FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Chamberlain Group LLC, The/
  3. HBW2141E

HBW2141ETransceiver

Chamberlain Group LLC, The
Transceiver - FCC ID HBW2141E - Chamberlain Group LLC, The
Click to zoom

Application Details

Equipment Class
DSR - Part 15 Remote Control/Security Device Transceiver
Date of Grant
May 17, 2011
Application Purpose
Original Equipment
Date of Application
May 17, 2011
Equipment Note
Transceiver
Frequency Range
315.00000000 - 315.00000000
Company
Chamberlain Group LLC, The
Country
United States

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Cover Letter(s)

845 Larch Ave. Elmhurst, IL 60126 Phone 630.993.6306 Fax 630.530.6140 Email: [email protected] May 6, 2011 Federal Communications Commission EQUIPMENT APPROVAL SERVICES PO Box 358315 Pittsburgh, PA 15251-5315 Re: FCC ID: HBW2141E Request for Confidentiality In accordance with 47 C.F.R. Section 0.459, we, The Chamberlain Group, Inc., hereby request confidentiality for the block diagram, schematic and product description presented for certification. In support of the Request for Confidentiality, the following is stated: Enclosed within this application is technical information which we deem to be trade secrets and proprietary. If made public, the information might be used to our disadvantage. To assist in assuring that we receive the full value of our product and protect its competitive posture, we respectfully request this grant of confidentiality. Sincerely, THE CHAMBERLAIN GROUP, INC. Barbara Kelkhoff Manager, Regulatory Affairs

ID Label/Location Info

Artwork: 132LA2331-60-A 2.35" x 1.30" x .10" (W x H x R) Shown at 100% ECN: 04638 22 Dec 2010 PATENT# 7,071,850; 7,561,075 132B2331-6 MODEL DATE CHAMBERLAIN GROUP INC. ELMHURST, IL 60126, USA FCC ID: ASSEMBLED IN MEXICO IC: 2666A- This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

Test Report

Engineering Test Report No. 1101232-01 Rev A Measurement of RF Emissions from a 1A6210-1 Garage Door Transceiver For The Chamberlain Group, Inc. Elmhurst, IL 60126 P.O. Number 872696 Date Tested April 18 th through May 16, 2011 Test Personnel Richard E. King Test Specification FCC "Code of Federal Regulations” Title 47 Part15, Subpart C Industry Canada RSS-GEN Industry Canada RSS-210 Test Report By: Richard E. King EMC Engineer Approved By: Raymond J. Klouda Registered Professional Engineer of Illinois - 44894 Elite Electronic Engineering, Inc. 1516 Centre Circle Downers Grove, IL 60515 Tel : (630) 495-9770 Fax: (630) 495-9785 www.elitetest.com Engineering Test Report No. 1101232-01 Rev A TABLE OF CONTENTS PARAGRAPH DESCRIPTION OF CONTENTS PAGE NO. THIS REPORT SHALL NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT THE WRITTEN APPROVAL OF ELITE ELECTRONIC ENGINEERING INCORPORATED. Page 2 of 52 1. Introduction ................................................................................................................................................... 5 1.1. Scope of Tests ..................................................................................................................................... 5 1.2. Purpose ............................................................................................................................................... 5 1.3. Deviations, Additions and Exclusions .................................................................................................. 5 1.4. EMC Laboratory Identification ............................................................................................................. 5 1.5. Laboratory Conditions.......................................................................................................................... 5 2. Applicable Documents .................................................................................................................................. 5 3. EUT Setup and Operation ............................................................................................................................ 6 3.1. General Description ............................................................................................................................. 6 3.1.1. Power Input ................................................................................................................................. 6 3.1.2. Peripheral Equipment ................................................................................................................. 6 3.1.3. Signal Input/Output Leads .......................................................................................................... 6 3.1.4. Grounding ................................................................................................................................... 6 3.2. Operational Mode ................................................................................................................................ 6 3.3. EUT Modifications ................................................................................................................................ 6 4. Test Facility and Test Instrumentation ......................................................................................................... 6 4.1. Shielded Enclosure .............................................................................................................................. 6 4.2. Test Instrumentation ............................................................................................................................ 6 4.3. Calibration Traceability ........................................................................................................................ 7 4.4. Measurement Uncertainty ................................................................................................................... 7 5. Test Procedures ........................................................................................................................................... 7 5.1. Powerline Conducted Emissions ......................................................................................................... 7 5.1.1. Requirements .............................................................................................................................. 7 5.2. Periodic Operation Measurements ...................................................................................................... 8 5.2.1. Requirements .............................................................................................................................. 8 5.2.2. Procedures .................................................................................................................................. 8 5.2.3. Results ........................................................................................................................................ 8 5.3. Duty Cycle Factor Measurements ....................................................................................................... 8 5.3.1. Procedures .................................................................................................................................. 8 5.3.2. Results ........................................................................................................................................ 9 5.4. Radiated Measurements ..................................................................................................................... 9 5.4.1. Requirements ............................................................................................................................ 11 5.4.2. Procedures ................................................................................................................................ 11 5.4.3. Results ...........................................................................................................…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Thomas DeSilvia(Director Corporate Compliance)
[email protected]630 993 8618Fax: 630 516 6871

Technical Contact

The Chamberlain GroupHank Sieradzki
[email protected]6309936564

845 Larch Ave · Elmhurst, Illinois · United States

Test Firm

Elite Electronic Engineering Inc.Kevin Halpin
[email protected]630-495-9770Fax: 630-495-9785

Technical Specifications

#Rule PartsFrequency RangePower Output
115.231315 MHz - 315 MHz-
Confidentiality
Long Term

Other Applications from Chamberlain Group LLC, The

iDock Link 2 - FCC ID HBW73514 - Chamberlain Group LLC, The
HBW73514

iDock Link 2

Jul 06, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
HBW-VKP2K

SMART GARAGE VIDEO KEYPAD

Jun 23, 2026

Equipment Class

DTS - Digital Transmission System
Wireless Chime - FCC ID HBWCHM1 - Chamberlain Group LLC, The
HBWCHM1

Wireless Chime

Dec 03, 2025

Equipment Class

DTS - Digital Transmission System
HBWN519

VEHICULAR GATE OPENER

Oct 10, 2024

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
HBWN329

Handheld Remote

Sep 22, 2024

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter