standards and requirements as identified herein. EUT, test instrument configurations, test procedures and recorded data are generally described in this report. The reader is referred to the applicable test standards for detailed procedures. The following table summarizes the test results obtained during this evaluation. SUMMARY The Diamond Checkpoint Development Group, Inc., RFID Tag Pad Reader (Serial) Model 741407 was tested to the standards listed below, and found to have the following characteristics: TESTSTANDARDREQUIREMENTRESULT Radiated Emissions - Intentional Radiator FCC 15.225, 15.209 13 MHz - 1 GHzBelow Limit Radiated Emissions Digital Device FCC Class AGeneral Requirements 30 MHz - 1 GHz Below Limit Conducted EmissionsFCC 15.207General Requirements 450 kHz to 30 MHz Below Limit Frequency StabilityFCC 15.225ยฑ0.01%Within Tolerance UNISYS PCTC Page 3 of 23, 3/16/2001 Product Compliance Test CenterDoc. No. 20010305R/Project No. 607 FCC ID: DO4PRO7100 TABLE OF CONTENTS 1.0Client Information.....................................................................................................................5 1.1Requested Service...........................................................................................................................................................5 1.2Purpose of Test(s)...........................................................................................................................................................5 2.0Description of the Equipment Under Test (EUT).......................................................................6 2.1General Description and Operational Overview..........................................................................................................6 2.2Equipment Sample...........................................................................................................................................................7 2.2.1Identification...........................................................................................................................................................7 2.2.2Condition of Received Sample..............................................................................................................................7 3.0Applicable Requirements, Methods and Procedures..................................................................7 3.1Applicable Requirements...............................................................................................................................................7 3.1.1USA..........................................................................................................................................................................7 3.2Basic Test Methods and Procedures...........................................................................................................................8 4.0Deviations or Exclusions from the Requirements and Standards.................................................8 5.0Operation of the EUT during Testing.........................................................................................8 5.1Test Environment............................................................................................................................................................8 5.1.1Climatic Environment.............................................................................................................................................8 5.1.2Electrical Power.......................................................................................................................................................8 5.1.2.1Radio Disturbance Measurements.......................................................................................................................8 5.2Grounding.........................................................................................................................................................................9 5.3Operating Mode...............................................................................................................................................................9 5.3.1Rationale for the Chosen Mode of Operation....................................................................................................9 5.4Test Configuration........................................................................................................................................................10 5.4.1Test Configuration Block Diagram.....................................................................................................................10 5.4.2EUT Details............................................................................................................................................................11 5.4.3Rationale for the Chosen Test Configuration..................................................................................................11 5.5EUT Classification......................................................โฆ
Text truncated - open the document above for the full version.
VOJTZT PCTC Product Compliance Test Center 2476 Swedesford Road, Malvern, PA 19355 ELECTROMAGNETIC DISTURBANCE TEST REPORT Doc. No. 20010305R/Project No. 607 TEST STANDARDS: USA CFR 47 PART 15 REQUIREMENTS RFID TAG PAD READER (SERIAL) MODEL 741407 FCC ID: DO4PRO7100 DIAMOND CHECKPOINT DEVELOPMENT GROUP THOROFARE, NEW JERSEY TEST DATE: 10/20/00 TO 12/6/00 ISSUE: January 19, 2001 Prepared by: Approved: Paul BankerWallace E. Amos Technical Staff EngineerGroup Manager, PCTC/ICC The results described in this report relate only to the item(s) tested. This document shall not be reproduced except in full without written permission of Unisys - PCTC. AMERICAN ASSOCIATION FOR LABORATORY ACCREDITATION VOJTZT PCTC Page 2 of 23, 3/16/2001 Product Compliance Test CenterDoc. No. 20010305R/Project No. 607 FCC ID: DO4PRO7100 PREFACE This report documents product testing conducted to verify compliance of the specified EUT with applicable standards and requirements as identified herein. EUT, test instrument configurations, test procedures and recorded data are generally described in this report. The reader is referred to the applicable test standards for detailed procedures. The following table summarizes the test results obtained during this evaluation. SUMMARY The Diamond Checkpoint Development Group, Inc., RFID Tag Pad Reader (Serial) Model 741407 was tested to the standards listed below, and found to have the following characteristics: TESTSTANDARDREQUIREMENTRESULT Radiated Emissions - Intentional Radiator FCC 15.225, 15.209 13 MHz - 1 GHzBelow Limit Radiated Emissions Digital Device FCC Class AGeneral Requirements 30 MHz - 1 GHz Below Limit Conducted EmissionsFCC 15.207General Requirements 450 kHz to 30 MHz Below Limit Frequency StabilityFCC 15.225ยฑ0.01%Within Tolerance VOJTZT PCTC Page 3 of 23, 3/16/2001 Product Compliance Test CenterDoc. No. 20010305R/Project No. 607 FCC ID: DO4PRO7100 TABLE OF CONTENTS 1.0Client Information..................................................................................................................5 1.1Requested Service..........................................................................................................................................5 1.2Purpose of Test(s) ..........................................................................................................................................5 2.0Description of the Equipment Under Test (EUT) ..................................................................6 2.1General Description and Operational Overview ............................................................................................6 2.2Equipment Sample .........................................................................................................................................7 2.2.1Identification ..........................................................................................................................................7 2.2.2Condition of Received Sample...............................................................................................................7 3.0Applicable Requirements, Methods and Procedures .............................................................7 3.1Applicable Requirements ...............................................................................................................................7 3.1.1USA .......................................................................................................................................................7 3.2Basic Test Methods and Procedures ..............................................................................................................8 4.0Deviations or Exclusions from the Requirements and Standards ..........................................8 5.0Operation of the EUT during Testing ....................................................................................8 5.1Test Environment...........................................................................................................................................8 5.1.1Climatic Environment ............................................................................................................................8 5.1.2Electrical Power .....................................................................................................................................8 5.1.2.1Radio Disturbance Measurements..........................................................................................................8 5.2Grounding ......................................................................................................................................................9 5.3Operating Mode .............................................................................................................................................9 5.3.1Rationale for the Chosen Mode of Operation ........................................................................................9 5.4Test Configuration .......................................................................................................................................10 5.4.1Test Configuration Block Diagram ......................................................................................................10 5.4.2EUT Details .........................................................................................................................................11 5.4.3Rationale for the Chosen Test Configuration.......................................................................................11 5.5EUT Classification.......................................................................................................................................11 5.6EUT Modifications ......................................................................................................................................11 6.0Summary of Tests Performed, Procedures and Test Results ...........................โฆ
Text truncated - open the document above for the full version.
TECHNICAL DOCUMENTATION March 22, 2001 Photo 1 โ Photo of Radiated Emission test setup of REID TAG PAD READER FCC ID D04PRO7100 Front view TECHNICAL DOCUMENTATION March 22, 2001 Photo 2 โ Photo of Radiated Emission test setup of REID TAG PAD READER FCC ID D04PRO7100 Rear view TECHNICAL DOCUMENTATION March 22, 2001 Photo 3 โ Photo of Radiated Emission test setup of REID TAG PAD READER FCC ID D04PRO7100
PCTC Building ยท Malvern, Pennsylvania ยท United States
| # | Rule Parts | Frequency Range | Power Output | Tolerance |
|---|---|---|---|---|
| 1 | 15C | 13.56 MHz - 13.56 MHz | - | 0.0100000000 % |
EAS RF System
Equipment Class
DXX - Part 15 Low Power Communication Device TransmitterUHF-RFID Reader WRTZ-1550
Equipment Class
DSS - Part 15 Spread Spectrum TransmitterEAS RF Detection System
Equipment Class
DXX - Part 15 Low Power Communication Device TransmitterEAS RFDetection System
Equipment Class
DXX - Part 15 Low Power Communication Device TransmitterAntenna Pedestal
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter