FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Chamberlain Group LLC, The/
  3. HBW2228

HBW2228Remote Control Transmitter

Chamberlain Group LLC, The
Remote Control Transmitter - FCC ID HBW2228 - Chamberlain Group LLC, The
Click to zoom

Application Details

Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
Date of Grant
Nov 21, 2005
Application Purpose
Original Equipment
Date of Application
Nov 21, 2005
Equipment Note
Remote Control Transmitter
Frequency Range
390.00000000 - 390.00000000
Company
Chamberlain Group LLC, The
Country
United States

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Cover Letter(s)

845 Larch Ave. Elmhurst, IL 60126 Phone 630.993.6306 Fax 630.530.6140 Email: [email protected] November 18, 2005 Federal Communications Commission EQUIPMENT APPROVAL SERVICES PO Box 358315 Pittsburgh, PA 15251-5315 Re: FCC ID: HBW2228 Request for Confidentiality In accordance with 47 C.F.R. Section 0.459, we, The Chamberlain Group, Inc., hereby request confidentiality for the block diagram, schematic and product description presented for certification. In support of the Request for Confidentiality, the following is stated: Enclosed within this application is technical information which we deem to be trade secrets and proprietary. If made public, the information might be used to our disadvantage. To assist in assuring that we receive the full value of our product and protect its competitive posture, we respectfully request this grant of confidentiality. Sincerely, THE CHAMBERLAIN GROUP, INC. Barbara Kelkhoff Manager, Regulatory Affairs

Test Report

Engineering Test Report No. 35781-01 Measurement of RF Interference from a Model 001A6234-1 Keyless Entry Transmitter For : Chamberlain Manufacturing Elmhurst, IL P.O. No. : 852056 Date Received : October 20, 2005 Date Tested : October 21, 2005 Test Personnel : Mark E. Longinotti, NARTE® Certified : EMC Test Engineer, ATL-0154-E Specification : FCC "Code of Federal Regulations” Title 47 Part 15, Subpart C Test Report By : Mark E. Longinotti NARTE® Certified EMC Test Engineer, ATL-0154-E Approved By : Raymond J. Klouda Registered Professional Engineer of Illinois - 44894 Elite Electronic Engineering Inc. 1516 Centre Circle Downers Grove, IL 60515 Tel : (630) 495-9770 Fax: (630) 495-9785 www.elitetest.com Engineering Test Report No. 35781-01 THIS REPORT SHALL NOT BE REPRODUCED, EXCEPT IN FULL, WITHOUT THE WRITTEN APPROVAL OF ELITE ELECTRONIC ENGINEERING INCORPORATED. Page 2 of 18 TABLE OF CONTENTS PARAGRAPH DESCRIPTION OF CONTENTS PAGE NO. 1.0 INTRODUCTION ................................................................................................................................................ 4 1.1 Description of Test Item.................................................................................................................................... 4 1.2 Purpose ............................................................................................................................................................. 4 1.3 Deviations, Additions and Exclusions ............................................................................................................... 4 1.4 Applicable Documents ...................................................................................................................................... 4 1.5 Subcontractor Identification .............................................................................................................................. 4 1.6 Laboratory Conditions..................................................................................................................................... 4 2.0 TEST ITEM SETUP AND OPERATION............................................................................................................. 4 2.1 Power Input...................................................................................................................................................... 4 2.2 Grounding......................................................................................................................................................... 5 2.3 Peripheral Equipment........................................................................................................................................ 5 2.4 Interconnect Cables........................................................................................................................................... 5 2.5 Operational Mode ............................................................................................................................................. 5 2.6 Test Item Modifications................................................................................................................................... 5 3.0 TEST EQUIPMENT............................................................................................................................................. 5 3.1 Test Equipment List .......................................................................................................................................... 5 3.2 Calibration Traceability ................................................................................................................................... 5 3.3 Measurement Uncertainty................................................................................................................................ 5 4.0 REQUIREMENTS, PROCEDURES AND RESULTS.......................................................................................... 6 4.1 Powerline Conducted Emissions ..................................................................................................................... 6 4.1.1 Requirements............................................................................................................................................ 6 4.2 Duty Cycle Factor Measurements .................................................................................................................. 6 4.2.1 Procedures ............................................................................................................................................... 6 4.2.2 Results ..................................................................................................................................................... 6 4.3 Radiated Measurements................................................................................................................................... 7 4.3.1 Requirements............................................................................................................................................ 7 4.3.2 Procedures ................................................................................................................................................ 7 4.3.3 Results ...................................................................................................................................................... 8 4.4 Occupied Bandwidth Measurements ............................................................................................................... 8 4.4.1 Requirement ............................................................................................................................................. 8 4.4.2 Procedures ................................................................................................................................................ 8 4.4.3 Results .......................................................…

Text truncated - open the document above for the full version.

Test Setup Photos

Figure 2a Test Setup for Radiated Emissions, 390MHz - Horizontal Polarization Test Setup for Radiated Emissions, 390MHz - Vertical Polarization Figure 2b Test Setup for Radiated Emissions, 1GHz to 4GHz – Horizontal Polarization Test Setup for Radiated Emissions, 1GHz to 4GHz – Vertical Polarization

Contact Information

Applicant

Thomas DeSilvia(Director Corporate Compliance)
[email protected]630 993 8618Fax: 630 516 6871

Technical Contact

Chamberlain Group Inc, TheHank M Sieradzki
[email protected]630-993-6564

845 Larch Avenue · Elmhurst, Illinois · United States

Test Firm

Elite Electronic Engineering Co.Daniel Crowder
[email protected]630-495-9770Fax: 630-495-9785

Technical Specifications

#Rule PartsFrequency RangePower Output
115.231390 MHz - 390 MHz-
Confidentiality
Long Term

Other Applications from Chamberlain Group LLC, The

iDock Link 2 - FCC ID HBW73514 - Chamberlain Group LLC, The
HBW73514

iDock Link 2

Jul 06, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
HBW-VKP2K

SMART GARAGE VIDEO KEYPAD

Jun 23, 2026

Equipment Class

DTS - Digital Transmission System
Wireless Chime - FCC ID HBWCHM1 - Chamberlain Group LLC, The
HBWCHM1

Wireless Chime

Dec 03, 2025

Equipment Class

DTS - Digital Transmission System
HBWN519

VEHICULAR GATE OPENER

Oct 10, 2024

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
HBWN329

Handheld Remote

Sep 22, 2024

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter