FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Chamberlain Group LLC, The/
  3. HBW7208

HBW7208Remote Control Transmitter

Chamberlain Group LLC, The
Remote Control Transmitter - FCC ID HBW7208 - Chamberlain Group LLC, The
Click to zoom

Application Details

Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
Date of Grant
Mar 01, 2010
Application Purpose
Original Equipment
Date of Application
Mar 01, 2010
Equipment Note
Remote Control Transmitter
Frequency Range
315.00000000 - 315.00000000
Company
Chamberlain Group LLC, The
Country
United States

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗

External Photos

↗
↗

ID Label/Location Info

↗
↗

Internal Photos

↗
↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Cover Letter(s)

845 Larch Ave. Elmhurst, IL 60126 Phone 630.993.6306 Fax 630.516.6863 Email: [email protected] March 1, 2010 Federal Communication Commission Equipment Authorization Division Application Processing Branch 7435 Oakland Mills Road Columbia, Maryland 21046 FCC ID:HBW7208 Request for Confidentiality In accordance with 47 C.F.R. Section 0.457 and 0.459, we, Chamberlain Group, Inc., hereby request confidentiality for the block diagram, schematic and product description presented for certification. In support of the Request for Confidentiality, the following is stated: Enclosed within this application is technical information which we deem to be trade secrets and proprietary. If made public, the information might be used to our disadvantage. To assist in assuring that we receive the full value of our product and protect its competitive posture, we respectfully request this grant of confidentiality. I would appreciate your prompt attention to the submittal. If there are any questions, please call me at 630-993-6306 or send a fax to 630-516- 6863. Sincerely, Barbara Kelkhoff Regulatory Project Manager II Chamberlain Group, Inc. 845 Larch Ave. Elmhurst, IL. 60126

ID Label/Location Info

ASSEMBLED IN MEXICO IC:2666A FCC ID: DATE CHAMBERLAIN GROUP INC. ELMHURST, IL 60126, USA Shown at 100% 132LA2000-70-D 2/12/03 This device complies with Part 15 of the FCCRules. Operation is subject to the followingtwo conditions: (1) this device may not causeharmful interference, and (2) this device mustaccept any interference received, includinginterference that may cause undesired oper-ation. 132C2000-7

Test Report

Engineering Test Report No. 0903515-01 Rev. A Measurement of RF Interference from a Model 885LM transmitter For : The Chamberlain Group, Inc. 845 Larch Ave Elmhurst, IL 60126 P.O. No. : 864100 Date Tested : November 15 and 24, 2009 Test Personnel : Richard King Specification : FCC "Code of Federal Regulations" Title 47 Part 15, Subpart C : Industry Canada RSS-210 : Industry Canada RSS-GEN Test Report By : Richard King EMC Test Engineer Approved By : Raymond J. Klouda Registered Professional Engineer of Illinois - 44894 Elite Electronic Engineering Inc. 1516 Centre Circle Downers Grove, IL 60515 Tel : (630) 495-9770 Fax: (630) 495-9785 www.elitetest.com Engineering Test Report No. 0903515-01 Rev. A TABLE OF CONTENTS PARAGRAPH DESCRIPTION OF CONTENTS PAGE NO. This report shall not be reproduced, except in full, without the written approval of Elite Electronic Engineering Inc. Page 2 of 20 1 INTRODUCTION..........................................................................................................................................4 1.1 Scope of Tests..................................................................................................................................... 4 1.2 Purpose ............................................................................................................................................... 4 1.3 Deviations, Additions and Exclusions.................................................................................................. 4 1.4 EMC Laboratory Identification ............................................................................................................. 4 1.5 Laboratory Conditions ......................................................................................................................... 4 2 APPLICABLE DOCUMENTS .......................................................................................................................4 3 TEST ITEM SET-UP AND OPERATION .....................................................................................................4 3.1 General Description ............................................................................................................................. 4 3.1.1 Power Input ..................................................................................................................................... 5 3.1.2 Peripheral Equipment...................................................................................................................... 5 3.1.3 Interconnect Cables ........................................................................................................................ 5 3.1.4 Grounding........................................................................................................................................ 5 3.2 Operational Mode ................................................................................................................................ 5 3.3 Test Item Modifications........................................................................................................................ 5 4 TEST FACILITY AND TEST INSTRUMENTATION.....................................................................................5 4.1 Shielded Enclosure.............................................................................................................................. 5 4.2 Test Instrumentation ............................................................................................................................ 5 4.3 Calibration Traceability ........................................................................................................................ 5 4.4 Measurement Uncertainty ................................................................................................................... 5 5 TEST PROCEDURES..................................................................................................................................6 5.1 Powerline Conducted Emissions ......................................................................................................... 6 5.1.1 Requirements .................................................................................................................................. 6 5.2 Duty Cycle Factor Measurements ....................................................................................................... 6 5.2.1 Procedures ...................................................................................................................................... 6 5.2.2 Results ............................................................................................................................................ 6 5.3 Radiated Measurements ..................................................................................................................... 6 5.3.1 Requirements .................................................................................................................................. 6 5.3.2 Procedures ...................................................................................................................................... 6 5.3.3 Results ............................................................................................................................................ 7 5.4 Occupied Bandwidth Measurements................................................................................................... 7 5.4.1 Requirement.................................................................................................................................... 7 5.4.2 Procedures ...................................................................................................................................... 7 5.4.3 Results ............................................................................................................................................ 7 6 OTHER TEST CONDITIONS ...…

Text truncated - open the document above for the full version.

Test Setup Photos

Engineering Test Report No. 0903515-01 Rev. A Page 11 of 20 Figure 2 Test Set-up for Radiated Emissions 315Hz – Horizontal Polarity Test Set-up for Radiated Emissions 315MHz – Vertical Polarity Engineering Test Report No. 0903515-01 Rev. A Page 12 of 20 Figure 3 Test Set-up for Radiated Emissions 315MHz – Horizontal Polarity Test Set-up for Radiated Emissions 315MHz – Vertical Polarity

Contact Information

Applicant

Thomas DeSilvia(Director Corporate Compliance)
[email protected]630 993 8618Fax: 630 516 6871

Test Firm

Elite Electronic Engineering Inc.Kevin Halpin
[email protected]630-495-9770Fax: 630-495-9785

Technical Specifications

#Rule PartsFrequency RangePower Output
115.231315 MHz - 315 MHz-
Confidentiality
Long Term

Other Applications from Chamberlain Group LLC, The

iDock Link 2 - FCC ID HBW73514 - Chamberlain Group LLC, The
HBW73514

iDock Link 2

Jul 06, 2026

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
HBW-VKP2K

SMART GARAGE VIDEO KEYPAD

Jun 23, 2026

Equipment Class

DTS - Digital Transmission System
Wireless Chime - FCC ID HBWCHM1 - Chamberlain Group LLC, The
HBWCHM1

Wireless Chime

Dec 03, 2025

Equipment Class

DTS - Digital Transmission System
HBWN519

VEHICULAR GATE OPENER

Oct 10, 2024

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
HBWN329

Handheld Remote

Sep 22, 2024

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter